HomeMy WebLinkAboutMinutes TAC 02-18-09Carmel Technical Advisory Committee Meeting Minutes
Date: Wednesday, February 18, 2009
Place: Planning /Zoning Dept. Conference Room, 3 rd Floor, Carmel City Hall
Primrose School Carmel Drive: Applicant seeks the following development
standards and use variance approvals:
Docket No. 08120006 UV Appendix A Preschool in the M3 District
Docket No. 08120007 V Ch. 200.08.01(1) Fence Height 6' in Front Yard
Docket No. 08120008 V Ch.27.08 Parking Reduction
The site is located at the southeast corner of W. Carmel Drive and Adams Street
and is zoned M3 /Manufacturing. Filed by Matt Skelton of Baker Daniels, LLP
for the Primrose School Franchising Company.
Matt Skelton of Baker Daniels present for the petitioner. He was accompanied
by Brandon Burke of the Schneider Corp. In the processes of seeking a few
variances for a preschool facility, you all should have received a copy of an aerial
location map, site plan, and renderings of the facility, please let me know if you
have not yet received that. After we get through this variance process we plan to
submit for ADLS and development plans. The use variance we are seeking is to
be able to have a preschool in the science and technology park which currently a
preschool is not an approved use. After discussion with some of your staff and
stakeholders the general feeling is that it is a complementary and compatible use
to the district.
The two development standards we are seeking variances on are the fence
height and the parking lot size. The fence height variance is really a security
issue; it is a typical request for private preschool facilities. They are tastefully
designed with a rod iron appearance and are 6' rather than the typical 4'. The
reduction in parking space is requested and based on actual observation. For
this type of use we have enough data to support and take care of anyone's
concerns on parking usage. We are planning to go to the Feb 23 BZA meeting
for a couple of public hearings.
Greg Hoyes, Hamilton County Surveyor's Office- Sent letter, we have no
other comments at this time.
Nick Redden, City Engineers Office- We have no addition comments at this
time.
Trudy Weddington, DOCS No comments at this time.
Scott Brewer, Urban Forestry- Sent letter, just one thing to keep in mind about
what is going on, on the site. For example the size of the building and all the
other important details, because at the end of the project we will not be able to be
squeezing out certain details.
Chris Ellison, CFD- I have been in contact with you, we went though quite a bit
of information on Jan. 23 I don't have any comments on the three items for
today's meeting, but I do want to let you know ahead of time, that due to the
layout of the structure and the property that the fire department connection
location might be a bit of a challenge. Something that will need to be looked into
during the planning stage.
Ryan Hartman, CTRWD We have no further issues at this time, we will do a
review once plans are submitted.
David Littlejohn, Alternative Transportation- Sent comment letter, have no
further comments.
END
Docket No. 09010001 TAC: Prudentia Building (Village of WestClay, Sec
3004, Blk D)
The applicant seeks TAC approval to construct a multi -use building. The site is
located east of Broad St, on Broughton St. The site is zoned PUD /Planned Unit
Development. Filed by Brandon Burke of The Schneider Corp. for Prudentia,
LLC.
Brandon Burke of The Schneider Corp. presented for the petitioner. He was
accompanied by Steve Churchill John Loveys developers, Keith Lash- master
developer, and Steven Goldberg architect. Brought in map to help explain
location of the building for those who are not familiar with the location. It is going
to be a 2 story mix use building, the first floor which will be approximately 4,000
square feet of office space. The second floor will also be approximately 4,000
square feet of residential living unit and will have a garage internal to it. Finally
the project does propose an expansion to the private parking lot.
Greg Hoyes, Hamilton County Surveyor's Office- Sent you a letter; we will
need an outlet permit and a revision to the plans, no further comments
Nick Redden, City Engineers Office- Sent a comment letter, have no further
comments.
Trudy Weddington, DOCS Passed out applications and contact information,
no further comments at this time.
Scott Brewer, Urban Forestry- Passed out contact information, talked with
Steven and believed to get issues resolved. One concern I have is how you are
going to be protecting the existing trees that will remain on the site during the
construction process.
Chris Ellison, CFD- Sent letter and have exchanged e- mails, one question I
have is based on the use of the 1 floor? If it is used for a restaurant or anything
similar to that it will need to have a sprinkler systems installed.
Ryan Hartman, CTRWD Have had communication with Brandon. We are
going to require the system to be gravity feed system.
Brandon- In using that system there is a lot of complexity to it to get it too the
building I hope to sit down with you with the plans for 10 minutes or so and
discuss other options.
David Littlejohn, Alternative Transportation- Sent comment letter, no further
comments.