Loading...
HomeMy WebLinkAboutMinutes TAC 06-18-03 EXCERPT FROM JUNE 18, 2003 TAC MEETING MINUTES Critical Skills (Site Plan Approval) Filed by Joe Sheets. REPRESENTING THE PETITIONER: Joe Sheets, JBS HOLDING, LLC My name is Joe Sheets. I am looking to pave the parking lot at 220 North Range Line Road. I have a survey site plan. The site is located at 220 North Range Line Road. The site is zoned B -5 Business and is within the Historic Range Line Road Overlay. SOUTH: No plans, no comments. GROVES: No plans. DOBOSIEWICZ: There is an existing gravel area and a garage that they are going to demolish to create parking spaces. Access to the building does not change. GROVES: Call 800 -521 -2232 to set up an appointment. SHUPPERD: No plans. Our service comes off the alley straight to the meter. They will have to dig some so make sure they call the 1 -800 number by law all utilities must be located and marked. BREWER: No plans. I need to get a set. DOBOSIEWICZ: You will need to have a landscape plan for the area around the proposed parking. You will need to meet the buffer requirements. HILL: On those crossroads plans I am assuming they are showing a drainage swale around the south and the west perimeter of the parking lot to be installed on that site. The improvements if they would identify them as such. Landscape island nudges into the alley right -of- way you need to back that out a little so it does not encroach. FOSTER: No plans no comments. You might want to come by our office and get a copy of the turning radius requirements before you complete the island in the alley. DOBOSIEWICZ: The ordinance would require the parking area be curbed. S. Brewer will get in touch with you about landscaping requirement. Take a couple of photos and give them to S. Brewer so he has a better idea of what is already there. SHEETS: Okay. HILL: You mentioned a mirror image parking lot next door is that to the north or south? SHEETS: North. DOBOSIEWICZ: J. Sheets you will need to respond to the specific depaitments with specific questions, i.e. Engineering, Utility etc... and we can sit down in regard to the curbing. SHEETS: Okay, also there is a garage to be demolished who do I need to see about that? DOBOSIEWICZ: You can demo the garage without approval of this plan. SHEETS: Is the alley island a requirement? DOBOSIEWICZ: No but it does create a measure of traffic control. You can discuss that with engineering ...End...