Loading...
HomeMy WebLinkAbout04100002 TAC Carmel Dad's Club, Concession Stand, Site Plan, pg 102' 10' MIN. WATER MAIN SANITARY SEWER /CLASS 22 MECH. JOINT C.A.. OR CLASS 2 D.I. PIPE FLEXIBLE COUPLING OR ADAPTER SANITARY SEWER PLAN ELEVATION 10' MIN. WATER MAIN CONC. COLLAR COUPLINGS USf_D WHEN LESS THAN 18 OR IN CASES WHERE WATER IS BELOW SAN. SEWER NOTES: Water and sewer crossings and separations shall be in accordance with Ten State Standards and local codes. There shall be no physical connections between a public or private water supply system and a sanitary sewer or appurtenances thereto which would permit the passage of any polluted water into the potable supply. Sanitary sewers shall be laid ten (10) feet horizontally from any existing or proposed water line. The distance shall be measured edge to edge. In cases where it is not practical to maintain a ten (10) foot separation, the appropriate reviewing agency may allow deviation on a case -by -case basis if supported by data from the design engineer. Such deviation may allow installation of the sewer closer to a water main provided that the water main is in a separate trench or on an undisturbed earth shelf located to one side of the sewer, and at an elevation so the bottom of the water main is at least 18 inches above the top of the sewer. Sanitary sewers crossing water mains shall be laid to provide a minimum vertical separation distance of 18 inches between the outside of water main and the outside of the sewer. This shall be the case where the water main is either above or below the sewer. The crossing shall be arranged so that the sewer joints will be equidistant and as far as possible from the water main joints. Where a water main crosses under a sewer, adequate structural support shall be provided for the sewer to prevent damage to the water main. When it is impossible to obtain proper horizontal and vertical separation as stipulated above, the sewer shall be designed and construe equal to water pipe, and shall be pressure tested to assure water tightness prior to backfilling. MIN. CROSSOVER AND SEPARATION SA -10 NO SCALE (WATER MAINS SANI, SEWERS) z 0 5 0 0 v_ NOTE: 1/4 Bend to be installed at this point when 90' deflection to laterals req'd. 3' -0" MAX. TC= ELEVATION FINISH GRADE NO SCALE 18 "x18 "x6" CONC. PAD BLDG. DRAIN s CAST IRON CAP INSTALLED FLUSH WITH FINISHED GRADE IN PAVEMENT AREAS BACKFILL WITH COMPACTED GRANULAR MATERIAL UNDER PAVEMENT AREAS NO SCALE PLAN 45* WYE SECTION 45' ELBOW FINISH GRADE 45' WYE (6 "x6 CLEANOUT PLUG ADAPTER 4" PVC 1/4 BEND 11111 IND 6" LATERAL 4 "x6" INCREASER CLEANOUT DETAIL (PVC) PVC CAP INSTALLED FLUSH WITH FINISHED GRADE IN UNPAVED AREAS I I I 11.7:1 BACKFILL WITH SELECT EXCAVATED MATERIAL FOR UNPAVED AREAS SEWER CLEANOUT EXTENSION SAME SIZE AS SEWER UP TO 6" DIAMETER PLUG SEAL FOR FUTURE CONNECTION OR CONTINUATION OF MAIN. --41- III REPLACE EXCAVATED MATERIAL BEDDING MATERIAL TO BE COMPACTED #8 CRUSHED STONE NOTE: FOR ROCK OR OTHER INCOMPRESSIBLE MATERIALS, THE TRENCH SHOULD BE OVER EXCAVATED A MINIMUM OF 6" AND REFILLED W #8 CRUSHED STONE. FLEXIBLE PIPE BEDDING DETAIL NO SCALE TYPICAL SANITARY SEWER SPECIFICATIONS TO BE USED FOR PRIVATE SEWER DEVELOPMENT WITHIN CLAY TOWNSHIP REGIONAL WASTE DISTRICT REVISED MAY, 2002 1. Standard specifications of the Clay Township Regional Waste District (District) and Indiana Department of Transportation shall apply for all work and materials. Pipe shall be installed in accordance with Section 715 of the latest edition of the Indiana Department of Transportation Standard Specifications. 1. 2. Sanitary sewer pipe shall be PVC and accordance he pipe s shall be of PVC plastic having 2 a cell PVC pipe shall have a grooved be gasket. classification of 12454B. 3. PVC sewer fittings shall conform to the requirements of ASTM D- 3034 -89 specification. Fittings in sizes through 8" shall be molded in one piece with elastomeric joints and minimum socket depths as specified in sections 6.2 and 7.3.2. Fittings 10" and larger shall be molded or fabricated in accordance with section 7.11 with manufacturers standard pipe bells and gaskets. Wall thickness of fittings shall be SDR 26 as defined in section 7.4.1 of specifications. Gaskets for elastomeric joints shall be molded with a minimum cross sectional area of 0.20 square inches and conform to ASTM F -477 specification. 4. All sanitary manholes shall be Aprecast concrete® manholes in accordance with ASTM C -478 and Section 720. 0 -rings shall conform to C -443. Kent Seal or equivalent shall also be applied to all joints and between riser rings and castings. Manhole step spacing shall be no more than 16- inches. Manholes shall be air tested for leakage in accordance with ASTM C1244 -93, Standard Test Method for Concrete Sewer Manholes by the Negative Air Pressure (Vacuum) Test. A Installation and operation of vacuum equipment and indicating devices must be in accordance with manufacturer =s recommendations and performance specifications which have been provided by the manufacturer and accepted by the Engineer. The vacuum equipment must be capable of testing the entire manhole, including the casting and riser rings. B. With the vacuum tester set in place: 1. Connect the vacuum pump to the outlet port with the valve open. 2. Draw a vacuum of ten (10) inches of Hg. and dose the valve. C. Accepted standards for leakage will be established from the elapsed time for a negative pressure change from ten (10) inches to nine (9) inches of mercury. The maximum allowable leakage rate for a four (4) foot diameter manhole must be in accordance with the following: Minimum Elapsed Time for a Manhole Depth Pressure Change of 1 Inch Hg 10 feet or less 60 seconds >10 feet but <15 feet 75 seconds >15 feet but <25 feet 90 seconds For manholes five (5) feet in diameter, add an additional fifteen (15) seconds and for manholes six (6) feet in diameter, add an additional thirty (30) seconds to the time requirements for four (4) foot diameter manholes. For all manholes deeper than twenty -five (25) feet. Engineer will determine the applicable minimum elapsed time. D. If the manhole fails the test, necessary ssry repairs a test must be made and the vacuum test and repairs must be repeated until the manhole passes E. If manhole joint sealants are pulled out during the vacuum test, the manhole must be disassembled and the joint sealants replaced. F. Manholes will be subject to visual inspection with all visual Teaks being repaired. 5. Butyl rubber coating shall be applied around each manhole joint from 6- inches above to 6- inches below each joint. The appropriate primer shall be applied prior to applying the rubber coating. Inside joints to be filled with precoat plug material. 6. The manhole chimney =s including all riser rings shall be sealed using Infi Shield AUniband® or approved equal. Prior to placement, the top 4- inches of the manhole cone and casting frame shall be cleaned and primed. The Uniband shall extend from 3- inches below the top of the cone section to 2- inches over the flange of the manhole casting frame. 7. The casting elevations are set by plan. However, the castings are to be adjusted in the field by the Engineer =s representative, should a discrepancy occur between plan grade and existing grade. New manhole ring and cover shall be installed to establish grade. Maximum height of adjusting rings shall be 12- inches. 8. Backfill around all structures and all cuts under paved areas with granular material. Trenches opening within 5 -feet of paved roadways shall be backfilled with granular material in accordance with Section 211. Backfill under sidewalks shall be granular, unless the walks are constructed a minimum of 6 months after backfill has been in place. 9. The Contractor shall be responsible for to verifying that ha all state highways, city, and county permits have been obtained by the developer prior The Contractor shall be required to furnish the developer =s Engineer with a set of prints, marked in red pencil, showing actual sewer location and invert, to include lateral location, depth and length. Such Aas built@ prints must be aterals d by the stubs termination shall shall the be final indicated sated contract on payment authorized. The sanitary sewer I the surface with a metal fence post set immediately above the said termination point. 11. All sanitary sewer lines upon completion will be required to pass a low pressure air test. Said test shall be conducted according to ASTM 1417 -92, and shall be witnessed by an Engineer and a representative of the District. The testing shall be in accordance with Table 1. Add 0.5 psig for each foot of water above the sewer line being tested. 12. Deflection tests shall be performed on all flexible* pipe after the final backfill has been in place at least 30 days. No pipe shall exceed a vertical deflection of 57. deflection test results. *The following are considered non flexible pipes: concrete pipe, ductile iron pipe, and cast iron pipe). The deflection test shall be performed with a nine -point mandrel. Proving rings shall be available. 13. All mandrel testing shall be observed by a professional engineer representative for certification and a representative of the District. 14. The ends of laterals are to be plugged tight with a braced plastic disc or cap capable of withstanding a low pressure air test without leakage. 15. Bedding for flexible pipe shall be No. 8 crushed stone from 6- inches below the pipe to 12- inches above the pipe. Bedding for rigid pipe shall be No. 8 crushed stone from 6- inches below the pipe to the spring line of the placed pipe n from less than point nche 12-inches 8 cbushed bedding or equivalent. Manholes shall be plac on no 16. Water and sewer line crossings and separations shall be in accordance with 327IAC 3 -6 -9. 17. Trench shall be opened sufficiently ahead of pipe laying to reveal obstruction, and shall be properly protected and /or barricaded when left unattended. 18. No water shall be permitted to flow into the sanitary sewer system during construction. Contractor shall utilize a pump to keep the water state and below federal laws and Pump regulations discharge (327 shall IAC be directed to a storm outlet in accordance with 3- 6 -20). Any pipe entering existing sewers shall be plugged with screw type mechanical, braced plug until such time as all tests on the sewers have been completed and the lines have passed all punch lists. 19. All sewer laterals installed by the mainline Contractor shall be bedded the same as the main line sewer. 20. trucy -ntion.ght Also, 48 hours 8 hour s n notice shall shallbbegiven to the given prior to District doing prior any testing done on the sewer. construc. o, 4ur 21. Manhole castings shall be stamped SANITARY SEWER, Neenah Casting R 1642A or equal and be self sealing type. The casting flange s1916eF�4and stamped the SANITARY SEWER. shall be 24 inches. Waterproof castings shall be Neenah R 22. The minimum slope for sewer acceptance by the Clay Township Regional Waste District are: Size of Pipe Minimum Constructed Slope 8 -inch 0.40% 10 -inch 0.28% 12 -inch 0.22% 15 -inch 0.15% 18 -inch 0.12% 23. The Contractor shall provide measurements of the slope of the sewer for each manhole section as construction progresses. Such measurements shall be certified by a Registered Land Surveyor or Engineer and be available on -site for observation by the District=s Insp n s ector. No more than three manhole sections can be constructed in advance 24. In the event the Contractor does not meet t the h m ra pes, the o sewer section and any other affected sewer sections shall be reconstructed 25. Laterals are to be traced with a minimum size of 14 gauge wire from the wye to the terminus. The contractor for the building or home will extend the wire from this terminus to the building cleanout adjacent to the building. i 1 v) w re F ce W z 0 a W N c� o W Q Z O Q Z W Z w t Z� gNa W N S J C3 C O Z ZZZ< oo 0) o u7 N o N cc z a Q Ct v rn ?d w Il fY 0 t` Q tV Lv 5 CO r- M If It# PE 10000126 t 1 STATE OF dt ;'L c,„ 111)111u o‘ Drawn By: Checked By: Quality Memo= Scale: O Scale: t' NA' NM NMI Sheet C503 oat. 10/04/04 Project Number 040368 -10000 1