Loading...
HomeMy WebLinkAbout04100001 SP - Cherry Creek Estates, Section 5, Site Plan, pg 1421 ±50 MISSISSINEWA DRIVE 22 +50 NN �DD L ...J (J 12 +50 FOR DE AIL E SHT. #C404 12 +71.63 244 13+00 POINT OF TANGENCY STA. 12 +71.63 HIGH POINT ELEV 779.94 HIGH POINT STA 13 +71.65 PVI STA 13 +71.63 PVI ELEV 780.00 A.D. -1.20 K 33.37 40' VC 259 H.R. 13+50 13+71.65 14+00 243 242 a 0 0 0 CC °c) SEE J= 4 +50 14 7.30 15 +00 0 L1) 272 CO 15+50 164-00 ICI ,SSISSINEWA DRIVE INTERSECTION STA. 14+77.30 STA. 7+23.43 241 NOTE: FINAL BACKFILL FOR WATER MAINS, WATER SERVICE LATERALS, SANITARY MAINS AND SANITARY SERVICE LATERALS UNDER AND WITHIN 5 -FEET OF PAVEMENT SHALL BE B- BORROW FOR STRUCTURE BACKFILL MEETING THE MATERIAL REQUIREMENTS OF THE INDOT AND SHALL BE COMPACTED IN 6-INCH MAXIMUM LIFTS TO NOT LESS THAN 95% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE MATERIAL PLACED. THE BACKFILL FOR THE TOP 6-INCHES OF THE EXCAVATION BELOW THE START OF THE AGGREGATE SUBBASE OF THE PAVEMENT SHALL BE NO. 53 STONE MEETING THE MATERIAL REQUIREMENTS OF THE INDOT AND SHALL BE COMPACTED TO NOT LESS THAN 95 STANDARD PROCTOR DENSITY. IF THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER THE INSTALLATION HAS A MORE STRINGENT FINAL BACKFILL REQUIREMENT, THE MORE STRINGENT REQUIREMENT SHALL GOVERN. 240 L 16+ 0.61 1 1 1 1 LOW POINT ELEV 778.25 LOW POINT STA 16 +70.61 PVI STA 16 +75.63 PVI ELEV 778.18 A.D. 1.60 185 1700 17 INTERSEC110 STA. 18 +29.4 STA. 1+33.30 239 1 30' to GR. CHG. GR. CHG. 18+13.63 18+ 9.49 18 5.35 OR DETAIL SEE SHT. #C404 NOTE: BEDDING, HAUNCHING, AND INITIAL BACKFILL MATERIALS, PLACEMENT AND COMPACTION FOR WATERMAINS, WATER SERVICE LATERALS, SANITARY MAINS AND SANITARY SERVICE LATERALS SHALL BE IN ACCORDANCE WITH THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER THE INSTALLATION. 19+00 238 19 +50 _rt LOW POINT ELEV 778.22 LOW POINT STA 19 +92.35 PVI STA 19 +87.35 PVI ELEV 778.14 A.D. 1.60 19+ 237 230 236 NOTE: FOR INSTALLATION OF STORM MAINS, WATER MAINS, SANITARY MAINS, WATER SERVICE LATERALS, SANITARY SERVICE LATERALS UNDER CITY STREETS, REGARDLEJJUr THE JURISDICTION I IUIN Ur THE U T I L I T Y THE MINIMUM COVER FROM THE TOP OF THE INSTALLED PAVEMENT TO THE TOP OF THE INSTALLED PIPE SHALL BE THE PAVEMENT SECTION THICKNESS (ALL BITUMINOUS AND AGGREGATE MATERIAL ABOVE THE SUBGRADE) PLUS 1' -0 IF THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER THE INSTALLATION HAS A MORE STRINGENT COVER REQUIREMENT, THE MORE STRINGENT REQUIREMENT SHALL GOVERN. HIGH POINT ELEV 778.80 HIGH POINT STA 21 +07.35 PVI STA 21+07.35 PVI ELEV 778.86 A.D. -1.20 K 33.33 235 228 234 PVI STA 23 +27.35 PVI ELEV 777.54 A.D. -2.57 227 L 33 226 CURVE A=14°47'41" R=150.0 C 38.73 19.47' STA. 25 +42.35 232 POINT OF CURVATU ATA 225 E INTER SEC ON STA. 26 +62 20 STA. 1+32 231 OINT F TA STA. 2 +81. C SCALE: 1 50' .P. 4.42 O cd co O 01 0 O Q \u 4 O 03 IQ to W CG\ A. 0 0`` `t 1t111111111,,, s 19358 -o STATE OF e W LL 0 ck3 Z J W W mm U u O N rC X JOB NO. 43405S5 H 0 v) 0 J u I 6 II m w I- 0 0 o (N 0 0 N z 0 z (I) W win Y Z W W� Ct U U w (f) CL W I U z 0 z LJ CC U SHEET NO. C401 CONSULTING ENGINEERS LAND SURVEYORS REVISIONS REV PROFILE ADD NOTES ro (0 in 29'16 +2L 88°6LL I L .J V L 1 L .J V LJ 40' VC K 19.44 40' VC 40' VC 778.74 1+27.35 50' VC SCALE: 1"=50' HOR. r o 1 =5 VERT° o Li r o6 CO in 29'56+ 02'8/ J L L V �2'8L N N co LOW POINT ELEV 768.44 OA8 PA9 SOA3 Z V c c BVCE: 7 9 L :SOA3 w 3 L Q o 0 61. :50A9 cri o N w L :30A3 BVCS: 2 :3 :SOA3 :30A3 BVCS: 23 BVCE: 77; EVCS: 23 +52.. EVCE: 776.7` PVI PVI TA 26 LEV .D. 3 40' VC +17.09 768. .69 5 0.si0% 1 00% A EXISTING GRADE -0.607 PR 'POSED GRADE \3 >>9 60'L6 +SZ :5OA9 86'99L :3OA9 I. 60 LS +9Z :SOA3 1 T INV.= 5' I R.C.P. 77.41 Q 8" WA ERMAIN 15" INV.= R.C.P. 774.17 12" F.C• INV.= 773.31 ICI I 8 S.D. INV.= 779.01 2 0% 29'L S2'Z 7 .7" V. R.0 =7E =NCY STA. 12+ h Q U V STA. 18 +13.63 C 'STA. 22 +81.36 VATURE STA. 25 in Q U Z w STA. 26 +42.0 \l STA. 26 +62.0! POINT OF TANIE C C.. L L (l a L2'6LL GRADE CHANGE 9S'6LL 779.89 GRADE CHANG (0 in Oi 1 STORM SEWER Z8'LLL 1 92'LLL POINT OF CUR` Z L' LLL L6 )N' 1 00. GRADE CHANGE 8 INTERSECTIOI ZL'6LL LS °6LL L8 °6LL t6'6LL 28'6LL 89'6LL 22•6LL 779.38 2Z'6LL 90'6LL 26'SLL 29'8LL 8L °8LL 81?'8LL 2'8LL 9Z'2LL Zti8LL L9'8LL Z6'9LL L L'6LL Z 08 °6LL L5'6LL 9Z °6LL LO'6LL 9L'8LL L2'8LL 778.28 2Z'8 LL L2 °8LL Z8'8LL L9'8 LL 6L'8LL 778.75 09'9LL l 778.45 0'8LL 5 L'8LL 00'8LL 28'LLL OL'LLL Zt'LLL Z8•9LL 20'9LL 1�Z'9LL Wi7LL 29'2LL 98'ZLL 772.06 LZ• LLL 8V'OLL 69'69L 06'89L 9t'29L 09'29L LZ'6LL Z L °6LL Z 12 +50 13 +00 13 +50 14 +00 14 +50 15 +00 15 +50 16 +00 16 +50 17 +00 17 +50 18 +00 18 +50 19 +00 19 +50 20 +00 20 +50 21 +00 21 +50 22 +00 22 +50 23 +00 23 +50 24 +00 24 +50 25 +00 25 +50 26 +00 26 +50 PADDL RIV /VISSISSI\ WA DRIV 21 ±50 MISSISSINEWA DRIVE 22 +50 NN �DD L ...J (J 12 +50 FOR DE AIL E SHT. #C404 12 +71.63 244 13+00 POINT OF TANGENCY STA. 12 +71.63 HIGH POINT ELEV 779.94 HIGH POINT STA 13 +71.65 PVI STA 13 +71.63 PVI ELEV 780.00 A.D. -1.20 K 33.37 40' VC 259 H.R. 13+50 13+71.65 14+00 243 242 a 0 0 0 CC °c) SEE J= 4 +50 14 7.30 15 +00 0 L1) 272 CO 15+50 164-00 ICI ,SSISSINEWA DRIVE INTERSECTION STA. 14+77.30 STA. 7+23.43 241 NOTE: FINAL BACKFILL FOR WATER MAINS, WATER SERVICE LATERALS, SANITARY MAINS AND SANITARY SERVICE LATERALS UNDER AND WITHIN 5 -FEET OF PAVEMENT SHALL BE B- BORROW FOR STRUCTURE BACKFILL MEETING THE MATERIAL REQUIREMENTS OF THE INDOT AND SHALL BE COMPACTED IN 6-INCH MAXIMUM LIFTS TO NOT LESS THAN 95% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE MATERIAL PLACED. THE BACKFILL FOR THE TOP 6-INCHES OF THE EXCAVATION BELOW THE START OF THE AGGREGATE SUBBASE OF THE PAVEMENT SHALL BE NO. 53 STONE MEETING THE MATERIAL REQUIREMENTS OF THE INDOT AND SHALL BE COMPACTED TO NOT LESS THAN 95 STANDARD PROCTOR DENSITY. IF THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER THE INSTALLATION HAS A MORE STRINGENT FINAL BACKFILL REQUIREMENT, THE MORE STRINGENT REQUIREMENT SHALL GOVERN. 240 L 16+ 0.61 1 1 1 1 LOW POINT ELEV 778.25 LOW POINT STA 16 +70.61 PVI STA 16 +75.63 PVI ELEV 778.18 A.D. 1.60 185 1700 17 INTERSEC110 STA. 18 +29.4 STA. 1+33.30 239 1 30' to GR. CHG. GR. CHG. 18+13.63 18+ 9.49 18 5.35 OR DETAIL SEE SHT. #C404 NOTE: BEDDING, HAUNCHING, AND INITIAL BACKFILL MATERIALS, PLACEMENT AND COMPACTION FOR WATERMAINS, WATER SERVICE LATERALS, SANITARY MAINS AND SANITARY SERVICE LATERALS SHALL BE IN ACCORDANCE WITH THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER THE INSTALLATION. 19+00 238 19 +50 _rt LOW POINT ELEV 778.22 LOW POINT STA 19 +92.35 PVI STA 19 +87.35 PVI ELEV 778.14 A.D. 1.60 19+ 237 230 236 NOTE: FOR INSTALLATION OF STORM MAINS, WATER MAINS, SANITARY MAINS, WATER SERVICE LATERALS, SANITARY SERVICE LATERALS UNDER CITY STREETS, REGARDLEJJUr THE JURISDICTION I IUIN Ur THE U T I L I T Y THE MINIMUM COVER FROM THE TOP OF THE INSTALLED PAVEMENT TO THE TOP OF THE INSTALLED PIPE SHALL BE THE PAVEMENT SECTION THICKNESS (ALL BITUMINOUS AND AGGREGATE MATERIAL ABOVE THE SUBGRADE) PLUS 1' -0 IF THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER THE INSTALLATION HAS A MORE STRINGENT COVER REQUIREMENT, THE MORE STRINGENT REQUIREMENT SHALL GOVERN. HIGH POINT ELEV 778.80 HIGH POINT STA 21 +07.35 PVI STA 21+07.35 PVI ELEV 778.86 A.D. -1.20 K 33.33 235 228 234 PVI STA 23 +27.35 PVI ELEV 777.54 A.D. -2.57 227 L 33 226 CURVE A=14°47'41" R=150.0 C 38.73 19.47' STA. 25 +42.35 232 POINT OF CURVATU ATA 225 E INTER SEC ON STA. 26 +62 20 STA. 1+32 231 OINT F TA STA. 2 +81. C SCALE: 1 50' .P. 4.42 O cd co O 01 0 O Q \u 4 O 03 IQ to W CG\ A. 0 0`` `t 1t111111111,,, s 19358 -o STATE OF e W LL 0 ck3 Z J W W mm U u O N rC X JOB NO. 43405S5 H 0 v) 0 J u I 6 II m w I- 0 0 o (N 0 0 N z 0 z (I) W win Y Z W W� Ct U U w (f) CL W I U z 0 z LJ CC U SHEET NO. C401 CONSULTING ENGINEERS LAND SURVEYORS REVISIONS REV PROFILE ADD NOTES