HomeMy WebLinkAbout04100007-15 KFC, Long John Silvers, Site Plan, pg 07STORM WATER POLLUTION PREVENTION NOTES 1. ALL WORK SPECIFIED AS AN INDOT ITEM SHALL BE GOVERNED BY THE CURRENT STATE OF INDIANA DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MATERIAL SPECIFICATION HANDBOOK. IT IS THE CONTRACTOR'S RESPONSIBIUTY TO POSSESS AND TO BE FAMIUAR WITH APPUCABLE SECTIONS. 2. THIS CONTRACT DRAWING SHALL BE MADE AVAILABLE ON SITE AT ALL TIMES AND PRESENTED UPON REQUEST. IF UNFORESEEN STORMWATER POLLUTION PREVENTION IS ENCOUNTERED, ADDITIONAL STORMWATER POLLUTION PREVENTION (SWPP) MEASURES MAY BE REQUESTED BY THE OWNER, COUNTY ENGINEER, PROJECT ENGINEER OR SOIL CONSERVATION SERVICE REPRESENTATIVE AT ANYTIME. SUCH REQUESTS SHALL BE IMPLEMENTED IMMEDIATELY AT CONTRACTOR'S EXPENSE. 3. ALL STORM WATER POLLUTION PREVENTION ITEMS SHALL BE INSTALLED AS SHOWN OR NOTED ON THE SITE PLAN. 4. PLANT TEMPORARY SEEDING AND MULCHING IN ALL AREAS THAT SHALL BE INACTIVE FOR 15 DAYS OR MORE. ALL DISTURBED AND ERODED EARTH SHALL BE REGRADED AND SEEDED WITHIN 14 DAYS WITH SEEDING, AS DEFINED ABOVE AND AS SHOWN ON THE TABLE BELOW, TO ESTABUSH STABIUTY AND PROVIDE SEDIMENT CONTROL. WHERE POSSIBLE, TEMPORARY SEEDING GROWTH SHALL NOT BE MOWED UNTIL IT HAS GONE TO SEED FOR 1 YEAR. TEMPORARY SEEDING SPECIFICATIONS: SEEDING DATES SEED TYPE APPUCATION RATE PER 1,000 S.F. MARCH 1 AUGUST 15 OATS PERENNIAL RYE GRASS OR TALL FESCUE AUGUST 16 NOVEMBER 1 RYE, WHEAT OR PERENNIAL RYE GRASS 3# TALL FESCUE AFTER NOVEMBER 1 STRAW OR HAY MULCH SEED BED PREPARATION UME 10 -10 -10 OR 12 -12 -12 FERTIUZER 1# 1# 3# 5. SILT BARRIERS SHALL BE INSTALLED AROUND ALL EXISTING OR NEW STORM INLETS, CATCH BASINS, YARD DRAINS. INSTALL ROCK CHECK DAMS FOR HEADWALL INLETS FOR STORM WATER POLLUTION PREVENTION. 6. STORM WATER POLLUTION PREVENTION MEASURES SHALL BE INSTALLED OR TOPSOIL STOCKPILES AND OTHER TEMPORARILY DISTURBED AREAS AS SHOWN ON THESE PLANS AND AS DIRECTED BY THE ENGINEER. 7. TEMPORARY SEDIMENTATION AND STORM WATER POLLUTION PREVENTION MEASURES MUST BE INSPECTED AND LOGGED EY THE CONTRACTOR FOR INSPECTION, LOGGING SHALL BE WEEKLY AND AFTER RAIN STORMS. 8. UTIUTY COMPANIES MUST COMPLY WITH ALL STORM WATER POLLUTION PREVENTION MEASURES AS DEFINED ON THE STORM WATER POLLUTION PREVENTION PLANS, DETAILS AND NOTES. 9. THE TOTAL AREA OF DISTURBANCE FOR THIS PROJECT IS 0.71 ACRES. 10. ALL EXISTING WATER COURSES WITHIN THE PROJECT LIMITS SHALL BE TEMPORARILY PROTECTED DURING LAND CLEARING AND GRADING OPERATIONS. SOILS WITHIN 50 FEET OF SAID WATER COURSES SHALL BE STABIUZED WITHIN 2 DAYS OF THE INITIAL CLEARING GRADING OPERATION AS SHOWN ON PLANS. 11. ALL DISTURBED AREAS SHALL BE STABIUZED WITHIN 7 DAYS OF FINAL GRADING. 2 -3 BALES 100# 12 -15# 12. IT IS THE CONTRACTOR'S RESPONSIBIUTY TO MAINTAIN ALL SEDIMENTATION AND STORM WATER POLLUTION PREVENTION ITEMS AT ALL TIMES. 13. ALL STORM WATER POLLUTION PREVENTION PRACTICES WILL BE INSTALLED BEFORE ANY OTHER EARTHMOVING OCCURS. 14. THE FOLLOWING STORM WATER POLLUTION PREVENTION AND SEDIMENT CONTROL MEASURES WILL BE USED ON THIS SITE: 1.SILT BARRIERS 2SILT FENCE LESS THAN 5% SLOPE ATTACH GEOTEXTILE OVER WIRE MESH BACKING TO 2x4 WOOD FRAME, OVERLAPPING FABRIC TO NEXT STAKE MIL 1 18_ MAX. DRAIN GRATE 1 36* l NOTES: 1. DROP INLET SEDIMENT BARRIERS ARE TO BE USED FOR SMALL, NEARLY LEVEL DRAINAGE AREAS. (LESS THAN 575) 2. USE 2X4 WOOD OR EQUIVALENT METAL STAKES, (3 FT. MIN. LENGTH) 3. INSTALL 2X4 WOOD TOP FRAME TO INSURE STABIUTY. 4. THE TOP OF THE FRAME (PONDING HEIGHT) MUST BE WELL BELOW THE GROUND ELEVATION DOWNSLOPE TO PREVENT RUNOFF FROM BY- PASSING THE INLET. A TEMPORARY DIKE MAY BE NECESSARY ON THE DOWNSLOPE SIDE OF THE STRUCTURE. 0000000000 100 0000 PLAN VIEW DROP INLET SECT1ON A -A FABRIC PROPERTIES MIN. TENSILE STRENGTH MAX. ELONGATION 0 60 LBS. MIN. PUNCTURE STRENGTH MIN. TEAR STRENGTH MIN. BURST STRENGTH APPARENT OPENING SIZE MIN. PERMITTIVITY ULTRAVIOLET EXPOSURE STRENGTH RETENTION SILT BARRIER NOT TO SCALE 1. SET THE STAKES. A 70% TOP FRAME NECESSARY FOR STABIUTY 120 LBS. 50% 50 LBS. 40 LBS. 200 PSI =0.84 mm 1x10 -2) SEC1-1) PONDING HT. 2x4 WOOD FRAME 4 SIDES OF D.I. 1 j X 5. WIRE MESH SHALL BE OF SUFFICIENT STRENGTH TO SUPPORT FABRIC WITH WATER FULLY IMPOUNDED AGAINST IT. IT SHALL BE STRETCHED TIGHTLY AROUND THE FRAME AND FASTENED SECURELY TO THE FRAME. 6. GEOTEXTILE SHALL HAVE AN EQUIVALENT OPENING SIZE OF 20 -40 SIEVE AND BE RESISTANT TO SUNUGHT. IT SHALL BE STRETCHED TIGHTLY AROUND THE FRAME AND FASTENED SECURELY. IT SHALL EXTEND FROM THE TOP OF THE FRAME TO 18 IN. BELOW THE INLET NOTCH ELEVATION. THE GEOTEXTILE SHALL OVERLAP ACROSS ONE SIDE OF THE INLET SO THE ENDS OF THE CLOTH ARE NOT FASTENED TO THE SAME POST. 2. EXCAVATE A 4"x4' TRENCH UPSLOPE ALONG THE UNE OF STAKES. 20' MIN. AND NOT LESS THAN WIDTH OF INGRESS/EGRESS. NOT TO SCALE 440't 10'± WATER BAR RIGHT OF WAY DIVERSION AS NEEDED LJ 1 1 1=11=1 I 1 I I I-1 I�Z�r`V._�ii� 1 NOTES: 18" OR SUFFICIENT TO DIVERT RUNOFF 3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. 00%.8 CONSTRUCTION OF A FILTER BARRIER E /P I I= iii =i I i 41 =1 I I -1 I [,,I I I, ;III =I I I_I I I I 11= 1. STONE SIZE TWO INCH STONE SHALL BE USED, OR RECYCLED CONCRETE EQUIVALENT. 2. THE CONSTRUCTION ENTRANCE SHALL COINCIDE WITH THE PROPOSED DRIVE AS SHOWN ON THE PLAN. 3. PAVEMENT THICKNESS STONE LAYER SHALL BE AT LEAST 6 THICK. 4. DRIVEWAY WIDTH THE ENTRANCE SHALL BE AT LEAST 10' WIDE, BUT NOT LESS THAN FULL WIDTH AT POINTS WHERE INGRESS/EGRESS OCCURS. 5. BEDDING -A GEOTEXTILE SHALL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING STONE. IT SHALL HAVE A GRAB TENSILE STRENGTH OF AT LEAST 200 LBS. AND A MULLEN BURST STRENGTH OF AT LEAST 190 LBS. 6. CULVERT -A PIPE OR CULVERT SHALL BE CONSTRUCTED UNDER THE ENTRANCE IF NEEDED TO PREVENT SURFACE WATER FLOWING ACROSS THE ENTRANCE FROM BEING DIRECTED OUT ONTO PAVED SURFACES. 7. WATER BAR A WATER BAR SHALL BE CONSTRUCTED AS PART OF THE CONSTRUCTION ENTRANCE IF NEEDED TO PREVENT SURFACE RUNOFF FROM FLOWING THE LENGTH OF THE CONSTRUCTION ENTRANCE AND OUT ONTO PAVED SURFACES. 8. MAINTENANCE TOP DRESSING OF ADDITIONAL STONE SHALL BE APPUED AS CONDITIONS DEMAND. MUD SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBUC ROADS, OR ANY SURFACE WHERE RUNOFF IS NOT CHECKED BY SEDIMENT CONTROLS, SHALL BE REMOVED IMMEDIATELY. REMOVAL SHALL BE ACCOMPUSHED BY SCRAPING OR SWEEPING. 9. CONSTRUCTION ENTRANCES SHALL NOT BE REUED UPON TO REMOVE MUD FROM VEHICLES AND PREVENT OFF SITE TRACKING. VEHICLES THAT ENTER AND LEAVE THE CONSTRUCTION SHALL BE RESTRICTED FROM MUDDY AREAS. TEMPORARY STABILIZED CONSTRUCTION ENTRANCE NOT TO SCALE 4. BACKFILL AND COMPACT THE EXCAVATION SOIL h ...r..A. r CONTRACT DATE: BUILDING TYPE: PLAN VERSION: SITE NUMBER: STORE NUMBER: PLOT DATE: z W r r o ,140.1 N l) m cc CA 8 3 v0) A o 11 N r-% m 0. KFC LJS XX.XX.XX KL60 -y04 Jan04 -E 283006 2004087.05 1331 S. RANGELINE ROAD CARMEL, IN 46032 KL6O-y04 STORMWATER POLLUTION PREVENTION NOTES DETAILS C3.1 08.27.04