Loading...
HomeMy WebLinkAbout04100001 SP - Cherry Creek Estates, Section 5, Site Plan, pg 23ANHOLE TD 11 00'� O im <d d- Ld �V)U)1- O a)ro Npcj ii d w c 0 N U)d- wNNO (J O n -0 (r) w�I Q� (n 09'6LL =•0'1 ZL +8 •VJ S //it •vac Q w z (7) EXISTING GRADE x. 3 2 8" S.D.R. 35 P.V.C. S. INV.= 772.05 70. 146 L.F. 72.46 8" WATERNAIN� PROPOSED GRADE 12" R.C.P. INV.= 773.70 346 L.F 2. 0°% 8 S.D 8 S D. R. 35 R.V.. 97% s" S.D R 35 P C* 6 .70 ;S 1 1 I 379 L.F T 56.4 A 1` EX. 10 S.D.R. 35 P.V.C. S. INV.= 754.74 (AS— (BUILT) X. 10" S.D.R. 35 P.V.C. N. INV.= 754.84 (AS—BUILT) CONTRACTOR SHALL VERIFY PRIOR TO CONSTRUCTION \OT =S FULL DEPT GRANJLAR BACKFILL SHALL BE INSTALLED 0\ ALL SEWER LATERAL STREET CROSSI \GS COv1PACTED PER .D..O STANDARDS. MIN. SLOPES PER THE TE\ STATE STA \DARDS SHALL PREVA L I\ ALL CASES. CO \TRACTOR SHALL EXTEND SEWER LATERALS THRU EASEME \TS AS SHOWN. A MI \IMUM OF 5 FT. AND A N AXI M L M OF 6 FT. OF COVER OVER LATERAL TERMINATION. ALL MA \HOLES TO BE CO \STRUCTED WITH 0 \E 4" RISER RI \G \O MORE, \O LESS TO ESTABLISH PLA\ D 1\OTES FULL DEPT (sA\3) GRA \ULAR BACKFILL CAST( \G GRADE. 780 770 760 DATUM ELEV 750.00 STA. 0 +00 265 17 L.F. -6" WYE LAT. STA. 0 +71 264 15 L.F. -6" WYE LAT. STA. 1+60 263 13 L.F. -6" WYE LAT. STA. 2 +49 262 11 L.F. -6" WYE Sc LAT. STA. 3 +40 NOTE: BEDDING, HAUNCHING, AND INITIAL BACKFILL FOR ALL RCP INSTALLATIONS SHALL BE B— BORROW FOR STRUCTURE BACKFILL MEETING THE MATERIAL REQUIREMENTS OF THE INDOT. BEDDING SHALL BE PLACED IN THE TRENCH BOTTOM SUCH THAT AFTER THE PIPE IS INSTALLED TO GRADE AND LINE, THERE REMAINS A 4 —INCH MINIMUM DEPTH OF MATERIAL BELOW THE PIPE BARREL AND A MINIMUM OF 3— INCHES BELOW THE BELL. FOR PIPE SIZES 66— INCHES AND LARGER, THE MINIMUM DEPTH OF MATERIAL BELOW THE PIPE BARREL SHALL BE 6— INCHES. BEDDING, HAUNCHING AND INITIAL BACKFILL SHALL BE COMPACTED IN 6 —INCH MAXIMUM LIFTS TO NOT LESS THAN 95% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTHOF THE MATERIAL PLACED. THE BACKFILL SHALL BE BROUGHT UP EVENLY ON BOTH SIDES OF THE PIPE FOR THE FULL LENGTH OF THE PIPE. HAUNCHING SHALL EXTEND TO THE SPRINGLINE OF THE PIPE. THE LIMIT OF INITIAL BACKFILL SHALL BE 6— INCHES ABOVE THE SPRINGLINE. MINIMUM TRENCH WIDTH SHALL BE THE OUTSIDE DIAMETER OF THE PIPE PLUS 18— INCHES. 3 +79 SCALE: 1"=50' HOR. 1"=5' VERT. 261 260 259 10 L.F. -6" WYE LAT. STA. 0 +50 10 L.F. -6" 10 L.F. -6" WYE LAT. WYE LAT. STA. 1+40 STA. 2 +19 NOTE: FINAL BACKFILL FOR ALL RCP INSTALLATIONS UNDER AND WITHIN 5 —FEET OF PAVEMENT SHALL BE B— BORROW FOR STRUCTURE BACKFILL MEETING THE MATERIAL REQUIREMENTS OF THE INDOT AND SHALL BE COMPACTED IN 6 —INCH MAXIMUM LIFTS TO NOT LESS THAN 95% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE MATERIAL PLACED. THE BACKFILL FOR THE TOP 6— INCHES OF THE EXCAVATION BELOW THE START OF THE AGGREGATE SUBBASE OF THE PAVEMENT SHALL BE NO. 53 STONE MEETING THE MATERIAL REQUIREMENTS OF THE INDOT AND SHALL BE COMPACTED TO NOT LESS THAN 95% STANDARD PROCTOR DENSITY. FINAL BACKFILL FOR ALL RCP INSTALLATIONS GREATER THAN 5 —FEET OF PAVEMENT SHALL BE CLEAN FILL MATERIAL FREE OF ROCKS LARGER THAN 6— INCHES IN DIAMETER, FROZEN LUMPS OF SOIL, WOOD OR OTHER EXTRANEOUS MATERIAL, COMPACTED IN 12 —INCH MAXIMUM LIFTS TO NOT LESS THAN 90% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE EXCAVATION. 240 22 L.F. -6" WYE LAT. STA. 1 +32 SCALE: 1"= 50' NOTE: "EXCEPT FOR FORCE MAINS, CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL SEPARATION (AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN SANITARY SEWER FACILITIES AND STORM SEWERS IS 18" OR LESS." STOEPp F,p No. 19358 r. -0 STATE OF ONAL E,.s% r co Z NJ 0 0 0 W 0 w 0 ck3 (r) z w w z m m 6 V) 0 z 0 0 Q w 5 w 0 N N 0 J u I 0 SHEET NO. C501 JOB NO. 4340555 w E 0 cc rZ w V) 5 w Cc 0 M m w 1- 0 0 w o N z 0 z w z 0 z W U LAND SURVEYORS CONSULTING ENGINEERS FAX: (317) 849-5942 REVISIONS PROFILE