Loading...
HomeMy WebLinkAboutUntitled (10)L1 L2 L3 L1 L2 L3 5,578 1 2 1 20A #12 1272 EMERGENCY & FLUORESCENT LTS 5,578 3 4 1 20A #12 500 SECURITY LIGHTS 5,578 5 6 1 20A #12 900 CONV & GFI RECEPT EAST & SOUTH 5,578 78 1 20A SPARE 5,578 9 10 1 20A SPARE 5,578 11 12 1 20A SPARE 5,578 13 14 1 20A SPARE 5,578 15 16 1 20A SPARE 5,578 17 18 1 20A SPARE 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 SUM (THIS SIDE), L1 16,733 16,733 + 1,272 = 18,005 1,272 SUM (THIS SIDE), L1 SUM (THIS SIDE), L2 16,733 16,733 + 500 = 17,233 500 SUM (THIS SIDE), L2 SUM (THIS SIDE), L3 16,733 16,733 + 900 = 17,633 900 SUM (THIS SIDE), L3 HVAC #2 #8 50A 3 VA CKT NO. POLE #8 3 WIRE 50A PANEL SCHEDULE - PANEL PP1 DESCRIPTION BRK AMP BRK AMPS POLE HVAC #5 #8 50A 3 HVAC #1 TYPE: 120/208V 3 PHASE WYE, 60HZ, 42 SPACE WITH 225 AMP MAIN CIRCUIT BREAKER CKT NO. DESCRIPTION VA WIRE 52,870 TOTAL L1: TOTAL L2: TOTAL L3: TOTAL PANEL: L1 L2 L3 L1 L2 L3 EQUIPMENT OUTLET #2 180 #12 20A 1 1 2 1 20A #12 180 EQUIPMENT OUTLET #4 EQUIPMENT OUTLET #6 180 #12 20A 1 3 4 1 20A #12 180 EQUIPMENT OUTLET #8 EQUIPMENT OUTLET #10 180 #12 20A 1 5 6 1 20A #12 180 EQUIPMENT OUTLET #12 EQUIPMENT OUTLET #14 180 #12 20A 1 7 8 1 20A #12 180 EQUIPMENT OUTLET #16 EQUIPMENT OUTLET #18 180 #12 20A 1 9 10 1 20A #12 180 EQUIPMENT OUTLET #20 EQUIPMENT OUTLET #22 180 #12 20A 1 11 12 1 20A #12 180 EQUIPMENT OUTLET #24 EQUIPMENT OUTLET #26 180 #12 20A 1 13 14 1 20A #12 180 EQUIPMENT OUTLET #28 EQUIPMENT OUTLET #30 180 #12 20A 1 15 16 1 20A #12 180 EQUIPMENT OUTLET #32 EQUIPMENT OUTLET #34 180 #12 20A 1 17 18 1 20A #12 180 EQUIPMENT OUTLET #36 EQUIPMENT OUTLET #38 180 #12 20A 1 19 20 1 20A #12 180 EQUIPMENT OUTLET #40 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 SUM (THIS SIDE), L1 720 720 + 720 = 1,440 720 SUM (THIS SIDE), L1 SUM (THIS SIDE), L2 540 540 + 540 = 1,080 540 SUM (THIS SIDE), L2 SUM (THIS SIDE), L3 540 540 + 540 = 1,080 540 SUM (THIS SIDE), L3 WIRE VA CKT NO. POLE 3,600 TOTAL L1: TOTAL L2: TOTAL L3: TOTAL PANEL: PANEL SCHEDULE - PANEL PP2 DESCRIPTION BRK AMP BRK AMPS POLE TYPE: 120/208V 3 PHASE WYE, 60HZ, 42 SPACE WITH 225 AMP MAIN CIRCUIT BREAKER CKT NO. DESCRIPTION VA WIRE L1 L2 L3 L1 L2 L3 5,578 12 1 20A #12 1152 FLUORESCENT LTS 5,578 3 4 1 20A SPARE 5,578 5 6 1 20A #12 900 CONV & GFI RECEPT NORTH & WEST 5,578 78 1 20A SPARE 5,578 9 10 1 20A SPARE 5,578 11 12 1 20A SPARE SPARE 20A 1 13 14 1 20A SPARE SPARE 20A 1 15 16 1 20A SPARE SPARE 20A 1 17 18 1 20A SPARE 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 SUM (THIS SIDE), L1 11,155 11,155 + 1,152 = 12,307 1,152 SUM (THIS SIDE), L1 SUM (THIS SIDE), L2 11,155 11,155 + 0 = 11,155 0 SUM (THIS SIDE), L2 SUM (THIS SIDE), L3 11,155 11,155 + 900 = 12,055 900 SUM (THIS SIDE), L3 WIRE 50A HVAC #4 #8 50A 3 HVAC #3 VA CKT NO. POLE #8 3 35,517 TOTAL L1: TOTAL L2: TOTAL L3: TOTAL PANEL: PANEL SCHEDULE - PANEL PP3 DESCRIPTION BRK AMP BRK AMPS POLE TYPE: 120/208V 3 PHASE WYE, 60HZ, 42 SPACE WITH 225 AMP MAIN CIRCUIT BREAKER CKT NO. DESCRIPTION VA WIRE L1 L2 L3 L1 L2 L3 EQUIPMENT OUTLET #1 180 #12 20A 1 1 2 1 20A #12 180 EQUIPMENT OUTLET #3 EQUIPMENT OUTLET #5 180 #12 20A 1 3 4 1 20A #12 180 EQUIPMENT OUTLET #7 EQUIPMENT OUTLET #9 180 #12 20A 1 5 6 1 20A #12 180 EQUIPMENT OUTLET #11 EQUIPMENT OUTLET #13 180 #12 20A 1 7 8 1 20A #12 180 EQUIPMENT OUTLET #15 EQUIPMENT OUTLET #17 180 #12 20A 1 9 10 1 20A #12 180 EQUIPMENT OUTLET #19 EQUIPMENT OUTLET #21 180 #12 20A 1 11 12 1 20A #12 180 EQUIPMENT OUTLET #23 EQUIPMENT OUTLET #25 180 #12 20A 1 13 14 1 20A #12 180 EQUIPMENT OUTLET #27 EQUIPMENT OUTLET #29 180 #12 20A 1 15 16 1 20A #12 180 EQUIPMENT OUTLET #31 EQUIPMENT OUTLET #33 180 #12 20A 1 17 18 1 20A #12 180 EQUIPMENT OUTLET #35 EQUIPMENT OUTLET #37 180 #12 20A 1 19 20 1 20A #12 180 EQUIPMENT OUTLET #39 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 SUM (THIS SIDE), L1 720 720 + 720 = 1,440 720 SUM (THIS SIDE), L1 SUM (THIS SIDE), L2 540 540 + 540 = 1,080 540 SUM (THIS SIDE), L2 SUM (THIS SIDE), L3 540 540 + 540 = 1,080 540 SUM (THIS SIDE), L3 WIRE VA CKT NO. POLE 3,600 TOTAL L1: TOTAL L2: TOTAL L3: TOTAL PANEL: PANEL SCHEDULE - PANEL PP4 DESCRIPTION BRK AMP BRK AMPS POLE TYPE: 120/208V 3 PHASE WYE, 60HZ, 42 SPACE WITH 225 AMP MAIN CIRCUIT BREAKER CKT NO. DESCRIPTION VA WIRE L1 L2 L3 L1 L2 L3 19,445 1 2 13747 18,313 3 4 12235 18,713 5 6 13,135 50 78 10 50 9 10 10 50 11 12 10 13 14 15 16 17 18 19 20 21 22 23 24 SUM (THIS SIDE), L1 19,495 19,495 + 13,757 = 33,252 13,757 SUM (THIS SIDE), L1 SUM (THIS SIDE), L2 18,363 18,363 + 12,245 = 30,608 12,245 SUM (THIS SIDE), L2 SUM (THIS SIDE), L3 18,763 18,763 + 13,145 = 31,908 13,145 SUM (THIS SIDE), L3 ATS #2 PHASE MONITOR 3 400A (2)250 315A#14 PANEL SCHEDULE - MDP DESCRIPTION BRK AMP BRK AMPS POLE TYPE: 120/208V 3 PHASE WYE, 60HZ, 24 SPACE WITH 800 AMP MAIN CIRCUIT BREAKER CKT NO. DESCRIPTION VA WIRE VA CKT NO. POLE (2) 250 3 95,768 TOTAL L1: TOTAL L2: TOTAL L3: TOTAL PANEL: WIRE 400A TVSS #6 60A 3 ATS #1