KD2842z9 Highway Relocation Cost Estimate Page 1 of 13
KM2842 c &t 10/12/2009
Project Number
AT &T INDIANA
Customer Request Number 124252 Date 10/12/2009
Customer ID 112206 Project Number 7254906
CR Description:
Billing Information
Billing Party's Name CITY OF CARMEL
Phone (317) 571 -2438
Billing Address ONE CIVIC SQUARE
CITY OF CARMEL
CARMEL, IN 46032
Contact Name AMBER TOLLE /MIKE MCBRIDE
Phone (317) 571 -2438
Work Description RELOCATE CROSSBOX AT INTERSECTION OF 116TH STREET AND KEYSTONE AVENUE, CARMEL, IN
Engineering Remarks SUBMIT PAYMENT TO: AT &T, 220 WISCONSIN AVENUE, WAUKESHA, WI 53186.
NOTE: ADDTIONAL TASKS FOR THE TEMPORARY RELOCATION.
Expenses Quantity Amount
Total Plant Labor: 218 17,928.51
Total Engineering Labor: 5,405.94
Material Cost 11,854.84
'Contractor Cost 60,128.40
Right Of Way Cost: 0.00
Sub -Total Estimated Costs 95,317.69
Less Plant Betterment Credits 0.00
Less OSP Depreciation Credits 0.00
Total Estimated Costs
95,317.69
OSPE Representative: KIMBERLY MARSHALL
Title: AT &T MANAGER
Phone 262- 970 -8424
Note: Hours are rounded to the nearest whole hour value.
imniums
ocfo 0 i0 ODo
CITY" OF ARIVIEL
_JAMES BRAINARD, 1VIAYOR
May 21, 2009
Kimberly Marshall
AT&T Custom Work Order Center
220 Wisconsin Avenue, Floor #2
Waukesha, WI 53186
RE: 116 Street and Keystone Parkway CWO Approval, CR# 124252
The City of Carmel is in receipt of the detailed "Cost Estimate Invoice" for the reimbursable AT &T facility
relocations necessary to accommodate the City's reconstruction of the 116 Street Keystone Parkway
intersection. I have reviewed the "Cost Estimate Invoice" that was sent to the Department of Engineering
on May 18, 2009 in the amount of $90,110.98, and find it to be consistent with the scope of work that it
defines. Therefore, with this letter the City wishes to convey its approval of, and accept responsibility for
reimbursement of the costs described in the afore mentioned estimate.
At this time the City requests that AT &T release this project (CR# 124252) for construction in order to
facilitate a timely relocation and allow the City's interchange project to proceed as scheduled. The City
also understands that there will be some additional fees associated with temporary AT &T relocations
(estimated at approximately $5,000.00) at the southeast corner of the intersection near the existing
apartment building. These temporary relocations are necessary in order to allow the City's road
construction contractor to continue with retaining wall construction. The retaining wall construction is
currently on hold due to conflicts with existing AT &T facilities.
It is also the understanding of the City that AT &T is in the processing of preparing a Utility
Reimbursement Agreement to submit to the City for approval in order to formalize the details of this
reimbursement. I look forward to the receipt of this document and the expeditious completion of these
necessary relocations.
Sincerely,
Michael T. McBride, P.E.
Director of Engineering
cc: File
DEPAIITNWNT 01F ENc,INEERING
ONE Civic: SQUARE. CA1.M1eL, IN 46032 OFrlc:i: 317.57 1.24 41 FAX 317.571.2439
ENIA1L en[;ineerin,g ttarmrLin.gov
atsa
Custom Work Order Center
220 Wisconsin Avenue, Floor #2
Waukesha, WI 53186
PHONE (888) 901 -2779
FAX (888) 901 -2821
DATE: 10/12/09
TO: City Of Carmel PHONE: 317 571 2438
ATTN: Michael McBride FAX: 317 571 2439
FROM: Kimberly Marshall PHONE: 888 521 3740
RE: CR# 124252 LEGAL MANDATE
Project# 7254906
Job#
Requesting relocate fiber crossbox and temporary
relocation costs
Location 116` Street and Keystone Avenue
Carmel, IN
NOTE: Enclosed is the "Cost Estimate Invoice."
AT &T must receive a signed contract or a letter of approval to start
construction.
Please assign the CR# 124252 on your correspondence.
When Project is complete a final invoice will be prepared.
Please mail payment to the above address.
If you have any questions, please feel free to contact me.
Thank You,
CWO Manager
Customer Contract Specialist
CM2842 Highway Relocation Cost Estimate Page 2 /2 13
KM2842 10/12/2009
Project Number
AT &T INDIANA
Detail Material Report
Customer Request Number: 124252 Date 10/12/2009
CR Name RELOCATE CROSSBOX Project Number: 7254906
Customer Name CITY OF CARMEL
Material Placed
Reference Number Material Quantity Cost Per Unit Unit Total
0001994693 1- PC -4 -C 42 0.83 FT 34.69
0001994696 1- PC -4 -C 14 0.83 FT 11.56
0001994698 1- PC -4 -C 16 0.83 FT 13.21
0001994868 1- PC -4 -C 20 0.83 FT 16.52
0001994873 1- PC -4 -C 6 0.83 FT 4.96
0001994876 1- PC -4 -C 75 0.83 FT 61.94
0001994887 1- PC -4 -C 534 0.83 FT 441.03
0001994890 1- PC -4 -C 30 0.83 FT 24.78
0002032236 5092MT -024 353 0.31 FT 109.54
0002032238 ANMW -600 271 6.29 ET 1,703.55
0002032331 ANMW -600 44 6.29 FT 276.59
0002032333 ANMW -900 124 9.59 FT 1,189.08
0002032347 ANMW -300 55 3.25 FT 178.92
0'002033516 ANMw -300 55 3.25 FT 178.92
0002034765 BXCNNL2700 1 2,765.02 FT 2,765.02
0002039455 ANMW -900 145 9.59 FT 1,390.46
0002039469 BEGNNSM *14 1 139.62 FT 139.62
Sub -Total Material Cost 8,540.39
Exempt Material Overhead 3,314.45
Total Material Cost 11.854.84
CDSR0024 Page 3 of 13
KM2842 cat &t Highway Relocation Cost Estimate 10/12/2009
Project Number
AT &T INDIANA
Customer Request Number: 124252
CR Name RELOCATE CROSSBOX
Customer Name CITY OF CARMEL
Depreciation (Material Removed)
'Reference Number Material Quantity Cost Per Unit Unit Total
0001994900 11- PC -4 -C 100 8.20 FT 820.15
0001994901 11- 12C -4 -C 245 8.20 FT 2,009.37
0001994902 2- PC -4 -C 40 8.20 FT 328.06
0001994903 11- PC -4 -C 14 8.20 FT 114.82
0001994904 2- PC -4 -C 244 8.20 FT 2,001.17
0001994905 2- PC -4 -C 90 8.20 FT 738.14
0001994906 2- PC -4 -C 87 8.20 FT 713.53
0001994907 1- PC -4 -C 15 8.20 FT 123.02
0001994908 1- PC -4 -C 20 8.20 FT 164.03
0001994909 2- PC -4 -C 30 8.20 FT 246.05
0001994911 1- PC -4 -C 12 8.20 FT 98.42
0002033688 ANMW -300 480 10.76 FT 5,165.86
Detail Contractor Report
Customer Request Number: 124252 Date 10/12/2009
CR Name RELOCATE CROSSBOX Project Number: 7254906
Customer Name CITY OF CARMEL
Contractor Cost
Reference Number FTI Description Quantity Total
0001994694 TRENCH PLACE ONE ITEM BY BACKHOE 21 106.68
13 TO 24 IN. WIDTH
0001994695 PLACE ADDITIONAL ITEM IN OPEN TRENCH 21 13.65
(NOT IN IBPLACE ADDITIO
0001994697 TRENCH PLACE ONE ITEM BY BACKHOE 14 51.52
UP TO 12 IN. WIDTH
0001994699 TRENCH PLACE ONE ITEM BY BACKHOE 16 58.88
UP TO 12 IN. WIDTH
0001994701 TRENCH PLACE ONE ITEM BY BACKHOE 14 71.12
13 TO 24 IN. WIDTH
0001994702 PLACE ADDITIONAL ITEM IN OPEN TRENCH 28 18.20
(NOT IN IBPLACE ADDITIO
0001994869 TRENCH PLACE ONE ITEM BY BACKHOE 5 25.40
13 TO 24 IN. WIDTH
0001994870 BACKHOE WIDTH ADDITIONAL 12 IN. 5 8.40
KM284224 Highway Relocation Cost Estimate Page 4 of 13
KM2892 10/12/2009
Project Number
AT &T INDIANA
Customer Request Number: 124252
CR Name RELOCATE CROSSBOX
Customer Name CITY OF CARMEL
WIDTH INCREMENT OVER 24 IN
0001994871 BACKHOE DEPTH ADDITIONAL 12 IN. X 15 36.75
12 IN. DEPTH INCREMENT B
0001994872 PLACE ADDITIONAL ITEM IN OPEN TRENCH 15 9.75
(NOT IN IBPLACE ADDITIO
0001994874 TRENCH PLACE ONE ITEM BY BACKHOE 6 22.08
UP TO 12 IN. WIDTH
0001994875 BACKHOE DEPTH ADDITIONAL 12 IN. X 6 14.70
12 IN. DEPTH INCREMENT B
0001994877 BORE PLACE HDPE TWO 4 IN. PIPE 25 450.00
1 -100 FT DIRT
0001994878 PLACE HDPE ADDITIONAL 4 IN. IN BORE 25 225.00
1 -100 FT DIRT
0001994879 TRENCH PLACE ONE ITEM BY BACKHOE 42 154.56
UP TO 12 IN. WIDTH
0001994880 PLACE PEDESTAL /APP CASE DIRT 12 1 75.00
IN. AND OVER IN CONJUN
0001994881 POUR -IN -PLACE CABINET PAD DIRT W 84 2,940.00
OR W/0 TEMPLATE (SAT /F
0001994882 PLACE VRAD CABINET, PAD, POWER PED 1 5,139.00
GROUND GRID DIRT
0001994883 PLACE POWER METER PEDESTAL (FREE 1 180.00
STANDING) IN CONJUNCTION
0001994884 PLACE GROUND FIELD (3 GROUND RODS 1 280.00
W /WIRE AND BONDING) DI
0001994888 BORE PLACE HDPE TWO 4 IN. PIPE 178 3,168.40
OVER 100 FT DIRT
0001994889 PLACE HDPE ADDITIONAL 4 IN. IN BORE 178 1,566.40
OVER 100 FT DIRT
0001999891 TRENCH PLACE ONE ITEM BY BACKHOE 10 50.80
13 TO 24 IN. WIDTH
0001994892 BACKHOE WIDTH ADDITIONAL 12 IN. 20 33.60
WIDTH INCREMENT OVER 24 IN
0001994893 BACKHOE DEPTH ADDITIONAL 12 IN. X 80 196.00
12 IN. DEPTH INCREMENT B
0001994894 PLACE ADDITIONAL ITEM IN OPEN TRENCH 20 13.00
(NOT IN IBPLACE ADDITIO
0001994895 PREMIUM GRANULAR PER YARD 7 189.00
24 Highway Relocation Cost Estimate Page 5 of 13
KM2842
KM2892 10/12/2009
Project Number
AT &T INDIANA
Customer Request Number: 124252
CR Name RELOCATE CROSSBOX
Customer Name CITY OF CARMEL
0001994896 CORE DRILLING TO ACCEPT UP TO 4 IN. 1 300.00
PIPE INITIAL IN CONJ
0001994897 CORE DRILLING TO ACCEPT UP TO 4 IN. 2 260.00
PIPE ADDITIONAL IN C
0001994898 PLUG DUCTS UP TO 6 EACH IN 1 50.00
CONJUNCTION WITH OTHER WORK
0001994912 REMOVE PG /FIBER CABINET (INCLUDES 1 525.00
PAD) IN CONJUNCTION WITH
0001994913 EXTRA COSTS 250 250.00
0001995000 EXTRA COSTS 32216 32,216.00
0002032234 PLACE TWO (2) ITEMS NO RODDING 240 300.00
REQUIRED 1 -1000 FT PER DU
0002032235 PLACE ONE (1) ITEM NO RODDING 353 345.94
REQUIRED 1 -1000 FT PER DUC
0002032237 PLACE ONE (1) ITEM NO RODDING 271 265.58
REQUIRED 1 -1000 FT PER DUC
0002032330 PLACE ONE (1) ITEM NO RODDING 44 43.12
REQUIRED 1 -1000 FT PER DUC
0002032332 PLACE ONE (1) ITEM NO RODDING 124 121.52
REQUIRED 1 -1000 FT PER DUC
0002032346 PLACE ONE (1) ITEM NO RODDING 55 53.90
REQUIRED 1 -1000 FT PER DUC
0002033467 REMOVE FIBER CABLE PLACE PULL 495 396.00
ROPE /TAPE 1 -1000 FT
0002033469 REMOVE COPPER CABLE 2 IN. O.D. 430 709.50
PLACE PULL ROPE /TAPE 1 -1
0002033500 HAND DIG PIT EXISTING CABLE UP TO 1 640.00
36 CUBIC FEET (4 FT.W X
0002033501 PLACE PEDESTAL /APP CASE DIRT UP 1 31.00
TO 10 IN. IN CONJUNCTI
0002033513 PLACE PEDESTAL /APP CASE DIRT 12 1 75.00
IN. AND OVER IN CONJUN
0002033514 HAND DIG PIT EXISTING CABLE UP TO 1 640.00
36 CUBIC FEET (4 FT.W X
0002033515 BORE PLACE ONE CABLE OR INNERDUCT 240 1,308.00
0 IBORE PLACE ONE CAB
0002033517 PLACE ONE (1) ITEM NO RODDING 55 53.90
REQUIRED 1 -1000 FT PER DUC
CDSR0029 Page 6 of 13
KM2842 cat &t Highway Relocation Cost Estimate
10/12/2009
Project Number
AT &T INDIANA
Customer Request Number: 124252
CR Name RELOCATE CROSSBOX
Customer Name CITY OF CARMEL
0002033518 PLACE SAI, APP CASE OR NEUTRALIZER 1 275.00
CABINET (EXCLUDES PAD)
0002033684 REMOVE COPPER CABLE 2 IN. O.D. 42 69.30
PLACE PULL ROPE /TAPE 1 -1
0002033685 REMOVE PEDESTAL /APP CASE 12 IN. AND 1 120.00
OVER IN CONJUNCTION
0002033686 REMOVE COPPER CABLE 2 IN. 0.D. 170 280.50
PLACE PULL ROPE /TAPE 1 -1
0002033687 REMOVE PEDESTAL /APP CASE 12 IN. AND 1 120.00
OVER IN CONJUNCTION
0002033692 HAND DIG PIT EXISTING CABLE UP TO 1 640.00
36 CUBIC FEET (4 FT.W X
0002033693 PLACE PEDESTAL /APP CASE DIRT UP 1 31.00
TO 10 IN. IN CONJUNCTI
0002033694 PLACE DROP OR WIRE 18 INCH DEPTH 110 88.00
FIRST 100 FT IN DIRT IN
0002033695 ADDER PLACE DROP OR WIRE 18 INCH 110 82.50
DEPTH FOOTAGE AFTER
0002033696 ADDITONAL DROP OR WIRE IN SAME TRENCH 110 66.00
0002033697 TRENCH PLACE ONE ITEM BY BACKHOE 250 895.00
UP TO 12 IN. WIDTH
0002033698 PLACE ADDITIONAL ITEM IN OPEN TRENCH 125 81.25
(NOT IN IBPLACE ADDITIO
0002033699 REMOVE PEDESTAL /APP CASE 12 IN. AND 1 120.00
OVER IN CONJUNCTION
0002034551 PLACE ONE (1) ITEM NO RODDING 55 53.90
REQUIRED 1 -1000 FT PER DUC
0002034588 BORE PLACE ONE CABLE OR INNERDUCT 195 1,062.75
0 IBORE PLACE ONE CAB
0002034592 REMOVE SAT, APP CASE OR NEUTRALIZER 1 1,600.00
CABINET (INCLUDES PAD)
0002034640 REMOVE COPPER CABLE 2 IN. 0.D. 24 39.60
PLACE PULL ROPE /TAPE 1 -1
0002034641 REMOVE COPPER CABLE 2 IN. O.D. 65 107.25
PLACE PULL ROPE /TAPE 1 -1
0002034642 PLACE DROP OR WIRE 18 INCH DEPTH 100 80.00
FIRST 100 FT IN DIRT IN
0002034649 ADDER PLACE DROP OR WIRE 18 INCH 10 7.50
24 Highway Relocation Cost Estimate Page 7 of 13
KM2842
KM2842 CLRI 10/12/2009
Project Number
AT &T INDIANA
Customer Request Number: 124252
CR Name RELOCATE CROSSBOX
Customer Name CITY OF CARMEL
DEPTH FOOTAGE AFTER
0002034703 PLACE PEDESTAL /APP CASE DIRT UP 1 31.00
TO 10 IN. IN CONJUNCTI
0002039454 TRENCH PLACE ONE ITEM BY BACKHOE 125 447.50
UP TO 12 IN. WIDTH
0002039468 REMOVE PEDESTAL /APP CASE 12 IN. AND 1 120.00
OVER IN CONJUNCTION
0002039472 REMOVE PEDESTAL /APP CASE UP TO 10 1 28.00
IN. IN CONJUNCTION WIT
Total Contractor Cost 60,128.40
Detail Labor Report
Customer Request Number: 124252 Date 10/12/2009
CR Name RELOCATE CROSSBOX Project Number: 7254906
Customer Name CITY OF CARMEL
Engineering Labor Qty Rate Amount
CDSR0024 Page 8 of 13
KM2842 .dtA Highway Relocation Cost Estimate
g 10/12/2009
Project Number
AT &T INDIANA
Customer Request Number: 124252
CR Name RELOCATE CROSSBOX
Customer Name CITY OF CARMEL
Engineering Labor Qty Rate Amount
Placement
Direct Cost
Salary Wages
Dir Eng Labor 23 S 20.85 .4 7.naa QS
Dir Eng Other 23 S 1.96 s as 12
Benefits
Benefits (Clearances) 23 S 0_23 S 6.2(1
Payroll Taxes (Clearances) 23 S 0.98 s 1 Rn
Operating Expenses
Eng G &S Labor (Capital) 23 S 11.32 S ?SF
Eng G &S Other (Capital) 23 S 0.71 S 1S QR
Asi Staff Loading
Asi G &S Eng (Capital) 23 S 18.99 S 477 45
Direct Cost Totals 23 $121.26 2,796.98
Indirect Cost
Corporate Loadings
Executive (Capital) 23 5 3.71 4 15 2R
Planning (Capital) 23 S 0_52 S 1'Z 2R
Accounting Finance (Capital) 23 S 3.52 S An Al
External Relations (Capital) 23 S 11_nn s n nn
Human Resources (Capital) 23 3 4.68 S 14S 24
Information Management (Capital) 23 S 73.66 R Fa 11
Legal (Capital) 23 S 2.74 S F1 F
Procurement (Capital) 23 S 1.52 S '2a 2 1
Research Development (Capital) 23 5 (1.30 s n nn
Other General. Administrative (Capital) 23 S 8.35 s 19Q 71
Indirect Cost Totals 23 51.34 1,155.61
Placement Totals 23 $175.60 3,952.59
CDSRoo24 Highway Relocation Cost Estimate Page 9 of 13
KM2842 t CC 10/12/2009
Project Number
AT &T INDIANA
Customer Request Number: 124252
CR Name RELOCATE CROSSBOX
Customer Name CITY OF CARMEL
Engineering Labor Qty Rate Amount
Rearrangement and Maintenance
Direct Cost
Salary wages
Dir Eng Labor 0 S 90 -85 fi 7 74
Dir Eng Other 0 S 1 96 fi n 71
Benefits
Benefits (Clearances) 0 S 0.25 4 n.n
Payroll Taxes (Clearances) 0 8 0.07 4 0 n1
Direct Cost Totals 0 93.13 9.98
Indirect Cost
Corporate Loadings
Executive (Expense) 0 S 0-63 .4 n 07
Planning (Expense) 0 5 0 -54 4 n 0
Accounting Finance (Expense) 0 8 3.].9 5 0 44
External Relations (Expense) 0 8 0.00 S n nn
Human Resources (Expense) 0 8 4.16 5 n aH
Information Management (Expense) 0 S 25.46 fi 2 77
Legal (Expense) 0 8 2.43 fi n 7
Procurement (Expense) 0 8 1.35 fi n 14
Research Development (Expense) 0 5 0.00 s n nn
Other General Administrative (Expense) 0 8 7.87 s n R4
Indirect Cost Totals 0 45.63 4.89
Rearrangement and Mainte Totals 0 $138.76 14.87
KM284229 Highway Relocation Cost Estimate Page 10 of 13
KM2892 10/12/2009
Project Number
AT &T INDIANA
Customer Request Number: 124252
CR Name RELOCATE CROSSBOX
Customer Name CITY OF CARMEL
Engineering Labor Qty Rate Amount
Removal
Direct Cost
Salary Wages
Dir Eng Labor 8 S 90.85 S 744 77
Dir Eng Other 8 S 1.96 s 1 n ti
Benefits
Benefits (Clearances) 8 S n.28 S 7 70
Payroll Taxes (Clearances) 8 8 0.08 S n tiF
Operating Expenses
Eng G &S Labor (Capital) 8 8 11.19 S 02 '10
Eng G &S Other (Capital) 8 S 0.71 S 5 07
Asi Staff Loading
Asi G &S Eng (Capital) 8 8 18.00 S 175 56
Direct Cost Totals 8 $124.26 1,017.91
Indirect Cost
Corporate Loadings
Executive (Capital) 8 8 n.71 s 5 09
Planning (Capital) 8 8 0.50 0 a 02
Accounting Finance (Capital) 8 S 3.50 .4 70 41
External Relations (Capital) 8 S 0.00 s n nn
Human Resources (Capital) 8 S 4.80 s `10 05
Information Management (Capital) 8 S 28.66 s 724 70
Legal (Capital) 8 S 2.74 s 9? 45
Procurement (Capital) 8 S 1.52 s 17 SR
Research Development (Capital) 8 S n.nn 0 n nn
Other General Administrative (Capital) 8 8 8.8.5 S 7, 5n
Indirect Cost Totals 8 51.34 420.57
Removal Totals 8 $175.60 1,438.48
CDSR0024 Highway Relocation Cost Estimate Page 11 of 13
KM2842 10/12/2009
Project Number
AT &T INDIANA
Customer Request Number: 124252 Date 10/12/2009
CR Name RELOCATE CROSSBOX Project Number: 7254906
Customer Name CITY OF CARMEL
Plant Labor Qty Rate Amount
Placement
Direct Cost
Salary Wages
Dir Plnt Lab 173 S 36.79 S 6.262 77
Dir Plnt Othe 173 S 1.17 .4 7n7 29
Benefits
Benefits (Clearances) 173 10.54 4 1.922.1
Payroll Taxes (Clearances) 173 8 3.1.6 S 54(1 F
Operating Expenses
Plant G &S Lab (Capital) 173 S 2.24 S 2(1 a(1
Plant G &S Oth (Capital) 173 S 2.32 R ant -n
Asa. Staff Loading
Asi G &S Pint (Capital) 173 S 0.90 S 169 29
Direct Cost Totals 173 57.02 9,863.06
Indirect Cost
Indirect Expense
Nantf G &S Lab (Capital) 173 S 0.00 S n nn
Nantf G &S Oth (Capital) 173 8 0.00 S n nn
Reg Travel Time G &S Labor (Capital) 173 S 0.00 S n nn
Reg Travel Time G &S Other (Capital) 173 S 0.00 S n nn
Asi Nantf G &S Other (Capital) 173 S 0.00 4 n nn
Asi Reg Travl G &S Other (Capital) 173 S 0.00 fi n nn
Corporate Loadings
Executive (Capital) 173 S 0.27 fi• 46 7n
Planning (Capital) 173 S 0.23 .4 29 7R
Accounting Finance (Capital) 173 S 1.37 s 22(1 9R
External Relations (Capital) 173 S 0.00 s n nn
Human Resources (Capital) 173 8 1.79 S 209 tin
Information Management (Capital) 173 S 10.93 S 1_94n 47
Legal (Capital) 173 S 1.04 S 179 R9
Procurement (Capital) 173 S 0.58 4 Inn 42
Research Development (Capital) 173 S 0.00 S n nn
Other General Administrative (Capital) 173 S 3.38 S 5f14 FF
Overhead Investment Related Cost
Other Work Equip 173 S 2.40 S 415 14
Plant My 173 S 2.92 S 5n5 09
Pool My 173 S 0.24 s 41 51
Indirect Cost Totals 173 25.15 4,350.33
Placement Totals 173 82.17 14,213.39
CDSP.0024 Page 12 of 13
KM2a42 Highway Relocation Cost Estimate
10/12/2009
e Project Number
AT &T INDIANA
Customer Request Number: 124252
CR Name RELOCATE CROSSBOX
Customer Name CITY OF CARMEL
Plant Labor Qty Rate Amount
Rearrangement and Maintenance
Direct Cost
Salary Wages
Dir Pint Lab 3 S 36.79 8 q1 02
Dir Plnt Othe 3 0 1 -17 0 9 an
Benefits
Benefits (Clearances) 3 S 9.93 S 2a R?
Payroll Taxes (Clearances) 3 S 2.98 s 7 a
Direct Cost Totals 3 50.87 127.18
Indirect Cost
Corporate Loadings
Executive (Expense) 3 0 n -26 0 n 00
Planning (Expense) 3 0 0.21 s n 52
Accounting Finance (Expense) 3 0 1.20 0 2 72
External Relations (Expense) 3 8 0.00 s n nn
Human Resources (Expense) 3 S 1.69 8 a 2"2
Information Management (Expense) 3 S 10.31 8 20 "72
Legal (Expense) 3 S 0.98 S 9 1
Procurement (Expense) 3 S 0.55 S 1 22
Research Development (Expense) 3 0 0.90 8 n nn
Other General Administrative (Expense) 3 S 3.1.9 8 7 72
Overhead Investment Related Cost
Other Work Equip 3 S 2.49 8 ti nn
Plant NIv 3 S 2.92 S 7 2n
Pool My 3 8 0.24 G n Fn
Indirect Cost Totals 3 24.01 60.10
Rearrangement and Mainte Totals 3 74.91 187.28
w Highway Relocation Cost Estimate Page 13 of 13
KM2842
KM2842w 10/12/2009
Project Number
AT &T INDIANA
Customer Request Number: 124252
CR Name RELOCATE CROSSBOX
Customer Name CITY OF CARMEL
Plant Labor Qty Rate Amount
Removal
Direct Cost
Salary Wages
Dir Pint Lab 43 S 36.79 S 1 .57Q 57
Dir Pint Othe 43 S 1.17 fi 5n 77
Benefits
Benefits (Clearances) 43 S 101.54 4 452 57
Payroll Taxes (Clearances) 93 S 3.16 4 175 fi
Operating Expenses
Plant G &S Lab (Capital) 43 S 2.24 S 06 17
Plant G &S Oth (Capital) 43 S 2.32 S 70 6 1
Asi Staff Loading
Asi G &S Pint (Capital) 43 S O.RO 6 74 75
Direct Cost Totals 43 57.02 2,448.06
Indirect Cost
Indirect Expense
Nantf G &S Lab (Capital) 43 S 0.00 S n nn
Nantf G &S Oth (Capital) 43 S 0.00 S n nn
Reg Travel Time G &S Labor (Capital) 43 S 0.00 S n no
Reg Travel Time G &S Other (Capital) 43 S 0.00 S n nn
Asi Nantf G &S Other (Capital) 43 S 01.00 S n nn
Asi Reg Travl G&S Other (Capital) 43 S 0.00 s n nn
Corporate Loadings
Executive (Capital) 93 S 0.27 R 11 52
Planning (Capital) 43 S 0.23 S 2 67
Accounting Finance (Capital) 43 S 1.37 S 5A 62
External Relations (Capital) 43 S 0.00 R n nn
Human Resources (Capital) 43 S 1.74 S 76 65
Information Management (Capital) 93 S 10.93 S 4fia 7 6
Legal (Capital) 43 S 1.04 S 44 fi5
Procurement (Capital) 43 S 0_5R 0 74 an
Research Development (Capital) 43 S 0.00 4 n nn
Other General Administrative (Capital) 43 S 3.38 S 145 11
Overhead Investment Related Cost
Other Work Equip 43 S 2.40 S 177 74
Plant My 43 S 2.92 4 125 77
Pool My 43 S 0.24 S 1n 7n
Indirect Cost Totals 43 25.15 1,079.78
Removal Totals 43 82.17 3,527.84
Prescribed by State Board of Accounts City Form No 201 (Rev. 1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
AT &T Purchase Order No. NA
220 Wisconsin Avenue, Floor #2 Terms
Waukesha WI 53186 Date Due
Invoice Invoice Description Amount
Date Number (or note attached invoice(s) or bill(s))
10/12/09 CR124252 Keystone Reconstruction Project $95,317.69
116th Street Crossbox Relocation
Project 07 -08
Total $95,317.69
I hereby certify that the attached invoice(s), or bills(s), is (are) true and correct and I have audited same in accordance
I with IC 5- 11- 10 -1.6.
20
Clerk- Treasurer
P
VOUCHER NO. WARRANT NO.
AT &T ALLOWED 20
220 Wisconsin Avenue, Floor #2 IN THE SUM OF
Waukesha WI 53186
95,317.69
ON ACCOUNT OF APPROPRIATION FOR
AT&T
tO)jiy_
PO# or INVOICE NO. ACCT /TITLE AMOUNT Board Members
DEPT.#
NA l j I 4,253) 4470305 $95,317.69
I hereby certify that the attched invoice(s), or
bill(s) is (are) true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
January 19, 20 10
Total $95,317.69 Signature
Cost distribution ledger classification if City Engineer
claim paid motor vehicle highway fund Title