HomeMy WebLinkAboutDrainageMercedes Benz Service Center
4000 E. 96 Street
Carmel, Indiana
DRAINAGE REPORT
Mercedes Benz Service Center
4000 E. 96 Street
Carmel, Indiana
Report Contents
Narrative
I. Design Calculations
A. Pre Development Calculations
B. Post Development Calculations
C. Detention Calculations
D. Pipe Sizing Calculations
E. Water Quality
II. Project Summary
III. Hydrologic /Hydraulic Calculations Exhibits
A. Basin Exhibits
B. HydroCAD (Hydrologic) Computer Output
C. Pipe Calculations
D. Off-site Analyses
E. Water Quality Documents
Narrative
This project proposes improvements to 4000 E. 96 Street, Carmel, Indiana. Improvements consist of removing
existing concrete sunken dock areas, replacing the dock areas with a building addition, and reconstructing
adjoining parking lot areas. All proposed improvements will outlet to a swale /ditch along the north side of the
property. This swale /ditch drains approximately 34.3 acres of upland areas consisting of business /industrial
uses. The effects of this swale were factored into the consideration and design of proposed storm sewers.
1. Design Calculations: A. Pre Development Calculations
1 23 4
RECEIVED
UULC 1 8 2009
DOCS
0 i i II I i ''i
f..
No-
1990011:3
$TArFE 01'
iiiit0
This project will replace existing impervious areas with new impervious areas. New parking lot areas were
limited to ensure no change in the amounts of project impervious areas. As such, the proposed impervious areas
equal the existing impervious areas. See the next section (I. Design Calculations: B. Post Development
Calculations) for pre and post storm run off amounts.
Bordenet Civil Engineering Land Surveying, LLC
8902 Alibeck Ct. Office: 317 -536 -6181
Indianapolis, [N 46256 sbordenet a civil- Is.com
Storm Event
WQ
Q2
Q5
Q10
Q25
Q50
Q100
Inches of Rainfall
1
2.66
3.27
3.83
4.72
5.52
6.46
On -site, cfs
0.19
0.51
0.63
0.74
0.91
1.06
1.24
Off -site, cfs
3.16
16.23
21.42
26.22
33.86
40.73
48.77
Mercedes Benz Service Center
4000 E. 96 Street
Carmel, Indiana
L Design Calculations: B. Post Development Calculations
See section III. Hydrologic /Hydraulic Calculations Exhibit:
indicating the existing and proposed impervious areas. Also,
sheets indicating limits of construction. Offsite areas draining
basin delineation may be seen in this section of the report.
A. Basin Exhibits of this report for exhibits
see the construction plans for 24" x 36" plan
to the site's outlet were also assessed, and the
See section III. Hydrologic /Hydraulic Calculations Exhibit: B. HydroCAD (Hydrologic) Computer Output
of this report for storm run -off quantities.
This project will disturb approximately 23,990 sft. of impervious areas. This area was assessed as CN =99.5.
This curve number was used as required for water quality considerations, and it was used for site run -off and
storm pipe sizing for conservative measure (instead of standard CN 98). The basin area and curve number in
conjunction with Carmel rainfall depths and a NRCS Type II rainfall distribution were entered into hydrograph
software to determine the 24 hour storm rates. Upland offsite areas draining to the site's discharge release point
were also assessed in the previously described manner. The upland areas were considered urban
commercial /industrial areas with 82% impervious coverage and a curve number of 91. The following table
summarizes the various storm rates:
L Design Calculations: C. Detention Calculations
As this project will not change the site run -off rates, there is no detention proposed. See the section I. Design
Calculations: D .Pipe Sizing Calculations for a discussion of on -site and off -site impacts on new and existing
storm drains.
L Design Calculations: D. Pipe Sizing Calculations
See section III. Hydrologic /Hydraulic Calculations Exhibit: C. Pipe Calculations of this report for exhibits
indicating pipe locations and labels. Also in this section are Manning pipe analyses indicating pipe capacities.
The storm sewer functions as a receiving pipe that discharges to a diversion structure. The diversion structure
sends an initial water quality treatment rate to an Aquaswirl and all subsequent storm discharge to the site
outlet. The water quality discharge also is released to the same site outlet but downstream of the diversion
structure. Though the proposed building addition discharges to the diversion structure, it is assumed for
conservative measure that all proposed areas discharge to the upstream most receiving pipe.
Bordenet Civil Engineering Land Surveying, LLC
8902 Alibeck Ct. Office: 317- 536 -6181
Indianapolis, IN 46256 sbordenet@civil-ls.com civil- Is.com
Pipe
Label
Q2 Tailwater
from
Manning's
Q2 Tailwater
from HY -8
Q10
Tailwater
from
Manning's
Q10
Tailwater
from HY -8
Q100
Tailwater
from
Manning's
Q100
Tailwater
from HY -8
Diversion
Structure
746.81
747.06
747.48
Water Quality
Structure
746.50
746.85
747.80
Pipe
Label
Pipe
Size
Slope
10 Year
Discharge
0.34 cfs
10 Year
Velocity
3.0 fps
Max
Capacity
4.2 cfs
Max
Velocity
5.4 fps
Pipe 1
12"
1.00%
Pipe 3
12"
0.20%
0.34 cfs
1.7 fps
1.9 cfs
2.4 fps
Pipe 5
12"
0.25%
0.40 cfs
1.9 fps
2.1 cfs
2.7 fps
Pipe 6
12"
0.20%
0.74 cfs
2.1 fps
1.9 cfs
2.4 fps
Pipe 8
12"
0.20%
0.74 cfs
2.1 fps
1.9 cfs
2.4 fps
Mercedes Benz Service Center
4000 E. 96 Street
Carmel, Indiana
The ten year event for the proposed improvements is 0.74 cfs. This enters the upstream storm sewer receiving
pipe. The diversion structure sends 0.34 cfs to the water quality structure and 0.40 cfs to the site outlet. See
section I. Design Calculations: E. Erosion Control Methods for a discussion of water quality treatment rates.
The following table summarizes the characteristics of the ten year flow rates in the pipes and the pipes'
maximum capacities:
See section III. Hydrologic /Hydraulic Calculations Exhibit: Off -site Analyses of this report for HY -8 offsite
pipe analysis for the culvert carrying the offsite swale (proposed construction's site outlet) under Lakeshore
Drive. Also see the same section for a Manning's analysis of the swale leading into the culvert.
Currently the site's outlet, the swale on the north side of the building addition, backs up into the existing site
during heavy storms. It is recognized that the storm sewer improvements will limit the flooding of the proposed
parking lot but it will eliminate flooding entirely. The proposed storm sewer discharges into the swale at two
points. One is at the diversion structure, and the second is at the water quality structure. When the storm sewer
is inundated at these locations, off -site storm water will flow back into the proposed storm sewer and site.
Flow back into the site is analyzed by projecting a Manning's channel head from the diversion structure outlet
and an HY -8 Lakeshore drive culvert headwater at the Lakeshore Drive culvert from the water quality structure.
This was done for the two, ten and on- hundred year events. The highest resulting head was accepted as the
depth of parking lot inundation in the northwest portion of the proposed lot construction. The following table
summarizes the results:
As shown in the table, the two year event will not back up into the lower parking lot. The ten year event will
inundate the parking lot by 0.06' (3/4 The on- hundred year event will inundate into the parking lot by 0.80'
(9.5
8902 Alibeck Ct.
Indianapolis, IN 46256
Bordenet Civil Engineering Land Surveying, LLC
Office: 317 -536 -6181
sbordenet @civil- ls.com
Mercedes Benz Service Center
4000 E. 96 Street
Carmel, Indiana
L Design Calculations: E. Water Quality
Note in the HY -8 culvert analysis (see profile section diagram) that culvert under Lakeshore Drive has
sufficient capacity to convey all storm events including the one hundred year event.
See section III. Hydrologic /Hydraulic Calculations Exhibit: Water Quality Documents for the site CN -wq,
BMP structure sizing chart, and Structure O &M Manual.
As previously discussed, the proposed water quality curve number was determined to be 99.5. By hydrograph
analysis and previously indicated in this report, the water quality treatment rate was determined to be 0.19 cfs
(minimum). An AS -2 offline Aquaswirl was selected to treat a rate of 0.34 cfs. Therefore, the depth flowing
into and through the Aquaswirl is (746.05 +0.30, see Manning's pipe calculation sheet for 12" RCP at 0.20
746.35. Based on the HY -8 Analysis, the depth at the structure outlet is 746.19. Therefore, the required rate
will flow through unaffected by the off -site Tailwater and the required rate is achieved.
The diversion structure was designed by setting the diversion pipe's outlet (upstream invert of Pipe 5) at a depth
of 0.3 feet (resulting depth from 0.34 cfs in 12" RCP at 0.2 see Manning's analysis sheet) above the upstream
invert of Pipe 3 (discharge pipe into the water quality structure.
As previously indicated in this section of the report, the Tailwater of the water quality structure is below the
structure's designed flow rate depth during the onsite /offsite water quality discharges. After the this initial
discharge (ie. first flush), the offsite swale will inundate the diversion structure's outlet and water quality outlet.
This equal head on the system inlet and outlet will effectively "shut off" flow through this section of storm
sewer. The swale depths will back above the diversion structure into the northwest parking lot as previously
discussed.
IL Project Summary
This project does not propose detention. Since discharge from the site is not increased and downstream
facilities (swale along the north side of the project and culvert under Lakeshore Drive) are more than adequate
to handle discharges from the site, they are not necessary. The project will address water quality requirements.
The main focus of this project is to provide a building addition for the site. New parking lots will be
constructed and be drained by new storm sewers. The new storm sewers and grading will provide limited
improvement in flooding. The parking lot flooding is manageable and safe under high flow events (9.5" during
the one hundred year event).
It should be noted that the cover on the proposed pipe is 1' at a minimum. This cover is in a non -paved area
and is deemed acceptable. If the project were to raise the site as much as possible and provide inlet type pipe
collection, inlets would necessarily be in pavement areas. The inlet storm sewer pipes would then have covers
of approximately 6 Project improvements are limited by the site outlet (pipe under Lakeshore Drive) and
existing finished floors. The proposed solution provides acceptable (but not preferred) cover and manageable
parking lot inundation from off -site drainage.
Bordenet Civil Engineering Land Surveying, LLC
8902 Alibeck Ct. Office: 317 536 -6181
Indianapolis, IN 46256 sordenet @civil- Is.com
Mercedes Benz Service Center
4000 E. 96 Street
Carmel, Indiana
III. Hydrologic /Hydraulic Calculations Exhibit: A. Basin Exhibit
Bordenet Civil Engineering Land Surveying, LLC
8902 Alibeck Ct. Office: 317 -536 -6181
Indianapolis, IN 46256 sordenet @civil- ls.com
ii/
ifil 08 Vg
1 1 :7°,..i.t. /27—, /Q 7.---.
IC I ao'� <4 j i:'
r+ I J P
ltd --771 �r�
i r
a
0 1
0 0 r
I i 1 I •LII'•'4::;:k1;;;;,..„--::: c;—
1
03 u_
,:::40:41444407 /147 km
1 z
F i 9' s /6 //j LL
II 1,-,',::'„'•fr'-s:'-';'j.,'-.N.14ANtjpillOtitlFgk4Z:N.;iiiti.4Iq;,Wt4i;:;--:,--,.
II g li,,,,t,,,,,,,,:,,,_.,:ii„,:,,,,„s,.,,,,,,,,:::„7::::....„.iii..,,,,..„..e.s„,gmii„:::4:.4V‘Wkigtfitikt,/..t.:
1-
1 I mi 11 ii. --,-,1-::',-.'-:1'.:-!:'''.',:.,.':.!:.,,,.::',,-,,,A...77`;':-...;:::.,,:::,-..-4..4011VkaiVArttftr,/ly,-..
S
j I 1 ''':::'':1:1'::7:::::::;1:41;I'4.4iii4;441.. r;
1I �:A. p� 8 111
I /1 g
..7„...,,,,.= -10
ig Li•
AMY
H P
i