Loading...
HomeMy WebLinkAboutMinutes TAC 01-20-10Alexia Donahue Wold -DOCS -No comments Nick Redden Engineering (on behalf of Alexia Donahue -Wold) Sent comment letter, no additional comments Sue Maki Carmel City Utilities Petitioner has no plans to install irrigation system -No comments -Sue to follow up with John Duffy regarding water /sewer available END No additional comments Docket No. i 9120027 ADLS Amend: orld Wide Motors, Mercedes -Benz The applicant see or .urlding remodel and landscape, sidewalk signage changes. The site is located at 3900 E 96 St. The site is zoned B- 3fBusiness. Filed by Marc Tworek of Versatile Construction Group, LLC. and Docket No. 09120028 ADLS Amend: Mercedes -Benz Service Center The applicant seeks approval for a building remodel/addition and landscape signage changes. The site is located at 4000 E 96 St. The site is zoned B- 3/Business. Filed by Marc Tworek of Versatile Construction Group, LLC. Marc Tworek of Versatile Construction, Paul Pettenado with World Wide Motors, and Scott Bordenet with Bordenet were present and are seeking an approval to expand and remodel their existing buildings at 3900 East 96 Street and 4000 East 96 Street. The existing 3900 building (currently the service center and sales for World Wide Motors) is to be recreated in order to bring up to Mercedes Benz standards before the end of 2010. The 4000 building is currently Smart Car sales would be renovated to expand showroom for new car sales and the service center at the rear of that building would become used car sales along with adding a showroom for Sprint Truck Sales. An addition to the 4000 building requires a height addition and adds a 5 bay service area for the Sprint Truck sales. The 3900 building would become the service center for all vehicles including a ride up /pick up area for customers. Petitioner questioned the comments received from continent letters regarding EIFS not being allowed 3 feet from ground level; which does not meet the standards of Mercedes Benz specifications. Mercedes Benz would allow for reinforced EIFS to be used. It was suggested from the committee to have Petitioner bring material samples with them to the Special Studies Committee meeting so the members can see what Mercedes Benz is requesting. Greg Hoyes Hamilton County Surveyor Office -Sent comment letter -Does not form regulated drainage water shed, no comments Joanie Clark Vectren Energy Additional gas load needed for addition to 4000 building Passed out contact information Shirley Hunter -Duke Energy -IP &L services facilities Angie Conn -DOGS -No additional comments Chris Ellison- Carmel Fire Department Expansion of 4000 building -need to verify sprinkler system is sufficient Tao .2.0 1zo 10 No changes to any Location or fire department connections David Littlejohn -DOCS- Alternative Transportation Sent comment letter -No further comments Alexia Donahue Wold -DOCS No comments Nick Redden Engineering (on behalf of Alexia Donahue -Wold) -Sent comment letter, no additional comments Sue Maki Carmel City Utilities Irrigation already exists on building and there are no plans to change system -No comment END 10 a.m. INTRODUCTION: Coxhall Mansion Renovation Chris Wisemal from Cripe Engineers introduced a project that is to be submitted from Parks Department. Petitioner is seeking to renovate existing Coxhall Mansion, 2000 West 116 Street, Carmel, into a banquet hall to allow for public use. The master plan is to extend entrance /drive on west side (by the bell tower) up to mansion. Over all design will include green elements including rain gardens in middle of parking area and pervious concrete in parking bases. There are known drainage issues around the mansion currently and with renovations these issues should be corrected. They are looking for administrative approval with a courtesy filing to TAC committee. Plan to submit drawings later this week or next week.