Loading...
HomeMy WebLinkAbout04100001 SP - Cherry Creek Estates, Section 5, Site Plan, pg 16U) U 1 .11 1 l- a U L L C c o H 0) z 6 i c R 35 64.50 t- r oi r N V27 L+ 2S'292 +22.34 768.75 SSINEWA DRIVE 2L' L E: 769.70 :S: 2 +24.73 CE: 770.12 YCE: 780.43 8Z'S9 +Z :SO� VCE: 780.45 BVCS: :30A8 :SOA3 ISSIw :30A3 .:r S2' )A3 .I 0A8 w EXISTING GRADE\ 0.60 011 L2 Z' 60% 0.607 PROPOSED G R.C.P. 1.52% 0 N 02'22+ l 'V1S r 8" WA ;ENCY STA. 1 +4 oo' D ERMAIN M I- U) z 0 PROPOSED GRADE 88'9LL ll�I I ('A I/'�l'� AllL11r7 18" INV 764.2 FL.ot+L 'VJ.S 69 POINT OF TANI o N I- 1 POINT OF TAN( I L°08L 88'8LL 96'29L ZZ•6LL 0t'6LL II a z LS•6LL ri L6'6LL Lo O r L•6LL r"h P, INTERSECTIOr 06'99L -1 7'08L 00'OLL 111111 1573231Wa 62'08L �fl ISNO0 0N3I 96'99L 1.9 99'99L LS'89L ZS'99L 6L °99L L L'69L 769.55 769.90 LOLL LZ'0LL 770.42 LS'OLL ZL'0LL L8'OLL U) U 1 .11 1 l- a U L L C c o H 0) z 6 i c R 35 64.50 t- r oi r N SINEWA DRIVE CS: 2 +25.28 YCE: 780.43 8Z'S9 +Z :SO� VCE: 780.45 SISSIW .:r S2' m 1 0 13 f 011 L2 Z' 60% PROPOSED G GRADE 0 02'22+ l 'V1S r 8" WA ;ENCY STA. 1 +4 oo' D ERMAIN $ENCY STA. 2+8 88'9LL ll�I I ('A I/'�l'� AllL11r7 6S'6LL INTERSECTIOII 69 POINT OF TANI 1 POINT OF TAN( I L°08L 88'8LL S0'6LL ZZ•6LL 0t'6LL II a z LS•6LL ri L6'6LL Lo O r L•6LL r"h P, 60'02L 780.26 -1 7'08L OSIO9L 62'08L 186 CURVE DATA A =14 °51'48" R= 150.00' L= 38.91' T= 19.57' 1+02.48 INT OF TANGEN A. 1 +41.35 239 BEGIN CONSTRUCTION 10 NOTE: FINAL BACKFILL FOR WATER MAINS, WATER SERVICE LATERALS, SANITARY MAINS AND SANITARY SERVICE LATERALS UNDER AND WITHIN 5 —FEET OF PAVEMENT SHALL BE B— BORROW FOR STRUCTURE BACKFILL MEETING THE MATERIAL REQUIREMENTS OF THE INDOT AND SHALL BE COMPACTED IN 6 —INCH MAXIMUM LIFTS TO NOT LESS THAN 95% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE MATERIAL PLACED. THE BACKFILL FOR THE TOP 6— INCHES OF THE EXCAVATION BELOW THE START OF THE AGGREGATE SUBBASE OF THE PAVEMENT SHALL BE NO. 53 STONE MEETING THE MATERIAL REQUIREMENTS OF THE INDOT AND SHALL BE COMPACTED TO NOT LESS THAN 95 STANDARD PROCTOR DENSITY. IF THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER THE INSTALLATION HAS A MORE STRINGENT FINAL BACKFILL REQUIREMENT, THE MORE STRINGENT REQUIREMENT SHALL GOVERN. 765.00 790 780 770 DATUM ELEVa 0 +00 PO ST 0 +50 1+00 RED CE SCALE: 1 =50' HOR. 1"=5' VERT. 1+50 HIGH POINT ELEV 780.51 HIGH POINT STA 2 +46.68 PVI STA 2 +45.28 PVI ELEV 780.57 A.D. -1.29 K 31.05 2 +00 40' VC 2 +50 NOTE: BEDDING, HAUNCHING, AND INITIAL BACKFILL MATERIALS, PLACEMENT AND COMPACTION FOR WATERMAINS, WATER SERVICE LATERALS, SANITARY MAINS AND SANITARY SERVICE LATERALS SHALL BE IN ACCORDANCE WITH THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER THE INSTALLATION. V) N d a1 3 +00 AR WAY 04 END CONSTRUCTION 4 POINT OF TANGENCY STA. 2 +82.37 INT OF' CURVATURE A. 2 +45.33 NOTE: FOR INSTALLATION OF STORM MAINS, WATER MAINS, SANITARY MAINS, WATER SERVICE LATERALS, SANITARY SERVICE LATERALS UNDER CITY STREETS, REGARDLESSOF THE JURISDICTION OF THE UTILITY, THE MINIMUM COVER FROM THE TOP OF THE INSTALLED PAVEMENT TO THE TOP OF THE INSTALLED PIPE SHALL BE THE PAVEMENT SECTION THICKNESS (ALL BITUMINOUS AND AGGREGATE MATERIAL ABOVE THE SUBGRADE) PLUS 1' -0 IF THE STANDARD PRACTICE OF THE UTILITY THAT HAS JURISDICTION OVER THE INSTALLATION HAS A MORE STRINGENT COVER REQUIREMENT, THE MORE STRINGENT REQUIREMENT SHALL GOVERN. 780 770 760 DATUM ELEVC 755.00 0 +00 0 +50 LOW POINT ELEV 768.49 LOW POINT STA 0 +86.65 PVI STA 0 +97.34 PVI ELEV 768.38 A.D. 2.08 K 24.02 1 +00 CURVE DATA A =37 °35'13" R= 500.00' L= 328.01' 1=170.15' 1+50 CHERRY CREE POINT OF TANGENCY PVI STA 2 +04.73 PVI ELEV 770.00 A.D. -0.92 K 43.53 40' VC SCALE: 1"=50' HOR. 1"=5' VERT. 2 +00 2 +50 3+00 END CONSTRUCTION 3 +50 BOULEVARD SCALE: l''= 50' .N N‘ STOEPP =a No. s 19358 -o STATE OF c' EN. E N J LL. 47 43 O Z J W W m X L N) JOB NO. 43405S5 0 0 0 II m w H 0 0 0) N 0) Q z Q 0 z W W� Y Z W Q LLI C U (f) Ct W Z U Q z 0 z SHEET NO. C4O3 CONSULTING ENGINEERS LAND SURVEYORS CERTIFIED REVISIONS REV. PROFILE