Loading...
HomeMy WebLinkAbout04100001 SP - Cherry Creek Estates, Section 5, Site Plan, pg 24NOTES FULL DEPTH GRA \ULAR BAC <FILL SHALL BE I \STALLED ON ALL SEWER LATERAL STREET CROSSI \GS COMPACTED PER I.9.O.H. STA \DARDS. MI SLOPES PER THE TEN STATE STA\ DARDS SHALL PREVAIL I\ ALL CASES. CO \TRACTOR SHALL EXTE\D SEWER LATERALS THRU EASEN ENTS AS SHOW A MI \IMU VI OF 5 FT. A\ D A MAXIMUM OF 6 FT. OF COVER OVER LATERAL TERMI \ATION. ALL VA\HOLES TO BE CO 4" RISER RI \G \O v ORE, \STRUCTED WITH 0 \E \O LESS TO ESTABLISH PLA DE\OTES FULL DEPTH GRAN (SAND) JLAR BAC FI LL CASTI \G GRADE. PADDLE 0+Ie STA.1-35 N &S 251 24 L.F. -6" WYE LAT. STA. 1+08 249 18 L.F. -6" WYE LAT. STA. 1+35 256 70 L.F. -6" WYE LAT. STA. 2+10 246 24 L.F. -6" WYE LAT. STA. 4 +05 770 760 DATUM ELEV 750.00 252 19 L.F. -6" WYE LAT. STA. 0 +31 0 LC) Liln O J II (O O hm a U� 780 U'~ Q 253 68 L.F. -6" WYE LAT. STA. 0 +54 254 74 L.F. -6" WYE LAT. STA. 0 +30 MANHOLE 775 STA. 1+48 250 16 L.F. -6" WYE LAT. STA. 0 +45 NOTE: BEDDING, HAUNCHING, AND INITIAL BACKFILL FOR ALL RCP INSTALLATIONS SHALL BE B— BORROW FOR STRUCTURE BACKFILL MEETING THE MATERIAL REQUIREMENTS OF THE INDOT. BEDDING SHALL BE PLACED IN THE TRENCH BOTTOM SUCH THAT AFTER THE PIPE IS INSTALLED TO GRADE AND LINE, THERE REMAINS A 4 —INCH MINIMUM DEPTH OF MATERIAL BELOW THE PIPE BARREL AND A MINIMUM OF 3— INCHES BELOW THE BELL. FOR PIPE SIZES 66— INCHES AND LARGER, THE MINIMUM DEPTH OF MATERIAL BELOW THE PIPE ?ARREL SHALL BE 6— INCHES. BEDDING, HAUNCHING AND INITIAL BACKFILL SHALL BE COMPACTED IN 6 —INCH MAXIMUM LIFTS TO NOT LESS THAN 95% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTHOF THE MATERIAL PLACED. THE BACKFILL SHALL BE BROUGHT UP EVENLY ON BOTH SIDES OF THE PIPE FOR THE FULL LENGTH OF THE PIPE. HAUNCHING SHALL EXTEND TO THE SPRINGLINE OF THE PIPE. THE LIMIT OF INITIAL BACKFILL SHALL BE 6— INCHES ABOVE THE SPRINGLINE. MINIMUM TRENCH WIDTH SHALL BE THE OUTSIDE DIAMETER OF THE PIPE PLUS 18— INCHES. 248 20 L.F. -6" WYE LAT. STA. 2 +25 SCALE: 1"=50' HOR. 1"=5' VERT. F 257 68 L.F. -6" WYE LAT. STA. 3 +00 L_ 247 22 L.F. -6" WYE LAT. STA. 3 +14 258 66 L.F. -6" WYE LAT. STA. 3 +90 STA. 6 +03 245 15 L.F. -6" WYE LAT. STA. 4 +51 NOTE: FINAL BACKFILL FOR ALL RCP INSTALLATIONS UNDER AND WITHIN 5 —FEET OF PAVEMENT SHALL BE B— BORROW FOR STRUCTURE BACKFILL MEETING THE MATERIAL REQUIREMENTS OF THE INDOT AND SHALL BE COMPACTED IN 6 —INCH MAXIMUM LIFTS TO NOT LESS THAN 95% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE MATERIAL PLACED. THE BACKFILL FOR THE TOP 6— INCHES OF THE EXCAVATION BELOW THE START OF THE AGGREGATE SUBBASE OF THE PAVEMENT SHALL BE NO. 53 STONE MEETING THE MATERIAL REQUIREMENTS OF THE INDOT AND SHALL BE COMPACTED TO NOT LESS THAN 95% STANDARD PROCTOR DENSITY. FINAL BACKFILL FOR ALL RCP INSTALLATIONS GREATER THAN 5 —FEET OF PAVEMENT SHALL BE CLEAN FILL MATERIAL FREE OF ROCKS LARGER THAN 6— INCHES IN DIAMETER, FROZEN LUMPS OF SOIL, WOOD OR OTHER EXTRANEOUS MATERIAL, COMPACTED IN 12 —INCH MAXIMUM LIFTS TO NOT LESS THAN 90% STANDARD PROCTOR DENSITY FOR THE ENTIRE DEPTH OF THE EXCAVATION. EX. 10" S.D.R. 35 P.V.C. S. INV.= 753.65 (AS- BUILT) X. 10" S.D.R. 35 P.V.C. N. INV.= 753.77 (AS- BUILT) CONTRACTOR SHALL VERIFY PRIOR TO CONSTRUCTION PROPOSED GRADE 0 12" R.C.P. INV.-772.50 SCALE: 1"= 50' NOTE: "EXCEPT FOR FORCE MAINS, CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL SEPARATION (AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN SANITARY SEWER FACILITIES AND STORM SEWERS IS 18" OR LESS." %I1111111111�� STOEP PF�•,��. �'L ��J� :'�GISTEq�•• t� No. s= 19358 -o ST ATEOF cz z 0 0 N 0) F-- m LLI 0 co m 6 U w 1-- 0 z 0 0 w J Id O a. w 5 w Id 0 N u 0 II V 0 J 0 O a Id 0 cc u) O N) 0 co JOB NO. 43405S5 z 0 w w 0 0 0 N 0) z 0 z w 0 CI. Li Q w w o w 1 U W >JD W Q U Z SHEET NO. Ct w 0 z L�J CC U C502