Loading...
HomeMy WebLinkAboutApplication Info 12-11-09 10 Conn, Angelina V From: Conn, Angelina V Sent: Monday, December 14, 2009 2:05 PM To: Boone, Rachel M.; Blanchard, Jim E; Donahue -Wold, Alexia K; Hancock, Ramona B; Hollibaugh, Mike P; Holmes, Christine B; Littlejohn, David W; Martin, Candy; Mindham, Daren; Stewart, Lisa M; Tingley, Connie S; Duncan, Gary R; Barnes, David R Cc: 'Scott Yeager' Subject: Docket No. Assignment: Fidelity Keystone Office Park #09120004 ADLS Amend) I have issued the necessary Docket Number for (ADLS Amend) Fidelity Keystone Office Park Ph I Carmel Office Suites. It is the following: Docket No. 09120004 ADLS Amend: Fidelity Keystone Office Park Ph I Carmel Office Suites The applicant seeks approval for exterior building modifications, wall sign, and addition of green space. The site is located at 600 E. Carmel Dr. and is zoned B -8 /Business. Filed by Scott Yeager of Yeager Construction Company. Mr. Yeager can be reached at 317- 716 -4829. ADLS Amend Application Fee: $295.00 Total Fee Due: $295.00 Petitioner, please note the following: 1. This item will be not be on an agenda of the Technical Advisory Committee (TAC). However, the petitioner must submit plans and review materials to all TAC members ASAP (already done). The TAC members list is online at: http: /www.ci.carmel. in. us/ services /DOCS/TAC2009 /TAC %20members %207.08.09. pdf 2. Mailed and Published Public Notice does not need to occur. 3. Proof of Notice is not needed. 4. The Filing Fee and Eight (8) Information packets must be delivered to Plan Commission Secretary, Ramona Hancock, no later than 12:00 PM, Wednesday, December 23. If filing fee and materials are not delivered by this time, this application will be continued to the February 2, 2010 meeting. 5. This Item will appear on the January 5, 2010 agenda of the Plan Commission Special Studies Committee at 6:00 pm in the Caucus Room, Second Floor, City Hall. Please have a representative attend. 6. Info packets must contain a site plan, building elevations, brief description of changes, and details on the proposed changes. 04-'7. Please label the building materials /colors. 0\ c_, if. Please show how the on -site mechanical equipment is screened. AO t-\ J t JWA' Please provide signage specs /details. o>�i115. Please provide a copy of the parking easement. 0 02. Please provide details on the trash dumpster location and screening. 13. Please add bike racks near the building entrance, per ZO 27.06. If you have any questions, please let me know. Thank you, Angie Conn, Planning Administrator Planning Zoning Dept City of Carmel 1 Civic Square, 3rd Floor Carmel, IN 46032 0: 317 571 -2417 F: 317 571 -2426 E: aconn(acarmel.in.gov Website j Please consider the ircmn ent before printing this c -trail 1 1 Project Overview for Carmel ADLS Amendment Application Project: Carmel Office Suites Location: 600 E. Carmel Drive, Carmel, IN 9 R 0 1 DE A OGS Applicant: Yeager Construction Company pp g p Y D t Date of Submittal: December 11, 2009 Existing conditions: Currently, a two -story 41,150 square foot office building and parking lot exist on this site. The current building use is office /vacant. Proposed changes: Alter exterior of building, remodel interior, and add green space to the parking lot. The proposed use is individual office spaces with shared physical and service amenities. Packet Details: Existing conditions Page one: color pictures of the existing building Page two: Location, Soils, and Flood Plain Maps Page three: Site plan Page four: Landscaping Page five: Lighting Page six: Legal Description Proposed changes Pages seven and eight: color renderings of proposed changes to building Page nine: color site plan depicting changes to parking lot and landscaping Page ten A &B: erosion control details during construction Pages eleven through thirteen: ADLS Amendment application Contact: Scott Yeager, Yeager Construction Company, 23 S. 8 Street, Noblesville, IN 46060 Email: scott @yeagerproperties.com Cell phone: 716 -4829