HomeMy WebLinkAbout04100001 SP - Cherry Creek Estates, Section 5, Site Plan, pg 16U) U
1 .11 1 l-
a
U L
L
C c
o
H 0)
z 6 i
c
R 35
64.50
t-
r
oi
r
N
V27 L+
2S'292
+22.34
768.75
SSINEWA DRIVE
2L' L
E: 769.70
:S: 2 +24.73
CE: 770.12
YCE: 780.43
8Z'S9 +Z :SO�
VCE: 780.45
BVCS:
:30A8
:SOA3
ISSIw
:30A3
.:r
S2'
)A3 .I
0A8
w
EXISTING
GRADE\
0.60
011 L2 Z'
60%
0.607
PROPOSED G
R.C.P.
1.52%
0
N
02'22+ l 'V1S r
8" WA ;ENCY STA. 1 +4
oo'
D
ERMAIN
M
I-
U)
z
0
PROPOSED
GRADE
88'9LL
ll�I I ('A I/'�l'� AllL11r7
18"
INV
764.2
FL.ot+L 'VJ.S
69
POINT OF TANI
o
N
I-
1 POINT OF TAN(
I
L°08L
88'8LL
96'29L
ZZ•6LL
0t'6LL
II
a z
LS•6LL
ri
L6'6LL
Lo O
r L•6LL
r"h P,
INTERSECTIOr
06'99L
-1 7'08L
00'OLL
111111 1573231Wa
62'08L
�fl ISNO0 0N3I
96'99L
1.9
99'99L
LS'89L
ZS'99L
6L °99L
L L'69L
769.55
769.90
LOLL
LZ'0LL
770.42
LS'OLL
ZL'0LL
L8'OLL
U) U
1 .11 1 l-
a
U L
L
C c
o
H 0)
z 6 i
c
R 35
64.50
t-
r
oi
r
N
SINEWA DRIVE
CS: 2 +25.28
YCE: 780.43
8Z'S9 +Z :SO�
VCE: 780.45
SISSIW
.:r
S2'
m 1
0
13 f
011 L2 Z'
60%
PROPOSED G
GRADE
0
02'22+ l 'V1S r
8" WA ;ENCY STA. 1 +4
oo'
D
ERMAIN
$ENCY STA. 2+8
88'9LL
ll�I I ('A I/'�l'� AllL11r7
6S'6LL
INTERSECTIOII
69
POINT OF TANI
1 POINT OF TAN(
I
L°08L
88'8LL
S0'6LL
ZZ•6LL
0t'6LL
II
a z
LS•6LL
ri
L6'6LL
Lo O
r L•6LL
r"h P,
60'02L
780.26
-1 7'08L
OSIO9L
62'08L
186
CURVE DATA
A =14 °51'48"
R= 150.00'
L= 38.91'
T= 19.57'
1+02.48
INT OF TANGEN
A. 1 +41.35
239
BEGIN CONSTRUCTION
10
NOTE: FINAL BACKFILL FOR WATER MAINS, WATER
SERVICE LATERALS, SANITARY MAINS AND
SANITARY SERVICE LATERALS UNDER AND
WITHIN 5 —FEET OF PAVEMENT SHALL BE
B— BORROW FOR STRUCTURE BACKFILL
MEETING THE MATERIAL REQUIREMENTS OF THE
INDOT AND SHALL BE COMPACTED IN 6 —INCH
MAXIMUM LIFTS TO NOT LESS THAN 95%
STANDARD PROCTOR DENSITY FOR THE ENTIRE
DEPTH OF THE MATERIAL PLACED. THE
BACKFILL FOR THE TOP 6— INCHES OF THE
EXCAVATION BELOW THE START OF THE
AGGREGATE SUBBASE OF THE PAVEMENT
SHALL BE NO. 53 STONE MEETING THE
MATERIAL REQUIREMENTS OF THE INDOT AND
SHALL BE COMPACTED TO NOT LESS THAN 95
STANDARD PROCTOR DENSITY. IF THE
STANDARD PRACTICE OF THE UTILITY THAT HAS
JURISDICTION OVER THE INSTALLATION HAS A
MORE STRINGENT FINAL BACKFILL
REQUIREMENT, THE MORE STRINGENT
REQUIREMENT SHALL GOVERN.
765.00
790
780
770
DATUM ELEVa
0 +00
PO
ST
0 +50
1+00
RED CE
SCALE: 1 =50' HOR.
1"=5' VERT.
1+50
HIGH POINT ELEV 780.51
HIGH POINT STA 2 +46.68
PVI STA 2 +45.28
PVI ELEV 780.57
A.D. -1.29
K 31.05
2 +00
40' VC
2 +50
NOTE: BEDDING, HAUNCHING, AND INITIAL BACKFILL
MATERIALS, PLACEMENT AND COMPACTION FOR
WATERMAINS, WATER SERVICE LATERALS, SANITARY
MAINS AND SANITARY SERVICE LATERALS SHALL BE
IN ACCORDANCE WITH THE STANDARD PRACTICE OF
THE UTILITY THAT HAS JURISDICTION OVER THE
INSTALLATION.
V)
N
d
a1
3 +00
AR WAY
04
END CONSTRUCTION
4
POINT OF TANGENCY
STA. 2 +82.37
INT OF' CURVATURE
A. 2 +45.33
NOTE: FOR INSTALLATION OF STORM MAINS, WATER MAINS,
SANITARY MAINS, WATER SERVICE LATERALS,
SANITARY SERVICE LATERALS UNDER CITY STREETS,
REGARDLESSOF THE JURISDICTION OF THE UTILITY,
THE MINIMUM COVER FROM THE TOP OF THE
INSTALLED PAVEMENT TO THE TOP OF THE
INSTALLED PIPE SHALL BE THE PAVEMENT SECTION
THICKNESS (ALL BITUMINOUS AND AGGREGATE
MATERIAL ABOVE THE SUBGRADE) PLUS 1' -0 IF
THE STANDARD PRACTICE OF THE UTILITY THAT HAS
JURISDICTION OVER THE INSTALLATION HAS A MORE
STRINGENT COVER REQUIREMENT, THE MORE
STRINGENT REQUIREMENT SHALL GOVERN.
780
770
760
DATUM ELEVC
755.00
0 +00
0 +50
LOW POINT ELEV 768.49
LOW POINT STA 0 +86.65
PVI STA 0 +97.34
PVI ELEV 768.38
A.D. 2.08
K 24.02
1 +00
CURVE DATA
A =37 °35'13"
R= 500.00'
L= 328.01'
1=170.15'
1+50
CHERRY CREE
POINT OF TANGENCY
PVI STA 2 +04.73
PVI ELEV 770.00
A.D. -0.92
K 43.53
40' VC SCALE: 1"=50' HOR.
1"=5' VERT.
2 +00
2 +50
3+00
END CONSTRUCTION
3 +50
BOULEVARD
SCALE:
l''= 50' .N N‘
STOEPP
=a No. s
19358
-o STATE OF
c'
EN.
E N
J
LL.
47 43
O
Z
J
W
W
m
X
L
N)
JOB NO.
43405S5
0
0
0 II
m
w
H
0
0
0)
N
0)
Q
z
Q
0
z
W
W�
Y Z
W Q
LLI
C U
(f)
Ct
W
Z
U
Q
z
0
z
SHEET NO.
C4O3
CONSULTING ENGINEERS LAND SURVEYORS
CERTIFIED
REVISIONS
REV. PROFILE