DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
902 4460894 2 16,860.60 RANGE LINE ROAD —SOUTH
APPLICATION AND CERTIFICATE FOR PAYMENT AIA DOCUMENT G702 (Instructions on reverse side)
PAGE ONE OF 2 PAGES
TO OWNER: CITY OF CARMEL REDEV. COMM. PROJECT: Parcel 94 Streetscape APPLICATION NO.: 2 Distribution to:
33 WEST MAIN STREET, SUITE 220 PERIOD TO: 11/20/2009 OWNER
CARMEL, IN 46032 PROJECT NOS.: ARCHITECT
ATTN: LES OLDS, AIA, DIR. OF REDEVELOPMENT CONTRACTOR
FROM CONTRACTOR: HARCO ASPHALT PAVING INC. VIA ARCHITECT: CONTRACT DATE:
1650 HARCO Way
Indianapolis, IN 46217
CONTRACT FOR: ASPHALT PAVING
CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the contractor's knowledge, infor-
Application is made for payment, as shown below, in connection with the Contract. mation and belief the Work covered by this Application for Payment has been completed
Continuation Sheet, AIA Document G703, is attached. in accordance with the Contract Documents, that all amounts have been paid by the
Contractor for Work for which previous Certificates for Payment were issued and pay-
ments received from the Owner, and that current payment shown herein is now due.
1. ORIGINAL CONTRACT SUM 97,600.00
CONTRACTO HARCO ASPH ''T PAVIN
2. Net change by Change Orders i
(Line 2) By 3. CONTRACT SUM TO DATE Line 1 2 97,600.00 B vue Date: 11/20/2009
Paul G. Harding, President
4. TOTAL COMPLETED STORED TO DATE $95,095.00
(Column G on G703) State of: INDIANA
County of: MARION
5. RETAINAGE: Subscribed and sworn to before �7
a. 6% of Completed Work 6,019.51 me this Cc?0 day of e Z�
(Columns D E on G703) Z b. of Stored Material
(Column F on G703) Notary Public:
Total Retainage (Line 5a 5b or My Commision expires: 940 /00 7
Total in Column I of G703) 6,019.51 ARCHITECTS CERTIFICATE FOR PAYMENT
6. TOTAL EARNED LESS RETAINAGE 89,075.49
(Line 4 less Line 5 Total) In accordance with the Contract Documents, based on on -site observations and the data
comprising this application, the Architect certifies to the Owner that to the best of the
7. LESS PREVIOUS CERTIFICATES FOR PAYMENT Archtiect's knowledge, information and belief the Work has progressed as indicated, the
(Line 6 from prior Certificate) $72,214.89 quality of the Work is in accordance with the Contract Documents, and the Contractor
is entitled to payment of the AMOUNT CERTIFIED.
8. CURRENT PAYMENT DUE I $16,860.60
9. BALANCE TO FINISH, INCLUDING RETAINAGE AMOUNT CERTIFIED it 16, 6100. 1.0
(Line 3 less Line 6) $8,524.51
(Attach explanation if amount certified differs from the amount applied for. Initial
all figures on this Application and on the Continuation Sheet that are changed to
CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS confrom to the a nt certified)
Total changes approved in
previous applications by Owner $0.00 $0.00 ARCHITECT �r
Total approved this Application By: Date: 20
TOTALS This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Con
NET CHANGES by Change Order tractor named herein. Issuance, payment and acceptance of payment are without
prejudice to any rights of the Owner or Contractor under this Contract.
AIA DOCUMENT G703 APPLICATION AND CERTIFICATE FOR PAYMENT 1992 EDITION AIA 1992 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK
AVENUE, N.W., WASHINGTON, D.C. 20006 G702 1992
CONTINUATION SHEET AIA DOCUMENT G703 (Instruction on reverse side) PAGE 2 OF 2 PAGES
AIA DOCUMENT G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER: 2
Contractor's signed Certification is attached. HARCO ASPHALT PAVING APPLICATION DATE: 11/20/2009
In tabulations below, amounts are stated to the nearest dollar. parcel 94 PERIOD TO: 11/20/2009
Use Column I on Contracts where variable retainage for line items may apply. ARCHITECTS PROJECT NO: 0
A B C D I E F G H 1
ITEM DESCRIPTION OF WORK SCHEDULED WORK COMPLETED MATERIALS TOTAL BALANCE RETAINAGE
NO. VALUE FROM PREVIOUS THIS PERIOD PRESENTLY COMPLETED (G C) TO FINISH
APPLICATION STORED AND STORED (C G)
(D E) (NOT IN TO DATE
DORE) (D +E +F)
1 MOBILIZING AND DEMOBILIZING $1,000.00 $1,000.00 $0.00 $0.00 $1,000.00 100% $0.00 $63.30
2 EXCAVATION $4,620.00 $4,620.00 $0.00 $0.00 $4,620.00 100% $0.00 $292.45
3 CONCRETE $37,320.00 $37,320.00 $0.00 $0.00 $37,320.00 100% $0.00 $2,362.36
4 HAC $8,400.00 $8,400.00 $0.00 $0.00 $8,400.00 100% $0.00 $531.72
5 BRICK WALK PAVERS $6,960.00 $6,960.00 $0.00 $0.00 $6,960.00 100% $0.00 $440.57
6 ELECTRIC $13,000.00 $13,000.00 $0.00 $0.00 $13,000.00 100% $0.00 $822.90
7 SOD $300.00 $300.00 $0.00 $0.00 $300.00 100% $0.00 $18.99
8 TRAFFIC CONTROL $2,000.00 $2,000.00 $0.00 $0.00 $2,000.00 100% $0.00 $126.60
9 TESTING $1,000.00 $1,000.00 $0.00 $0.00 $1,000.00 100% $0.00 $63.30
10 Allowance $5,000.00 $2,495.00 $0.00 $0.00 $2,495.00 50% $2,505.00 $157.93
LIGHT FIXTURES $18,000.00 $0.00 $18,000.00 $0.00 $18,000.00 100% $0.00 $1,139.40
0 0 $0.00 $0.00 $0.00 $0.00 $0.00 0%
$0.00 $0.00
0 0 $0.00 $0.00 $0.00 $0.00 $0.00 0%
$0.00 $0.00
0 0 $0.00 $0.00 $0.00 $0.00 $0.00 0%
$0.00 $0.00
0 0 $0.00 $0.00 $0.00 $0.00 $0.00 0% $0.00 $0.00
0 0 $0.00 $0.00 $0.00 $0.00 $0.00 0%
$0.00 $0.00
0 0 $0.00 $0.00 $0.00 $0.00 $0.00 0%
$0.00 $0.00
0 0 $0.00 $0.00 $0.00 $0.00 $0.00 0% $0.00 $0.00
0 0 $0.00 $0.00 $0.00 $0.00 $0.00 0% $0.00 $0.00
0 0 $0.00 $0.00 $0.00 $0.00 $0.00 0% $0.00 $0.00
0 0 $0.00 $0.00 $0.00 $0.00 $0.00 0% $0.00 $0.00
0 0 $0.00 $0.00 $0.00 $0.00 $0.00 0% $0.00 $0.00
0 0 $0.00 $0.00 $0.00 $0.00 $0.00 0% $0.00 $0.00
0 0 00.00 $0.00 $0.00 $0.00 00.00 0% 00.00 $0.00
0 0 $0.00 $0.00 $0.00 $0.00 $0.00 0% $0.00 $0.00
$97,600.00 $77,095.00 $18,000.00 $0.00 $95,095.00 97% $2,505.00 $6,019.51
AIA DOCUMENT G703 APPLICATION AND CERTIFICATE FOR PAYMENT MAY 1983 EDITION AIA 0 1992 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK
AVENUE, N.W., WASHINGTON, D.C. 20006 -5292 G703_1992
AFFIDAVIT AND WAIVER OF LEIN
FINAL PARTIAL XX
WHEREAS, HARCO ASPHALT PAVING INC. 1650 Harco Way, Indianapolis, IN 46217
(Contractor) has been heretofore employed by CITY OF CARMEL to furnish certain material, supplies
PARCEL 94 STREETSCAPE. hereinafter collectively referred to as the "premises"; and WHEREAS, the
undersigned is duly authorized to execute this Waiver of Lien for and on behalf of the Contractor.
Now, therefore, the Contractor, for SIXTEEN THOUSAND EIGHT HUNDRED SIXTY DOLLARS
AND 60/100($16860.60) herby waives and releases the Owner of the Premises and the Company from any and
all liens., rights and in consideration of the receipt of lien or claims of whatsoever kind or character on or
against the Premises or the improvements located thereon on account of any and all labor, supplies, equipment
or material furnished for, in connection with or incorporated in the Premises by the Contractor on or before the
date hereof; represents and warrants that no other person or has any right to a lien or claim on account of any
labor worked performed or material, supplies or equipment furnished by, to or through the Contractor, on or
before the date hereof, and agrees to indemnify, defend and hold the Owner and The Company harmless from
and against any and all claims or lien for any labor, material or services furnished or in connection with or
incorporated on the Premises by through or to the Contractor prior to the date hereof. This Waiver of Lien is
given in order to induce the Company to pay the amount indicated above, and upon receipt of such amount by
the Contractor, this release may be recorded, becomes valid, enforceable and of full effect.
Harco Aspha Paving Inc.
By
,7, Paul G. Harding, President
STATE OF Indiana) ss.
COUNTY OF Marion)
Before me, a Notary Public in and for said County and State, personally appeared Paul G. Harding, who
acknowledged the execution of the foregoing Waiver of Lien, and who, having been sworn, stated that the
representation therein contained are true.
Witness my hand and Notarial Seal this 20 of Novemb- 009. ,_,Y2/1.
Notary Public
Cynthia L. Sartain
County of Residence: Hamilton
Commission Expires 9/20/2017
Prescribed by State Board of Accounts City Form No. 201 (Rev. 1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
J� I Payee
f ae ra �y Purchase Order No.
CO y r �v ll/� Terms
//7l/r67.4.2 li yG 2/7 Date Due
Invoice Invoice Description Amount
Date Number y (or note attached invoice(s) or bill(s))
///2G/0/ 2 /�j lJ/ 56,
Total ,F60 -6 a
I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance
with IC 5- 11- 10 -1.6.
20
Clerk- Treasurer
VOUCHER NO. WARRANT NO.
ALLOWED 20
JJ IN SUM OF$
/42 4 G 2/ 7
/6, R6' G, co
ON ACCOUNT --"1• FOR
1
Board Members
PO# or INVOICE NO. ACCT #/TITLE AMOUNT hereby certify invoice( s),
DEPT. I hereb certif that the attached invoices or
9 o2 2 '?2 /6 SW6 bill(s) is (are) true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
�Z 2 2002
(7 L Sign ire 2
Director of Opera ons
Cost distribution ledger classification if Tit e
claim paid motor vehicle highway fund