HomeMy WebLinkAbout182125 02/03/2010 7„ CITY OF CARMEL, INDIANA VENDOR: 00351256 Page 1 of 1
t.: I�ti ONE CIVIC SQUARE UNITED CONSULTING ENGINEERS
CARMEL, INDIANA 46032 1625 N POST ROAD CHECK AMOUNT: $16,670.00
-Z;, OM Al INDIANAPOLIS IN 46219 CHECK NUMBER: 182125
CHECK DATE: 2/3/2010
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
1205 R4462836 18343 16 16,670.00 MONON TRAIL BRIDGE CI
1625 North Post Road
I I D Indianapolis, IN 46219
Bus. (317) 895 -2585
Consulting= Fax (317) 895 -2596
t�v
City of Carmel
Mike McBride Invoice number 15,1 L
One Civic Square Date December 31, 2009
Carmel, IN 46032
Project: 08 -304 Carmel Monon Bridge over Carmel
Drive
Za° "a
For Professional Services rendered through: December 31, 2009
P.0.#1
Additional Services #12
Inspection
Professional Fees
Billed
Hours Rate Amount
Department Manager
Brian N. Miller
Project Time 0.50 160.00 80.00
Construction Manager I
Christopher J. Miller
Project Time 41.00 105.00 4,305.00
Construction Technician
Bret Smiley
Project Time 20.00 80.00 1,600.00
Joef A. Tichenor
Project Time 35.00 80.00 2,800.00
Seth McClarnon
Project Time 95.00 80.00 7,600.00
Overtime 2.00 80.00 160.00
Professional Fees subtotal 193.50 16,545.00
Reimbursables
Billed
Units Rate Amount
Miles 250.00 0.50 125.00
A'1$1 21 total 16,670.00
EGE,�O Invoice Total (rounded) 16,670.00
CO
Invoice Summary V P �ME c
c N Cu o w Total Current
Description 6`8 -10 L Billed Billed
INSPECTION 392,619.49 16,670.00
City of Carmel Invoice number 15 Invoice date: 12/31/2009
City of Carmel
Invoice number 15
Date December 31, 2009
Project: 08 -304 Carmel Monon Bridge over Carmel
Drive
Total 392,619.49 16,670.00
Aging Summary
Invoice Number Invoice Date Outstanding Current Over 30 Over 60 Over 90 Over 120
15 12/31/2009 16,670.00 16,670.00
Total 16,670.00 16,670.00 0.00 0.00 0.00 0.00
Approved by:
4 (‘—"1":"
Brian N. Miller
Manager Const. Engineering Dept
**Please note Billing software calculates and rounds irregular values on a daily basis.
If questions anse, please call us for clarification.
City of Carmel Invoice number: 15 Invoice date: 12/31/2009
City of Carmel
Invoice number 15
Date December 31, 2009
Project: 08 -304 Carmel Monon Bridge over Carmel
Drive
Invoice Supporting Detail
08 -304 Carmel Monon Bridge over Carmel Drive
Phase: Inspection
Date Units Rate Amount
Labor
Department Manager
Brian N. Miller
Project. Time 12/16/2009 0.50 160.00 80.00
Subtotal 0.50 80.00
Construction Manager 1
Christopher J. Miller
Project Time 12/01/2009 5.00 105.00 525.00
Project Time 12/02/2009 5.00 105.00 525.00
Project Time 12/07/2009 2.00 105.00 210.00
Project Time 12/08/2009 2,00 105.00 210.00
Project Time 12/09/2009 2.00 105.00 210.00
Project Time 12/18/2009 4.00 105.00 420.00
Project Time 12/19/2009 3.00 105.00 315.00
Project Time 12/21/2009 2.00 105.00 210.00
Project Time 12/22/2009 2.00 105.00 210.00
Project Time 12/28/2009 4.00 105.00 420.00
Project Time 12/29/2009 4.00 105.00 420.00
Project Time 12/30/2009 4.00 105.00 420.00
Project Time 12/31/2009 2.00 105.00 210.00
Subtotal 41.00 4,305.00
Construction Technician
Bret Smiley
Project Time 12/22/2009 3.00 80.00 240.00
Project Time 12/29/2009 9.00 80.00 720.00
Project Time 12/30/2009 8.00 80.00 640.00
Subtotal 20.00 1,600.00
Joel A. Tichenor
Project Time 12/01/2009 2.00 80.00 160.00
Project Time 12/16/2009 5.00 80.00 400.00
Project Time 12/17/2009 7.00 80.00 560.00
Project Time 12/18/2009 7.00 80.00 560.00
Project Time 12/21/2009 7.00 80.00 560,00
Project Time 12/22/2009 7.00 80,00 560.00
Subtotal 35.00 2
Seth McClarnon
Project Time 12/01/2009 4.00 80.00 320.00
Project Time 12/02/2009 8.00 80.00 640.00
Project Time 12/03/2009 8.00 80.00 640.00
Project Time 12/04/2009 8.00 80.00 640.00
Project Time 12/07/2009 3.00 80.00 240.00
Project Time 12/08/2009 3.00 80.00 240.00
Project Time 12/10/2009 2.50 80.00 200.00
Project Time 12/11/2009 6.00 80.00 480.00
Project Time 12/14/2009 8.00 80.00 640.00
City of Carmel Invoice number: 15 Invoice date: 12/31/2009
City of Carmel
Invoice number 15
Date December 31, 2009
Project: 08 -304 Carmel Monon Bridge over Carmel
Drive
08 -304 Carmel Monon Bridge over Carmel Drive
Phase: Inspection
Date Units Rate Amount
Labor
Construction Technician
Seth McClarnon
Project Time 12/15/2009 8.00 80.00 640.00
Project Time 12/16/2009 8.00 80.00 640.00
Project Time 12/17/2009 8.00 80.00 640.00
Project Time 12/21/2009 2.50 80.00 200.00
Project Time 12 /22/2009 9.00 80.00 720.00
Project Time 12/29/2009 4.00 80.00 320.00
Project Time 12/3112009 5.00 80.00 400.00
Overtime 12/01/2009 0.50 80.00 40.00
Overtime 12/10/2009 0.50 80.00 40.00
Overtime 12/15/2009 1.00 80.00 80.00
Subtotal 97.00 7,760.00
Labor Total 193.50 16,545.00
Expense
Bret Smiley
Bret Smiley
Mileage 12/31/2009 184.00 0.50 92.00
Subtotal 184.00 92.00
Seth McClarnon
Seth McClarnon
Mileage 12/31/2009 66.00 0.50 33.00
Subtotal 66.00 33.00
Expense Total 250.00 125.00
Project Summary
Contract Billed Remaining
Labor 406,500.00 379,501.50 93 26,998.50 7
Expense 0.00 11,034.67 11,034.67
Consultant 0.00 2,083.32 2,083.32
Total 406, 500.00 392, 619.49 97 13,880.51 3
Invoice Summary
Contract Billed Remaining
Labor 406,500.00 379,501.50 93 26,998.50 7
Expense 0.00 11,034.67 0 11,034.67 0
Consultant 0.00 2,083.32 0 2,083.32 0
Total 406,500.00 392,619.49 97 13,880.51 3
City of Carmel Invoice number: 15 Invoice date: 12/31/2009
City of Carmel
Invoice number 15
Date December 31, 2009
Project: 08 -304 Carmel Monon Bridge over Carmel
Drive
Bret Smiley
Timesheet date: 0110112010
Project Phase Activity Employee Type Sat -26 Sun -27 Mon -28 Tue -29 Wed -30 Thu -31 Fri -01 T otal
Carmel Monon Bndge over Inspection Project Time Construction Manager II 9.00 8.00 17.00
Carmel Drive
Direct Total 0.00 0.00 0.00 9.00 8.00 0.00 0.00 17.00
Regular total 0.00 0.00 0.00 9.00 8.00 0.00 0.00 17,00
Timesheet Total 0.00 0.00 0.00 9.00 8.00 0.00 0.00 17.00
Timesheet date: 12/25/2000
Project Phase Activity Employee Type Sat -19 Sun -20 Mon -21 Toe-22 Wed -23 Thu -24 Fri -25 Total
Carmel Monon Bridge over Inspection Project Time Construction Manager II 3.00 3.00
Carmel Drive
e n w D4ect Total 0.00 0.00 0.00 3.00 0.00 0.00 0.00 3.00
Regular total 0.09 0,00 0.00 3.00 0.00 0.00 0.00 3.00
Timesheet Total 0.00 0.00 0.00 1.00 0.00 0.00 0.00 3.00
Brian N, Miller
Timesheet date: 12/18/2009
Project Phase Activity Employee Type Sat -12 Sun -13 Mon -14 Tue -15 Wed -16 Thu -17 Fri -18 Total
Carmel Mahon Bridge over Inspection Project Time Department Manager 0.50 0_50
Carmel Drive
Direct Total 0.00 0.00 0.00 0.00 0.50 0.00 0.00 050
Regular total 0.00 0.00 0.00 0.00 0.50 0.00 0.00 0.50
Timesheet Total 0.00 0.00 0.00 0.00 0.50 0.00 0.00 0.50
Christopher J. Miller
Timesheet date: 01/0112010
Project Phase Activity Employee Type Sat -28 Sun -27 Mon -28 Tue -29 Wed -30 Thu -31 Fri -01 Total
Carmel Monon Bridge over Inspection Project Time Construction Manager I 4.00 4.00 4.00 2.00 14,00
Carmel Dnve
Direct Total 0.00 0.00 4.00 4.00 4.00 2.00 0.00 14.00
Regular total 0.00 0.00 4.00 4.00 4.00 2.00 0.00 14.00
Timesheet Total 0.00 0.00 4.00 4.00 4.00 2.00 0.00 14.00
Timesheet date: 1212512009
Project Phase Activity Employee Type Sat -19 Sun -20 Mon -21 Tue -22 Wed -23 Thu -24 Fri -25 Total
Carmel Monon Bridge over Inspection Project Time Construction Manager I 3.00 2.00 2.00 7.00
Carmel Drive
Direct Total 3.00 0.00 2.00 2.00 0.00 0.90 0.00 7.00
Regular total 1.00 0.00 2.00 2.00 0.00 0.00 0.00 7.00
Timesheet Total 3.00 0.00 2.00 2.00 0.00 0.00 0.00 7.00
City of Carmel Invoice number: 15 Invoice date: 12/31/2009
City of Carmel
Invoice number 15
Date December 31, 2009
Project: 08 -304 Carmel Monon Bridge over Carmel
Drive
Christopher J. Miller
Timesheet date: 12125/2009
Timesheet date: 12118/2009
Project Phase Activity Employee Type Sat -12 Sun -13 Mon -14 Tue -15 Wed -16 Thu -17 Fri -18 Total
Carmel Monon Bridge over Inspection Project Time Construction Manager I 4.00 4.00
Carmel Drive
Direct Total 0.00 0.00 0.00 0.00 0.00 0.00 4.00 4.00
Regular total 0.00 0.00 0.00 0.05 0.00 0.00 4.00 4.00
Timesheet Total 0.00 0.00 0.00 0.00 0.00 0.00 4.00 4.00
Timesheet date: 12/11/2009
Project Phase Activity Employee Type 500.05 Sun -06 Mon-07 Tue-08 Wed-09 Thu -10 Fri -11 Total
Carmel Monon Bridge over Inspection Project Time Construction Manager I 2.00 2.00 2.00 6.00
Carmel Drive
Direct Total 0.00 0.00 2.00 2.00 2.00 0.00 0.00 6.00
Regular total 0.00 0.00 2.00 2.00 2.00 0.00 0.00 6.00
Timesheet Total 090 0.00 2.00 2.00 2.00 0.00 090 6.00
Timesheet date: 12/0412009
t Phase Activity Sat -28 Sun -20 Mon-30 Tue -01 Wed -02 Thu -03 Fri -04
Project Y Employee Type total
Carmel Morton Bridge over Inspection Project Time Construction Manager I 5.0D 5.00 1000
Carmel Dnve
Direct Total 0.00 0.00 0.00 5.00 5.00 0.00 0,00 1090
Regular total 0.00 0.00 0.00 5.00 5.00 0,50 0.00 10.00
Timesheet Total 0.00 0.00 0.00 5.00 5.00 0.00 0.00 10.00
Joel A. Tichenor
Timesheet date: 12/25 /2009
Project Phase Activity Employee Type Sat -19 Sun -20 Mon -21 Tue -22 Wed -23 Thu -24 Fri -25 Total
Carmel Monon Bridge over Inspection Project Time Construction Manager II 7.00 7.00 14.00
Carmel Drive
Direct Total 0.00 0.00 7.00 7.00 0.00 0.00 0.00 14.00
Regular total 0.00 0.00 7.00 7.00 0.00 0.00 0.00 14.00
Timesheet Total 0.00 0.00 7.00 7.00 0.00 0,05 900 14.00
Timesheet date: 12/18/2009
Project Phase Activity Employee Type Sat -12 Sun -13 Mon -14 Tue -15 Wed -16 Thu -17 Fri -18 Total
Carmel Monon Bridge over Inspection Project Time Construction Manager II 5.00 7.00 7.00 19.00
Carmel Nee
Direct Total 0.00 0.00 0.00 0,00 5.00 7.00 7.00 10.00
City of Carmel Invoice number: 15 Invoice date: 12/31/2009
City of Carmel
Invoice number 15
Date December 31, 2009
Project: 08 -304 Carmel Monon Bridge over Carmel
Drive
Joel A. Tichenor
Timesheet date: 12/1812009
Regular total 0.00 0.00 0.00 0.00 5.00 7.00 7.00 19.00
Timesheet Total 0.00 1 0.001 0.001 0.001 5.00 1 7.001 7.00 19.00
Timesheet date: 12/04/2009
Project Phase Activity Employee Type Sat -28 Sun -29 Mon-30 Tue -01 Wed -02 Thu -03 Fri -04 Total
Carmel Monon Bridge over inspection Project Time Construction Manager II 2.00 2.00
Carmel Drive
Direct Total 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.00
Regular total 0.00 0.00 0.00 2.00 0.00. 0.00 0.00 2.00
Timesheet Total 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.00
Seth McClamon
Timesheet date: 01/0112010
Project Phase Activity Employee Type Sat -25 Sun -27 Mon -28 Tue -29 Wed -30 Thu -31 Fri -01 Total
Carmel Monon Bridge over Inspection Project Time Construction Manager!! 4.00 5.00 9.00
Carmel Dnve
Direct Total 0.00 0.00 0.00 4.00 0.00 5.00 0.00 9.00
Regular total 0.00 0.00 0.00 4.00 0.00 5.00 0.00 9.00
Timesheet Totai 0.50 0.00 0.00 4.00 0.00 5.00 0.02 9.00
Timesheet date: 12125/2009
Project Phase Activity Employee Type Sat -19 Sun -20 Mon -21 Tue -22 1Ned -23 Thu -24 Fri -25 Total
Carmel Monon Bridge over Inspection Project Time Construction Manager 11 2.50 9.00 11.50
Carmel Drive
Direct Total 0.00 0.00 2.50 9.09 0.00 0.00 0.00 11.50
Regular total 0.00 0.00 2.50 9.00 0.00 0.00 0.00 11.50
Timesheet Total 0,00 0.00 2.50 9.00 0.00 0.00 0.00 11.50
Timesheet date: 12/18/2009
Project Phase Activity Employee Type Sat -12 Sun -13 Mon -14 Tue -15 Wed -16 Thu -IT Fri -18 Total
Carmel Monon Bridge over Inspection Project Time Construction Manager II 8.00 8.00 8.00 8.00 32.00
Carmel Drive
Carmel Monon Bridge over Inspection Overtime Construction Manager II 1.00 1.00
Carmel Drive
Direct Total 0.00 0.00 8.00 9.00 8.00 8.00 0.00 33.00
Regular total 0.00 0.00 8.00 8.00 8.00 8.00 5.00 32.00
Total 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00
Timesheet Total 0.00 0.00 8.00 9.00 8.00 8.00 0,00 33.00
City of Carmel Invoice number: 15 Invoice date: 12/31/2009
City of Carmel
Invoice number 15
Date December 31, 2009
Project: 08 -304 Carmel Monon Bridge over Carmel
Drive
Seth McClarnon
Timesheet date: 1211112009
Project Phase Activity Employee Type Sat-05 Sun -08 Mon -07 Tee-08 Wed -09 The-10 Fri -11 Total
Carmel Monon Bridge over Inspection Project Time Construction Manager!! 3.00 3.00 2.50 6.00 14.50
Carmel Drive
Carmel Monon Bridge over Inspection Overtime Construction Manager!! 0.50 0.50
Carmel Drive
Direct Total 0.00 0.00 3.00 3.00 0.00 3.00 6.00 10.00
Regular total 0.00 0.00 3,00 3.00 0.00 2.50 6.00 14.50
Total 0.00 0.00 0.00 0.00 0.00 0.50 0.00 0.50
Timesheet Total 0.00 0.00 3.00 3.00 0.00 3.00 6.00 15.00
Timesheet date: 12104/2009
Project Phase Activity Employee Type Sat -28 Sun -29 Mort-30 Tue -01 Wed -02 Thu -03 Fri-04 Total
Carmel- Monon Bridge over Inspection Project Time Construction Manager!! 4.00 8.00 8.00 8.00 28.00
Carmel Drive
Carmel Monon Bridge over Inspection Overtime Construction Manager II 0.50 0.50
Carmel Dnve
Direct Total 0.50 0.00 0.00 4.50 8,00 8.00 8.00 28.50
Regular total 0.00 0.00 0.00 4.00 8.00 8.00 8.00 28.00
Total 0.00 0.00 0.00 0.50 0,00 0.00 0.00 0.50
Timesheet Total 0.00 0.00 0.00 4.50 8.00 8.00 8.00 26.50
City of Carmel Invoice number: 15 Invoice date: 12131/2009
UNITED CONSULTING V l t,:
Mileage log Business expense Signature:
Empl 364
Name Bret Smiley for Pay Period ending: 1(1!10 Approval:
,r
�,�1 S: Y 6; g �,3��� a Mrs 'k Be r n E ndrn M rle :'Miles e.
D ate r :Job `,Client, aa., ;1Jttend ees_orDescrr trop �;:Ex r
p R r�:.1?erd►em Meafs °�;�_Parkrr 'mifes _�,mrle ch :zpense f, ''';',r
12/21/2009 09 -315 Grant County Bridge Job Mileage 32,607 32,693 86 47.30
12/21/2009 09 -315 Grant County Bridge Job Mileage 32,693 32,779 86 47.30
12/22/2009 08 -304 Monon Bridge Job Mileage 32,855 32,878 23 8 12.65
12/22/2009 09- 314 -02 Madison County Job Mileage 32,878 32,919 41 22.55
12/22/2009 09- 314 -01 Madison County Job Mileage 32,919 32,935 16 8,80
12/22/2009 09- 314 -03 Madison County Job Mileage 32,935 32,959 24 13.20
12/22/2009 09- 314 -06 Madison County Job Mileage 32,959 32,978 19 10.45
12!2212009 09- 314 -05 Madison County Job Mileage 32,978 33,002 24 13.20
12/22/2009 09- 314 -04 Madison County Job Mileage 33,002 33,015 13 7.15
12/22/2009 08 -304 Monon Bridge Job Mileage 33,015 33,078 63 34.65
12/23/2009 04019 Elkhart Co. Pre Contract Job Mileage 33,142 33,484 342 8 188.10
12/29/2009 08 -304 Monon Bridge Job Mileage 33,739 33,776 37 20.35
12/30/2009 08 -304 Monon Bridge Job Mileage 33,839 33,862 23 12.65
12/30/2009 09 -304 104th and Olio Rd. Job Mileage 33,862 33,881 19 10.45
12/30/2009 08 -304 Monon Bridge Job Mileage 33.881 33,919 38 20.90
12/2112009 07 -312 Greenwood Graham Rd 32,779 32,798 19 10.45
Total 873 480.15
'Grand total t 480.151
Memo. Mileage charge Mile 0.55
Prepared 1/4/2010
A
UNITED CONSULTING
Mileage log 1 Business expense Signature:
Empl 349
Name Seth McClanion for Pay Period ending: 1/1/10 Approval
n a M15 F cb� Be In Ending. MfleS .•c�:�l� fled f' s,
Date
'Job,
r Attendees tlon Ex .,ti Pertd M ea l s Pa rkin miles m i l e s w= cha
12/21/2009 09- 319 -01 Rush County Highway CR 800E 600 N Mileage 102,689 102,707 18 9.90
12/22/2009 08 -304 City of Carmel Mileage 102,707 102,753 46 25.30
12/29/2009 08 -304 City of Carmel Mileage 102,826 102,846
20 11.00
12/31/2009 09-319-02 Rush County Highway CR 800E 1100 N Mileage 102,857 102,879 22 12.10
111/2010 04012 Admin Cell Phone Allowance 50.00
Total 50.00 106 58.30
[Grand total I 108.30 1
Memo: Mileage charge Mile 0.55
Prepared 1/4/2010
UNITED CONSULTING
Mileage to I B usiness
9 expense Signature: 7.--- Eni 349 ./a
Name Seth McClarnon for Pay Period ending: 12/18/09 Approval:
.3 =.r. x 8 rn::• 's" M l les N1il
.v u 4� 5 4 e x. s4 L Lr.. r'. g' r,a: Y,4 eage
°Job 1< Ghent" m :7
�_w� �,�,.,...u' t:o. �°F�; �ttendees.�:or,D esc rfptron a �E xp :wPer,.diem„.
es;jPa rR _r.'i l es. ;:m iles e�,zcha
Date
12/7/2009 09- 31V -03 Rush County Highway CR 800 E 600 N Mileage 102,364 102,387 23 12.65
12/8/2009 09- 318 -02 Rush County Highway CR 800 E 1100 N Mileage 102,387 102,407 20 11.00
12/9/2009 09 -304 Hamilton County Highway 104th Street 102,407 102,454 47 25.85
12/10/2009 09- 319 -03 Rush County Highway CR 800 E 600 N Mileage 102,454 102,474 20 11.00
12/11/2009 09- 318 -02 Rush County Highway CR 800 E 1100 N Mileage 102,474 102,494 20 11.00
12/14/2009 08 -304 City of Carmel Mileage 102,534 102,554 20 11.00
12/15/2009 08 -304 City of Carmel Mileage 102,554 102,574 20 11.00
12/16/2009 08 -304 City of Carmel Mileage 102,574 102,601 27 14.85
12/17/2009 08 -304 City of Cannel Mileage 102,601 102,621 20 11.00
12/18/2009 04012 Admin Mileage INDOT Testing 102,631 102,649 18 9.90
12/16/2009 04012 Admin De-icer for Field Office 2.66
12/16/2009 04012 Admin Dividers for files 13.32
Total 15.98 235 129.25
Grand total 145.23
Memo: Mileage charge Mile 0 -55
Prepared 12/18/2009
Prescribed by State Board of Accounts City Form No. 201 (Rev. 1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
United Consulting
Purchase Order No.
1625 N. Post Road
Terms
Indianapolis, IN 46219
Date Due
Invoice Invoice Description Amount
Date Number (or note attached invoice(s) or bill(s))
12/31/10 Inv. 16 Monon Trail Bridge Over Carmel Drive $16,670.00
$13
Total
I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance
with IC 5- 11- 10 -1.6.
20
Clerk- Treasurer
VOUCHER NO. WARRANT NO.
ALLOWED 20
United Consulting IN SUM OF
1625 N. Post Road
Indianapolis, IN 46219
$16,670.00
ON ACCOUNT OF APPROPRIATION FOR
Department of Engineering
Board Members
PO# or INVOICE NO. ACCT #/TITLE AMOUNT hereby certify invoice( s), DEPT. I hereb certif that the attached invoices or
bill(s) is (are) true and correct and that the
18343 illy. Nu. 10 leUb- 1 Ib,b /U.UU
materials or services itemized thereon for
which charge is made were ordered and
received except
Z4 20
Signature
C i�I E c\∎ rya
Title
Cost distribution ledger classification if
claim paid motor vehicle highway fund