HomeMy WebLinkAbout1998-Amended Economic Development Plan/126th St. Corridor t
1
Carmel Redevelopment Commission
Carmel, Indiana
y 1 r.
,tom
ff
r xtls rr v R
evelo
Le
t•
Pr xi
Amended 126` Street Corridor
Economic Development Area
January 9, 1998
'1. L fi t,
Michael R. Shaver, President
1 4742 Bluffwood North Drive
Indianapolis, IN 46228
(voice) 317/299 -9529
(fax) 317/329 -9885
(e -mail) wabsci @aol.com
Table Of Contents
Introduction 1
Purpose of the Amendment 1
Description of the Amended Economic Development Area 2
Findings of Fact 5
FINDING OF FACT #1: "...PROMOTES SIGNIFICANT OPPORTUNITIES FOR THE GAINFUL
EMPLOYMENT OF RS CITIZENS..." 5
FINDING OF FACT #2: "...LACK OF LOCAL PUBLIC IMPROVEMENT..." 6
FINDING #3: "...THE PUBLIC HEALTH AND WELFARE WILL BE BENEFITTED...." 8
FINDING #4: AN INCREASE IN THE PROPERTY TAX BASE 9
FINDING #5: "CONFORMS TO OTHER DEVELOPMENT REDEVELOPMENT PLANS" 10
SUMMARY: 12
Amended Description of the Proposed Projects 12
THE CITY CENTER PROJECT' 12
Estimated Cost of the Proposed Projects 13
Economic Development Strategy, as Amended 13
Conclusions: Economic Development Plan as Amended 15
Recommendations: Economic Development Plan as Amended 16
U i :w -tt
LI
�ipPl OW ti N Q Q X Q D
R !t'. ISCUMI K owe 3 a
CITY CENTER 1 r.: 6
a REDEVELOPM�NA
au .e at s tea
AMENDED 126 th r R
CORR ECON IC
wa 41��� I rov�rc at
DEVELOPMENT 7.-
r0
.___t_
L
..•41.41•••••. t 0.41.0...
•4141••••.
41••
a
41. ....41.
�j' 41.4141••••..
••••41••••41
i i 41.41 Vt�
•4141•••••
:41414141••41.•,
:,•41•••41•• ❖41•:,
4141 i i
i ii •••••41•
MI II ml
41.41
i
j i _41 41.. 41 41
i ter..`
ti
I
I
4 r
mow
I A I
R.
r a, new MEET mew, snaT dam e ce i f 1 t
1
CITY CENTER
REDEVELOPMENT AREA
AND
AMENDED
128 th STREET CORRIDOR
ECONOMIC DEVELOPMENT AREA
MAP No. 1
WABASH SCIENTIFIC, INC.
Introduction
The 126th Street Corridor Economic Development Area was created by
the Carmel Redevelopment Commission, with the affirmation of the Plan
Commission and City Council, during the summer of 1997. The
Economic Development Plan which documented the creation of the 126
Street Corridor Economic Development Area was officially named the
"Economic Development Plan: Old Town 126 Street Corridor
Economic Development Areas." It is clear from the title that the original
Economic Development Plan created two Economic Development Areas
simultaneously, each with its own documented findings and justification
through previous editions of the comprehensive plan.
This amended Economic Development Plan deals solely with the portion
of the original Plan pertaining to the 126th Street Corridor. No portion of
the Old Town Economic Development Area or Economic Development
Plan is currently being amended by virtue of this effort, therefore, for
simplicity in presentation, the amended Economic Development Plan
which follows refers solely to the 126th Street Corridor Economic
Development Area and its portion of the Plan without further reference to
the Old To area and its portion of the plan.
Purpose of the Amendment
The purposes of this amendment to the 126 Street Corridor Economic
Development Plan are to amend the boundaries of the 126 Street
Corridor Economic Development Area and to establish a Tax Allocation
Area to allow the capture of real property tax increment.
The boundaries of the Economic Development Area are being amended
for two reasons:
1. To remove the portion of the current Economic Development Area
which contains the City Center project area in order to create a
Redevelopment Area, and;
2. To increase the size of the Economic Development Area to include a
larger portion of the Carmel Science Technology Park.
Both of these boundary adjustments are reflected in Map #l.
Amended 126th Street Corridor Economic Development Plan 1
The Tax Allocation Area (to allow the capture of property tax increment)
is to create an additional revenue source to financially support the
proposed City Center project. The City Center project area is located in a
portion of the 126th Street Corridor Economic Development Area which is
being removed from the Economic Development Area, as noted above.
The use of Tax Increment Financing (TIF) will provide additional
flexibility for financing portions of the City Center project.
Description of the Amended Economic Development Area
The description of the boundaries of the amended 126th Street Economic
Development Area is based on the aerial parcel maps provided by the
Hamilton County Auditor's office on December 15, 1997 (aerial
photography dated April, 1994), as follows:
Beginning at the point of intersection of the north right of way of Adams
Street with the westem boundary of Parcel No. 005 on Map No. 09-36
00, and extending southwesterly and westerly along the north right of way
line of Adams Street to its point of intersection with the western right of
way line of Guilford Road;
Thence north along the western right of way Tine of Guilford Road to the
northeast corner of Parcel No. 007 of Map No. 09- 36 -00;
3 Thence west along the northem boundaries of Parcel Numbers 007,
007.001 and 002, to the point of intersection with the north right of way
line of Carmel Drive;
Thence northwesterly along the north right of way Tine of Carmel Drive to
the point of intersection with the.sotttheastem right of way line of Old U.S.
Hwy 31, as shown on Map No. 09- 35 -00;
r Thence southwesterly along the southeastern right of way line of Old
U.S. Hwy 31 to the point of intersection with the northem boundary of
Parcel No. 027 (Map No. 09- 35 -00) to-the-northeast-corner-of-said-parcel
oor ci6� �2 i ti�� Q7 Ti T; .vim
7 Thence south along the eastem boundaries of Parcel Numbers 027, 026, a
025, 024, 022, and 021 to the southeast corner of Parcel No. 021 (Map
No. 09- 35 -00);
6 Thence east along the southern boundary of Parcel No. 021 to the point
of intersection with the eastem right of way line of Pennsylvania Avenue;
Thence south along the eastem right of way line of Pennsylvania Avenue,
across 116th Street, to the point of intersection with the center line of
116th Street;
Amended 126th Street Corridor Economic Development Plan 2
Thence east along the center line of 116th Street to the point of
intersection with the westem boundary of Parcel No. 059 (Map No. 09-
36-00);
Thence north along the westem boundary of Parcel Numbers 059 and
060 to the northwest comer of Parcel No. 060;
Thence east along the northern boundary of Parcel 060 to the northeast
corner of Parcel No. 060;
Thence north along the eastem boundary of Parcel Numbers 002, 004,
and 003 (as shown on Map No. 09- 36 -00) to the northeast comer of
Parcel No. 003;
G
Thence east along the southem boundary of Parcel Numbers 003 and
005 to the interior southwest comer of Parcel No. 005; 1 J)
Thence south along the southwest boundary of Parcel No. 005 and
continuing south along the westem boundary of Parcel Numbers
004.005, 004 and 004.004 to the southwest comer of Parcel No. 004.004;
Thence east along the southem boundary of Parcel 004.004 to the
southeast comer of said parcel;
Thence north along the eastem boundary of Parcel Numbers 004.004,
004.003, 004.101, and 004.001 to the point of intersection with the south
right of way line of Carmel Drive;
Thence east along the south right of way line of Carmel Drive, across
Rangeline Road to the eastem right of way line of Rangeline Road;
Thence north along the eastem right of way line of Rangeline Road to the
south right of way line of Executive Drive, as shown on Map No.10- 31 -00;
Thence east along the south right of way line of Executive Drive, as
shown on Map No. 10- 31 -00, to the northwest comer of Parcel No. 006,
as shown on said map;
Thence south along the western boundary of Parcel No. 006 to the
southwest comer of said parcel;
Thence eastward, northward and eastward along the southern boundary
of Parcel No. 006, as shown on Map No. 10- 31 -00, to the southeast
comer of Parcel No. 006, thence eastward across the right of way of
Executive Drive to the southwest comer of Parcel No. 001 (Centerpoint
Section 2 -A);
Thence eastward along the southern boundary of Parcel No. 001 of
Centerpoint Section 2 -A, as shown on Map No. 10 -31-00 to the southeast
comer of said parcel;
Amended 126th Street Corridor Economic Development Plan 3
Thence northward along the eastern boundary of Parcel No. 001 to the
northeast comer of said parcel;
Thence westward along the northern boundary of Parcel No. 001, to the
northeast comer of Parcel No. 003 (Centerpoint Section 2), thence
westward along the northem boundaries of Centerpoint Section 2, Parcel
Numbers 003, 002 and 001;
Thence west along the northem boundary of Parcel No. 001 of
Centerpoint Section as shown on Map No. 10 -31 -00, to the point of
intersection with the center line of Rangeline Road;
Thence north along the center line of Rangeline Road to the point of
intersection with the northem boundary of Parcel No. 013 as shown on
Map No. 09- 36-00;
Thence west along the northem boundary of Parcel No. 013 to the
northwest comer of said parcel;
Thence south along the westem boundary of Parcel No. 013 to the
southwest corner of said parcel;
Thence west along the southern boundary of Parcel No. 008.001 to the
southwest comer of said parcel;
Thence south, across the road right of way and continuing south along
the westem boundary of Parcel Numbers 016, 017, 018, 019, 020, 021,
022, 023, 024, 025.001, and 026.001, as shown on Map No. 09- 36 -00, to
the southwest comer of Parcel No. 026.001;
Thence west along the southem boundary of Parcel No. 015 to the
southwest corner of said parcel, continuing across the Old Monon right of
way to the point of intersection with the west right of way line of the Old
Monon Railroad;
Thence north along the west right of way line of the Old Monon Railroad
to the point of intersection with the southern boundary of Parcel No. 005;
Thence west along the southem boundary of Parcel No. 005 to the
southwest corner of said parcel;
Thence north along the western boundary of Parcel No. 005 to the point
of intersection with the northem right of way line of Adams Street, which
is the point of beginning.
Amended 126th Street Corridor Economic Development Plan 4
Findings of Fact
The Findings of Fact of the 126 Street Corridor Economic Development
Plan are amended as follows to reflect the new areas being added to, or
deleted from, the 126th Street Corridor Economic Development Area and
the addition of new projects. The primary increase in the scope of the
Economic Development Plan is the addition of the City Center project as a
part of the Economic Development Strategy for the area.
FINDING OF FACT #1: ...PROMOTES SIGNIFICANT OPPORTUNITIES FOR
THE GAINFUL EMPLOYMENT OF ITS CITIZENS..."
The area being added to the Economic Development Area consists mainly
of the remainder of the Carmel Science Technology Park, located south
of Carmel Drive, north of 116th Street, west of 3rd Avenue SW, and east
of Pennsylvania Avenue. This area contains a substantial amount of the
city's highest profile light industrial and office land uses, and is
unquestionably the city's major employment center
The original Economic Development Plan for the 126th Street Corridor
Economic Development Area cited the need for improving the
thoroughfare system in the area by completing the 126 Street corridor
from Rangeline Road to Adams Street. In September, 1997, the Carmel
Redevelopment Authority issued COIT Lease/Rental Revenue bonds. A
portion of the COIT bond proceeds will be used to finance the 126th Street
extension.
This amendment to the 126 Street Corridor Economic Development Plan
is undertaken in support of the City Center project. It is the specific
finding of this amendment that the City Center project directly
contributes to the economic development of and serves the amended
126th Street Corridor Economic Development Area. The City Center
project area is being removed from the 126th Street Corridor Economic
Development Area in order for the Redevelopment Commission to declare
the City Center project area as a Redevelopment Area under Indiana
statute.
The proposed City Center project contributes to economic development in
the 126th Street Corridor Economic Development Area in several ways.
First, the City Center project will provide for development of land that is
currently unimproved and meets the statutory definition of "blight."
Amended 126th Street Corridor Economic Development Plan 5
Second, the retail/office space proposed for the City Center project will
increase the intensity of use of the City Center project area, adjacent to the
amended boundaries of the 126 Street Corridor Economic Development
Area. This increased intensity will contribute to the economic activity of
the area, including the amended 126th Street Corridor Economic
Development Area and the proposed City Center Redevelopment Area.
Third, the development of the City Center project is centered around the
community's need for entertainment facilities. The City Center proposal
includes a community center (which was cited as a need in the
Comprehensive Plan), a major theater complex, an amphitheater and
performing arts center, as well as commercial and retail space. By
fulfilling these needs of the community, the City Center project
contributes to the full development of the adjacent areas, including the
amended 126 Street Corridor Economic Development Area.
Development of the City Center project is expected to provide the
community with a focal point for cultural and social interaction.
This need has been expressed not only in the Comprehensive Plan but
also by citizens and business leaders throughout the community and
particularly by businesses located within the amended Economic
Development Area. A vital city center would contribute to the overall
quality of life in Carmel which is important to recruiting and retaining
growth- oriented businesses to the community.
For these reasons, it is concluded that the plan for the amended 126t Street
Corridor Economic Development Area, as amended (including the
proposed City Center project), promotes significant opportunities for the
gainful employment of Carmel's citizens, and thereby confirms this
statutory finding of fact.
FINDING OF FACT #2: "...LACK OF LOCAL PUBLIC IMPROVEMENT..."
The goal of amending the Economic Development Area (and creating the
Redevelopment Area) is directly related to the need for additional public
improvements in order to achieve the highest level of economic activity in
the combined areas. Carmel is truly a gifted community. It has achieved a
level and success of development which is virtually unparalleled in any
other part of the state, and as such, the standards of the community are
higher than most other communities. Because Indiana statute does not
create highly specific and detailed criteria for statutory findings of fact or
findings of blight, communities are able to adjust these findings to their
Amended 126th Street Corridor Economic Development Plan 6
own context and apply the statute to the particular idiosyncracies of their
community. In Carmel, the goal is literally to achieve the highest possible
level of success with new development of the highest possible quality.
The historical development patterns of the city are reaching the point
where certain types of goals cannot be achieved without the re-
arrangement of land uses and activities. The Comprehensive Plan predicts
that by the year 2020, all of the land within the Carmel planning area will
be developed. The importance of planning for the highest and best use of
the land becomes even more important to achieve the community's goals.
The amended 126 Street Corridor Economic Development Area
represents Carmel's highest profile employment center. The Science and
Technology Park holds many of the City's top employers and most
growth- oriented companies. It is the success of these companies which
will continue to provide the area with economic growth, even after the
planning area is fully developed. The amended 126th Street Corridor
Economic Development Area is in a critical location for the economic
activity of the community.
The 126th Street extension from Rangeline Road to Adams Street was
presented as a critical element of the public improvements necessary for
the original Economic Development Plan. In addition, this amendment
establishes that the City Center project, which contributes directly to the
Economic Development Plan for the 126th Street Corridor Economic
Development Area, provides additional public improvements which are
necessary to rectify some of the previous developmental errors and to
enable the combined areas to reach their optimal economic potential.
Included within the proposed City Center project are a number of public
improvements designed to establish a cultural center for the City of
Carmel. Those public improvements include:
Parking Facilities
A Community Center
An Outdoor Amphitheater
Improvements to the Monon Trail Corridor
The City Center proposal provides additional perspective for the public to
understand the magnitude and architectural detail of the City Center
proposal. In addition, the architect also provides a perspective rendering
of the proposed project to demonstrate the overall architectural integrity of
the project and its impact on the community and surrounding area.
Amended 126th Street Corridor Economic Development Plan 7
The City Center project is of such a substantial scale and impact that it
will become an active part of the overall economic development of the
area, including both the 126th Street Corridor Economic Development
Area and the City Center Redevelopment Area. It is projected that the
proposed City Center project and the public improvements to be funded as
part of its implementation will have a direct impact on the entire
community. Without these public improvements, the City of Carmel will
not become economically distressed, but it is clear that the successful
development of the City Center project will have a direct economic benefit
to the surrounding area.
For these reasons, it is concluded that the plan for the amended 126 Street
Corridor Economic Development Area (including the proposed City
Center project) cannot be achieved by the regulatory process or by the
ordinary operation of private enterprise without resort to the powers
allowed under IC Sections 36- 7- 14 -2.5, 41 and 43 because of lack of local
public improvements which, once implemented, will enable the combined
areas to achieve a higher level of economic activity than would otherwise
be possible, thereby confirming this statutory finding of fact.
FINDING #3: "...THE PUBLIC HEALTH AND WELFARE WILL BE
BENEFITTED....
The amendment of the Economic Development Area along with the
addition of the City Center project will benefit the public health and
welfare of the City of Carmel in several ways. First, the City Center
project will generate more intense and coordinated development in the
central area. Instead of the existing pattern of unimproved land and
property which needs reinvestment and remodeling, a single,
architecturally coordinated development will be undertaken generating a
substantially greater number of jobs and economic activity than the current
land uses of the City Center area.
Second, these improvements will lead to substantially greater levels of
local tax revenues including property taxes and COIT. Such revenues can
then be directed to public services needed by the community, including
road repairs, maintenance of public spaces, infrastructure improvements
and so forth. The uses for these funds can be determined annually by the
City's leadership as part of the budgeting process.
Third, the addition of cultural and public facilities such as the performing
arts center and the community center will have a direct and positive impact
Amended 126th Street Corridor Economic Development Plan 8
on the public welfare. These facilities will increase the number of
opportunities available for Carmel's citizens to be exposed to intellectually
and culturally enlightening performances, as well as offering the
opportunity to participate in those activities directly. In addition, the
community center will provide opportunities for the residents of the area
to meet and interact with regard to a broad range of public, semi- public,
and community -based activities. The activities programmed for a
community center are virtually limitless, and with the creative capacity of
an educated population, the community center in Carmel will undoubtedly
provide a huge benefit to the community at large.
Fourth, the Monon Trail corridor improvements are part of the City Center
project. This linear park is an extension of the Monon Trail of northern
Marion County which has become one of the most popular park facilities
in central Indiana. The portion of the linear park which stretches from
Broad Ripple to Nora is a public health attraction for the community at
large with people making a point of traveling to the Monon Trail to jog or
walk its entire length. It is not unreasonable to expect similar usage in
Carmel, thereby creating a direct benefit to the public health and welfare
of the community at large.
For these reasons, it is concluded that the public health and welfare will
benefitted by accomplishment of the plan for the 126 Street Corridor
Economic Development Area (including the proposed City Center
project), thereby confirming this statutory finding of fact.
FINDING #4: "AN INCREASE IN THE PROPERTY TAX BASE..."
The amended Economic Development Plan will directly meet the statutory
finding of "public utility and benefit as measured by: the attraction or
retention of permanent jobs; an increase in the property tax base;
improved diversity in the economic base, OR other similar public
benefits." The City Center project will increase the land use intensity
within the proposed Redevelopment Area (which is currently a part of the
126th Street Corridor Economic Development Area, but is to be removed
by this amendment). This increased intensity will provide more office and
retail space and, with that increase in space, there will be a commensurate
increase in the number of perrnanent jobs created and retained in the
community.
Many of the proposed improvements will take place on land that is
currently either totally unimproved or whose improvements are suffering
Amended 126th Street Corridor Economic Development Plan 9
from a lack of reinvestment. Although there may be some acquisition and
demolition involved in the project, the net result of the plan is to
substantially increase the amount of taxable improvements in the real
property of the area, leading to an increase in the property tax base.
The construction of an integrated entertainment complex, economically
buttressed by infrastructural improvements and new office and retail space
will increase the diversity of the local economy. The location of this
project, between the historic retail center of the community and the
primary retail center of Carmel Drive /116t Street, links the overall retail
functions of the community, providing continuity of land uses. This
project, combined with the impact of the 126 Street corridor extension,
should improve the diversity of the local economy, resulting in badly
needed investment and reinvestment to property in the area.
For these reasons, it is concluded that the accomplishment of the plan for
the Amended 16th Street Corridor Economic Development Area will be "a
public utility and benefit as measured by: the attraction or retention of
permanent jobs; an increase in the property tax base; improved diversity in
the economic base, OR other similar benefits," thereby confirming this
statutory finding of fact.
FINDING #5: "...CONFORMS TO OTHER DEVELOPMENT AND
REDEVELOPMENT PLA NS...
This amended Economic Development Plan complies with other plans for
the area in several ways. First, this plan is being amended to include the
provision of deleting the City Center project area from the Economic
Development Area and establishing a Redevelopment Area in that
location. As such, this amended Economic Development Plan is
developed in tandem with the City Center Redevelopment Plan and
conforms specifically thereto. By developing these two Plans in tandem,
the Redevelopment Commission can use its diligence of review and
approval to assure that they conform directly with one another.
This amended Economic Development Plan further complies with the
1997 Old Town Economic Development Plan. The Old Town Economic
Development Area is located just north of the City Center Redevelopment
Area and the 126th Street Corridor Economic Development Area, covering
the areas of old Carmel, including the historic retail area. The Old Town
Plan recommended enhancement of pedestrian access within the area,
improvements to the Monon Trail corridor (which is also pedestrian-
I
Amended 126th Street Corridor Economic Development Plan 10
based), and streetscaping and infrastructure improvements to enhance the
architectural and visual appeal of the area. The concept is to increase the
retail viability of the area through these infrastructural improvements.
Both the Old Town Economic Development Area and the 126 Street
Corridor Economic Development Area were included in a single planning
document, with each area separately addressed and justified. The
Redevelopment Commission unified the document in order to firmly
demonstrate the economic interrelationships between the two areas, as
well as the interdependency of their individual projects and strategies. The
126th Street extension, for example, would increase transportation access
to Old Town as well as increasing thoroughfare system efficiency through
the 126th Street Corridor Economic Development Area. Simultaneously,
improvements to the economic and retail environment in Old Town would
benefit the development of the Carmel Science and Technology Park by
providing viable space nearby for related functions. By combining the
two Economic Development areas into one planning document, the
economic links between the two areas was made indisputable.
In addition to economic development planning for the overall area, this
amended Economic Development Plan complies with the Carmel Drive
Corridor Streetscape Master Plan. This plan, developed by David C.
Klauba Associates, provides specific detail as to the proposed land uses
for the 126th Street Corridor Economic Development Area, and details the
landscaping design requirements for the Carmel Drive corridor. This
amended Economic Development Plan complies with the
recommendations of the Streetscape Master Plan.
Finally, this amended Economic Development Plan complies with the
Comprehensive Plan for the community. The Amended Economic
Development Plan was meticulously crafted to comply with the
Comprehensive Plan for the area. Pages 9 -15 of the original Economic
Development Plan, entitled "Relationship to Previous Planning Efforts,"
were specifically dedicated to a detailed review of the relevant
recommendations of comprehensive planning for the community dating
back to 1961. In that detailed analysis, the Economic Development Plan
tracked the comprehensive planning recommendations for these areas
through each edition of the comprehensive plan and demonstrated
conclusively and irrefutably that the recommendations within the
Economic Development Plan conformed with the goals, policies and
recommendations of the Comprehensive Plan. This amended Economic
Development Plan simply extends that conformity to include the new
Amended 126th Street Corridor Economic Development Plan 11
recommendations related to the City Center project and the Monon Trail
improvements.
For these reasons, it is concluded that the plan as amended for the 126th
Street Corridor Economic Development Area conforms to other
development and redevelopment plans for the City of Carmel, thereby
confirming this statutory finding of fact.
SUMMARY:
The narrative above is presented to demonstrate that the Amended 126th
Street Corridor Economic Development Plan meets the requirements of all
five "findings of fact" as provided in Indiana statute, IC36 -7 -14. It is clear
that the Redevelopment Commission has considered all of the relevant
issues related to the establishment of the Amended 126th Street Corridor
Economic Development Area and has determined that the City Center
project is sufficiently important to the overall economic development of
the Amended 126th Street Corridor Economic Development Area to justify
this amendment to the 126 Street Corridor Economic Development Plan.
Amended Description of the Proposed Projects
This amendment to the 126 Corridor Street Economic Development Plan
includes the addition of the City Center project, described as follows:
THE CITY CENTER PROJECT:
The City Center project is proposed for an area of slightly less than 100
acres located along Rangeline Road and stretching from the City Hall on
the south to the new alignment of 126th Street on the north. The dominant
land uses in the area are commercial and governmental uses with about 61
acres of the area totally unimproved.
The primary proposed development within City Center project is
commercial, and includes an entertainment complex with a theater and
performing arts center and amphitheater. Full scale commercial retail and
office development is planned along the major transportation corridors
(126th h Street Rangeline Road).
The project will include land acquisition, construction of parking
facilities, infrastructure, and other project related and support activities,
eligible for COIT and TIF financing.
Amended 126th Street Corridor Economic Development Plan 12
Estimated Cost of the Proposed Projects
The proposed projects do not yet have detailed architectural and
engineering cost estimates, therefore the costs currently available are
planning level estimates only. These planning level estimates are to be
used for the development of an overall implementation strategy and will
be revised as more detailed estimates are developed based on detailed
design documents. These design documents may either be developed for
the entire project at once, or for individual elements of the project to be
undertaken incrementally. The costs are broken down as follows:
Estimated Project Costs
Cost item Est. Minimum Est. Maximum
City Center: Land Acquisition 8,000,000 9,000,000
City Center. Infrastructure 2,500,000 3,500,000
Monon Trail Corridor improvements 2,000,000 3,000,000
Estimated Total Cost 12,500,000 S 15,500,000
Economic Development Strategy, as Amended
The comprehensive planning for the City of Carmel over the last three
decades demonstrates a substantial concern for the fate of the city's
original core area. While Carmel has enjoyed an incredible amount of
high quality growth, there are still some areas developed mostly before the
city has a clear vision of its future, where the original development was /is
not compatible with a city which is nearing its developmental limits. The
prime areas of need are in the vicinity of the Old Town area and along
Rangeline Road.
With this understanding, the Economic Development Strategy for the
126 Street Corridor Economic Development Area as amended will
contain the following major elements:
1. The Carmel Redevelopment Commission should amend the
boundaries of the 126th Street Corridor Economic Development
Area to include the boundaries shown on Map #1, as presented
earlier in this document.
Amended 126th Street Corridor Economic Development Plan 13
2. The City Center project was distinctly designed to re- direct the focal
point of the community of Carmel. The Government Center was
developed over the last decade to include a new City Hall, Police
Station and Fire Station, as well as a central public space. The
Government Center Is also adjacent to the Monon Trail corridor
which is proposed for significant improvements creating a linear
park, linked to Indianapolis and unequaled in the state of Indiana.
By developing the proposed City Center project, the City of Carmel
will generate a new focal point for the City based on an integrated
entertainment complex, and new office and retail space designed to
support and augment the space available at the Science
Technology Park. The integration of these needs into the overall
needs of Carmel's premier employment center assures that the City
Center project will directly benefit the amended 126 Street
Corridor Economic Development Area.
3. The Redevelopment Commission should consider the
establishment of a Tax Allocation Area to coincide with the
boundaries of the amended 126 Street Corridor Economic
Development Area.
4. The Redevelopment Commission should consider the viability of
using TIF proceeds, generated by the establishment of a Tax
Increment Finance Allocation Area as recommended to assist in
paying for the necessary improvements related to the City Center
project.
5. The Redevelopment Commission should also consider the viability
of using COPT bonding to assist in paying for the necessary
improvements related to the City Center and Monon Trail projects.
C
Amended 126th Street Corridor Economic Development Plan 14
b
Conclusions: Economic Development Plan as Amended
The following conclusions are offered for the amended 126th Street
Corridor Economic Development Plan. Unless otherwise noted, these
conclusions are in addition to the conclusions offered for the original 126th
Street Corridor Economic Development Plan.
Based on the examination of the facts and the analysis set forth in this
amended 126th Street Corridor Economic Development Plan, the following
conclusions are offered:
1. That the Implementation of the City Center project will directly
benefit the 126 Street Corridor Economic Development Area, as
amended.
2. That the implementation of the City Center project will help to
developmentally unify the entirety of the employment center of the
City of Carmel, including the Rangeline Road corridor, the Old Town
(historic downtown) area, and the Science and Technology Park.
3. That the need for the 126'" Street extension project Is still critical to
the thoroughfare system of the area.
4. That the 126 Street extension project will directly benefit the City
Center project.
5. That the future development of the entire area, including the
amended 126 Street Corridor Economic Development Area, the
Old Town Economic Development Area and the City Center
Redevelopment Area, as the primary employment center for the
community will be directly benefitted by the projects proposed in
this amended Economic Development Plan.
6. That it is appropriate to delete the Ctty Center project area from the
126 Street Corridor Economic Development Area in order to
facilitate the creation of the City Center Redevelopment Area and to
implement the City Center project.
7. That it is appropriate to extend the boundaries of the 126`" Street
Corridor Economic Development Area to take in a larger portion of
the Science Technology Park, due to the economic
Interdependence of the economic development areas as the
functional employment center for the community.
8. That a positive economic impact will result from the implementation
of the projects recommended in this amended Economic
Development Plan in the form of creating new permanent jobs,
securing existing jobs and additional tax revenues to the City.
Amended 126th Street Corridor Economic Development Plan 15
I .4
9. That If this amended Economic Development Plan is not approved
and the recommended projects are not implemented, it will be more
difficult for the community to achieve the levels of economic
intensity and competitive efficiencies which will be possible with
the approval of this Economic Development Plan and the
implementation of the recommended projects.
10. That it is appropriate to offer public financing for certain portions of
the proposed projects in the form of COIT or TIF bonds as an
economic stimulus for the proposed projects.
11. That the City and the Redevelopment Commission should seek
private sectors partners to assist in the implementation of the
recommended projects and in assembling project "packages" which
will minimize the public sector investment and optimize the
i.: economic impact of the projects.
f..
The Redevelopment Commission has done an outstanding job of
analyzing and implementing an appropriate level of activity to encourage
the optimal economic development of the interdependent economic
development areas. The conclusions of this amended Economic
Development Plan are predicated on the continued perforrnance of
objective analysis, public policy direction, and the formation of
partnerships with the Plan Commission and the City Council necessary to
assure the success of the projects.
Recommendations: Economic Development Plan as
Amended
Based on the information presented, the analyses performed and the
findings and conclusions of this amended Economic Development Plan,
the following recommendations are presented for the consideration of the
Carmel Redevelopment Commission, and thereafter to the Plan
Commission and City Council for affirmation.
1. That the Carmel Redevelopment Commission should formally
amend the boundaries of the 126 Street Corridor Economic
Development Area in accordance with the boundaries shown on
Map #1 and the boundary description contained previously In this
Amended Economic Development Plan as amended, In accordance
with IC 36 -14.
2. That the Carmel Redevelopment Commission should formally
create a Tax Increment Finance (TIF) Allocation Area whose
boundaries coincide with the boundaries of the 126th Street
Corridor Economic Development Area.
Amended 126th Street Corridor Economic Development Plan 16
4 4
3. That the Carmel Redevelopment Commission should formally
approve this amended Economic Development Plan, including the
addition of the City Center project and the Monon Trail corridor
improvements, in order to develop potential financing opportunities
for the projects included in this amended Economic Development
Plan.
4. That the Carmel Redevelopment Commission should work directly
with the City to develop a financial plan for the implementation of
the City Center project, including possible eminent domain actions,
as well as financing for various portions of the project, as
determined necessary by the Redevelopment Commission and the
City.
/cramedp
Amended 126th Street Corridor Economic Development Plan 17
1
RESOLUTION NO. Z -1
RESOLUTION OF THE CITY OF CARMEL
REDEVELOPMENT COMMISSION AMENDING THE
BOUNDARIES OF AN ECONOMIC DEVELOPMENT AREA,
APPROVING AN AMENDED PLAN FOR THE
AREA, DECLARING THE AREA AN ALLOCATION AREA,
AND TAXING OTHER ACTIONS RELATED THERETO
WHEREAS, on June 16, 1997, the City of Carmel Redevelopment Commission (the
"Commission the governing body of the City of Carmel Department of Redevelopment (the
"Department adopted Resolution No. 9 -1997 (the "Original Resolution pursuant to Indiana
Code 36 -7 -14, as amended (the "Act approving a plan (the "Original Plan for and designating
the "126th Street Corridor Economic Development Area" (the "Original Area and
WHEREAS, Section 17.5 of the Act permits the amendment of a resolution designating an
economic development area and the amendment of a plan for such an area; and
WHEREAS, it has been proposed that the boundaries of the Original Area be amended to be
the area of the City of Carmel, Indiana (the "City described on Exhibit A hereto (the "Amended
Area and there has been presented to this meeting for consideration and approval of the
Commission a plan (the "Amended Plan for the Amended Area, entitled "Amended Economic
Development Plan-- Amended 126th Street Corridor Economic Development Area and
WHEREAS, the Commission has caused to be prepared: (a) maps and plats showing the
boundaries of the Amended Area, the location of the various parcels of property, streets, alleys and
other features affecting the acquisition, clearance, replatting, replanning, rezoning or redevelopment
and the economic development of the Amended Area, indicating any parcels of property to be
excluded from the acquisition, if any, and showing the parts of the Amended Area acquired, if any,
that are to be devoted to public ways, levees, sewerage, parks, playgrounds and other public purposes
under the Amended Plan; (b) lists of the owners of the various parcels of property to be acquired,
if any; and (c) an estimate of the cost of acquisition, redevelopment and economic development; and
WHEREAS, the Amended Plan and supporting data were reviewed and considered at this
meeting; and
WHEREAS, Section 39 of the Act permits the creation of "allocation areas" to provide for
the allocation and distribution of property taxes for the purposes and in the manner provided in said
section;
WHEREAS, the Commission has given consideration to transitional and permanent
Ii provisions for adequate housing for any residents of the Amended Area who will be displaced by
the project contemplated by the Amended Plan; and
NOW, THEREFORE, BE IT RESOLVED by the City of Carmel Redevelopment
Commission, the governing body of City of Carmel Department of Redevelopment, as follows:
1. The Commission hereby finds that the Amended Plan for the Amended Area
promotes significant opportunities for the gainful employment of its citizens, attracts a major new
business enterprise to the City, retains or expands a significant business enterprise existing in the
boundaries of the City, and meets other purposes of Sections 2.5, 41 and 43 of the Act, including
without limitation benefiting the public health, safety and welfare, increasing the economic well-
being of the City and the State of Indiana (the "State and serving to protect and increase property
values in the City and the State.
2. The Commission hereby finds that the Amended Plan for the Amended Area cannot
be achieved by regulatory processes or by the ordinary operation of private enterprise without resort
to the powers allowed under Sections 2.5, 41 and 43 of the Act because of lack of local public
improvement, existence of improvements or conditions that lower the value of the land below that
of nearby land, multiple ownership of land and other similar conditions, including without limitation
the cost of the projects contemplated by the Amended Plan and the necessity for requiring the proper
use of the land so as to best serve the interests of the City and its citizens.
3. The Commission hereby finds that the public health and welfare will be benefited by
accomplishment of the Amended Plan for the Amended Area.
4. The Commission hereby finds that the accomplishment of the Amended Plan for the
Amended Area will be a public utility and benefit as measured by the attraction or retention of
permanent jobs, an increase in the property tax base, improved diversity of the economic base and
other similar public benefits.
5. The Commission hereby finds that the Amended Plan for the Amended Area
conforms to other development and redevelopment plans for the City.
6. Based upon the findings set forth in Sections 1 through 5 hereof, the Commission
hereby determines, designates and declares that the Amended Area is an "economic development
area" within the meaning of the Act.
7. The Commission hereby finds that: (a) the amendments to the Original Resolution
and the Original Plan effected by this Resolution and the Amended Plan are reasonable and
appropriate when considered in relation to the Original Resolution and the Original Plan and the
purposes of the Act; and (b) the Original Resolution and the Original PIan, with the proposed
amendments thereto effected by this Resolution and the Amended Plan, conform to the
comprehensive plan of the City.
2
8. In support of the findings, determinations, designations and declarations set forth in
Sections 1 through 7 hereof, the Commission hereby adopts the specific findings set forth in the
Amended Plan, including any reports, studies and plans incorporated therein by reference.
9. The general boundaries of the Amended Area are those set forth in EallibiLA
attached hereto. While the Amended Plan contemplates the possibility of future property acquisition
in the Amended Area, the Department does not at this time propose to acquire any land or interests
in land within the boundaries of the Amended Area. If, at some future time, the Department
proposes to acquire any land or interests in land in the Amended Area, the required procedures for
amending the Amended Plan under the Act will be followed.
10. The Amended Plan is hereby in all respects approved and adopted, and the secretary
of the Commission is hereby directed to file a certified copy of the Amended Plan with the minutes
of this meeting.
11. The Amended Area is hereby designated as an "allocation area" pursuant to Section
39 of the Act for purposes of the allocation and distribution of property taxes for the purposes and
in the manner provided by said Section 39. Any real property taxes subsequently levied by or for
the benefit of any public body entitled to a distribution of property taxes on taxable property in said
allocation area shall be allocated and distributed as follows:
Except as otherwise provided in said Section 39, the proceeds of taxes attributable to the
lesser of (a) the assessed value of the property for the assessment date with respect to which the
allocation and distribution is made or (b) the base assessed value shall be allocated to and, when
collected, paid into the funds of the respective taxing units. Except as otherwise provided in said
Section 39, property tax proceeds in excess of those described in the previous sentence shall be
allocated to the redevelopment district and, when collected, paid into an allocation fund for said
allocation area that may be used by the redevelopment district to do one or more of the things
specified in Section 39(b)(2) of the Act, as the same may be amended from time to time. Said
allocation fund may not be used for operating expenses of the Commission. Except as otherwise
provided in the Act, before July 15 of each year, the Commission shall take the actions set forth in
Section 39(b)(3) of the Act.
12. The foregoing allocation provision shall apply to all of the Amended Area and shall
expire on the date that is thirty (30) years after the effective date of this Resolution.
13. Said allocation area is hereby designated as the "126th Street Corridor Economic
Development Allocation Area" and said allocation fund is hereby designated as the "126th Street
Corridor Economic Development Allocation Area Fund."
14. Each officer of the Commission is hereby authorized and directed to make any and
all required filings with the Indiana State Board of Tax Commissioners and the Hamilton County
Auditor in connection with the creation of said allocation area.
3
15. The provisions of this Resolution shall be subject in all respects to the Act and any
amendments thereto.
16. This Resolution, together with any supporting data, including the Amended Plan,
shall be submitted to the Carmel/Clay Plan Commission (the "Plan Commission and the Common
Council of the City (the "Common Council as provided in the Act, and, if approved by the Plan
Commission and the Common Council, shall be submitted to a public hearing and remonstrance as
provided by the Act, after public notice as required by the Act.
17. Each officer of the Commission is hereby authorized and directed, for and on behalf
of the Commission, to take any action determined by such officer to be necessary or appropriate to
effect this Resolution, such determination to be conclusively evidenced by such officer's having
taken such action, and any such action heretofore taken is hereby ratified and approved.
18. This Resolution shall be effective upon its adoption.
Adopted this 15th day of January, 1998.
CITY OF CARMEL REDEVELOPMENT
COIVMISSION
7
j am
President
Vice President
Secretary
emb
-,4
mber
4
exhibit A
DESCRIPTION OF AMENDED
126TH STREET CORRIDOR ECONOMIC DEVELOPMENT AREA
is
ADSOI NWS 239204
r
moo 0 g
sasra Ram 1=-__..—
6 �ll
t m r..: I
1 Li
CITY CENT ft ft t_ a �i
REDEYELOPVE o —aT t s
AM 125 th I
CORRIDOR EC x IC `a"• t
I
DEVELOPMENT
j
q JD •i.• t• 4 1 ii iiii i iii T i 1 a k
i e A iii 7
i.
4 ,d L f d 4 I I I P .4. 4 7 O .41A
7 7
iss 7/
i
A- .1
i al lep07 i
/7
t irdgc 4
raw =err r
I "001 mai
i
1
J
..1. 1
1 1 ig 1 ow
CITY CENTER
REDEVELOPMENT AREA
AND
AMENDED
f 126 th STREET CORRIDOR
ECONOMIC DEVELOPMENT AREA
t
MAP No. 1
WABASH SCIENTIFIC, INC.