HomeMy WebLinkAboutLandscape Update 8-17-06 St. Christopher's Episcopal Church
1440 West Main Street Carmel Indian 4
a 6032
2lie RP. Steve Fares, Rector
r -:1111111( The Rev Caron Toper -Fowl gs, !Minister of
Christian Tbrmation and 'Youth
j I- Vie ftv- Susan alcBeatfi, Deacon
i f 317- 846 -8716
August 17, 2006
Mr. Scott Brewer and Mr. Daren Mindham
City of Carmel
Urban Forestry Department of Community Services
One Civic Square
Carmel, Indiana 46032
Dear Mr. Brewer and Mr. Mindham:
Thank you for taking the time to help us understand what is needed to successfully complete the
landscaping, for Phase I and Phase II of the St. Christopher Episcopal building project. As you
requested, we are now submitting to you a drawing which shows only the landscaping required
for these two phases. The following changes have been approved by you and are noted on the
new drawings:
1. Taxus yews were substituted for Taxus x media "Viridis "yews as "Viridis" yews were
not available at any local suppliers
2. The 5 roses shown in the small island southeast of Phase II on the original plan, have
been moved to south entrance of Phase I as that island is now concrete
3. The 6 yews shown in the small island southeast of Phase II on the original plan, have
been substituted with 6 boxwood and moved to the south side of Phase II
4. The Locust tree shown is the small island southeast of Phase II on the original plan, has
been delayed until Phase III
Again, thank you for your cooperation and insight into making the overall landscaping in Carmel
visually appealing.
I
Sincerely,
/07 %c"--C__ 57 i S 9q 3 h..„ h..„ Karen K. Poyser 5 1 `l -c ,2 Ged
Chair of Architecture Committee
St. Christopher Episcopal Church