HomeMy WebLinkAboutCorrespondence Conn, Angelina V
From: Jon Dobosiewicz [jond@NF-LAW.COM]
Sent: Monday, January 04, 2010 12:51 PM
To: Conn, Angelina V
Cc: Littlejohn, David W
Subject: PFM Green Building List
Attachments: Carmel Green Building Checklist.doc
Angie,
See attached green building list.
In addition I spoke with David and he was in agreement with pedestrian access only to Guilford r -o -w pending seeing a
revised site plan with the connection identified.
Thanks,
Jon
Jon C. Dobosiewicz
Land Use Professional
Nelson Frankenberger, PC
3105 East 98th Street, Suite 170
Indianapolis, IN 46280
317 844 -0106 Voice
317 428 -8393 Cell
317 846 -8782 Fax
jon@nf- Law.com
1
Conn, Angelina V
From: Redden, Nick
Sent: Wednesday, December 30, 2009 11:28 AM
To: Conn, Angelina V
Subject: RE: Jan. 5 Plan Commission committee meeting items
Good morning, Angie,
Yesterday, 12 -29 -2009, at approximately 2:00 pm, the Department of Engineering received responses to the review
comments that John e- mailed to Mr. Ed Fleming on 12 -21 -2009 and the supplemental review comments that Gary e-
mailed to Mr. Fleming on 12 -22 -2009. A quick review of Gary's comments indicates that 1 through 14 and 16 have been
responded to, but not all have been resolved as the response to comments 5, 6, 14, and 16 is: "This comment will be
addressed by the client's attorney." There was no response to comment 15. In response to comment 9, the
Department of Engineering received a request for a variance from Mr. Fleming.
Sincerely,
Nick
From: Conn, Angelina V
Sent: Tuesday, December 29, 2009 4:25 PM
To: Redden, Nick
Subject: FW: Jan. 5 Plan Commission committee meeting items
Hi Nick—does your dept have any major outstanding concerns with the following project?
1. Docket No. 09110040 ADLS Amend: PFM Car Truck Care Center (former PSI/Duke Energy Site)
The applicant seeks approval for a building addition and exterior building /site modifications. The site is located at
1441 S Guilford Rd. and is zoned PUD/Planned Unit Development. Filed by John Neely of Five J, LLC.
Please let me know by tomorrow afternoon.
Thanks!
-Angie Conn, Planning Administrator
From: Conn, Angelina V
Sent: Monday, December 28, 2009 12:52 PM
To: Duncan, Gary R; Brewer, Scott I; 'Noyes, Greg R'
Cc: 'Lucas, David E'; Barnes, David R; Mindham, Daren
Subject: Jan. 5 Plan Commission committee meeting items
Good afternoon!
Please see the attached agenda. I am writing the Dept reports, and would like to know if you have any major
outstanding issues with any of these projects, particularly Items 10, 11, and 13. I need your comments by Wednesday
afternoon, please!
Thanks!
-Angie Conn, Planning Administrator
1
Conn, Angelina V
From: Brewer, Scott I
Sent: Monday, December 28, 2009 4:02 PM
To: Conn, Angelina V
Subject: FW: PFM Car and Truck Care Center at 1441 S. Guilford Rd.
Angie: this is the latest email from Darren to Eric Carter and Ed Fleming. I think this might answer some of the questions
they had. Does it agree with what you had as comments?
Scott Brewer, City Forester
Environmental Planner, DOCS
City of Carmel,
One Civic Square
Carmel, IN 46032
PH: 317- 571 -2478
FAX: 317- 571 -2426
Urban Forestry is the center of sustainability for municipalities
From: Mindham, Daren
Sent: Thursday, December 17, 2009 10:29 AM
To: 'Eric Carter'
Cc: Ed Fleming
Subject: RE: PFM Car and Truck Care Center at 1441 S. Guilford Rd.
Eric,
I am uncertain what the overall point of this calculation is. Technically, in nature trees grow within inches of each other
with great success. Obviously, society tries to maintain a distance between trees and depending on the species 20'
between trees is not unrealistic. If I do my math right this would encompass the 54 trees per .5 acre. Fortunately, there are
alternatives to planting all the trees on site, like planting them adjacently off -site ect. Hopefully this will not need to be an
issue.
From what I see with the latest landscape plan I am unaware where there is a problem with too many trees on the site. In
all actuality, the City of Carmel would like to have all existing trees remain and any landscaping changes needed would
only affect the proportionally small area of the site where additions and construction are taking place. We do not desire
any changes to any of the perimeter landscaping outside of your requested building construction limits.
Hopefully, this answers your question.
PS. Scott Brewer the Environmental Planner will be back at work starting on Monday. He will be the one to contact on any
plan review questions from here on out. I will of course relay any conversation and thoughts that we have had.
Daren Mindham
Urban Forester
City of Carmel
317 -571 -2283
From: Eric Carter [mailto:cartere @weihe.net]
Sent: Thursday, December 17, 2009 10:00 AM
To: Mindham, Daren
Cc: Ed Fleming
Subject: FW: PFM Car and Truck Care Center at 1441 S. Guilford Rd.
Daren,
In your experience, what is the maximum amount of trees that can be planted in .5 AC. It appears with your calculation
chart below, the amount trees required will be 54. The only area possible for planting is about .5 AC.
1
Do you have any suggestions?
Thanks
Eric
Original Message
From: Ed Fleming
Sent: Monday, December 07, 2009 10:41 AM
To: Eric Carter
Subject: FW: PFM Car and Truck Care Center at 1441 S. Guilford Rd.
Original Message
From: Mindham, Daren [mailto:dmindham @carmel.in.gov]
Sent: Monday, December 07, 2009 10:34 AM
To: John S. Neely
Cc: Jim Shinaver; Jon Dobosiewicz; Ed Fleming; Jon Byrum
Subject: PFM Car and Truck Care Center at 1441 S. Guilford Rd.
Dear Mr. Neely:
The following email represents comments for this project specifically addressing the area of urban forestry. I
have reviewed the drawings submitted November 20, 2009 and offer the following comments:
URBAN FORESTRY REVIEW COMMENTS
1) After reviewing the site, I have found discrepancies with what existing trees are on the site
compared to what existing trees are shown on the plan C100. All three berms show a lesser count of
existing trees on the plan as compared to the actual site. Please provide an updated and accurate
Sheet C100 noting these discrepancies.
2) The Park Place PUD District requires that the developer shall conserve existing trees. With that, I
would like to have the existing trees that are outside any construction limits saved. This particularly
details the west berm and the south berm. If it is decided that removing the berms are an essential
part of the construction process, tree replacement shall occur to mitigate the size and quantity of the
existing trees. See chart:
City of Carmel Tree Preservation Replacement Formula
Diameter at Breast Height (dbh -4.5 feet) Number of Replacement Trees (2.5" caliper)
Less than 6" 1 for 1
6" and greater, but Tess than 16" 2 for 1
16" and greater, but less than 26" 3 for 1
26" and greater, but less than 36" 4 for 1
36" and greater 5 for 1
3) Please provide a dotted -line indicating the construction limits of the project. There are many other
trees on the site on the east side of the project that are not shown on the landscape plan and appear
outside proposed construction limits.
2
`y
4) Please provide shrubs along the entire length of the parking lot on the south side, where possible.
This will make a definite bearing on shielding headlights from shining at 116 St.
We request that all responses to our comments be provided in writing. Failure to provide written responses may
result in delay of the review process.
It is critical that this office be made aware of all modification made on the plans being re- submitted, particularly
if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans
indicating all revisions. Please notify us of any changes and specifically state any changes, including changes
resulting from Plan Commission, Special Studies or other committee meetings.
The Department of Community Services reserves the right to provide additional comments based on subsequent
reviews.
If you have questions, please contact me at 571 -2417.
Sincerely,
Daren Mindham
Urban Forester
City of Carmel
317 571 -2283
3
Conn, Angelina V
From: Hollibaugh, Mike P
Sent: Tuesday, December 22, 2009 10:39 AM
To: Conn, Angelina V; 'Jon Dobosiewicz'
Cc: Boone, Rachel M.; Holmes, Christine B
Subject: RE: PFM Car and Truck Care Center signage
Jon,
I appreciate your understanding while we were looking further at this issue.
Angie explained correctly where we ended up, in that the pole barn is an accessory structure which is clearly subordinate
to the main building, not part of a complex where the buildings are designed to act together as a whole.
It may not take a lot of additional investment in order to re -work the building /site so they look and function as more of a
unit. We are interested in talking with you more about that possibility, and working to help get you there.
Yours truly,
Mike H.
From: Conn, Angelina V
Sent: Monday, December 21, 2009 12:07 PM
To: 'Jon Dobosiewicz'
Cc: Hollibaugh, Mike P; Boone, Rachel M.
Subject: RE: PFM Car and Truck Care Center signage
Good Afternoon, Jon
I am aware that since we met a few weeks ago, that you have briefly discussed the signage concerns with the Director,
Mike Hollibaugh. And prior to that, Mike consulted with the Plan Commission attorney. The way the definition of multi
tenant building complex is read, the two buildings have to be primary buildings and not an accessory building. That was
the result of conversations at the staff meeting last Monday.
However, if you can bring plans to us that show the accessory building being used as a primary building, such as with an
additional tenant located in the easternmost building that is not located in the western primary building, additional
paved parking, and some exterior color /material upgrades that match the proposed upgrades to the westernmost
building, then we can permit additional signage. But as of now, we have not seen revised plans for that accessory
structure, and cannot permit the additional signage for that building, or the additional multi- tenant ground sign, without
a variance.
Mike Hollibaugh and Rachel Boone can correct me if I have misinterpreted the results of that Staff meeting.
Angie Conn, Planning Administrator
Planning Zoning Dept
City of Carmel
1 Civic Square, 3rd Floor
Carmel, IN 46032
0: 317 571 -2417
F: 317 571 -2426
E: aconn(&carmel.in.gov
Website
Please consider the environment before printing this e -mail
1
From: Jon Dobosiewicz [mailto:jond @NF- LAW.COM]
Sent: Monday, December 21, 2009 11:47 AM
To: Conn, Angelina V
Subject: PFM Car and Truck Care Center
Angie,
I will have the information booklets for this item to your office no later than Tuesday (tomorrow).
Per our last conversation on signage you advised me that we should proceed with the understanding that the site qualified
as a Multi- tenant building complex permitting a Center Identification Ground Sign.
You indicated at that time that you were going to speak with Mike about this. He indicated to me on December 11 that it
would be discussed at the staff meeting on the following Monday.
Can you please let me know if you have spoken with Mike and if he supports your conclusion?
Thanks,
Jon
Jon C. Dobosiewicz
Land Use Professional
Nelson Frankenberger, PC
3105 East 98th Street, Suite 170
Indianapolis, IN 46280
317- 844 -0106 Voice
317 428 -8393 Cell
317 846 -8782 Fax
jon U nf- Law.com
2
P
"'cam
ITY E
December 22, 2009 JAMES BRAINARD, MAYOR
Mr: Edward E. Fleming
Weihe Engineers
10505 North College. Avenue.
Indianapolis, IN 46280
RE: PFM Car Truck Care Center- Project Review #1 Supplemental Comments
Dear Mr. Fleming:
Based on additional review, the City provides additional comments:
CONSTRUCTION DRAWING REVIEW COMMENTS
J1'. The Department of Engineering will not support the proposed 116" Street access.
X Please indicate additional right -of -way for a 70 -foot half on 116" Street and a 45 -foot
half on Guilford Road.
7 Please confirm with the -Department of Community Services if bicycle parking and path
in accordancewith.the Alternative Transportation Plan is required across each frontage.
Proper easement is required for storm water quality and storm water detention systems. 6 Guilford Road plans indicate the reconstruction of the two drives from Guilford Road.
Due to the proxirnity of the southernmost drive to the intersection of 116 Street and
Guilford Road, the City cannot guarantee long -term full access to this drive.
Any improvements on Guilford Road need to be constructed to accommodate the current
design plans, the same as if these improvements already existed.
Please indicate the flood route.
X. Please revise grading note 8 to be the City standard note.
7 While, the overall increase in percent impervious is not large, the total land disturbance is
t OE' over the threshold. The proposed use has the potential to produce pollutants of concern.
The proposed plan requires removal of existing trees in favor of lawn areas that will
likely be irrigated and fertilized.- Two ;BMPs are required for the storm water generated
b`\ from the new impervious areas. The Department of Engineering will support a variance
to provide only one provided that the runoff from more of the existing site is treated by
the single BMP. There appears to be the opportunity to install a bio -swale in the existing
drydetention basin.
Will the existing fuel 'station continue to be used?
Please indicate the location of the 3 -foot concrete drainage swale included in the detail on
Sheet C800.
X. Please revise all ADA ramp details if proposed to be in the right -of -way. If different
ones will be utilized on site, both private and City standard details will need to be
included and differentiated on the site plan.
4 Please replace sidewalk detail with current City standard.
ursuant to Section 2.09 of the Carmel Zoning Ordinance, compliance with the
Thoroughfare Plan includes construction of the improvements prescribed by the
DFPARENIENT OF ENGINEERING
ONE CIVIC SQUARE, CAr tn., IN 46032 OFFICE. 317.571.2441 FAX 317.571 2439
ENIAII. engineerring cannel.in.goV
Mr. Edward E. Fleming.
December 22; 2009.
RE: PFM Car and Truck Care Center- Project Review #1 Supplemental Comments
Page -2 oft
Thoroughfare Plan across the frontage controlled by the development (including sections
no access)..
()with
The Department is still reviewing detention issues raised during the meeting on
December 11, 2009.
dp,
Please indicate the construction of multi -use path along the Guilford Road frontage 1 -foot
off of the proposed right -of -way line. This may differ from the path indicated on the
current Guilford Road construction plans. The path shall he constructed at elevations that
are consistent with the planned cross section of Guilford Road. The path must be
constructed to the 116 Street and Guilford Road intersection and include the
construction ofADA ramps to accommodate the planned pedestrian crossings at this
intersection.
If you have questions, please contact me at 571 -2441.
Sincerely,
li
f
Gary R. uncan, Jr., P.E.
Assistant City Engineer
Department of Engineering
cc: Angelina Conn, Department of Community Services
John Duffy, Carmel Utilities
Paul Pace. Carmel Utilities
Paul Arnone, Carmel Utilities
Greg Hoyes, <Hamilton County Surveyor's Office
Greg llko, Crossroad Engineers, PC
Department Review /File Copy
Z:\shared\DHill \PROJRE V09\PFMCAR &TRUCKCARECEN 1 ERREV# 1 SUPPLEMENTAL.doc
Conn, Angelina V
From: Conn, Angelina V
Sent: Monday, December 21, 2009 12:07 PM
To: 'Jon Dobosiewicz'
Cc: Hollibaugh, Mike P; Boone, Rachel M.
Subject: RE: PFM Car and Truck Care Center signage
Good Afternoon, Jon
1 am aware that since we met a few weeks ago, that you have briefly discussed the signage concerns with the Director,
Mike Hollibaugh. And prior to that, Mike consulted with the Plan Commission attorney. The way the definition of multi
tenant building complex is read, the two buildings have to be primary buildings and not an accessory building. That was
the result of conversations at the staff meeting last Monday.
However, if you can bring plans to us that show the accessory building being used as a primary building, such as with an
additional tenant located in the easternmost building that is not located in the western primary building, additional
paved parking, and some exterior color /material upgrades that match the proposed upgrades to the westernmost
building, then we can permit additional signage. But as of now, we have not seen revised plans for that accessory
structure, and cannot permit the additional signage for that building, or the additional multi- tenant ground sign, without
a variance.
Mike Hollibaugh and Rachel Boone can correct me if I have misinterpreted the results of that Staff meeting.
Angie Conn, Planning Administrator
Planning Zoning Dept
City of Carmel
1 Civic Square, 3rd Floor
Carmel, IN 46032
0: 317 571 -2417
F: 317 571 -2426
E: aconn(acarmel.in.ciov
Website
Please consider the environment before printing this e-mail
From: Jon Dobosiewicz [mailto:jond @NF- LAW.COM]
Sent: Monday, December 21, 2009 11:47 AM
To: Conn, Angelina V
Subject: PFM Car and Truck Care Center
Angie,
I will have the information booklets for this item to your office no later than Tuesday (tomorrow).
Per our last conversation on signage you advised me that we should proceed with the understanding that the site qualified
as a Multi- tenant building complex permitting a Center Identification Ground Sign.
You indicated at that time that you were going to speak with Mike about this. He indicated to me on December 11 that it
would be discussed at the staff meeting on the following Monday.
Can you please let me know if you have spoken with Mike and if he supports your conclusion?
Thanks,
1
Jon
Jon C. Dobosiewicz
Land Use Professional
Nelson Frankenberger, PC
3105 East 98th Street, Suite 170
Indianapolis, IN 46280
317 844 -0106 Voice
317 -428 -8393 Cell
317 846 -8782 Fax
jon @nf- Law.com
2
L1! WEIHE
ENGINEERS
Land Surveying l Civil Engineering
Land ,cape Architecture..._..
Build with confidence"'
December 15, 2009
RECENED
Angelina V. Conn, Plan Administrator DEC 1 5 2009
City of Cannel
DOGS
Planning Zoning Department..
One Civic Square, 3 Floor
Carmel, IN 46032
RE: pfm Car Truck Care Center
Project Review
Dear Ms. Conn:
This letter is in response to your Plan Review Comments via email on December 3, 2009 for the
above referenced project. We have prepared the following responses to the comments listed
below.
REVIEW COMMENTS
1. Comment: Bring material /color samples to the Plan Commission committee meeting.
Response: The Architect and developer will provide these.
2. Comment: Please add a soils map to the plans.
Response: The soils map is on the cover sheet and the SWPPP plan.
3. Comment: Please break down the percentage of the building square footage that will
be used for retail uses, auto repair, office, etc. (This is mostly to calculate
the required number of parking spaces.
Response: The breakdown is shown on the cover sheet.
4. Comment: Please show the screening of the rooftop mechanical equipment on the
north, if possible.
Response: The architect will be addressing this comment.
5. Comment: Please provide copies of your correspondence with the TAC members and
their correspondence with you.
Response: Noted.
10505 N. College Avenue 1 Indianapolis, IN 46280 1 weihe.net 1 317 1 846 6611 1 800 1 452 6408 I Fax: 3171 843 0546
Allan H. Weihe, P.E., L.S. President
I6 WEIHE Pfm Car Truck Care Center
ENGINEERS December 15, 2009
Page 2 of 3
6. Comment: Please provide a list of all green/sustainable building /site aspects you will
pursue, such as a white roof, solar panels, pervious pavers in all or part
of the parking area, etc.. A green checklist is attached..
Response: The architect and developer will provide this.
7. Comment: Show /label the trash receptacle location, and provide screening details.
Make sure that the dumpster enclosure is taller than the dumpster.
Response: The dumpster will be located in the rear of the garage area. Once this
location is determined, I will provide you with the drawings.
8. Comment: Prepare an estimated construction cost to comply with the Thoroughfare
Plan Alternative Transportation Plan; contact the Engineering Dept.
for more details.
Response: The developer will provide this information.
9. Comment: Please provide the lot coverage percentage, which should include the
building footprint as well as pavement.
Response: This percentage has been added to the notes.
10. Comment: Please add the bike parking location on the site plan, and also provide the
bike rack details as required in Chapter 27.06.
Response: The bike parking with details have been added as requested.
11. Comment: Please add a sidewalk connection from your building entrances to the
path along 116 Street and to the Guilford Rd. right of way to connect to
the development to the west and future development to the north.
Response: Once we decide if the entrance onto 116 Street will remain, we will
show a connection and discuss if warranted.
12. Comment: Drainage calculations most likely need to be submitted to the Carmel
Engineering Dept and the Hamilton County Surveyor 's office.
Response: If the entrance goes away, these calculations will not be needed..
13. Comment: Signage In the sign package, please limit each sign text to be a maximum
of one color (not a mix of two -three colors for the letters within one sign).
H:\2009 \W 090548 \d ocs \Comments\20091215 C annelPl an. doc
LI: WEIHE Pfm Car Truck Care Center
ENGINEERS December 15, 2009
Page 3 of 3
Also, please add to the sign criteria: no raceways, limit the colors to three
plus black and white, logos are limited to 25% of the total sign area but
are not restricted in color, and sign width cannot exceed 80% of the
storefront width.
Response: This will be addressed by the attorney and developer.
14. Comment: Signage: additional signage review comments are attached from Rachel
Boone, sign permits specialist
Response: This will be addressed by the attorney and developer.
Should you have any further questions or requests for additional information pertaining to this
project review, please contact Jim Shields of Weihe Engineers at 317 846 -6611.
Sincerely,
AA -/Aa
Edward E. Fleming
Project Manager
H:\2009\WO90548\docs\Comments\20091215CarmelPlan.doc
Conn, Angelina V
From: Conn, Angelina V
Sent: Thursday, December 03, 2009 2:55 PM
To: 'Jon Dobosiewicz'
Cc: Jim Shinaver; John Neely; 'Ed Fleming'; 'Jon Byrum'
Subject: Review comments for Docket No. 09110040 ADLS Amend: PFM Car Truck Care Center
(former PSI /Duke Energy Site)
Attachments: Carmel Green Building Checklist.doc; PFM center signage review
Preliminary Planning/Zoning Dept review comments:
Please reply to each of the review comments for the PFM Car Truck Care Center application via email or letter
correspondence before Dec. 21, Monday. Additional comments may be made at the Dec. 16 TAC meeting.
1. Bring material /color samples to the Plan Commission committee meeting.
o x° Please add a soils map to the plans.
K-X Please break down the percentage of the building square footage that will be used for retail uses, auto repair, office,
etc. (This is mostly to calculate the required number of parking spaces.
4. Please show the screening of the rooftop mechanical equipment on the north, if possible.
5. Please provide copies of your correspondence with the TAC members and their correspondence with you.
6. Please provide a list of all green /sustainable building /site aspects you will pursue, such as a white roof, solar
panels, pervious pavers in all or part of the parking area, etc.. A green checklist is attached.
7. Show /label the trash receptacle location, and provide screening details. Make sure that the dumpster enclosure is
taller than the dumpster.
8. Prepare an estimated construction cost to comply with the Thoroughfare Plan Alternative Transportation Plan; C.
contact the Engineering Dept. for more details.
9. Please provide the lot cover percentage, which should include the building footprint as well as pavement. v cp6l
o ,yd Please add the bike parking location on the site plan, and also provide the bike rack details as required in Chapter
27.06.
11. Please add a sidewalk connection from your building entrances to the path along 116 Street and to the Guilford
Rd. right of way to connect to the development to the west and future development to the north.
12. Drainage calculations most likely need to be submitted to the Carmel Engineering Dept and the Hamilton County
Surveyor's office.
ti 1 3 Signage: In the sign package, please limit each sign text to be a maximum of one color (not a mix of two -three
colors for the letters within one sign). Also, please add to the sign criteria: no raceways, limit the colors to three plus
black and white, logos are limited to 25% of the total sign area but are not restricted in color, and sign width cannot
exceed 80% of the storefront width.
Signage: additional signage review comments are attached from Rachel Boone, sign permits specialist.
Call or email me if you have any questions or if I may be of assistance.
Sincerely,
Angie Conn, Planning Administrator
Planning Zoning Dept
City of Carmel
1 Civic Square, 3rd Floor
Carmel, IN 46032
0: 317-571-2417
F: 317-571-2426
E: aconn(&carmel.in.00v
Website
Please consider the environment before printing this e-mail
1
Conn, Angelina V
From: Boone, Rachel M.
Sent: Thursday, December 03, 2009 2:35 PM
To: Conn, Angelina V
Subject: PFM center signage review
Angie,
The signage looks pretty good. The proposed sizes are correct, so long as the tenant spaces are exactly as shown. There
is one instance on the south elevation where they show two tenant signs for one tenant space (farthest sw). This would
only work if there are actually two tenants there. I know they're probably just showing what could be there...but based off
the floor plan as shown it would not work. If they could add to the sign criteria: no raceways, limit the colors to three plus
black and white, logos are limited to 25% of the total sign area but are not restricted in color, and sign width cannot
exceed 80% of the storefront width.
They have presented two ground signs and wall signs for all the tenants. They will not be able to do this. Since they are
on two street frontages, they can have wall signs for the tenants and one ground sign with all tenants represented on the
sign. They do have the option of having the ground sign and the wall signs face the same frontage, but I would
recommend having the sign at the sw corner (diagonal to the street intersection) of the site to most effectively utilize the
ground sign. If there is concern over entrance identification, they could have small (3 sq. ft. and 3' tall) directional signs to
identify the entrance /exits.
As for design of the building, I think the awning on the west elevation seems out of place. Also, the colors seem very
similar (muted). Are there going to be different accent colors? Like white at the top of parapet? Lastly, what kind of
screening are they going to provide to block the north view? I can imagine when the retirement community goes in there,
looking at garage doors, it will be an issue.
Let me know if anything needs clarification. Overall I think this will be an improvement to the site.
Rachel
2 ache,L 3 00n&
Sign Permit Specialist
City of Carmel
Department of Community Services
3rd Floor
One Civic Square
Carmel, IN 46032
317.571.2417
317.571.2426 fax
http://www.ci.carmel.in.us/services/communityservice.htm I
§A Please consider the environment before printing this e -mail
1
i
z
11.111111 k
December 15, 2009 C� SF 1 EL
Mr. Edward E, Fleming JAMES BRAINARD, MAYOR
Weihe Engineers
10505 North College Avenue
Indianapolis, IN 46280
RE: PFM Car Truck Care Center Project Review #1
Dear Mr. Fleming:
The City received your construction plans on November 24, 2009. We offer the following comments:
GENERAL INFORMATION
1. These comments: represent the Department of Engineering's first review of the preliminary
development plans forthis project.
2. We request that all responses to our comments be provided in writing and be accompanied by
a drawing reflecting the requested revisions. Failure to provide written responses may result
in the delay of the review process.
3. It is critical that this office be made aware of all modifications made on the plans being re-
submitted, particularly of any such changes are considered "new" or fall outside of our
'previous Please provide revised plans including all revisions. Please notify us of
any changes and specifically state any changes, including changes resulting from Plan
Commission, BZA.or other committee meetings.
4. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage
calculations submitted to this office for review. If you have not already done so, please
provide aset of drainage plans and calculations to their office for review. We will share
Crossroad's comments as they are received.
5. Final drawings will not be approved for construction until:
a. All Engineering Department and Utility Department and Hamilton County Surveyor
issues have been resolved.
b. All bonds and performance guarantees are posted.
c. All Board of Public Works-and Safety approvals and any other governing agency
approvals (if required) are obtained.
d. All off- site easements necessary to install utilities to serve the development are secured.
e. SWPP is approved.
f. All fees are
6. The Department reserves the right to provide additional comments based upon subsequent
reviews.
7. An approved Storm Water Management Permit is required prior to commencing any earth
disturbing activity.
8. An approved right -of -way permit is required prior to commencing any work in the public
right -of -way.
9. if it will be necessary to relocate existing utilities, the costs for such relocation shall be borne
solely by the developer. Any utility poles requiring relocation shall be relocated to within
one -foot of the outside edge of the proposed right way.
10. The Department requires that the construction drawings be developed in accordance with the
City of Carmel digital subrnission standards and that all required submittals for primary plat,
secondary plat, and construction drawings be made. The digital files must be submitted to
DEPARTMENT OF ENGINEERING
ONE Civic SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 F, x 317.571.2439
EMAIL engineering@carmel.in.gov
Mr Edward E. Fleming.
December 15, 2009
RE: 'PFM Car Truck Care Center- Project Review #1
Paget of 4
the Department of Engineering prior to the approval .of the construction plans. Please contact
the City GIS Department for the requireii ents.
11. Jurisdictions:
a. The project' site is located within current City of Carmel Corporate;Lirnits.
b. Perimeter Street and _Rightof Way City of Carmel (Guilford Road, 116' Street)
c. Water City of Carmel Utilities
d. Sanitary Sewers City of C armel Utilities
e. Storm Sewers /Drainage City of Cannel.
f. Legal Drains Hamilton County Surveyor's Office.
12: Drawings submitted for approval:
a. The design engineer must certify all drawings`submitted for final approval.
b. This office will require 9 sets of drawings for approval after all issues have been
resolved. The drawings will be stamped as approved and signed by the City Engineer
and by Cannel Utilities. The Owner will receive 3 sets, one of which must be maintained
on the construction site at all times. if this project is subject to review and approval;by
the Hamilton County `Surveyor's Office, a total l 1 sets will be required for final
approval.
13. Cartnel will provide separate reviews of this project for water issites..Please assure
that copies of all drawings are sent to
Paul Pace Paul Arnone
Carmel Utilities Distribution Carmel Utilities Collection
3450 West 131" Street 901 North Range Line Road
Westfield, IN 46074 Carmel; IN,46032
14_ Cannel Utilities "subscribes to "Holey Moley" who should be contacted directly for all .water
main locations.
15. The following items will be sent: electronically upon request regarding this correspondence
and project:
a. Project Approval Checklist
b. Performance /Maintenance Guarantees
c. Utility Jurisdictions /Right -of -Way Permits
d. Availability (acreage) Fees
BOARD OF PUBLIC WORKS:AND- SAFETY
16. A schedule for Board of Public Works and Safety meeting dates and agenda deadlines._ will be
sent electronically for-.your use upon request: Please use the Engineering Department
deadliiies for to the Board.
17. Any submission to the Board: requires prior approval by the Carmel C1ay:Plan
Commission and /or the Board of Zoning Appeals (if applicable) and completion of
review by the Technical Advisory Committee. All written requests to be_placed on the
Board's agenda must include the appropriate Docket Number, and the date (or dates) of
approval by the Plan Commission and /or the Board of. Zoning. Appeals .(if :applicable).
18. Water-' Availability and Sanitary Sewerapproval froni the:Board will be required.. This -is-an
EDU. approval based upon the proposed use of the site. Reference.ltems #33 -:to #35 below
for additional details /explanations: Please note that-if an entryway or other-irrigation
system is planned for this development, additional Water Availability Approval from
the Board will be required and additional Water Connection Fees will be assessed based
upon the size and usage of the system as, determined by 'the Director of Carmel Utilities.
19. •Cotnniercial Curb Ctit Approval. It appears.that the existing curb cuts:on Guilford Road are
not going.to be modified.. The proposed, entrance on 1.16 Street is within the functional
boundary of the Guilford Road /116Th Street intersection and there are already two existing
entrances hi this facility on Guilford. Road. For these reasons, the Department of Engineering
does not support theadditional curb cut on 116 Street.
Mr. Edward .E_Fleming.
December 15, 2009
RE: PFM Car Truck;Care Center Project Review 1
Page 3 of 4
20. Temporary Construction Entrance Approval. It appears the planned construction entrance is
located at the site.of a permanent curb cut planned on Guilford Road. Therefore, a separate
approval from the Board Will not be required.
21. The installation of any permanent privately owned and /or maintained improvement (signs,
`decorative street signs, irrigation Systems, walls, .streetlights', etc.) within dedicated right -of
way or dedicated easements requires the execution of a Consent to Encroach Agreement
betweenthe Owner anid the City of Cannel. Such agreements are executed by the Board of
Public Works and Satety.,The City, Engineer may.approve irrigation system agreements.
22. Secondary Plat approval if applicable. All performance guarantees must be posted prior to
submission of Secondary plats for.,Board of Public Works and Safety approval.
23. Dedication of Right of Way if net platted. This is, based upon. the City. Of Carmel 20 -Year
Thoroughfare Plan requirements, Dedication documents are available Open request. Please
be advised that all Right of Way Dedications must be accoriipanied by a Sales Disclosure
Agreement completed by the owner for the property being dedicated to. the City. The
.dedication document cannot be recorded Without a completed Sales Disclosure. The form is
available upon request.
24. Any open pavertient cuts of either Guilford Road er 116 Street will require Board approval.
25. Lane restrictions_of Guilford Road and /or 116` Street require Board of Public Works and
Safety approval. The Department of-Engineering assumes lane restrictions will be necessary
for curb work at' storm connector, and water, connection..
26. Sidewalk closuresrequired for any work require Board of Public Works and Safety approval
and must conform to City's sidewaik,closure policy. A detour must be established and
proper signage must be installed and iiiairitained for the duration of the closure.
BONDING REOUIREMENTS
27. Upon initial review if appears perfor ante guarantees shall be provided for the following:
a. Ifthisdevelopinentis`to be platted, a perforinance guarantee will be required for
PerimeterrMonurnentation.
b. Stornwater Post Construction BMPslnstallation Perfonnance- Guarantee.
c. Stonnwater-Construction BMPs Performance Guarantee. Please contact John Thomas,
Engineering Departrnent Construction Inspector, for details rega rding engineer's
estinrates!perfortnance guarantee requirements. for items b) and c).
d. All improvements in -.the right -of- -way.
28. The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for
100% ofthe cost of labor and Materials to construct the individual improvements, to be
provided by the design engineer. Please: provide detailed Engineer's Estimates for each
improvement including quantities, unit costs, pipe sizes and materials, etc.
29. Upon completion and release 'of individual Perfonnance Guarantees, a three -year
Maintenance Guarantee will be required. (see Street Sign comments above). The
Maintenance Guarantee. amount is based upon 15% of the Perfonnance amount for Streets
and Curbs and 10% ofthe Performance amount for all other
30. Performance Guarantees maybe Performance or Subdivision Bonds or Irrevocable Letters of
Credit.
31. Please reference the;available enclosures for more detailed explanation of our procedures.
RIGHT OF WAY PERMIT AND BONDING
32. Any work in the dedicated right -of -way of Guilford Road or 110 Streei will require an
approved Right -of -Way Pernitand a License Permit Bond.
33. The bond amount is determined by our Right -of -Way Manager. However, if the work is
included in the scope of work .ofa required and posted Performance Guarantee, the
Perfonnance Guarantee may be used to satisfy the bond requirements of the Right -of -Way
Permit.
Mr. Edward E. Fleming.
December 15, 2009
RE: PFM Car Truck Care Center- Project Review I
Page 4 of 4
34. .Please contact our Right-of-Way Manager. Fred Glaser, to arrange right -of -way permitting
and bonding.
AVMLABILITY AND CONNECTION FEES
35. We defer to Carmel Utilities regarding this issue.
36. if an entryway or overall site irrigation system is planned for this development,
additional Water Connection Fees will be assessed based upon the size and usage of the
system and upon the recommendations of the Director of Carmel Utilities.
37. These fees are required to be paid prior to final approval of construction plans by
Engineering and prior to issuance of building permits by Building Codes Services. Please
confine these fees and calculations with. Carmel' Utilities.
C ONSTRUCTION DRAWING REVIEW COMMENTS
38. General Comments
a. This project is subject to the City's. Storm Water Management and Storm Water Quality
Ordinances.
b. Please add the following note: to the drawings: IF iT WiLL BE NECESSARY TO
RELOCATE EXISTING UTILITIES, THE EXPENSE OF SUCH RELOCATION
SHALL BE THE RESPONSIBILITY THE. DEVELOPER. ALL UTILITY POLES
SHALL BE LOCATED WITHIN ONE -FOOT OF THE PROPOSED RIGHT -OF-
WAY."
39: Please add note stating NO EARTH DISTURBING ACTIVITY MAY COMMENCE
WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT" to all sheets.
40. Provide all current easements for entire tract to pertinent sheets .with correct< .calls for each..
41. Please provide the requisite store water /drainage information required by Section 100 of the
Storm Water Technical Standards Manual on the plan sheets.
42. Al]. swales on site must have subsurface pipe installed. Pipe to conform to requirements of
Storm Water Technical Standards Manual and shall be double wall, H1 -Q pipe.
If you have questions, please contact me at 571- 244.1.
Sincerely,
Nicholas J. Redden, P.E.
Plan Review Coordinator
Department of Engineering
cc: Angelina Conn, Department of Community Services
John Duffy, Carmel Utilities
Paul Pace, Cannel Utilities
Paul Arnone, Carmel Utilities
Greg Hoyes Hamilton County Surveyor's Office
Greg Ilko, Crossroad Engineers, PC
Department Review/File
issvrapp \userdatalz;1shared1DHlLLTRC?J VO9 \PFMCAft&FRUCKCARECLNIL-RREV4
�gV F ay O R'S OF
1
,s,;k C
F r/ t 'ai 111 P it 4 E t "41 ��I
I l cJ ma c
Y 1 19 .+a,a 11 i �a f n
9 1, Xenton C. `Ward, C'T.7Vt
Suite ISS
Surveyor of J (amilton County One 9- lamilton County Square
(Phone (317) 776 -3495 _Noblesville, Indiana 4606o -2230
Tax (3 776 -9628
December 10, 2009
Weihe Engineers
ATTN: Ed Fleming
10505 North College Avenue
Indianapolis, IN 46280
VIA E -MAIL: flemingeAweihe.net
RE: PFM Car Truck Care Center
Dear Mr. Fleming:
We have reviewed the construction plans submitted to the Hamilton County Surveyor's Office
on November 25, 2009, for this project and have the following comments:
1. The proposed project falls in the incorporated area and MS4 jurisdiction of the City of
Carmel.
2. The proposed project DOES NOT fall in a Carmel Wellhead Protection Zone.
3. The proposed project falls in the W.R. Fertig Regulated Drain Watershed.
4. The site has existing detention basins for the storm water runoff and the increase
impervious area with this proposal is minimal. The increased storage volume being
provided should cover the additional runoff without increasing the previously
approved site discharge rate.
5. No permits will be needed from our office.
6. Hamilton County Surveyor's Office has no objections to the proposed plans.
Should you have any questions, I can be reached at 317- 776 -8495.
Sincerely,
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
CC: Christine Barton Holmes Carmel DOCS, John Thomas Carmel Engineering
Dick Hill Carmel Engineering, Greg Ilko Crossroad Engineers
\`\1 yi'I k I1 1 �o F /a/ cg4
Q C ity of
I1
December 10, 2009
Mr. Edward Fleming
Weihe Engineers
10505 College Ave
Indianapolis, IN 46280
RE: PFM Car Truck Care Center (former PSI/Duke Energy Site)
Dear Mr. Fleming:
The following letter represents comments for this project specifically addressing the area of alternative transportation.
I have reviewed the drawings submitted for the December 16, 2009 Technical Advisory Committee meeting, and
comments from the Alternative Transportation review have been satisfactorily addressed.
ALTERNATIVE TRANSPORTATION REVIEW COMMENTS
1) The City of Carmel Parking Ordinance requires all commercial venues to include bicycle parking. Bicycle
parking spaces are required at a rate of five (5) bicycle parking spaces per one hundred (100) automobile
parking spaces with a minimum of four (4) spaces. Please see the City of Carmel's Parking Ordinance in
order to determine appropriate locations and construction details for the above.
We request that all responses to our comments be provided in writing. Failure to provide written responses may result
in delay of the review process.
It is critical that this office be made aware of all modification made on the plans being re- submitted, particularly if any
such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans indicating all
revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan
Commission, Special Studies or other committee meetings.
The Department of Community Services reserves the right to provide additional comments based on subsequent
reviews.
If you have questions, please contact me at 571 -2417.
Sincerel
David Littlejohn
Alternative Transportation Coordinator
Department of Community Services
cc: Angie Conn, Department of Community Services
Engineering Department Review
Project File
Page 1
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571 -2417
NELSON FRANKENBERGER
A PROFESSIONAL CORPORATION
ATTORNEYS AT LAW
JAMES J. NELSON 3105 EAST 98TH STREET, SUITE 170 JANE B. MERRILL,
CHARLES D. FRANKENBERGER INDIANAPOLIS, INDIANA 46280 Of Counsel
JAMES E. SHINAVER
LAWRENCE J. KEMPER PHONE: 317- 844 -0106
JOHN B. FLATT FACSIMILE: 317 846 -8782 JON C. DOBOSIEWICZ,
FREDRIC LAWRENCE Land Use Professional
JAMES A. NICKLOY
CHRISTOPHER A. FERGUSON 61 8 9 19 77 r
November 20, 2009 (N.7) C
F /VFD -v
Angie Conn Nov G 0 24
City of Carmel
One Civic Square Or
Carmel, IN 46032 a
8 9�
0L
Re: PFM Car and Truck Care Center 1441 South Guilford Avenue
Dear Angie:
Enclosed you will find an application for ADLS Amend approval. The engineer has
affected the TAC distribution, and our anticipated schedule is as follows:
December 16 TAC
January 5 Special Studies Committee
January 25 Board of Zoning Appeals
We will soon be conferring with you to identify any variances that may be required and
to further discuss the Use Variance for Indoor Automobile and Truck Repair which we plan on
filing on or before December 11 Should you have any questions regarding this, please do not
hesitate to call.
Very truly yours,
NELSON FRANKENBERGER, P.C.
Jon C. Dobosiewicz
Land Use Professional
Enclosures
H:\Becky\Zoning Real Estate Matters\PFM Car Truck\Letters\Ltr to A Conn 112009.doc
Ms WEIHE
ENGINEERS �1 ��1gt,��
Land Surveying i Civil Engineering h T
Landscape. Architecture RECEIVED -0
Build will, confidence':'
on.fidenc cal NOV 202009
TRANSMITTAL DOGS
0>
To: Vectren Energy Project pfm Car Truck Car e
Center t L
P.O. Box 1700 Job W090548
Noblesville, IN 46061 Phone: 317 776 -5535
Attn: Chuck Shupperd Fax: 317 776-5553
Date: November 20, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via UPS the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
1 Construction Set
These are transmitted as indicated below:
Approved For Your Review or Use
Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
Action Not Required For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 weihe.net 317 1 846 6611 800 1 452 6408 Fax: 3171 843 0546
Allan H. Weihc, P.E., L.S. President
WEIHF,
ENGINEERS
Land Surveying i Civil Engineering
Landscape Architecture
C Build with CDi! f itif P7C`
TRANSMITTAL
To: Transportation Systems Coor. DOCS Project: pfm Car Truck Care Center
One Civic Square, 3' Fir Job W090548
Carmel, IN 46032 Phone: 317 -571 -2417
Attn: David Littlejohn Fax: 317.571 -2426
Date: November 20, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via Delivered the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
1 Construction Plans
These are transmitted as indicated below:
Approved For Your Review or Use
Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
Action Not Required For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 weihe.nct 317 1 846 6611 800 1 452 6408 Fax: 317 1 843 0546
Allan H. Weihc, P.E., L.S. President
WEIHE
ENGINEERS
Land Surveying i Civii Engineering
Landscape Architecture
B u i l d with e o l7 t i d t: n „s:
TRANSMITTAL
To: Carmel City Utilities Project pfm Car Truck Care Center
760 Third Avenue SW Job W090548
Carmel, IN 46032 Phone: 317 -632 -9077 x 291
Attn: John Duffy Fax: 317-571-2642
Date: November 20, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via Delivered the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
2 Construction Plans
These are transmitted as indicated below:
Approved For Your Review or Use
Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
Action Not Required For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 wcihc.net 317 1 846 6611 800 1 452 6408 Fax: 3171 843 11546
Allan H. Wcihe, P.E., L.S. President
o.
WEIHE
ENGINEERS
Land Surveying j Civil Engineering
Landscape Architecture
r���� ��r���T Buitd with continence
1RAl\SMI1 iAL
To: Brighthouse Networks Project: pfm Car Truck Care Center
3030 Roosevelt Avenue Job W090548
Indianapolis, IN 46218 Phone: 317 -632 -9077 x 291
Attn: Jason ICrkman Fax: 317-632 -5311
Date: November 20, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via UPS the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
1 Construction Set
These are transmitted as indicated below:
Approved For Your Review or Use
Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
Action Not Required For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, 13 46280 1 weihe.net 317 1 846 6611 800 1 452 -6408 Fax: 3171 843 0546
Allan H. Wcihe, P.F., L.S. President
WEIHE
ENGINEERS
Land Surveying Cvii Engineering
Landscape Architecture
confide it
TRANSMITTAL
.3uitd
with
1 RAN SMI l 1AL
To: Carmel Clay Communications Project pfm Car Truck Care Center
31 First Avenue NW Job W090548
Carmel, IN 46032 Phone: 317-571 -2586
Attn: Bill Akers Fax: 317-571-2585
Date: November 20, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via Delivered the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
1 Construction Plans
These are transmitted as indicated below:
Approved For Your Review or Use
Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
Action Not Required For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 wcihe.net 317 1 846 6611 800 1 452 6408 i Fax: 317 1 843 0546
Allan H. Wcihe, P.E., I_.S. President
WEIHE
ENGINEERS
Land Surveying 1 Civil Engineering
Landscape Architecture
Bu ild ;~'iih confide rr ca.
TRANSMITTAL
To: Office of Police Chief Project pfm Car Truck Care Center
Three Civic Square Job W090548
Carmel, IN 46032 Phone: 317 -571 -2500
Attn: Michael Fogarty Fax: 317. 5714512
Date: November 20, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via Delivered the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
1 Construction Plans
These are transmitted as indicated below:
Approved For Your Review or Use
Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
Action Not Required For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 weihe.nct 317 1 846 6611 800 1 452 6408 Fax: 317 1 843 0546
Allan H. Wcihc, P.E., L.S. President
111 WEIHE
ENGINEERS
Land Surveying Civil Engineering
Landscape Architecture
TRANS ry.�T Ruj/c/ u ilh r clrr fide tr c• c:"
1 RA l\ SMI A L
To: Indianapolis Power and Light Company Project•. pfm Car Truck Care Center
1230 West Morris Street Job W090548
Indianapolis, IN 46221 Phone: 317 261 -5497
Attn: Dan Davenport Fax: 317-261-5201
Date: November 20, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via uPS the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
1 Construction Set
These are transmitted as indicated below:
Approved For Your Review or Use
Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
Action Not Required For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 weihe.ncl 317 1 846 6611 800 1 452 6408 Fax: 317 1 843 0546
Allan H. Wcihc, P.E., L.S. President
WFIIHE
ENGINEERS
Land Surveying I Civil Engineering
Landscape Architecture
Buhr wiih confidence:':'
TRANSMITTAL
To: Hamilton County Surveyor's Office Project: pfm Car Truck Care Center
One Hamilton Square, Suite 188 Job W090548
Noblesville, IN 46060 Phone: 317 776 -8495
Attn: Greg Noyes Fax: 317-776-9628
Date: November 20, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via UPS the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
1 Construction Set
1 Drainage Calculations
These are transmitted as indicated below:
Approved For Your Review or Use
Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
Action Not Required For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 weihe.net I 317 1 846 6611 800 1 452 6408 Fax: 317 1 843 0546
Allan H. Weihe, P.F., L.S. President
411
WEIHE
ENGINEERS
Land Surveying Civil Engineering
Landscape Architecture
TRANSMITTAL 8ui(ci with co ert.c
To: Hamilton County Sheriffs Office Project•. pfm Car Truck Care Center
18100 Cumberland Road Job W090548
Noblesville, IN 46060 Phone: 317 773 -1872
Attn: Broke Gajownik Fax: 317 776-9896
Date: November 20, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached [1] Under separate cover via UPS the following items:
Shop Drawings Prints Copy of Letter
Product Data n Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
1 Construction Set
These are transmitted as indicated below:
Approved For Your Review or Use
Approved as Noted For Your Review Comment
El Not Approved, Revise and Resubmit n As Requested
Action Not Required For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 weihe.net 317 1 846 6611 800 1 452 6408 Fax: 317 1 843 0546
Allan H. Wcihe, PF...., L.S. President
WEIHE
ENGINEERS
Lend Surveying Civii Engineering
Landscape Architecture
Rud i i with cFFnfi.t f "t Ca'
TRANSMITTAL
To: Hamilton County Health Department Project: pfm Car Truck Care Center
One Hamilton Square, Suite 30 Job W090548
Noblesville, IN 46060 Phone: 317 776 -8500
Attn: Jason Lemaster Fax: 317 776-8506
Date: November 20, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via UPS the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
1 Construction Set
These are transmitted as indicated below:
Approved For Your Review or Use
Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
Action Not Required For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 weihenet i 317 1 846 6611 800 7 452 6408 Fax: 317 t 843 0546
Allan H. Weihe, P.E., L.S. President
WEIHE
ENGINEERS
Land Surveying I Civil Engineering
Landscape Architecture
TRANSMITTAL
���rp��T Write. >4�1/h f tart 1;
1 RAl\ SMI JAL
To: Office of Fire Chief, Fire Station #1 Project: pfm Car Truck Care Center
Two Civic Square Job W090548
Carmel, IN 46032 Phone: 317 -571 -2600
Attn: Chris Ellison Fax: 317-571-2615
Date: November 20, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via Delivered the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
1 Construction Plans
These are transmitted as indicated below:
Approved For Your Review or Use
Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
Action Not Required For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 wcihc.net 317 1 846 6611 300 1 452 6408 Fax: 317 1 843 0546
Allan H. Wcihc, P.F.., L.S. President
WEIHE
ENGINEERS
Land Stilveying Givii Engineering
Landscape Architecture
u>!r ufirft,n
TRANSMITTAL
To: Urban Forestry DOCS Project pfm Car Sr. Truck Care Center
One Civic Square, 3" Fir Job W090548
Carmel, IN 46032 Phone: 317 -571 -2478
Attn: Scott Brewer, City Forester Fax: 317 -571 -2426
Date: November 20, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via Delivered the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
1 Construction Plans
1 Landscape Plans
These are transmitted as indicated below:
Ell Approved For Your Review or Use
Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
Action Not Required For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 weihe.net 317 1 846 6611 800 1 452 6408 Fax: 317 1 843 0546
Allan H. Wcihe, P.E., L.S. President
WF,IHE
ENGINEERS
Land Surveying i Civil Engineering
Landscape Architecture
TRANSMITTAL u:.1 d ;4 t; �7 co Af /ti e!t C'
To: Dept of Community Services (DOCS) Project pfm Car Truck Care Center
One Civic Square, 3 Fir Job W090548
Carmel, IN 46032 Phone: 317 -571 -2417
Attn: Angie Conn/ Christine Barton-Holmes Fax: 317-571 -2426
Date: November 20, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via Delivered the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
2 Construction Plans
See Application filed on ADLS by Nelson Frankenberger
These are transmitted as indicated below:
Approved For Your Review or Use
Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
Action Not Required For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 wcihe.nct 317 1 846 6611 800 1 452 6408 Fax: 317 1 843 0546
Allan H. Weihe, P.E., L.S. President
WEIHF,
ENGINEERS
Land Surveying Civil Engineering
Landscape Architecture
Build wilh.. ccufidenc,-"
TRANSMITTAL
To: Deputy Building Commissioner Project: pfm Car Truck Care Center
One Civic Square Job W090548
Carmel, IN 46032 Phone: 317 571 -24.44
Attn: Bill Hohlt Fax: 317 -571 -2499
Date: November 20, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via Delivered the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
1 Construction Plans
These are transmitted as indicated below:
Approved For Your Review or Use
Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
Action Not Required For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 wcihe.nct 317 1 846 6611 800 1 452 —6408 Fax: 3171 843 0546
Allan H. Weihe, P.E., L.S. President
WEIHE
ENGINEERS
Land Surveying 1 Civir Engineering
Landscape Architecture
Build w t c oni i d ett.,^.c
TRANSMITTAL
To: Crossroad Engineers Project: pfm Car Truck Care Center
3417 South Sherman Drive Job W090548
Beech Grove, IN 46107 Phone: 317 780 -1555
Attn: Gregory Ilko, PE Fax 317-780-6525
Date: November 20, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via UPS the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
1 Construction Set
1 Drainage Calculations and O&M Manual
These are transmitted as indicated below:
Approved For Your Review or Use
Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
Action Not Required For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 weihc.nct 317 1 846 6611 800 1 452 6408 Fax: 317 1 843 0546
Allan H. Wcihe, P.E., L.S. President
Pis WEIHE
ENGINEERS
Land Sury y'in:g I Civil Engineering
Landscape Architecture
ti i i 4i it r !t. C n 77 E et c+ 17
TRANSMITTAL.
To: City of Carmel Information Systems Project pfm Car Truck Care Center
Three Civic Square Job W090548
Carmel, IN 46032 Phone: 317 571 -2565
Attn: Terry Krueskamp Fax: 317-571-2568
Date: November 20, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via Delivered the following items:
Shop Drawings Prints Copy of Letter
n Product Data Specifications Meeting Minutes
n Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
n Sets Document Document Description
Copies Date Number
1 Digital File
These are transmitted as indicated below:
Approved n For Your Review or Use
n Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
Action Not Required n For Your Records
n Action Indicated on Item Transmitted n For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
1050: N. College Avenue Indianapolis, IN 46280 weihe.net 317 1 846 6611 800 1 452 6408 Fax: 317 1 843 0546
Allan H. Wcihc, P.E. L.S. President
el WEIHE
ENGINEERS
Land Surveying Civil Engineering
Landscape Architecture
r ��T�r��►�+r�,�T ?tr i1:i 12' 0022111 /000
1RAl\SMI AL
To: Carmel Street Department Project: pfm Car Truck Care Center
3400 W. 131st Job W090548
Westfield, IN 46074 Phone: 317 733 -2001
Attn: Dave Huffman Fax: 317 733 -2005
Date: November 20, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via Delivered the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
n Samples Change Order(s) n Inspection Report
n Sketches/Drawings Application(s) for Payment
Sets Document Document Description
n Copies Date Number
1 Construction Set
These are transmitted as indicated below:
Approved For Your Review or Use
n Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
n Action Not Required n For Your Records
n Action Indicated on Item Transmitted n For Your Approval
n For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 weihe.nct 317 1 846 6611 800 1 452 6408 Fax: 317 1 843 0546
Allan 14. Weihc, P.F., L.S. President
WEIHE
ENGINEERS
Land Surveying Civ. Engi
Landscape Arctliiiec arI
Build with cortf ide ncc
TRANSMITTAL
To: Carmel Engineering Dept. Project pfm Car Truck Care Center
One Civic Square, 1 Floor Job W090548
Carmel, IN 46032 Phone: 317 -571 -2441
Attn: Gary Duncan/ Nick Redden Fax: 317-571-2439
Date: November 20, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via Delivered the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
2 Construction Plans
1 Drainage Report and O &M Manual
These are transmitted as indicated below:
Approved For Your Review or Use
Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
Action Not Required For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 weihe.net 317 1 846 O611 8(1(1 452 6408 Fax: 317 1 843 0546
Allan H. Weihe, P.F_ L.S. President
1 WEIHE
ENGINEERS
Land Sur teylnq s Civil Engineeriilg
Landscape Architecture
TRANSMITTAL Build w i t h cc n iel
To: Carmel Engineering Dept-Stormwater Project pfm Car Truck Care Center
One Civic Square,1 Fl Job W090548
Carmel, IN 46032 Phone: 317 -571 -2441
Attn: John Thomas Fax: 317 -571 -2439
Date: November 20, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via Delivered the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
1 Construction Set
1 Drainage Calculations and O &M Manual
These are transmitted as indicated below:
Approved For Your Review or Use
Approved as Noted For Your Review Comment
[1 Not Approved, Revise and Resubmit n As Requested
Action Not Required For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 wcihe.net 317 1 846 6611 800 1 452 6408 Fax: 317 1 843 0546
Allan H. Weihe, P.E., L.S. President
WEIHE
ENGINEERS
Land Surveying Civ Engineering
Landscape Architecture
it!! c t ft f i tL c' ti
TRANSMITTAL
To: Carmel Clay Schools Project. pfm Car Truck Care Center
5201 East 131 Street Job W090548
Carmel, IN 46033 Phone: 317 -844 -9961
Athi: Ron Famand Fax: 317-844-9965
Date: November 20,2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via Delivered the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
1 Construction Set
These are transmitted as indicated below:
Approved n For Your Review or Use
Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
Action Not Required For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 weihe.net 317 1 846 6611 800 1 452 6408 Fax: 317 1 843 0546
Allan H. Weihc, P.E., L.S. President
WEIHE
ENGINEERS
Land Surveying Civil Engineering
Landscape Architecture
�4 ui/d with co!If ider.ca`
TRANSMITTAL
To: Carmel/ Clay Parks Department Project: pfm Car Truck Care Center
1411 E. 116 Street Job W090548
Carmel, IN 46032 Phone: 317 -848 -7275
Attn: Mark Westemieier Fax: 317 -571 -2468
Date: November 19, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via Delivered the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
1 Construction Set
These are transmitted as indicated below:
Approved For Your Review or Use
Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
Action Not Required. For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 wcihc.nct I 317 1 846 6611 800 452 6408 I Fax: 317 1 843 0546
Allan H. Weihe, P.E., L.S. President
WFIHF
ENGINEERS
Land Surveying i Civil Engineering
Landscape Architecture
Buit. ii s !f i' oUt1t� c
TRANSMITTAL
To: Duke Energy Project: pfm Car Truck Care Center
16475 Southpark Drive Job W090548
Westfield, IN 46074 Phone: 317 896 -6711
Attn: Shirley Hunter Fax: 317-896 -6712
Date: November 19, 2009 Re: TAC Construction Plan Submittal
We are sending you Attached Under separate cover via UPS the following items:
Shop Drawings Prints Copy of Letter
Product Data Specifications Meeting Minutes
Samples Change Order(s) Inspection Report
Sketches/Drawings Application(s) for Payment
Sets Document Document Description
Copies Date Number
1 Construction Set
These are transmitted as indicated below:
Approved For Your Review or Use
Approved as Noted For Your Review Comment
Not Approved, Revise and Resubmit As Requested
Action Not Required For Your Records
Action Indicated on Item Transmitted For Your Approval
For Signature. Return Copies to Us
Remarks: Please call with any questions. Thank you.
By: Edward E. Fleming cc:
10505 N. College Avenue Indianapolis, IN 46280 weihe.net 317 1 846 6611 800 1 452 6408 Fax: 317 1 843 0546