HomeMy WebLinkAbout181862 02/03/2010 o ��4y CITY OF CARMEL, INDIANA VENDOR: 363879 Page 1 of 1
I I ONE CIVIC SQUARE CONSTRUCTION PROCESS SOLUTIONS
0 CHECK AMOUNT: $31,174.22
k;, CARMEL, INDIANA 46032 4327 RED BANK ROAD
`CINCINNATI OH 45227
o, CHECK NUMBER: 181862
CHECK DATE: 213/2010
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
902 4460807 3780 22,012.57 PERFORMING ARTS CENTE
902 4460807 3820 9,161.65 PERFORMING ARTS CENTE
Iliti riC.: ..F AOCESISSOLUTION4 1 TD,
4327'PED ,9A.mc ROAD CINCINN 45227 2
.�1�.'[.PJH. a Please notenew address
Invoice
submitted to: November 2, 2009
Carmel Redevelopment Commission
c/o Krieg DeVauit LLP! Robert Schein
12800 N. Meridian Streeet, Ste. 300
Carmel IN 46032
I
CPS #9064 -11 Invoice 3780
In Reference to: Claims assessment services on the Carmel Performing Arts Center Project Terms: Net 15
Professional Services
Amount
Executive Cons 4,592.25
Senior Cons 15,635.00
Tech! Clerical 1,413.00
For professional services rendered $21,640.25
Additional Charges:
Color Repro 294(.00
Ledger Color repro !0 4.00
Ledger Repro 6
Mileage 166.73
Reproduction 55.02
Teleconference Meeting Costs 37,57
Travek 25
Total Costs $4gg
3-7 t. 3 Z
TOTAL AMOUNT OF THIS BILL $22.1.86.84
$412, 412.5"
r--
513,271 acme (F) 513271-9036 FED ID #31-14551411
11/2/2009 Construction Process Solutions, LTD.
2:10 PM Billing Backup for Time
BILLABLE N/C
PERSONNEL DATE HOURS HOURS DESCRIPTION
Tech/ Clerical AS 10/09/09 0.00 0.25 Set up conf call for 2:OOpm for RR
Tech/ Clerical AS 10/12/09 3.50 0.00 Enter 91 in start date cell for 2009 2010 in R52V Early Dates Spreadsheet Copy Is through to
finish date for all per RR
Tech/ Clerical AS 10/21/09 0.00 0.25 Set up conference call for RR for 4:00pm today
Tech/ Clerical AS 10/28/09 1.00 3.50 Copy/Paste RR email "S -S Initial Observations /Consideration from Yesterdays Meeting on R531Y into
Memo to Rob Schein. Formatting and print for AE to edit. Made Exhibits A -H Continue to make AE
changes to Memo per AE Combine Exhibits, Attachments and Memo into 1 Single PDF and cmailed to
RR/Rob Schein per AE
Total: Amber R. Scott 4.50 4.00
$270.00
Executive Cons AE 09/23/09 0.00 0.02 AE return R. Schein call leave vm
Executive Cons AE 09/23/09 0.00 0.42 Conference call w/ R. Schein
Executive Cons AE 09/24/09 0.00 0.08 Email R. Schein re: directions for FPP site
Executive Cons AE 0928109 0.00 0.03 AE call for R. Schein
Executive Cons AE 09/28/09 0.00 0.17 R. Schein called review my email from Friday; Conference call perhaps this afternoon
Executive Cons AE 09//28109 0,00 0.08 Track down documents thinks were sent to us re: General Piping
Executive Cons AE 09/28/09 0.00 0,17 R. Schein called met w/ Commission
Executive Cons AE 10/09/09 0.00 0.08 Email R. Schein
Executive Cons AE 10/09/09 0.83 0.00 Conference call: R. Schein, RR, AE
Executive Cons AE 10/20/09 0.50 0.00 Review of Activity day info to prepare observations; Meet w/ RR
Executive Cons AE 10/21/09 0.25 0.00 Discuss at high level concepts of RRs charts (following up on discussion from last night)
Executive Cons AE 10/21/09 1.50 0.00 Review w/ RR the following in order to develop talking points for today's 4:00 conference call w/ R.
Schein: 1. Analytical foundation for activities day assessment, 2. ovemll assessment
Executive Cons AE 10/21/09 1.08 0.00 Conference call w/ R. Schein
Executive Cons AE 10/21/09 0.33 0.00 R. Schein called to discuss potential ASI re: Completion date; discuss terms; R. Schein and AE to
discuss tomorrow
Executive Cons AE 10/21/09 1.00 0.00 Review Circle B 9/17/09 letter
Executive Cons AE 10/21/09 1.17 0.00 Review ERMCO 9/29/09 claim letter
Executive Cons AE 10/22/09 0.83 0.00 R. Schein called review proposed ASI and discuss other issues
Executive Cons AE 10/22/09 0.00 0.17 R. Schein called; update of meeting today (SS committed to contract complete 11- 8 -10); set up
meeting
Executive Cons AE 10/23/09 0.50 0.00 Set up outline for agenda for Monday's meeting, meet w/ RR, research Indiana WC rates to come up w/
rate for MB spreadsheet; Meet w/ LK
Executive Cons A13 10/23/09 0.33 0.00 Review on -line materials for meeting
Executive Cons AE 10/23/09 0.42 0.00 Work w/ RR on various schedule issues to review for this coming Monday's meeting
Executive Cons AE 10/26/09 0.33 0.00 Prep for meeting (review some RR efforts)
Executive Cons AE 10/26/09 7.00 1.00 Meeting
Executive Cons AE 1028/09 0.42 0.00 Review RR observations; make hand revisions for AS to incorporate info on ongoing developed memo
Executive Cons AE 10/28/09 3.00 0.00 Memo to R. Schein; Review RR initial high end observations on current schedule
Executive Cons AE 10/30/09 0.92 0.00 Conference call w/ R. Schein
Total: Andrew T Englehart 20.41 2.22
54,592 25
Tech/ Clerical 13D 10/21/09 0.00 1.17 per AE/RR revise assessment examples
Total: Beth Duffey 0.00 1.17
50.00
Senior Cons EK 0928/09 0.00 1.00 Review of schedule and Shiel letter to contractors in preparation forsite overview.
Total: Eric Kohls 0.00 1.00
$0.00
11/2/2009 Construction Process Solutions, LTD.
2:10 PM Billing Backup for Time
BILLABLE NIC
PERSONNEL DATE HOURS HOURS DESCRIPTION
Senior Cons JM 10/07/09 0.50 0.00 Set up schedules in P6 (downloaded into database and re -named activity code for "Phase
Senior Cons JM 10/15/09 0.00 0.25 Worked wI RR on P6 issues.
Total: John McCoy 0.50 0.25
$80.00
Tech/ Clerical LK 10/23/09 0.50 0.00 Create a spreadsheet using the Carmel, IN wage rates and calculate the all in rate using WC and SUTA
Total: Liz Kohls 0.50 0.00
$30.00
Senior Cons RR 09/28/09 0.00 2.25 Reviewing document inventory received via FTP site and outlining or denoting observations
questions for later use specific to revised schedule, participants (roles), prior future document
requests. Downloading articles and photos from the interne( to get a layout of the structure and infill
some of the structural steel delay
Senior Cons RR 09/29/09 1,00 1.00 Making observations of GPI's COF 34 Scope Change correspondence, and Coordinated Prime
Contractor Schedule with data date 9/8/09 that denotes regularly schedule construction activities have
been released to resume on 8/24/09
Senior Cons RR 10/05/09 1.011 0.00 Start reviewing document inventory of e- document received on FTP site of Claims Schedules.
Broadly speaking 4 schedules and 6 claims from various project participants. Specifically: 2009-09 -25
PSM quote- 09 -03 -09 Sched- SSC 1229.pdf, Bid Package #5 Construction Schedule 8- 1- 08.pdf,
Carmel RPAC Coordinated Prime Contmetnr Schedule 04.01- 2009.pdf, Carmel RPAC Coordinated
Prime Contractor Schedule 09- 04- 2009.pdf, Carmel RPAC Coordinated Prime Contractor Schedule 09-
30 -2009 Deounerpdf, Circle B Notice of Delay 9.17.09 Schedule Feasibility.pdf, Circle B Schedule
Impact Costs 9.18.09.pdf, CRPAC Claim Summary 28- Sept.pdf, Diversified Painting Claim
9.29.09.pdf, Dunkin Claim 9.25.09.pdf, Enrico Claim 9.29.09.pdf, Santarossa Claim 9.28.09 SSC
1229.pdf
Senior Cons RR 10/06/09 2.00 2,75 Continue reviewing and making observations, annotating comments on e- documents received on
FTP site regarding Claims Schedules. Updating Cast of Character's or Project Participants lising
(See MindMap)
Senior Cons RR 10/08(09 3.00 1,00 Prepare for and participate in conference call with R. Schein, AE RR. Start UPT (Units Per Time)
assessment of schedules: R5 IQ, R52V, and R53D by exporting data from 1 into MS Excel
Senior Cons RR 10 /09/09 7.00 1.58 Continue UPT (Units Per Time) assessment of schedules: R5IQ, R52V, and R53D exporting data from
P6 to MS Access (running a Crosstab Query) then exporting data into MS Excel
Senior Cons RR 10 /10/09 2,00 0.00 Continue UPT (Units Per Time) assessment of schedules: R5IQ, R52V, and R53D exporting data from
P6 to MS Access (running a Crosstab Quety) then exporting data into MS Excel
Senior Cons RR 10/12/09 6.00 4.00 Working within P6 adding resources to 1151Q (DD= 4/1/09) then manually adding the actual units,
readjusting the remaining units, completion units, etc. to represent in a graphical format then inputting
results into MS Excel for charting
Senior Cons RR 10/13/09 6.00 6.00 Global add UPT resources to database for individual schedule because now they are based on calendars
specific to schedules. Manually change discrete Actual Units, Remaining Units, or Completion Units
depending on Complete to represent the prior resource graphic with UPTs based on Actual Duration
(not normalized based on Baseline Schedule Original Durations until Primavera Technical Support
gets back to me). Manually entering values from P6 into MS Excel based on month summarizes for
entire schedule (will talk to tech, support to generate a report to do this later)
Senior Cons RR 10/14/09 2.50 5.00 Issues with UPT on OD and RD that lead to manual revisions
Senior Cons RR 10/ 15/09 6.00 1.25 Run global changes, verify data on Schedule Complete less than 100% related to OD RD within
units, run tabular reports: print export to ;.CS V then bring into MS Excel l and establish chart with
data on R5IQ and R52V based on (Early) Start
Senior Cons RR 10/18/09 5.75 0.00 Finish verifying data in Global Change executions. Run, Print, Pdf, Save as •.csds, and import in
Microsoft Excel remaining schedules Early and Late Date Units Per Time information by Project ID
and individual Prime Contractors. Start establishing UPT charts by Prime Contractor (or Bid
Packages). Issues with scope contamination and completeness of scope to needs to be addressed
Senior Cons RR 10/19/09 6.00 3.50 Finish creating UPT Monthly Histograms by Prime Contractor, by Early Dates. Coordinate with SC on
establishing the required PDFs needed from the exported Excel data from P6 I created
Senior Cons RR 10/21/09 8.00 2,25 Continued 1JPT, Payment Application, etc. graphics for meeting with AE RR. Make
changes/additions to work products in preparation for todays meeting with R. Schein at Krieg DeVault.
Conference call with Rob, AE RR at 4pm until roughly 5pm regarding our schedule assessment
Senior Cons RR 10/23/09 0.00 1.00 Meeting with AE RR regarding work product needed for Monday 10/26 meeting with S -S on -site.
Start establishing "Daily Number of Men Forecasted (based on 40 or 54 hours)" bar charts
Senior Cons RR 10/25/09 4.25 0.00 Finished "Daily Number of Men Forecasted (based on 40 or 54 hours)" bar charts in preparation for
meeting tomorrow 10/26 ensite meeting with S -S including establishing 3 ring binders of backup to all
information to be used as reference in the meeting
Senior Cons RR 10/26/09 7.00 1.75 Meeting with AE RR to review Daily Manpower graphics based on R53D and payment applications.
Travel to from Carmel, IN to meet with Shiel- Sexton people regarding schedule observations and
tour the jobsite.
Senior Cons RR 10/27/09 6.00 1.75 Meeting with AE RR to discuss content format of information to be shared with Shiel- Sexton via
Krieg DeVault on R53D. Draft up report on initial observations/considerations from yesterday's
meeting onsite regarding the schedule with DD °9/28/09 and submit to AE for review comment
11/2/2009 Construction Process Solutions, LTD.
2:10 PM Billing Backup for Time
BILLABLE N/C
PERSONNEL DATE HOURS HOURS DESCRIPTION
Senior Cons RR 10/28/09 7.75 0.00 After receipt of preliminary Shiel- Sexton schedule update R53M (DD= 10/16/09) load onto server,
import *.xer electronic schedule file into CPS P6 database, then analyze and make observations on the
software/schedule mechanics only given the short turnaround time given by S -S (by Fri 10/30/09).
Afterwards, draft an e-mail to R. Schein to pass along our observations to S -S for consideration
Senior Cons RR 10/29/09 6,00 1.75 Establish layouts and print out original /as- received bar chart layouts to keep as historical record along
with a copy paste of numerous schedule (column) critieria into MS Excel for possible later
comparison as original /as- received detail data. Write up reasons why each schedule mechanics section
should be considered and their meaning. Create an attachment of exhibits or detailed listings of
activities for the summary information initially provided yesterday. Field phone call from R. Schein
regarding our assessments. Denoting comments to specific activities in each section to field more
phone calls from S -S tomorrow.
Senior Cons RR 10/30/09 4.25 0.50 After phone call with R. Schein yesterday go through reports line by line. Make observations on
critical and near critical paths as well as longest paths. Call Marty leave vm
Total: Randy Rapin 91.50 37.33
815,555.00 fi
/6 /(fa f L� TLLe r�
Tech/ Clerical SLC 09/24/09 0.00 0.50 Create FTP Site Folder, update instructions and send e-mail to R. Schein; set up new Account Folder,
add job name and number to the printer /copier, Copy media to network account/ engagment folder
Run OCR on all PDF's; Update documentation log and notify consultants involved as to arrival of
documents
Tech/ Clerical SLC 09/28/09 0.00 0,17 Copy e-mail attachments to network account/ engagment folder; Run OCR on all PDF's; Update
documentation log and notify consultants involved as to arrival of documents
Tech/ Clerical SLC 10/05/09 0.00 0.25 Copy e-mail attachments to network account/ engagment folder; Run OCR on all PDF`s; Update
documentation log and notify consultants involved as to arrival of documents
Tech/ Clerical SLC 10/07/09 0.00 0.17 Copy a -mails to network account/ engagment folder; Update documentation tog and notify consultants
involved as to arrival of documents
Tech/ Clerical SLC 10/09/09 0.00 0.13 Activate FIT Site Folder, e-mail instructions to R. Schein.
Tech' Clerical SLC 10/12/09 0.00 0.25 Copy e-mail attachments to network account/ engagment folder; Run OCR on all PDF's; 'Update
documentation log and notify consultants involved as to arrival of documents
Tech! Clerical SLC 10/19/09 0.00 6.75 Convert 16 charts using three different data variations into PDF's, combine into a PDF Binder, add data
date line and set page transitions. Review charts with RR, add cumulative data into charts with a
separate line graph, reformat charts, copy formatted charts and re -pull data into charts, convert charts
into PDF's, two different versions and combine into a PDF Binder and set page transitions.
Tech/ Clerical SLC 10/20/09 4,50 0.00 Print out Pay Applications for all subcontractors, review each pay application and highlight labor, add
amounts to spreadsheet per RR
Tech/ Clerical SLC 10/21/09 5.50 0.00 Continue to add eaeh line item on pay applications for all subcontractors to spreadsheet per RR, Create
Appendix stamp.
Tech/ Clerical SLC 10/23/09 4.67 0.00 Continue to add each line item on pay applications for all subcontractors to spreadsheet per RR. Create
new spreadsheet importing the remaining labor dollar amounts and schedule
Tech/ Clerical SLC 10/27/09 0.17 0.00 Copy e-mail to network account/ engagment folder; Run OCR on all PDF's; Update documentation log
and notify consultants involved as to arrival of documents
Total: Stephanie Cocco 14,84 8.22
81,113.00
Total: Carmel Performing Arts Center 13125 54.19
821,640.25
11!212009 Construction Process Solutions, LTD.
3:27 PM Billing Backup Expenses Page 1
DESCRIPTION
DATE Billed Slip Value
Client: Carmel Performing Arts Center
nce Meeting Costs AE 10/09/09 $12.48 Conference call
nce Meeting Costs AE 10/21/09 $25.09 Conference call
Travel AE 10/26/09 $AS 77 Travel meal
Mileage AE 10/26/09 $166.73 Mileage to /from Carmel
Total: Andrew T Englehart JJ
$23 .07 2011. 3 0
Ledger Repro RR 09 /30/09 $5.50 In office ledger copies /prints to 9/30
Color Repro RR 09/30/09 $2.50 In office color copies /prints to 9/30
Reproduction RR 09/30/09 $3.57 In office copies /prints to 9/30
Reproduction R12 10/29/09 $51.45. In office prints/ copies to'10/29/09
Color Repro RR 10/29/09 $2,(5 1 In office color prints/ copies to 10/29/09
Ledger Color repro RR 10/29/09 $4.00 In office ledger color prints copies to 10/29/09
Ledger Repro RR 10/29/09 $1.00 In office ledger prints/ copies to 10/29/09
Total: Randy Rapin
$2.5�6 P
Total: Carmel Perfonr ing Arts Center
$499.59
Grand Total
$499.59
1
Einstein Bros Bagels.
Store 2280 PH: (317) 846 -9888
10/26/09 11:19:56 AM
Order Number; 1609960
Eat In
Cashier: Timmons
Register: 2
1 Chptle Trky Wrap 6.69
Side Soup 0.99
1 CYO Turkey 6
Bagel
Side Soup 0.99
1 Club Mex 6.69
Bagel
ADD CHIPS
1 Fount Bev Med 1.79
Sub. Total: 23,64
Tax: 2.13
Total: 25.77
Discount Total 0.00
Change 0.00
Master Card: -25.77
NEW
PUMPKIN BAGEL POPPERS
Freshly baked bite size pieces
ready to pop on the go!
0))
Master Card
Card Num XXX XXXXXXX5169
Terminal 1L18494731001
Approval 087411
Sequence 001264
I agree to pay the above Total Amount
according to Card Issuer Agreement,
Signature:
1
Tf t TI F )O E OLLOTI J LTD.
4327 RED BANK ROAD CINCINNATI O!t-4 2k Please note new add
Invoice
submitted to:
December 07, 2009
Carmel Redevelopment Commission
c/o Krieg DeVault LLP/ Robert Schein
12800 N. Meridian Street, Ste. 300
Carmel, IN 46032
invoice 3820
CPS #09064 -11 Terms: Net 15
In Reference To: Claims assessment services on the Carmel Performing Arts Center
Project
Professional Services:
Amount
Associate Cons 410.00
Executive Cons 1,050.75
Senior Cons 7,323.60
Tech/ Clerical 31.50
For professional services rendered $8,815.85
Additional Charges
Color Repro 59
Ledger Color repro 250.00
Ledger Repro 3.00
Long Distance Phone Charges 1.70
Reproduction 20.79
Teleconference Meeting Costs 11.31
Total costs $345.80
Total amount of this bill $9,161.65
513 271 aoas (F) 513471-9036 •FED 11 3 1 1455141
12/1/2009 Construction Process Solutions, LTD.
10:19 AM Billing Backup for Time Page 9
BILLABLE N/C DESCRIPTION
PERSONNEL DATE HOURS HRS
Client: Cartel Performing Arts Center
Tech Clerical AS 11/06/09 0.00 0.17 Set up conf call 5:15pm per RR
Total: Amber R Scott
0.00 0.17
$0.00
Executive Cons AE 11/03/09 0.00 0.05 Exchange emails w/ R. Schein re: telecall update tomorrow
Executive Cons AE 11/04/09 025 0.00 Prep for conference call; Discuss issues w/ RR
Executive Cons AE 11/04/09 0.33 0.00 Conference call
Executive Cons AE 11/04/09 0.50 0.00 R Schein call AE reinforces WCD or CO discussion; Substantial Completion
misc issues discussed
Executive Cons AE 11/06/09 0.67 0.00 Multiple discussion w/ RR on schedule
Executive Cons AE 11/06/09 0.50 0.00 AE'RRconference call w/ R Schein
Executive Cons AE 11/09/09 0.25 0.00 Meet w/ RRto discuss Friday
Executive Cons AE 11 /10 /09 0.33 0.00 Review RR 11/9/09 Detailed Report to R Schein questions and discussion w/
RR
Executive Cons AE 11/10/09 0.50 0.00 Compile key observations and email R. Schein (cc: RR) from RR's email from last
night
Executive Cons AE 11/13/09 0.25 0.00 Review draft WDCand CO
Executive Cons AE 11/13/09 0.25 0.00 AE call R. Schein review
Executive Cons AE 11/17/09 0.17 0.00 CO terms to R Schein
Executive Cons AE 11/25/09 0.00 0.08 Email R. Schein any update?
Executive Cons AE 11/25/09 0.25 0.00 Review proposed CO language and send back to R Schein
Executive Cons AE 11/30/09 0.42 0.00 Conference call w/ R. Schein to discuss CO's
Total: Andrew T Englehart
4.67 0.13
$1,050.75
Associate Cons KR 11/05/09 0.75 0.75 Downloaded Navisworks Freedom per TM. Working in Cannel Navisworks file
for RR Gathering select views of the auditorium and creating PDF files from
those select images. Reviewed end product with RR.
Associate Cons KR 11/06/09 0.25 0.50 Working in Navisworks 3D model with RR, ML.
12/1/2009 Construction Process Solutions, LTD.
10:19 AM Billing Backup for Time Page 10
BILLABLE N/C DESCRIPTION
PERSONNEL DATE HOURS HRS
Total: Kevin Riggleman
1.00 1.25
$110.00
Associate Cons ML 11/06/09 2.50 2.00 Project record review for spatial and area discussion. Reviewed drawings for
vertical of auditorium and surround North, South, East West Buildings.
Total: Matthew Lammers
2.50 2.00
$300.00
Senior Cons RR 1I /02/09 6.00 1.25 Performed a detailed review of the critical path ofschedule R53M (DD= 10 /l6 /09)
in conjunction with a prior released observations /considerations report to help
M. Talbott focus on what items have higher importance. Created schedule
graphic in P6 and draft e-mail explaining the criteria why's and why not's on
critical path. Start looking at Near Critical Paths, understanding the overall work
flow of Concert Hall (North, South, Center).
Senior Cons RR 11/03/09 7.58 0.00 Receive e-mail from M. Talbott for a conference call on our schedule findings.
Coordinate with AE then field phone call from Marty to lay the ground work for
call. Confirm call for tomorrow (11/4/09) at Sam. Continue researching critical
near critical paths. Prepare for conference call today with S -S by isolating a
couple examples of each listing of our schedule findings (why's why not's),
Along with researching the deeper meaning of some critieria directly with R.
Winter via e-mail because manual was not clear enough.
Senior Cons RR 11/04/09 6.00 1.25 Setup for and a chair conference call with M. Talbott, T. Eisenhut, RR AE
regarding schedule RPAC -R53M observations /findings then afterwards finish
notes and field an individual phone call with Marty as to why the Global
Calendar Carmel RPAC (6 -9's) did not import correctly. Review denote
comments on Draft Minutes of Meeting from Monday 10/26/09 with SS,
Krieg DeVault, and CPS. Coordinate meeting at 1pm to discuss FTP transfer and
Naviswork file, Drawings, and Front Ends we will be receiving today. Making
observations on near critical activities and paths
Senior Cons RR 11/05/09 4.00 1.50 Get with KR on AutoDesk Nav is works Freedom 2010 file from S-S (J. Place)
received the other day in conjunction with website Fly -Thru of what we need.
Located Drawing Index(s) print and markup for SC to print'''/ sized select
drawings for review of spatial aspects against the schedule line items. Make
revisions to Carmel RPAC Revised Schedule Meeting Notes 10 -26 -2009 Rev 1I
document for AE to send to R. Schein. After receipt of current Shiel- Sexton
schedule update R53P (DD =11/5/09) load onto server, import *,xer electronic
schedule file into CPS P6 database, then send PDF to R Schein. Start to review
Architectural drawings that SC printed to 11 x 17 (half) size sheets. Coordinate
e -mails with M. Talbott on P6 issues within the schedule
Senior Cons RR 11/06/09 8.00 1.00 Establish layouts and print out original/as- received bar chart layouts to keep as
historical record along with a copy paste of numerous schedule (column)
critieria into MS Excel for possible later comparison as original/as- received detail
data. Analyze and make observations on the software/schedule mechanics.
Request PDF (hardcopy) version of the schedule from S -S because it appears
the schedule was not calculated. Coordinate with M. Talbott as to why the
12/1/2009 Construction Process Solutions, LTD.
10:19 AM Billing Backup for Time Page 11
BILLABLE N/C DESCRIPTION
PERSONNEL DATE HOURS ARS
schedule appears not to have been scheduled (F9'ed) look at discrete durations
and logic of particular activities against the electronic /executable file received.
Communicate with AE on schedule issue then coordinate a conference call with
Krieg DeVault. Participant in a conference call with R. Schein, AE RR
regarding most recent schedule RPAC -R53P received today as to not issue
ASI/CO with it. Fielded phone call from M. Talbott at 10pm until10:30pm
regarding schedule. Then 11:15pm until 11:30pm exchanging e-mails regarding
the schedule and lastly two more phone calls before midnight. At Marty's
request called him on Saturday morning to offer assistance if necessary
Senior Cons RR 11/09/09 9.50 1.50 Meeting with AE RR on what transpired over the weekend related to R53P
(with Data Date 10/30/09). Fielded phone call from M. Talbott regarding recent
schedule R53P. Fielded phone call from R. Schein regarding e-mail sent this
morning regarding R53P. Draft up a memo to document my conversations with
Marty Talbott of Shiel Sexton from Friday 11/6/09 regarding R53P. Received
current schedule update RPAC -R53Q with Data Date 10/30/09 and started to
make observations on revised schedule update. Worked late to turnaround
schedule assessment ofconsiderations /suggestions per S -S request.
Senior Cons RR 11/11/09 2.00 0.00 Making annotations on Out -of- Sequence Progress section ofR53Q
(DD= 10/30/09) report and reviewing critical and near critical paths. Fielded
phone call with R. Schein regarding Carmel and Indy CH job of which
conferenced in AE
Total: Randy Rapin
43.08 6.50
$7,323.60
Tech/ Clerical SLC 11/04/09 0.25 0.25 Set up FTP Site; Copy documents uploaded to network account engagment
folder, Run OCR on all PDF's; Update documentation log and notify consultants
involved as to arrival of documents
Tech/ Clerical SLC 11/05/09 0.17 0.50 Print out Architectural plans on 11 x 17, place in binder per RR
Total: Stephanie Cocco
0.42 0.75
$31.50
Total: Carmel Performing Arts Center
51.67 10.80
$8,815.85
12/1/2009 Construction Process Solutions, LID.
10:29 AM Billing Backup Expenses Page 6
DESCRIPTION
DATE Billed Slip Value
;bent: Cannel Performing Arts Center
:e Meeting Costs AE 11/06/09 $1131 Conference call
Total: Andrew T Englehart
$11.31
Ledger Repro RR 11/30/09 $3.00 In office ledger copies/ prints to 11/30
:dger Color repro RR 11/30/09 $25 In office color ledger copies/ prints to 11/30 ($604.00 marked down)
Reproduction RR 11/30/09 $20.79 In office copies/ prints to 11/30
:e Phone Charges RR 11/30/09 $1.70 Long distance to 11/30
Color Repro RR 11/30/09 $59.00 In office color copies/ prints to 11/30
Total: Randy Rap in
$334A9
Total: Carmel Performing Arts Center
$345.80
Prgscribed 6 Board of Accounts City Form No. 201 (Rev. 1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
(0n J p C
5 1' r �(C 1 0 Y1 f P�Q C�. 55 JD1tjl oh S Purchase Order No.
Z■Y1�, Terms
C I b G t h I) 1 o ff 5227 Date Due
Invoice Invoice Description Amount
Date Number (or note attached invoice(s) or bill(s))
k-2 3780 (11.i PO' 55e5vilevt 5erViu5 2 -2 012 r57
42 7 -09 (I 5 y ervi (es )6),6S
j
I
Total 3 I 171i,
I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance
with IC 5- 11- 10 -1.6.
20
Clerk- Treasurer
VOUCHER NO. WARRANT NO.
ALLOWED 20
Co in S+ r u C Ph froce5J S IN SUM OF
1 4')27 e bkn C Rd.
c p li ow 45227
3) /7q.2
ON ACCOUNT OF APPROPRIATION FOR
CND
'02/4460207
Board Members
PO# INVOICE NO. ACCT #/TITLE AMOUNT hereby certify DEPT. I hereb certif that the attached invoice(s), or
`57 0 60 6 7 22 f2 7 7 bill(s) is (are) true and correct and that the
c)02 P A2 0 LA-1-q1 )3 7 c i b 1, (5 materials or services itemized thereon for
which charge is made were ordered and
received except
2 2 2 0 0
`i<
Si •nature
Director V
Cost distribution ledger classification if Title
claim paid motor vehicle highway fund