Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Correspondence
Sets ►1 Copies Document Date Document Number Description 1 Recorded Plat (Mylar) 2 Recorded Plat 1 CD (pdf) TRANSMITTAL To: Carmel, IN 46032 Attn: Angie Conn Date: November 24, 2009 We are sending you Attached Shop Drawings Product Data Samples These are transmitted as indicated below: Approved Approved as Noted Not Approved, Revise and Resubmit Action Not Required Action Indicated on Item Transmitted For Signature. Return Copies to Us By: Edward E. Fleming Department of Community Services Project: One Civic Square, 3 Floor Job WEIHE ENGINEERS Phone: Fax: Re: Under separate cover via Prints Specifications Change Order(s) n Sketches/Drawings 10505 N. College Avenue Indianapolis, IN 46280 weihe.net 31 Allan H. Weihc, P.E., l...S. President The Sanctuary at 116t i f`r RECEIVED NOV 2 4 2009 1 DOGS ti W06 -0882 317 -571 -2417 Recorded Plat Delivered the following items: Copy of Letter Meeting Minutes Inspection Report Application(s) for Payment n For Your Review or Use n For Your Review Comment As Requested For Your Records n For Your Approval Remarks: cc: 1 846 661 1 800 i 452 6408 Fax: 317 i 843 0546 Letter of Transmittal To: City of Carmel Department of Community Services One Civic Square From: Tim Walter We are sending you attached under separate COPIES Carmel, Indiana 46032 2 Signed Mylar Secondary Plat Signed Paper Secondary Plat these are transmitted for your action as indicated below: n REMARKS: for your use and /or file for review comment as requested approved as noted copy to Dick Hill, File. PLATINUM PROPERTIES, LLC. 9757 Westpoint Drive, Suite 600 Indianapolis, IN 46256 Phone: 818 -2900 Fax: 863 -2055 DESCRIPTION signed If enclosures are not as noted, kindly notify us immediately. co to 112p,1 4 RECEIVED NOV 4 2009 Date: November 4, 2 ATTN: Angie Conn Project: The Sanctuary at 116 RE: Secondary Plat Approval cover via personal delivery the documents as listed: returned for corrections please sign return original and Retain one copy for your file See Remark copies As previously discussed, please have the plats signed by the director and forwarded to Dick Hill for final approval and signatures by the Board of Public Works. Sanctuary at 116th Street Section'3 Page 1 of 1 Conn, Angelina V From: Brady Kuhn [KuhnB @weihe.net] Sent: Monday, August 18, 2008 2:33 PM To: Krueskamp, Theresa A Cc: Eric Carter; Conn, Angelina V Subject: Sanctuary at 116th Street Section 3 Attachments: Sanc 116th Sec 3 Plat.dwg Ms. Krueskamp, Attached you will find a CAD file of the Sanctuary at 116th Street Section 3 Final Plat. Thank you, W FIRE ENGINEERS yiiae l r`s Er-gnaw-1/2:g ands:. :r ctjrr Brady Kuhn, PLS Director, Land Surveying Weihe Engineers, Inc. 10505 N. College Avenue Indianapolis, Indiana 46280 317 1 846 6611 800 1 452 6408 317 1 843 0546 fax 317 1 654 8829 cell weihe.net This message and any files transmitted with it are confidential, may contain privileged information which is intended solely for the receipt, use and benefit of the intended recipient of this email. if you are not the intended recipient, be advised that dissemination, distribution, printing or copying of this message is strictly prohibited and may result in legal liability on your behalf. If you receive this message in error, or are not the named recipient, please notify the sender at either the email address or telephone number above and delete this email from your computer. Thank you. «Sanc 116th Sec 3 Plat.dwg>> 8/18/2008 Conn, Angelina V From: Steve Broermann [SBroermann @platinum properties.com] Sent: Monday, August 11, 2008 7:46 AM To: Foley, Amanda J; Eric Carter; Duncan, Gary R; Hohlt, William G; Brewer, Scott I; Duffy, John M; Fogarty, Michael D; Littlejohn, David W; Ellison, Christopher M; del @co.hamilton.in.us; Westermeier, Mark; jtl @co.hamilton.in.us; jason .kirkman @mybrighthouse.com; shirley.hunter @duke energy.com; rfarrand @ccs.kl2.in.us; ryan.hartman @ctrwd.org; troy.yackle @sug.com; ron.morris @aes.com; Huffman, David; dale.m.sparks @usps.gov; cshupperd @vectren.com; gary.mcnamee@duke- energy.com Cc: Conn, Angelina V; Ed Fleming; Jim Shields Subject: RE: sanctuary at 116th street, sections 1, 2 and Attachments: Sanc IDEM NOl.pdf Amanda attached is the information you requested. Let me know if you have any other questions. Thanks Steve From: Foley, Amanda J [mailto:afoley @carmel.in.gov] Sent: Friday, August 08, 2008 3:04 PM To: Eric Carter; Duncan, Gary R; Hohlt, William G; Brewer, Scott 1; Duffy, John M; Fogarty, Michael D; Littlejohn, David W; Ellison, Christopher M; del @co.hamilton.in.us; Westermeier, Mark; jtl @co.hamilton.in.us; jason .kirkman @mybrighthouse.com; shirley.hunter @duke energy.com; rfarrand @ccs.k12.in.us; ryan.hartman @ctrwd.org; troy.yackle @sug.com; ron.morris @aes.com; Huffman, David; dale.m.sparks @usps.gov; cshupperd @vectren.com; gary.mcnamee @duke- energy.com Cc: Conn, Angelina V; Steve Broermann; Ed Fleming; Jim Shields Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 Eric, Sections 1, 2a, and 3 should have been approved by John South prior to the City's stormwater ordinance. Please provide a copy of John South's SWPPP approval, as well as, the NOI submitted to IDEM. Thanks, Amanda Foley Storm Water Administrator City of Carmel Department of Engineering One Civic Square Carmel, IN 46032 (317) 571 -2314 (317) 571 -2439 (fax) From: Eric Carter [mailto:cartere @weihe.net] Sent: Friday, August 08, 2008 7:06 AM To: Eric Carter; Duncan, Gary R; Hohlt, William G; Brewer, Scott I; Duffy, John M; Fogarty, Michael D; Littlejohn, David W; Ellison, Christopher M; del @co.hamilton.in.us; Westermeier, Mark; jtl @co.hamilton.in.us; jason .kirkman @mybrighthouse.com; shirley.hunter @duke energy.com; rfarrand @ccs.k12.in.us; ryan.hartman @ctrwd.org; troy.yackle @sug.com; ron.morris @aes.com; Huffman, David; dale.m.sparks @usps.gov; cshupperd @vectren.com; Foley, Amanda J; gary.mcnamee @duke energy.com Cc: Conn, Angelina V; Steve Broermann (E- mail); Ed Fleming; Jim Shields Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 Carmel TAC members, 8/11/2008 Page 1 of 3 Conn, Angelina V From: David Lucas [del @co.hamilton.in.us] Sent: Monday, August 11, 2008 8:07 AM To: ron.morris @aes.com; Foley, Amanda J; Ellison, Christopher M; Huffman, David; Littlejohn, David W; Duncan, Gary R; Duffy, John M; Fogarty, Michael D; Westermeier, Mark; Brewer, Scott I; Hohlt, William G; rfarrand @ccs.k12.in.us; Jason LeMaster; ryan.hartman @ctrwd.org; gary.mcnamee @duke energy.com; shirley.hunter @duke energy.com; jason .kirkman @mybrighthouse.com; troy.yackle @sug.com; dale.m.sparks @usps.gov; cshupperd @vectren.com; Eric Carter Cc: Conn, Angelina V; Steve Broermann (E- mail); Edeming; Jim Shields Subject: RE: sanctuary at 116th street, sections 1, 2 an Eric, Sincerely, David E. Lucas HCHD Staff Engineer /Road 1700 South 10th Street Noblesville, IN 46060 (317) 770-4474 Direct Line (317) 773 -7770 Office (317) 776 -9814 Fax e -mail: del @co.hamilton.in.us website: www.co.hamilton.in.us Eric Section three is attached. 1 This project is outside of Highway jurisdiction. We have no comments. "Eric Carter" <cartere @weihe.net> 8/8/2008 7:05 AM Carmel TAC members, I'm following up to see if any of you have any comments for Sanctuary Section 1, 2a, 3, and 4a for us resubmitting. Thank you Original Message From: Eric Carter Sent: Thursday, July 31, 2008 11:40 AM To: Eric Carter; 'gduncan @carmel.in.gov'; 'wakers @carmel.in.gov'; 'whohlt @carmel.in.gov'; 'sbrewer @carmel.in.gov'; 'jduffy @carmel.in.gov'; 'mfogarty @carmel.in.gov'; 'dlittlejohn @careml.in.gov'; 'cellison @carmel.in.gov'; 'del @co.hamilton.in.us'; 'mwestermeier @carmel.in.gov'; 'jtl @co.hamilton.in.us'; 'grh @co.hamilton.in.us'; 'bmg @co.hamilton.in.us'; jason .kirkman @mybrighthouse.com'; 'shirley.hunter@duke- energy.com'; jennifer .marlett @veoliawaterna.com'; 'rfarrand @ccs.kl2.in.us'; 'ryan.hartman @ctrwd.org'; 'troy.yackle @sug.com'; 'ron.morris @aes.com'; 'gilko @crossroadengineers.com'; 'dhuffman @carmel.in.gov'; 'dale.m.sparks @usps.gov'; 'cshupperd @vectren.com'; 'afoley @carmel.in.gov'; 'gary.mcnamee @duke energy.com' Cc: 'Angelina Conn V (E- mail)'; 'Steve Broermann (E- mail)'; Ed Fleming; Jim Shields Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 Original Message From: Eric Carter Sent: Thursday, July 31, 2008 11:40 AM To: 'gduncan @carmel.in.gov'; 'wakers @carmel.in.gov'; 'whohlt @carmel.in.gov'; Conn, Angelina V Angie Conn, Planning Administrator Dept. of Community Services Planning Zoning 1 Civic Square, 3rd Floor City of Carmel, IN 46032 p. 317 -571 -2417 f. 317- 571 -2426 aconn©carmel.in.gov From: Conn, Angelina V Sent: Friday, August 08, 2008 2:18 PM To: 'Eric Carter' Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 Outstanding issues for Section 1 1. Provide the subdivider agreement form. 2. Provide the filled out secondary plat application. 3. Provide a copy of the covenants /restrictions, if any. From: Eric Carter [mailto:cartere @weihe.net] Sent: Friday, August 08, 2008 11:10 AM To: Conn, Angelina V Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 Attached is Section One. Thank you! I'm finishing up the rest of the sections and will follow in another email. 8/8/2008 Page 1 of 3 Original Message From: Conn, Angelina V [mailto:Aconn @carmel.in.gov] Sent: Friday, August 08, 2008 9:48 AM To: Eric Carter Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 Eric you can email me pdfs of the revised plats. That way you do not have to print off on paper. If all looks good, then I will send you an email saying that we are ready to sign off on the mylar plats. We need the revisions whenever you have them. It is more your timetable, since Steve Broermann wanted them on the next available agenda of BPW.... But that can't happen until our dept signs off on the plat. Angie Conn, Planning Administrator Dept. of Community Services Planning Zoning 1 Civic Square, 3rd Floor City of Carmel, IN 46032 p. 317- 571 -2417 f. 317- 571 -2426 aconn©carmel.in.gov From: Eric Carter [mailto:cartere @weihe.net] Sent: Friday, August 08, 2008 9:36 AM To: Conn, Angelina V Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 so you need the final mylars and not a paper copy to final review? When do you need them by? thank you Original Message From: Conn, Angelina V [mailto:Aconn©carmel.in.gov] Sent: Friday, August 08, 2008 9:30 AM To: Eric Carter Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 We are just waiting on revisions. Then we can present the mylars to mike h to sign. Conn, Angelina V From: Eric Carter [cartere @weihe.net] Sent: Friday, August 08, 2008 9:08 AM To: Jim Shields; Ed Fleming; Steve Broermann (E -mail) Cc: Conn, Angelina V Subject: FW: sanctuary at 116th street, sections 1, 2 and 3@ Original Message From: McNamee, Gary S [mailto:gary.mcnamee @duke energy.com] Sent: Friday, August 08, 2008 8:57 AM To: Eric Carter Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 Hi Eric, As your drawings for this project do not depict any transmission line easements being used for this project, Duke Energy's Asset Protection department does not have any objections or comments on this project. Thanks for contacting us. I have attached a copy of our transmission easement guidelines and restrictions for your future use. If in the future you are working on projects that involve a Duke Energy transmission line easement, please refer to these standards, and contact us for approval of the use of our easements. Sincerely, Gary S. McNamee Duke Energy Asset Protection Midwest North 812- 375 -2021 From: Eric Carter [mailto:cartere @weihe.net] Sent: Thursday, July 31, 2008 11:40 AM To: Eric Carter; gduncan @carmel.in.gov; wakers @carmel.in.gov; whohlt @carmel.in.gov; sbrewer @carmel.in.gov; jduffy @carmel.in.gov; mfogarty@carmel.in.gov; dlittlejohn @careml.in.gov; cellison @carmel.in.gov; del @co.hamilton.in.us; mwestermeier @carmel.in.gov; jtl @co.hamilton.in.us; grh @co.hamilton.in.us; bmg @co.hamilton.in.us; jason.kirkman @mybrighthouse.com; Hunter, Shirley A; jennifer.marlett@veoliawaterna.com; rfarrand @ccs.k12.in.us; ryan.hartman @ctrwd.org; troy.yackle @sug.com; ron.morris @aes.com; gilko @crossroadengineers.com; dhuffman @carmel.in.gov; dale.m.sparks @usps.gov; cshupperd@vectren.com; afoley @carmel.in.gov; McNamee, Gary S Cc: Angelina Conn V (E- mail); Steve Broermann (E- mail); Ed Fleming; Jim Shields Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 Section three is attached. 8/8/2008 Page 1 of 2 Original Message From: Eric Carter Sent: Thursday, July 31, 2008 11:40 AM To: 'gduncan @carmel.in.gov'; 'wakers @carmel.in.gov'; 'whohlt @carmel.in.gov'; 'sbrewer @carmel.in.gov'; 'jduffy @carmel.in.gov'; 'mfogarty @carmel.in.gov'; 'dlittlejohn @careml.in.gov'; 'cellison @carmel.in.gov'; 'del @co.hamilton.in.us'; 'mwestermeier @carmel.in.gov'; 'jtl @co.hamilton.in.us'; 'grh @co.hamilton.in.us'; 'bmg @co.hamilton.in.us'; 'jason.kirkman @mybrighthouse.com'; 'shirley .hunter @duke energy.com'; jennifer .marlett@veoliawaterna.com'; 'rfarrand @ccs.k12.in.us'; 'ryan.hartman @ctrwd.org'; 'troy.yackle @sug.com'; 'ron.morris @aes.com'; 'gilko @crossroadengineers.com'; 'dhuffman @carmel.in.gov'; 'dale.m.sparks @usps.gov'; 'cshupperd @vectren.com'; 'afoley @carmel.in.gov'; 'gary.mcnamee @duke energy.com' Cc: Angelina Conn V (E- mail); Steve Broermann (E- mail); Ed Fleming; Jim Shields Conn, Angelina V From: Eric Carter [cartere @weihe.net] Sent: Friday, August 08, 2008 9:08 AM To: Jim Shields; Ed Fleming; Steve Broermann (E -mail) Cc: Conn, Angelina V Subject: FW: sanctuary at 116th street, sections 1, 2 and 3 Original Message From: Yackle, Troy [mailto:Troy.Yackle @SUG.com] Sent: Friday, August 08, 2008 8:59 AM To: Eric Carter Subject: RE: sanctuary at 116th street, sections 1, 2 and() Panhandle Eastern Pipe Line Company has no company facilities involved in this project. Thank you Troy A. Yackle Right -of -Way Representative Panhandle Eastern Pipeline /Trunkline Gas Company 937 Zionsville Road Indianapolis, IN 46268 Office: (3 733 3 21 3 Fax: (3 733 3 2 04 Cell: (5 37 troy.yackle @sug.com From: Eric Carter [mailto:cartere @weihe.net] Sent: Friday, August 08, 2008 7:06 AM To: Eric Carter; gduncan @carmel.in.gov; whohlt @carmel.in.gov; sbrewer @carmel.in.gov; jduffy @carmel.in.gov; mfogarty@carmel.in.gov; dlittlejohn @carmel.in.gov; cellison @carmel.in.gov; del @co.hamilton.in.us; mwestermeier @carmel.in.gov; jtl @co.hamilton.in.us; jason.kirkman @mybrighthouse.com; shirley.hunter @duke- energy.com; rfarrand @ccs.k12.in.us; ryan.hartman @ctrwd.org; Yackle, Troy; ron.morris @aes.com; dhuffman @carmel.in.gov; dale.m.sparks @usps.gov; cshupperd @vectren.com; afoley @carmel.in.gov; gary.mcnamee @duke- energy.com Cc: Angelina Conn V (E- mail); Steve Broermann (E- mail); Ed Fleming; Jim Shields Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 Carmel TAC members, Eric 8/8/2008 Page 1 of 3 I'm following up to see if any of you have any comments for Sanctuary Section 1, 2a, 3, and 4a for us resubmitting. Thank you Original Message From: Eric Carter Sent: Thursday, July 31, 2008 11:40 AM To: Eric Carter; gduncan @carmel.in.gov'; 'wakers @carmel.in.gov'; 'whohlt @carmel.in.gov'; 'sbrewer @carmel.in.gov'; 'jduffy @carmel.in.gov'; 'mfogarty@carmel.in.gov'; 'dlittlejohn @careml.in.gov'; 'cellison @carmel.in.gov'; 'del @co.hamilton.in.us'; 'mwestermeier @carmel.in.gov'; 'jtl @co.hamilton.in.us'; 'grh @co.hamilton.in.us'; 'bmg @co.hamilton.in.us'; jason .kirkman @mybrighthouse.com'; 'shirley.hunter @duke- energy.com'; Jennifer .marlett@veoliawaterna.com'; 'rfarrand @ccs.k12.in.us'; 'ryan.hartman @ctrwd.org'; troy.yackle @sug.com'; 'ron.morris @aes.com'; 'gilko @crossroadengineers.com'; 'dhuffman @carmel.in.gov'; 'dale.m.sparks @usps.gov'; 'cshupperd @vectren.com'; 'afoley @carmel.in.gov'; 'gary.mcnamee @duke energy.com' Cc: 'Angelina Conn V (E- mail)'; 'Steve Broermann (E- mail)'; Ed Fleming; Jim Shields Conn, Angelina V From: Sent: To: Cc: Subject: Eric 8/4/2008 Eric Carter [cartere @weihe.net] Monday, August 04, 2008 12:24 PM Conn, Angelina V Steve Broermann; Ed Fleming; Donahue -Wold, Alexia K; Littlejohn, David W; Jim Shields RE: Sanctuary at 116th Street, Sections 1, 2A, 3, and 4A Attachments: Sanctuary at 116th Sidewalks They should be constructed at 5' wide. Steve Broermann contacted Carmel about it couple months ago and we forwarded it to the contractor. Our As- builts will have the sidewalk change, if that is acceptable. See attached email about the change Original Message From: Conn, Angelina V [mailto:Aconn @carmel.in.gov] Sent: Monday, August 04, 2008 12:10 PM To: Eric Carter Cc: Steve Broermann; Ed Fleming; Donahue -Wold, Alexia K; Littlejohn, David W Subject: Sanctuary at 116th Street, Sections 1, 2A, 3, and 4A Hi Eric I looking at the construction plans for all 4 sections, the only thing that really stuck out on the construction plans was the sidewalk width on the street details. It shows a minimum 4.5 feet wide, and the subdivision control ordinance section 8.09 requires 5 -ft wide sidewalks. Please revise the plans or you can seek plan commission approval of a waiver for sidewalk width. Thanks, Angie Conn, Planning Administrator Dept. of Community Services Planning Zoning 1 Civic Square, 3rd Floor City of Carmel, IN 46032 p. 317- 571 -2417 f. 317- 571 -2426 aconn @carmel.in.gov Page 1 of 1 Conn, Angelina V From: Eric Carter [cartere @weihe.net] Sent: Monday, August 04, 2008 9:28 AM To: Conn, Angelina V; Donahue -Wold, Alexia K Cc: Steve Broermann (E- mail); Jim Shields; Ed Fleming Subject: FW: sanctuary at 116th street, sections 1, 2 and 3 Original Message From: Greg Ilko [mailto:gilko @crossroadengineers.com] Sent: Friday, August 01, 2008 1:58 PM To: Eric Carter Cc: 'Duncan, Gary R'; 'Greg Noyes' Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 Eric, I have no drainage comments with regards to the plats. Thanks, Gregory J. Ilko CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 office: 317.780.1555 ext. 112 fax: 317.780.6525 web: www.crossroadengineers.com From: Eric Carter [mailto:cartere @weihe.net] Sent: Thursday, July 31, 2008 1:50 PM To: Eric Carter; gduncan @carmel.in.gov; wakers @carmel.in.gov; whohlt @carmel.in.gov; sbrewer @carmel.in.gov; jduffy @carmel.in.gov; mfogarty@carmel.in.gov; dlittlejohn @careml.in.gov; cellison @carmel.in.gov; del @co.hamilton.in.us; mwestermeier @carmel.in.gov; jtl @co.hamilton.in.us; grh @co.hamilton.in.us; bmg @co.hamilton.in.us; jason.kirkman @mybrighthouse.com; shirley.hunter @duke energy.com; jennifer.marlett @veoliawaterna.com; rfarrand @ccs.k12.in.us; ryan.hartman @ctrwd.org; troy.yackle @sug.com; ron.morris @aes.com; gilko @crossroadengineers.com; dhuffman @carmel.in.gov; dale.m.sparks @usps.gov; cshupperd @vectren.com; afoley @carmel.in.gov; gary.mcnamee @duke energy.com Cc: Angelina Conn V (E- mail); Steve Broermann (E- mail); Ed Fleming; Jim Shields Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 Attached is section 4A. 8/4/2008 Page 1 of 2 Original Message From: Eric Carter Sent: Thursday, July 31, 2008 11:40 AM To: 'gduncan @carmel.in.gov'; 'wakers @carmel.in.gov'; 'whohlt @carmel.in.gov'; 'sbrewer @carmel.in.gov'; 'jduffy @carmel.in.gov'; 'mfogarty@carmel.in.gov'; 'dlittlejohn @careml.in.gov'; 'cellison @carmel.in.gov'; 'del @co.hamilton.in.us'; 'mwestermeier @carmel.in.gov'; 'jtl @co.hamilton.in.us'; 'grh @co.hamilton.in.us'; 'bmg @co.hamilton.in.us'; Jason .kirkman @mybrighthouse.com'; 'shirley .hunter @duke energy.com'; jennifer .marlett@veoliawaterna.com'; 'rfarrand @ccs.k12.in.us'; 'ryan.hartman @ctrwd.org'; 'troy.yackle @sug.com'; 'ron.morris @aes.com'; 'gilko @crossroadengineers.com'; 'dhuffman @carmel.in.gov'; 'dale.m.sparks @usps.gov'; 'cshupperd @vectren.com'; 'afoley @carmel.in.gov'; 'gary.mcnamee @duke energy.com' Cc: Angelina Conn V (E- mail); Steve Broermann (E- mail); Ed Fleming; Jim Shields Conn, Angelina V From: Greg Hoyes [grh @co.hamilton.in.us] Sent: Friday, August 01, 2008 1:46 PM To: Eric Carter Cc: Conn, Angelina V; Duncan, Gary R; gilko @crossroadengineers.com; Steve Broermann (E- mail); Ed Fleming; Jim Shields Subject: Re: FW: sanctuary at 116th street, sections 1, 2 and 3 Eric We have no issues with the plats for Sections 1, 2A, and 3. If you have any questions, please let me know. I will look over 4A next. Greg Hoyes HCSO Plan Reviewer "Eric. Carter" <cartere @weihe.net> 11:39 AM Thursday, July 31, 2008 To all Carmel TAC members, Apparently Sections 1, 2 and 3 have not been filed for secondary plat application. We have been asked to file and work with each TAC member individually to get the plat approved. Applications will be sent to Angie separately. As most of you know, all three sections are built or in the process of being finished. We are requesting that you reply if you need a paper copy or will a PDF of the plat be acceptable for your review. We will need comments back to us prior to 8/8 so that we can make revisions to them and still make the BPW deadline of. 8/13. If you have any questions or need additional information, please contact either myself or Ed Fleming. If you need Construction sets for this filing, please let us know. Section One and Section 2a is attached. Section 3 will follow in another email. Thank you Eric From: Hill, Dick B [mailto:DHi11 @carmel.in.gov] Sent: Wednesday, July 30, 2008 2:51 PM To: Conn, Angelina V; Duncan, Gary R Cc: Redden, Nick; Barnes, David R; Donahue -Wold, Alexia K; Steve Broermann Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 We have approved construction plans for Sections 1, 2, 3 and 4A, accepted fees, accepted performance bonds and approved construction to commence. It was our assumption that the plat procedure had occurred but don't know that we would have known that. Also, given the history of this development, i.e. length of time that this development has been under review, change of engineers, change of developer, change from Hamilton County review authority to the City of Carmel and the various name changes over the years, I can understand confusion. From: Conn, Angelina V Sent: Wednesday, July 30, 2008 2:31 PM 1 Conn, Angelina V From: Eric Carter [cartere @weihe.net] Sent: Friday, August 01, 2008 9:41 AM To: Conn, Angelina V Cc: Donahue -Wold, Alexia K Subject: FW: sanctuary at 116th street, sections 1, 2 and 3 Original 'Message From: Brooke Gajownik [mailto:bmg @co.hamilton.in.us] Sent: Thursday, July 31, 2008 12:18 PM To: Eric Carter Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 Hi Eric I have no comments on any of the sections. They all look good tome. Hope you are doing well and talk to you soon! Brooke Gajownik, GISP 911 Address Coordinator Hamilton County Sheriffs Office admin:317.773.1872 fax: 317.776.9896 bmg ©co.hamilton.in.us "Eric Carter" <cartere ©weihe.net> 7/31/2008 11:40 AM Section three is attached. 8/4/2008 Page 1 of 3 Original Message From: Eric Carter Sent: Thursday, July 31, 2008 11:40 AM To: 'gduncan @carmel.in.gov'; 'wakers @carmel.in.gov'; 'whohlt @carmel.in.gov'; 'sbrewer @carmel.in.gov'; 'jduffy @carmel.in.gov'; 'mfogarty@carmel.in.gov'; 'dlittlejohn @careml.in.gov'; 'cellison @carmel.in.gov'; 'del @co.hamilton.in.us'; 'mwestermeier @carmel.in.gov'; 'jtl @co.hamilton.in.us'; 'grh @co.hamilton.in.us'; 'bmg @co.hamilton.in.us'; 'jason.kirkman @mybrighthouse.com'; 'shirley .hunter @duke energy.com'; jennifer.marlett @veoliawaterna.com'; 'rfarrand @ccs.k12.in.us'; 'ryan.hartman @ctrwd.org'; troy.yackle @sug.com'; 'ron.morris @aes.com'; 'gilko @crossroadengineers.com'; 'dhuffman @carmel.in.gov'; 'dale.m.sparks @usps.gov'; 'cshupperd @vectren.com'; 'afoley @carmel.in.gov'; 'gary.mcnamee @duke energy.com' Cc: Angelina Conn V (E- mail); Steve Broermann (E- mail); Ed Fleming; Jim Shields Subject: FW: sanctuary at 116th street, sections 1, 2 and 3 Importance: High To all Carmel TAC members, Apparently Sections 1, 2 and 3 have not been filed for secondary plat application. We have been asked to file and work with each TAC member individually to get the plat approved. Applications will be sent to Angie separately. As most of you know, all three sections are built or in the process of being finished. We are requesting that you reply if you need a paper copy or will a PDF of the plat be acceptable for your review. We will need comments back to us prior to 8/8 so that we can make revisions to them and still make the BPW deadline of 8/13. If you have any questions or need additional information, please contact either myself or Ed Fleming. If you need Construction sets for this filing, please let us know. Conn, Angelina V From: Conn, Angelina V Sent: Thursday, July 31, 2008 1:46 PM To: 'Eric Carter' Cc: sbroermann@platinum-properties.dom; 'Ed Fleming'; Donahue -Wold, Alexia K Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 Since I am out of the office tomorrow, and in order to help speed up the review /approval process for these 3 plats please see the preliminary review comments below. The official docket no. assignment email will go out once we receive the actual applications and construction plans. You may receive more review comments once we receive the construction plans and landscape plan. Section 1: Section 1 docket no 08070031 SP. Application Fee $5,544.50 1 Fill in all of the instrument numbers on the plat. 2. Provide a separate copy of the subdivider agreement form, found in the subdivision control ordinance, chapter 9.06. 3. Provide a copy of the covenants /restrictions, if there are any. 4. Provide copies of your correspondence with TAC members and their correspondence with you. 5. Provide a digital copy of the applications and recorded plat as a pdf. 6. If possible, show /label the approximate pond boundaries in the block areas that contain them. 7. Please add a location map to the plat, showing the nearest major road intersections, such as 116th Shelborne. 8. Add the date submitted to the plat. 9. Please add docket numbers 08070031 SP and 78 -03 PP Amend, 78 -03a SW 78 -03 e SW to the plat. 10. On sheet 1 add the zoning to the BSL requirements: S -1 /Residence ROSO with subdivision waiver. 11. Only show the plan commission certificate on the signature page; Remove duplicates on the other sheets. 12. Note: the amenities area in Block E will require a separate Special Use approval from the Board of Zoning Appeals. 13. Please provide a copy of the landscape plan and tree preservation plan to our Dept and to the City Forester. 14. Please wait to submit revised materials until after the Technical Advisory Committee (TAC) has met on this application. The resubmitted materials should include edits addressing any comment or requirements that arise from the TAC meeting. Additional comments may be made after the requested revisions have been submitted. 15. Please submit a revised Secondary Plat after making above mentioned changes. Once these changes have been made and comments addressed, please produce a Mylar copy for signature by this Department; the property owner and surveyor must sign the plat prior to the Director signing. Two paper copies of the plat must be filed with the Mylar prior to recording, and two paper copies and a Mylar of the recorded plat must be submitted following recording. Our approval of the secondary plat (signature) will be forthcoming upon revision of the plans according to the items listed above. 16. Also, the staff has been advised that we cannot present a Secondary Plat to the Director for signature from this point forward until Ms. Terry Krueskamp (tkrueskamp@carmel.in.gov) in Information Systems has received an e -mail with an electronic file attached (MicroStation .dgn is preferred, or AutoCad .dwg of the subdivision) and it (the e -mail) has been copied to myself (aconn @carmel.in.gov). Also, the Dept would also like a .pdf file of the plat, as we move toward a paperless office. Section 2a: Section 2A docket no 08070032 SP. Application Fee $1,547.00 1. Fill in all of the instrument numbers on the plat. 2. Provide a separate copy of the subdivider agreement form, found in the subdivision control ordinance, chapter 9.06. 3. Provide a copy of the covenants /restrictions, if there are any. 4. Provide copies of your correspondence with TAC members and their correspondence with you. 5. Provide a digital copy of the applications and recorded plat as a pdf. 6. Please add a location map to the plat, showing the nearest major road intersections, such as 116th Shelborne. 7. Add the date submitted to the plat. 8. Please add docket numbers 08070032 SP and 78 -03 PP Amend, 78 -03a SW 78 -03 e SW to the plat. 9. On sheet 1 —'add the zoning to the BSL requirements: S -1 /Residence ROSO with subdivision waiver. 10. Only show the plan commission certificate on the signature page; Remove duplicates on the other sheets. 7/31/2008 Page 1 of 3 ron.morris @aes.com; gilko @crossroadengineers.com; Huffman, David; dale.m.sparks @usps.gov; cshupperd @vectren.com; Foley, Amanda 3; gary.mcnamee @duke energy.com Cc: Conn, Angelina V; Steve Broermann (E- mail); Ed Fleming; Jim Shields Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 Section three is attached. 7/31/2008 Page 3 of 3 7/31/2008 11. Please provide a copy of the landscape plan and tree preservation plan to our Dept and to the City Forester. 12. Please wait to submit revised materials until after the Technical Advisory Committee (TAC) has met on this application. The resubmitted materials should include edits addressing any comment or requirements that arise from the TAC meeting. Additional comments may be made after the requested revisions have been submitted. 13. Please submit a revised Secondary Plat after making above mentioned changes. Once these changes have been made and comments addressed, please produce a Mylar copy for signature by this Department; the property owner and surveyor must sign the plat prior to the Director signing. Two paper copies of the plat must be filed with the Mylar prior to recording, and two paper copies and a Mylar of the recorded plat must be submitted following recording. Our approval of the secondary plat (signature) will be forthcoming upon revision of the plans according to the items listed above. 14. Also, the staff has been advised that we cannot present a Secondary Plat to the Director for signature from this point forward until Ms. Terry Krueskamp (tkrueskamp @carmel.in.gov) in Information Systems has received an e-mail with an electronic file attached (MicroStation .dgn is preferred, or AutoCad .dwg of the subdivision) and it (the e-mail) has been copied to myself (aconn @carmel.in.gov). Also, the Dept would also like a .pdf file of the plat, as we move toward a paperless office. Section 3: Section 3 docket no 08070033 SP. Application Fee $3,722.50 Fill in all of the instrument numbers on the plat. Provide a separate copy of the subdivider agreement form, found in the subdivision control ordinance, chapter 9.06. Provide a copy of the covenants /restrictions, if there are any. Provide copies of your correspondence with TAC members and their correspondence with you. Provide a digital copy of the applications and recorded plat as a pdf. On sheet 2, Label the 70 ft 1 /2 R/W of 116th Street. If possible, show /label the approximate pond boundaries in the block areas that contain them. 1 8„ On sheet 4, add (private drive) to the Cold Creek Court street name. Please add a location map to the plat, showing the nearest major road intersections, such as 116th Shelborne. "r&. Add the date submitted to the plat. Please add docket numbers 08070033 SP and 78 -03 PP Amend, 78 -03a SW 78 -03 e SW to the plat. '42- On sheet 1 add the zoning to the BSL requirements: S -1 /Residence ROSO with subdivision waiver. Only show the plan commission certificate on the signature page; Remove duplicates on the other sheets. Please provide a copy of the landscape plan and tree preservation plan to our Dept and to the City Forester. 15. Please wait to submit revised materials until after the Technical Advisory Committee (TAC) has met on this application. The resubmitted materials should include edits addressing any comment or requirements that arise from the TAC meeting. Additional comments may be made after the requested revisions have been submitted. 16. Please submit a revised Secondary Plat after making above mentioned changes. Once these changes have been made and comments addressed, please produce a Mylar copy for signature by this Department; the property owner and surveyor must sign the plat prior to the Director signing. Two paper copies of the plat must be filed with the Mylar prior to recording, and two paper copies and a Mylar of the recorded plat must be submitted following recording. Our approval of the secondary plat (signature) will be forthcoming upon revision of the plans according to the items listed above. 17. Also, the staff has been advised that we cannot present a Secondary Plat to the Director for signature from this point forward until Ms. Terry Krueskamp (tkrueskamp @carmel.in.gov) in Information Systems has received an e-mail with an electronic file attached (MicroStation .dgn is preferred, or AutoCad .dwg of the subdivision) and it (the e-mail) has been copied to myself (aconn @carmel.in.gov). Also, the Dept would also like a .pdf file of the plat, as we move toward a paperless office. Angie Conn, Planning Administrator Dept. of Community Services Planning Zoning 1 Civic Square, 3rd Floor City of Carmel, IN 46032 p. 317- 571 -2417 f. 317- 571 -2426 aconn ©carmel.in.gov Page 2 of 3 From: Eric Carter [mailto:cartere @weihe.net] Sent: Thursday, July 31, 2008 11:40 AM To: Eric Carter; Duncan, Gary R; Akers, William P; Hohlt, William G; Brewer, Scott I; Duffy, John M; Fogarty, Michael D; dlittlejohn @careml.in.gov; Ellison, Christopher M; del @co.hamilton.in.us; Westermeier, Mark; jtl @co.hamilton.in.us; grh @co.hamilton.in.us; bmg @co.hamilton.in.us; jason .kirkman @mybrighthouse.com; shirley.hunter @duke energy.com; jennifer.marlett@veoliawaterna.com; rfarrand @ccs.k12.in.us; ryan.hartman @ctrwd.org; troy.yackle @sug.com; ron.morris @aes.com; gilko @crossroadengineers.com; Huffman, David; dale.m.sparks @usps.gov; cshupperd @vectren.com; Foley, Amanda 3; gary.mcnamee @duke energy.com Cc: Conn, Angelina V; Steve Broermann (E- mail); Ed Fleming; Jim Shields Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 Section three is attached. 7/31/2008 Page 3 of 3 Conn, Angelina V Page 1 of 2 From: Eric Carter [cartere @weihe.net] Sent: Thursday, July 31, 2008 11:40 AM To: Eric Carter; Duncan, Gary R; Akers, William P; Hohlt, William G; Brewer, Scott I; Duffy, John M; Fogarty, Michael D; dlittlejohn @careml.in.gov; Ellison, Christopher M; del @co.hamilton.in.us; Westermeier, Mark; jtl @co.hamilton.in.us; grh @co.hamilton.in.us; bmg @co.hamilton.in.us; jason .kirkman @mybrighthouse.com; shirley.hunter @duke energy.com; jennifer .marlett @veoliawaterna.com; rfarrand @ccs.kl2.in.us; ryan.hartman @ctrwd.org; troy.yackle @sug.com; ron.morris @aes.com; gilko @crossroadengineers.com; Huffman, David; dale.m.sparks @usps.gov; cshupperd @vectren.com; Foley, Amanda J; gary.mcnamee@duke- energy.com Cc: Conn, Angelina V; Steve Broermann (E- mail); Ed Fleming; Jim Shields Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 Attachments: section 3 Plat -Sheet 04.PDF; section 3 Plat -Sheet 05.PDF; section 3 Plat -Sheet 06.PDF; section 3 Plat -Sheet 07.PDF; section 3 Plat -Sheet 08.PDF; section 3 Plat -Sheet 09.PDF; section 3 Plat -Sheet 10.PDF; section 3 Plat -Sheet 11.PDF; section 3 Plat -Sheet 01.PDF; section 3 Plat -Sheet 02.PDF; section 3 Plat -Sheet 03.PDF Section three is attached. 7/31/2008 Original Message From: Eric Carter Sent: Thursday, July 31, 2008 11:40 AM To: 'gduncan @carmel.in.gov'; 'wakers @carmel.in.gov'; 'whohlt @carmel.in.gov'; 'sbrewer @carmel.in.gov'; jduffy @carmel.in.gov'; 'mfogarty@carmel.in.gov'; 'dlittlejohn @careml.in.gov'; 'cellison @carmel.in.gov'; 'del @co.hamilton.in.us'; 'mwestermeier @carmel.in.gov'; 'jtl @co.hamilton.in.us'; 'grh @co.hamilton.in.us'; 'bmg @co.haniilton.in.us'; jason .kirkman @mybrighthouse.com'; 'shirley .hunter @duke- energy.com'; jennifer .marlett@veoliawaterna.com'; 'rfarrand @ccs.k12.in.us'; 'ryan.hartman @ctrwd.org'; 'troy.yackle @sug.com'; 'ron.morris @aes.com'; 'gilko @crossroadengineers.com'; 'dhuffman @carmel.in.gov'; 'dale.m.sparks @usps.gov'; 'cshupperd @vectren.com'; 'afoley @carmel.in.gov'; 'gary.mcnamee @duke energy.com' Cc: Angelina Conn V (E- mail); Steve Broermann (E- mail); Ed Fleming; Jim Shields Subject: FW: sanctuary at 116th street, sections 1, 2 and 3 Importance: High To all Carmel TAC members, Apparently Sections 1,2 and 3 have not been filed for secondary plat application. We have been asked to file and work with each TAC member individually to get the plat approved. Applications will be sent to Angie separately. As most of you know, all three sections are built or in the process of being finished. We are requesting that you reply if you need a paper copy or will a PDF of the plat be acceptable for your review. We will need comments back to us prior to 8/8 so that we can make revisions to them and still make the BPW deadline of 8/13. If you have any questions or need additional information, please contact either myself or Ed Fleming. If you need Construction sets for this filing, please let us know. Section One and Section 2a is attached. Section 3 will follow in another email. Thank you Eric From: Hill, Dick B [mailto:DHill @carmel.in.gov] Sent: Wednesday, July 30, 2008 2:51 PM Conn, Angelina V From: Hill, Dick B Sent: Wednesday, July 30, 2008 2:51 PM To: Conn, Angelina V; Duncan, Gary R Cc: Redden, Nick; Barnes, David R; Donahue -Wold, Alexia K; 'Steve Broermann' Subject: RE: sanctuary at 116th street, sections 1, 2 and 3 Page 1 of 1 We have approved construction plans for Sections 1, 2, 3 and 4A, accepted fees, accepted performance bonds and approved construction to commence. It was our assumption that the plat procedure had occurred but don't know that we would have known that. Also, given the history of this development, i.e. length of time that this development has been under review, change of engineers, change of developer, change from Hamilton County review authority to the City of Carmel and the various name changes over the years, I can understand confusion. From: Conn, Angelina V Sent: Wednesday, July 30, 2008 2:31 PM To: Duncan, Gary R Cc: Redden, Nick; Barnes, David R; Donahue -Wold, Alexia K; Hill, Dick B; 'Steve Broermann' Subject: sanctuary at 116th street, sections 1, 2 and 3 Gentleman Steve Broermann of platinum properties hinted that the construction plans for these sections were already approved by your dept. is this true? We are a bit confused because they have not yet submitted secondary plat applications for these three sections... currently, they have apps on fie for sections 4, 5, and 6) They wanted to get their plats on the next bpw agenda, but we will have them submit the 3 secondary plat applications and have them work with each TAC member individually to get the plat approved. That way they are not delayed by having to attend the next scheduled TAC meeting. Also, Alexia will review the plat for section 4, to make sure no additional changes are required for the plat. Thanks, Angie Conn, Planning Administrator Dept. of Community Services Planning Zoning 1 Civic Square, 3rd Floor City of Carmel, IN 46032 p. 317- 571 -2417 f. 317- 571 -2426 aconn @carmel.in.gov 7/30/2008 3atockuta)u, (1(0 Sk. (PI t Cj Sanctuary at 116th Sidewalks Page 1 of 1 Conn, Angelina V From: Ed Fleming [FlemingE @weihe.netj Sent: Tuesday, June 03, 2008 4:14 PM To: sbuckler @valentiheld.com; MZielinski @valentiheld.com Cc: Eric Carter Subject: Sanctuary at 116th Sidewalks Gentlemen, Please make note of the sidewalk change from Steve's email below. If you have any questions, please contact him direct. Thanks! Ed From: Steve Broermann Sent: Tuesday, June 03, 2008 10:23 AM To: Eric Simons; ibarratt@pittmanpartners.com; Steve Pittman; Ken Brasseur Subject: Sanctuary Gentlemen I just spoke to Bob Dykstra with Carmel about the walks at Sanctuary 116. All sidewalks will need to be 5' wide per the latest Carmel Standards, not the 5.5' shown on some areas of the plans. Thanks Steve Broermann 8/4/2008