HomeMy WebLinkAbout094-99 V Rosewalk, Landscape Plans, pg 02NDSCAPE NOTES
1. All planting and landscaped parking lot islands, excluding areas to receive annuals and
perennials, ore to incorporate Dewitt Weed Barrier, or equivalent, between a minimum of three inches
of shredded hardwood mulch and a minimum of six inches of topsoil or planting mix. An approved
pre-emergent herbicide shall be applied in all planting beds before and after mulching at rates
specified by the manufacturer.
2. All soil in designated planting areas to be loosened to depth of 6 inches prior to planting.
3. It is the landscape contractor's responsibility to provide and verify that the topsoil in the planting
areas is not over compacted and is reasonably free from subsoil, stones, downed timber, brush,
roots, stumps, rubbish, broken concrete, and any other material that may impede the establishment
of the proposed nt material.
4. All trees and evergreen plant material to be balled and burlapped, unless otherwise noted.
5. All shrubs may either be container grown, or balled and burlapped.
6. The landscape contractor shall supply all plant material in quantities sufficient to complete all
plantings shown on the drawings. If quantities of plant materials shown on the drawings conflicts
with quantities given on the plant list, the quantities shown on the drawings shall supersede the
plant list.
7. Any deviation from the project specifications effecting the health, handling, fertilization,
maintenance and general condition of the specified plant material must be presented to the owner
in written format for approval prior to execution. The landscape contractor shall assume full
responsibility and associated cost for all changes made without proper approval.
8. All plant material to be planted at the same relative depth as before transplanted.
9. Flood all plants twice during the first twenty -four hour period after planting.
10. Begin maintenance immediately after planting and continue until final acceptance.
11. All plant material shall be guaranteed for one full year from date of acceptance.
12. All plants to be guaranteed to be in healthy condition for one full year after acceptance of all
planting.
13. All new planting material shall meet or exceed ANSI specifications of quality.
14. All proposed plant materials are shown at 3/4 mature growth. Space as indicated on plant list
or to proper horticultural methods.
15. Tree caliper size indicates the diameter of the trunk taken at 12 inches above ground level.
16. All planting bed lines are to have a cleared spade cut edge to a minimum depth of 4 inches.
17. Keep the soil of all balled and container plants moist until they are planted. If plants cannot
be planted immediately, they should be heeled in and balls /containers should be covered with mulch.
The location of a designated landscape material staging area shall be determined by both the
landscape contractor and the owners on site representative.
18. Finish grading of landscape lawn areas to ensure proper drainage and aesthetic
quality, shall be the responsibility of the landscape contractor. Owners on site representative shall
approve shaping prior to the installation of plant material, seed, or sod in these areas.
19. The landscape contractor shall coordinate all finish grading of all lawn areas with the general
contractor and owner prior to beginning any final grading work. A minimum of 4" inches topsoil
shall be provided over all lawn areas receiving seed or sod. All work shall be in accordance with
the Project Specifications Section 02900 and 02930.
20. All seeding shall be installed in accordance with the Project Specification, Section 02930.
21. Contact all Utility Companies to locate all mains, conduits, service lines, etc., in the affected
construction area.
22. The location and protection of utility structures and facilities, their support and maintenance
during landscape construction (in cooperation with applicable utility) is the expressed responsibility of
the landscape contractor.
23. The landscape contractor is responsible for coordinating and scheduling the landscape installation
with other site work to assure proper placement of plant materials and other landscaping.
24. Any conflicts between existing plant material to remain, and proposed plant material shall be
brought to the attention of the owner, or owners representative. Recommendations for resolving
such conflicts will be issued by them.
25. Refer to project specifications Section 02900 'General Landscape Work', Section 02930 'Lawns and
;rasses And 2955 Trees and Shrubs.
All newly planted vegetative material shall meet minimum American Standard for Nursery Stock
andards.
PLANT MATERIAL SCHEDULE 'B' FOR SHEET L2
Note: Tree Staking Is For All
Trews 5" CaI. Or Larger
No Stoking Required
Under 5 Cal.
0:
Plan View
(Not To Scale)
Tree Planting Section
(Not To Scale)
Shrub Planting Section
(Not To Scale)
DON'T
DIG
BLIND
Ground Line To Be The Some
As At The Nursery
3" Shredded Hardwood Mulch
Remove All Wire, Strings And
Burlap From Top Of Ball
Finish Grade, Plant Tree 6"
Higher Than Grade
4" High Compacted Saucer
Slow Release Fertilizer
Tablets
Planting Mixture
Evergreen Tree Planting Section
(Not To Scale)
Compacted Saucer
3" Mulch Bed
Top Of Root Ball
7' Stake locate One Stake
Directly Sw Of Tree
Tree Trunk
Reinforced Rubber Hose
110 Wire
3 Reinforced Rubber Hose
Sections With Double Strand
Of #10 Wire
Wrap #10 Double Strand Wire At
Least Twice Around Each Post
Wrap Tree From Bottom Up With
50% Overlap And Tie Securely
3 Steel Fence Post, Spaced Evenly
Ground Line To Be The Some
As At The Nursery
3" Shredded Hardwood Mulch
Remove All Wire, Strings And
Burlap From Top Of Boll
Finish Grade, Plant Tree 6"
Higher Than Grade
6" High Compacted Saucer
Slow Release Fertilizer
Tablets
Planting Mixture
Ground Line To Be The Same
As At The Nursery
3" Shredded Hardwood Mulch
Remove All Wire, Strings And
Burlap From Top Of Ball
Finish Grade
4" High Compacted Saucer
Slow Release Fertilizer
Tablets
Planting Mixture
"HOLEY MaEr
SEZ
1 800- 382 -5544
CALL TOLL FREE
1 800- 428 -5200
FOR CALLS OUTSIDE OF INDIANA
CAUTION
LOCATICNS OF ALL EXISTING UNDERGROUND UTILITIES
SHOWN ON THIS PLAN ARE BASED UPON ABOVE
GROUND EVIDENCE (including, but not limited to,
manholes, inlets. valves, and marks made upon
the ground by others) AND ARE SPECULATIVE IN
NATURE. THERE MAY ALSO BE OTHER EXISTING
UNDERGROUND UTILITIES FOR WHICH THERE IS NO
ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE
GROUND EVIDENCE WAS OBSERVED. THE EXACT
LOCATIONS OF SAID EXISTING UNDERGROUND
UTILITIES SHOULD BE VERIFIED BY THE CONTRACTOR
PRIOR TO ANY AND ALL CONSTRUCTION.
Drown By:
MAV/ AJ
Checked er
Dote
1
f<1
!7:6
V
c�
x z o z c o
Vf
<W 6 _J
Quority fr urance:
L2
rn
00
0
N
o u
z
a
Q om
z
a
tr y
0 7
o
N a. v
Q N_
r• Q •v
z t l
Go
r•••
02-20-01
TON AL ,0
Project Number
980443 -20000
r7
a o
V)
z
4 a'
E
LANDSCAPE NOTES
Rosewalk On Main
Plant Type
Key
Number
Size
Botanical Name
Common Name
Remarks
Deciduous Shrubs
0
Q
CO
UW
68
51
60
24' B/B
24' B/B
24' B/B
Cornus Sericea
Euonymous a. 'Compactus'
Viburnum Carlessii
Red Stem Dogwood
Burning Bush
Korean Spice Viburnum
All Plant Selections Shall Be Of Locally
Grown Plant Material.
All Plant Material Shall Be Of Comparable
Size and Shape.
All Plant Material Shall Have Uniform
Branching gOVIdlfl9 r Shape
And Free pots.
Deciduous Trees
I,
FP
GB
GT
QAC
01
OR
TA
TC
1•••• et CO to Nt to CO to
2.5' Cal. B/B
2.5' Cal. B/B
2.5' Cal. B/B
2.5' Cal. B/B
2.5' Cal. B/B
2.5' Cal. B/B
2.5' Cal. B/B
2.5' Cal. B/B
Fraxinus Pennsylvanica
Ginkgo Biloba
Gleditsia t. 'Inermis'
Quercus Acutissima
Quercus Imbricaria
Quercus Rubra
Tilia Americana
Tilia Cordata
Green Ash
Ginkgo
Honeylocust
Sawtooth Oak
Shingle Oak
Red Oak
American Linden
Littleleaf Linden
Evergreen Trees
et 6'
Ar
0 0 a CO
to CO CO m
6' Min. B/B
6' Min. B/B
Min. B/B
6 Min. B/B
Abies Concolor
Picea omorika
Picea pungens 'glauca'
Pinus Strobus
White Fir
Serbian Spruce
Colorado Blue Spruce
White Pine
Evergreen Trees Must be 6' Tall Min. at
Time of Planting
Ornamental Trees
V
AA
AG
BN
CC
CP
NS
9
6
9
5
10
8
1.5' CaI. B/B
1.5' Cal. B/B
1.5' Cal. B/B
1.5' Cal. B/B
1.5' Cal. B/B
1.5' Cal. B/B
Amelanchier Arborea
Acer Ginnula
Betula Nigra
Cercis Canadensis
Crataegus Phaenopyrum
Nyssa Sylvatica
Downy Serviceberry
Amur Maple
River Birch
Eastern Redbud
Washington Hawthorn
Black Gum
NDSCAPE NOTES
1. All planting and landscaped parking lot islands, excluding areas to receive annuals and
perennials, ore to incorporate Dewitt Weed Barrier, or equivalent, between a minimum of three inches
of shredded hardwood mulch and a minimum of six inches of topsoil or planting mix. An approved
pre-emergent herbicide shall be applied in all planting beds before and after mulching at rates
specified by the manufacturer.
2. All soil in designated planting areas to be loosened to depth of 6 inches prior to planting.
3. It is the landscape contractor's responsibility to provide and verify that the topsoil in the planting
areas is not over compacted and is reasonably free from subsoil, stones, downed timber, brush,
roots, stumps, rubbish, broken concrete, and any other material that may impede the establishment
of the proposed nt material.
4. All trees and evergreen plant material to be balled and burlapped, unless otherwise noted.
5. All shrubs may either be container grown, or balled and burlapped.
6. The landscape contractor shall supply all plant material in quantities sufficient to complete all
plantings shown on the drawings. If quantities of plant materials shown on the drawings conflicts
with quantities given on the plant list, the quantities shown on the drawings shall supersede the
plant list.
7. Any deviation from the project specifications effecting the health, handling, fertilization,
maintenance and general condition of the specified plant material must be presented to the owner
in written format for approval prior to execution. The landscape contractor shall assume full
responsibility and associated cost for all changes made without proper approval.
8. All plant material to be planted at the same relative depth as before transplanted.
9. Flood all plants twice during the first twenty -four hour period after planting.
10. Begin maintenance immediately after planting and continue until final acceptance.
11. All plant material shall be guaranteed for one full year from date of acceptance.
12. All plants to be guaranteed to be in healthy condition for one full year after acceptance of all
planting.
13. All new planting material shall meet or exceed ANSI specifications of quality.
14. All proposed plant materials are shown at 3/4 mature growth. Space as indicated on plant list
or to proper horticultural methods.
15. Tree caliper size indicates the diameter of the trunk taken at 12 inches above ground level.
16. All planting bed lines are to have a cleared spade cut edge to a minimum depth of 4 inches.
17. Keep the soil of all balled and container plants moist until they are planted. If plants cannot
be planted immediately, they should be heeled in and balls /containers should be covered with mulch.
The location of a designated landscape material staging area shall be determined by both the
landscape contractor and the owners on site representative.
18. Finish grading of landscape lawn areas to ensure proper drainage and aesthetic
quality, shall be the responsibility of the landscape contractor. Owners on site representative shall
approve shaping prior to the installation of plant material, seed, or sod in these areas.
19. The landscape contractor shall coordinate all finish grading of all lawn areas with the general
contractor and owner prior to beginning any final grading work. A minimum of 4" inches topsoil
shall be provided over all lawn areas receiving seed or sod. All work shall be in accordance with
the Project Specifications Section 02900 and 02930.
20. All seeding shall be installed in accordance with the Project Specification, Section 02930.
21. Contact all Utility Companies to locate all mains, conduits, service lines, etc., in the affected
construction area.
22. The location and protection of utility structures and facilities, their support and maintenance
during landscape construction (in cooperation with applicable utility) is the expressed responsibility of
the landscape contractor.
23. The landscape contractor is responsible for coordinating and scheduling the landscape installation
with other site work to assure proper placement of plant materials and other landscaping.
24. Any conflicts between existing plant material to remain, and proposed plant material shall be
brought to the attention of the owner, or owners representative. Recommendations for resolving
such conflicts will be issued by them.
25. Refer to project specifications Section 02900 'General Landscape Work', Section 02930 'Lawns and
;rasses And 2955 Trees and Shrubs.
All newly planted vegetative material shall meet minimum American Standard for Nursery Stock
andards.
PLANT MATERIAL SCHEDULE 'B' FOR SHEET L2
Note: Tree Staking Is For All
Trews 5" CaI. Or Larger
No Stoking Required
Under 5 Cal.
0:
Plan View
(Not To Scale)
Tree Planting Section
(Not To Scale)
Shrub Planting Section
(Not To Scale)
DON'T
DIG
BLIND
Ground Line To Be The Some
As At The Nursery
3" Shredded Hardwood Mulch
Remove All Wire, Strings And
Burlap From Top Of Ball
Finish Grade, Plant Tree 6"
Higher Than Grade
4" High Compacted Saucer
Slow Release Fertilizer
Tablets
Planting Mixture
Evergreen Tree Planting Section
(Not To Scale)
Compacted Saucer
3" Mulch Bed
Top Of Root Ball
7' Stake locate One Stake
Directly Sw Of Tree
Tree Trunk
Reinforced Rubber Hose
110 Wire
3 Reinforced Rubber Hose
Sections With Double Strand
Of #10 Wire
Wrap #10 Double Strand Wire At
Least Twice Around Each Post
Wrap Tree From Bottom Up With
50% Overlap And Tie Securely
3 Steel Fence Post, Spaced Evenly
Ground Line To Be The Some
As At The Nursery
3" Shredded Hardwood Mulch
Remove All Wire, Strings And
Burlap From Top Of Boll
Finish Grade, Plant Tree 6"
Higher Than Grade
6" High Compacted Saucer
Slow Release Fertilizer
Tablets
Planting Mixture
Ground Line To Be The Same
As At The Nursery
3" Shredded Hardwood Mulch
Remove All Wire, Strings And
Burlap From Top Of Ball
Finish Grade
4" High Compacted Saucer
Slow Release Fertilizer
Tablets
Planting Mixture
"HOLEY MaEr
SEZ
1 800- 382 -5544
CALL TOLL FREE
1 800- 428 -5200
FOR CALLS OUTSIDE OF INDIANA
CAUTION
LOCATICNS OF ALL EXISTING UNDERGROUND UTILITIES
SHOWN ON THIS PLAN ARE BASED UPON ABOVE
GROUND EVIDENCE (including, but not limited to,
manholes, inlets. valves, and marks made upon
the ground by others) AND ARE SPECULATIVE IN
NATURE. THERE MAY ALSO BE OTHER EXISTING
UNDERGROUND UTILITIES FOR WHICH THERE IS NO
ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE
GROUND EVIDENCE WAS OBSERVED. THE EXACT
LOCATIONS OF SAID EXISTING UNDERGROUND
UTILITIES SHOULD BE VERIFIED BY THE CONTRACTOR
PRIOR TO ANY AND ALL CONSTRUCTION.
Drown By:
MAV/ AJ
Checked er
Dote
1
f<1
!7:6
V
c�
x z o z c o
Vf
<W 6 _J
Quority fr urance:
L2
rn
00
0
N
o u
z
a
Q om
z
a
tr y
0 7
o
N a. v
Q N_
r• Q •v
z t l
Go
r•••
02-20-01
TON AL ,0
Project Number
980443 -20000
r7
a o
V)
z
4 a'
E
LANDSCAPE NOTES
Rosewalk On Main