Loading...
HomeMy WebLinkAboutC3 Site Layout Plan10 1 f1 18.00' 18.00' 5.00' 27.79' EX. TELEPHONE 24.00' NEW. SAN. CLEANOUT T.C.= 758.60 ONE STORY BRICK OFFICE BUILDING 18,089 SQ. FT. 27.75' 5.00' 0002'00" W 124.55' m z N 0 .a N W 0 z Q C G--- 4 LAYOUT NOTES: O1 LIGHT DUTY BITUMINOUS PAVING. 0 HEAVY DUN BITUMINOUS PAVING. 0 CONCRETE SIDEWALK. 4O CONCRETE CURB. cI:: ROLLED CONCRETE CURB AND GUTTER TO MATCH EXISTING. 0 CONCRETE CURB AND SIDEWALK. TRANSITION INTO CURB AND GUTTER. 07 CONCRETE CURB AND SIDEWALK. 0 20' X 28' DUMPSTER PAD. TRASH ENCLOSURE BY ARCHITECT. 0 TAPER LAST 6' OF CONCRETE CURB DOWN TO FLUSH WITH PAVEMENT. 10 HANDICAP LANDING. 0 GAS METER AND LINE BY GAS COMPANY. COORDINATE WITH GAS COMPANY. 12 6" CONCRETE FILLED PIPE GUARD.(5' TALL) 0 HANDICAP PARKING SIGN. 14 HANDICAP PARKING SIGN. NOTED 'VAN ACCESSIBLE'. 15 PAINTED HANDICAP PARKING SYMBOL. 16 4" WIDE PAINTED PARKING LINES.(10'X18') (WHITE IN COLOR) 0 R 8 ti SEE ARCHITECTURAL PLANS FOR TRASH ENCLOSURE 7 7 TEMPORARY BENCHMARK IS A CUT CROSS ON A NORTHEAST HEX NUT OF FIRE HYDRANT. ELEVATION 759.83 0 27' OF 6" SAN. LAT PVCC�I .b9� NOO °22'00 "E 578.77 FLOWLINE OF DITCH 0 PAINTED HANDICAP ACCESSIBLE AISLE. 0 MATCH LINE TO DEVELOPER PROVIDED PAVEMENT LIMITS. 0 PROPOSED TELEHONE LINE. COORDINATE WITH UTILITY CO. 0 6" SANITARY LATERAL (MIN. 1.0% SLOPE) TO EXISTING SANITARY MANHOLE CONTRACTOR TO VERIFY LOCATION AND INVERT OF EXISTING MANHOLE. IF UNABLE TO LOCATE EXISTING MANHOLE, INSTALL NEW SANITARY MANHOLE PER DETAIL. 0 PROPOSED ELECTRIC LINE AND METER. COORDINATE WITH UTILITY COMPANY. PROPOSED WATER LINE BORE UNDER ROAD IF EXISTING LATERAL STUB NOT FOUND. (SIZE BY MEP PLANS) 0 APPROXIMATE LOCATION OF EXISTING WATER LINE STUB. (SIZE UNKNOWN) 0 PAINTED PARKING ISLAND. 0 7" THICK (FIBER REINFORCED) CONCRETE DUMPSTER PAD. 0 SANITARY SEWER LATERAL CLEANOUT. TC= 758.60. INVERT IS TO BE COORDINATED WITH MEP PLANS. 0 PARKING BARRIERS. NEW WATER SERVICE. (SIZE BY MEP) 29 EXCAVATE AROUND AND DOWN TO THE INVERT OF EXISTING PIPES. PROVIDE GRANULAR FILL BASED ON DETAILS 10, 11, 14, AND 23 (SHEET C7) 30 RAMP �1 CONNECT TO EXISTING MANHOLE IF UNABLE TO LOCATE EX. M.H., INSTALL A NEW MANHOLE WITH 1642A CASTING, MATCH EXISTING INVERT 6 HEAVY BRUSH SCRUB OR ��E PL S \0 Q T 4' CONCRETE WALK G--- G------ C G-- -•G 0G, O 4. FH A GM TP N &p —AL —w— G 0— RADIUS 158.00' ARC 77.12' RADIUS 137.00' ARC 176.94' QC N 15'52'48" W 45.11' 0 SLOPE 0' O LEGEND O MH UTILITY MANHOLE 5 GAS SHUTOFF VALVE WATER SHUTOFF VALVE FIRE HYDRANT GAS LINE MARKER TELEPHONE PEDESTAL POWER POLE AERIAL ELECTRICAL LINES WATER LINE BURIED GAS LINE HEAVY DUTY ASPHALT PARKING: 72 10' X 18' SPACES 4 H.C. SPACES z W 03 O O 00 4 6" STANDING CURB W /GUTTER (TYP.) z AVEAAF;° 6" STANDING C G— W GUTTER TYP. APPRO LINE PER UTILITY COMPANY REPRESENTATIVE ---G XIMATE LOCATION OF 4" STEEL GAS A O SOUTH LINE OF THE DEDICATION OF RIGHT OF WAY PER 1NSTR. NO. 87 -43509 G) ri 0 NOTE: 'U NO. 95 -158, DATED MARCH 9, 1995. CONCRETE WALK APPROXIMATE LOCATION OF 4" PLASTIC GAS L APPROXIMATE LOCATION OF 2" PLASTIC GAS LINE PER UTILITY COMPANY REPRESENTATIVE LINE PER UTILITY COMPANY REPRESENTATIVE GENERAL NOTES: 1. ALL DIMENSIONS ARE BASED ON FACE OF CURB OR FACE OF BUILDING. 2. ALL RADII ARE 3' UNLESS NOTED OTHERWISE. 3. SEE ARCHITECTURAL PLANS FOR DETAILS OF BUILDING AND BUILDING DIMENSIONS. DO NOT STAKE BUILDING FROM THESE PLANS. 4. DIMENSIONS INDICATE FIELD DIMENSION ADJUSTMENT AREA BASED ON ACTUAL FIELD LAYOUT COORDINATES. 5. ALL WORK TO CONFORM TO STATE AND LOCAL REGULATIONS. 6. ALL DIMENSIONS ARE PARALLEL AND PERPENDICULAR TO EAST PROPERTY LINE UNLESS OTHERWISE NOTED. 7. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD BEFORE STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBILE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPENCIES ARE FOUND IN THESE PLANS FROM ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY A/E IMMEDIATELY. 8. PROVIDE SMOOTH TRANSITION FROM NEW AREAS TO EXISTING FEATURES AS NECESSRY. 9. RESURFACE OR RECONSTRUCT AT LEAST TO ORIGINAL CONDITIONS ALL AREAS WHERE THE EXISTING PAVEMENT OR LAWNS ARE DAMAGED DURING CONSTRUCTION FROM TRAFFIC BY CONTRACTORS, SUBCONTRACTORS OR SUPPLIERS, AFTER CONSTRUCTION WORK IS COMPLETE. DOSING BULDN6 5 THE BOUNDARY SHOWN ON MIS TOPOGRAPHIC SURVEY WAS TAKEN FROM A PLOT PLAN AND LEGAL DESCRIPTION PREPARED BY WEIHE ENGINEERS FOR DAN YOUNG CHEVORLET AS JOB SAID SURVEY SHOULD BE REVIEWED REGARDING ANY QUESTIONS CONCERNING THE PERIMETER BOUNDARY AS SHOWN UPON THIS SHEET. SOO'22'00 'W (ASSUMED BEARING) 1255.00' 2 S3 OWING 1 0 15' 30 I SCALE: 1" 30' NORTHEAST CORNER OF THE SOUTHEAST QUARTER OF SECTION 7, TOWNSHIP 17 NORTH, RANGE 4 EAST BUILDING LOCATION MAP PLEASE CALL "HOLEY MOLEY" 1- 800 -382 -5544 TOLL FREE 60 BENCHMARK INFORMATION: TEMPORARY BENCHMARK FINISH FLOOR ELEVATION OF BUILDING NO. 3 (ACROSS STREET) ELEVATION 760.00 TEMPORARY BENCHMARK CUT CROSS ON A NORTHEAST FIRE HYDRANT ON WEST SIDE OF PROFESSIONAL DRIVE. ELEVATION 759.83 "DON'T DIG BLIND' "IT'S THE LAW" INDIANA UNDERGROUND PROTECTION SERVICE, INC. CALL 1 -800- 382 -5544 2 WORKING DAYS BEFORE YOU DIG. CAUTION!! THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY OTHER) AND ARE SPECULATIVE IN NATURE. THERE MAY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS OF SAID EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO ANY AND ALL CONSTRUCTION 0 b b H- z z W U 0 a d Z 0 p a) W W z U) 0 0 0 11111.1I■11 v� CC w 1.1.1 z z LLi w z w 0 0 z z 0 W U) 0 U) 0 a w a SHEET NO.i CC LO 0 CC co o da 1 C12 lf7 0 '-i CO C>~ i w O u") z I LC) 0 Z Cot ALLAN H. WEIHE P. 8827 C3 d t: ���t tJ H. No. 8827 Cr STATE OF r ��V l���: