HomeMy WebLinkAboutEngineering Dept Review letterFebruary 16, 2010 Mr. James O. Rinehart, IV, P.E. Stoppelwerth Associates, Inc. 7965 East 106"' Street Fishers, IN 46038 JAMES BRAINARD, MAYOR EL RE: The Livingstone Cottages Adult Family Living Community Project Review #1 Dear Mr. Rinehart: The City received your construction plans on January 15, 2010. The project is scheduled for review at the February 17, 2010 Technical Advisory Committee meeting. We offer the following comments: GENERAL INFORMATION I These comments represent the Department of Engineering's first review of the preliminary development plans for this project. 2. We request that all responses to our comments be provided in writing and be accompanied by a drawing reflecting the requested revisions. Failure to provide written responses may result in the delay of the review process. 3. It is critical that this office be made aware of all modifications made on the plans being re- submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. 4. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted to this office for review. If you have not already done so, please provide a set of drainage plans and calculations to their office for review. We will share Crossroad's comments as they are received. 5. Final drawings will not be approved for construction until: a. All Engineering Department and Utility Department and Hamilton County Surveyor issues have been resolved. b. All bonds and performance guarantees are posted. c. All Board of Public Works and Safety approvals and any other governing agency approvals (if required) are obtained. d. Al] off -site easements necessary to install utilities to serve the development are secured. e. SWPPP is approved. f. All fees are paid. 6. The Department reserves the right to provide additional comments based upon subsequent reviews. 7. An approved Storm Water Management Permit is required prior to commencing any earth disturbing activity. 8. An approved right -of -way permit is required prior to commencing any work in the public right -of -way. 9. If it will be necessary to relocate existing utilities, the costs for such relocation shall be borne solely by the developer. Any utility poles requiring relocation shall be relocated to within one -foot of the outside edge of the proposed right -of -way. 10. The Department requires that the construction drawings be developed in accordance with the City of Carmel digital submission standards and that all required submittals for primary plat, secondary plat, and construction drawings be made. The digital files must be submitted to DEPARTMENT OF ENGINEERING ONE Civic SQ ARE:, CARMEL, IN 46032 Orrlci: 317.571.2441 FAX 317.5712439 E11AIL cngiueering®clrmel.in,gor Mr. James O. Rinehart, IV, P.E. February 16, 2010 RE: The Livingstone Cottages Adult Family Living Community Project Review #1 Page 2 of 4 the Department of Engineering prior to the approval of the construction plans. Please contact the City GIS Department for the requirements. 11. Jurisdictions: a. The project site is located within current City of Cannel Corporate Limits. b. Perimeter Street and Right -of -Way Hamilton County (146 Street) c. Interior Street and Right -of -Way City of Cannel (Community Drive, Chen Creek boulevard) d. Water City of Carmel Utilities e. Sanitary Sewers City of Cannel Utilities f. Storm Sewers /Drainage City of Cannel. g. Legal Drains Hamilton County Surveyor's Office. 12. Drawings submitted for approval: a. The design engineer must certify all drawings submitted for final approval. b. This office will require 9 sets of drawings for approval after all issues have been resolved. The drawings will be stamped as approved and signed by the City Engineer and by Carne] Utilities. The Owner will receive 3 sets, one of which must be maintained on the construction site at all times. If this project is subject to review and approval by the Hamilton County Surveyor's Office, a total of 11 sets will be required for final approval. 13. Carmel Utilities will provide separate reviews of this project for water issues. Please assure that copies of all drawings are sent to: Panl Pace Paul Arnone Carmel Utilities Distribution Carmel Utilities Collection 3450 West 131 Street 901 North Range Line Road Westfield, IN 46074 Carmel, IN 46032 14. Carmel Utilities subscribes to "Holey Moley" who should be contacted directly for all water main locations. 15. The following items will be sent electronically upon request regarding this correspondence and project: a. Project Approval Checklist b. Performance /Maintenance Guarantees c. Utility Jurisdictions /Right of Way Permits d. Availability (acreage) Fees BOARD OF PUBLIC WORKS AND SAFETY 16. A schedule for Board of Public Works and Safety meeting dates and agenda deadlines will be sent electronically for your use upon request. Please use the Engineering Department deadlines for submissions to the Board. 17. Any submission to the Board requires prior approval by the Carmel Clay Plan Commission and /or the Board of Zoning Appeals (if applicable) and completion of review by the Technical Advisory Committee. All written requests to be placed on the Board's agenda must include the appropriate Docket Number and the date (or dates) of approval by the Plan Commission and /or the Board of Zoning Appeals (if applicable). 18. Water Availability and Sanitary Sewer approval from the Board will be required. This is an EDU approval based upon the proposed use of the site. Reference Items #33 to #35 below for additional details /explanations. Please note that if an entryway or other irrigation system is planned for this development, additional Water Availability Approval from the Board will be required and additional Water Connection Fees will be assessed based upon the size and usage of the system as determined by the Director of Carmel Utilities. 19. Curb Cut Approval. Please provide 81/4 x 11 exhibits with the request for approval. Provide all pertinent information including lane widths, overall width, radii, lane markings, location of opposing drives or streets, relationship to the location of previous curb cut, etc. Mr. James O. Rinehart, IV, P.E. February 16, 2010 RE: The Livingstone Cottages Adult Family Living Community Project Review #1 Page 3 of 4 20. Temporary Construction Entrance Approval. If a construction entrance is located at the site of a permanent curb cut, a separate approval from the Board for the construction entrance will not be required. 21. The installation of any permanent, privately owned and/or maintained improvement (signs, decorative street signs, walls, streetlights, etc.) within dedicated right of way or dedicated easements requires the execution of a Consent to Encroach Agreement between the Owner and the City of Carmel. Such agreements are executed by the Board of Public Works and Safety. The City Engineer may approve irrigation system agreements. 22. Secondary Plat approval if applicable. All performance guarantees must be posted prior to submission of secondary plats for Board of Public Works and Safety approval. 23. Dedication of Right -of -Way if not platted. This is based upon the City of Carmel 20 -Year Thoroughfare Plan requirements. Dedication documents are available upon request. Please be advised that all Right of Way Dedications must be accompanied by a Sales Disclosure Agreement completed by the owner for the property being dedicated to the City. The dedication document cannot be recorded without a completed Sales Disclosure. The form is available upon request, 24. Any open pavement cuts of either Community Drive or Street A, other than those required for the curb and median cuts, will require Board approval. BONDING REOUIREMENTS 25. Please contact Mr. Dave Barnes to review performance guarantee requirements. 26. The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100% of the cost of labor and materials to construct the individual improvements, to be provided by the design engineer. Please provide detailed Engineer's Estimates for each improvement including quantities, unit costs, pipe sizes, and materials, etc. 27. Upon completion and release of individual Performance Guarantees, a three -year Maintenance Guarantee will be required (see Street Sign comments above). The Maintenance Guarantee amount is based upon 15% of the Performance amount for Streets and Curbs and 10% of the Performance amount for all other improvements. 3$. Performance Guarantees may be Performance or Subdivision Bonds or Irrevocable Letters of Credit. 29. Please reference the available enclosures for more detailed explanation of our procedures. RIGHT OF WAY PERMIT AND BONDING 30, Any work in the dedicated right -of -way will require an approved Right -of -Way Permit and a License Permit Bond. 31. The bond amount is determined by our Right -of -Way Manager. However, if the work is included in the scope of work of a required and posted Performance Guarantee, the Performance Guarantee may be used to satisfy the bond requirements of the Right -of -Way Permit. 32. Please contact our Right -of -Way Manager, Fred Glaser, to arrange right of way permitting and bonding. AVAILABILITY AND CONNECTION FEES 33. We defer to Carmel Utilities regarding this issue. 34. If an entryway or overall site irrigation system is planned for this development, additional Water Connection Fees will be assessed based upon the size and usage of the system and upon the recommendations of the Director of Carmel Utilities. 35. These fees are required to be paid prior to final approval of construction plans by Engineering and prior to issuance of building permits by Building Codes Services. Please confirm these fees and calculations with Carmel Utilities. CONSTRUCTION DRAWING REVIEW COMMENTS Mr. James 0. Rinehart, IV, P.E. February 16, 2010 RE: The Livingstone Cottages Adult Family Living Community- Project Review #1 Page 4 of 4 36. General Comments a, This project is subject to the City's Storm Water Management and Storm Water Quality Ordinances. b. Please add the following note to the drawings: "IF IT WILL BE NECESSARY TO RELOCATE EXISTING UTILITIES, THE EXPENSE OF SUCH RELOCATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. ALL UTILITY POLES SHALL BE LOCATED WITHIN ONE -FOOT OF THE PROPOSED RIGHT -OF- WAY." 37. Please add note stating "NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT" to construction set. 38. Provide all current easements for entire tract to pertinent sheets with correct calls for each. 39. Please provide the requisite storm water /drainage information required by Section 100 of the Storin Water Technical Standards Manual on the plan sheets. 40. Please add note as required in Storm Water Technical Standards Manual Section 102 "Permit Requirement and Procedures Article 102.02 vii pertaining to construction and approval of storm sewer systems to all storm sewer plan and profile sheets. 41. All swales on site must have sub surface pipe installed. Pipe to conform to requirements of Storm Water Technical Standards Manual and shall be double wall, HI -Q pipe. 42. Will this development be platted? 43. On the title sheet, please show just the Livingstone Cottages Adult Family Living Community and the near adjacent surroundings so that it may be shown at a larger scale (there is no need to show the Towns and Flats, Legacy Residential, etc.). 44. Sheet C200 Site and parking plan. a. What is the offset distance between the west intersection of Street A and Street B and the next street to the west that approaches Street A from the north? If you have questions, please contact me at 571 -2441. Sincerely, Nicholas J. Redden, P.E. Plan Review Coordinator Department of Engineering cc: Angelina Conn, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Paul Amone, Carmel Utilities Greg Hayes, Hamilton County Surveyor's Office Greg Ilko, Crossroad Engineers, PC