Loading...
HomeMy WebLinkAboutC202 Stormwater Pollution PreventionOM MIXTURES RATE PER ACRE PURE LIVE SEED OPMAIDA SOIL PH 1. PERENNIAL RYEGRASS WHITE 150 LBS. 2 LBS. 5.5 TO 7.0 2. KENTUCKY BLUEGRASS SMOOTH BROMEGRASS SWITCHGRASS TIMOTHY PERENNIAL RYEGRASS WHITE CLOVER 20 LBS. 10 LBS. 3 LBS. 4 LBS. 10 LBS. 2 LBS. 5.5 TO 7.5 3. TALL FESCUE WHITE CLOVER 150 LBS. 2 LBS. 5.5 TO 7.5 4. TALL FESCUE PERENNIAL RYEGRASS KENTUCKY BLUEGRASS 150 LBS. 20 LBS. 20 LBS. 5.5 TO 7.5 S® M I X T U R E S R A T E P E R A C R E 1 E LIDS SEED OPTIMUM SOIL PEI 1. SMOOTH BROME GRASS RED CLOVER 35 LBS. 20 LBS. 5.5 TO 7.0 2. TALL FESCUE WHITE CLOVER 50 LBS. 2 LBS. 5.5 TO 7.5 3. TALL FESCUE RED CLOVER 50 LBS. 20 LBS. 5.5 TO 7.5 4. ORCHARD GRASS RED CLOVER WHITE CLOVER 30 LBS. 20 LBS. 2 LBS. 5.6 TO 7.0 5. CROWNVETCH TALL FESCUE 12 LBS. 30 LBS. 5.6 TO 7.0 SEM MIXTURES RATE PER ACRE PURE LIVE SEED CV IMUM SOIL PR 1. BLUEGRASS 140 LBS. 5.5 TO 7.0 2. PERENNIAL RYEGRASS (TURF TYPE) 60 LBS. 90 LBS. 5.6 TO 7.0 3. TALL FESCUE (TURF TYPE) BLUEGRASS 170 LBS. 30 LBS. 5.6 TO 7.5 SECO MIXTURES RATE PER ACRE PURBIIVE SEED OPTIMUM SOH. PH 1. PERENNIAL RYEGRASS WHITE CLOVER 70 LBS. 2 LBS. 5.6 TO 7.0 2. PERENNIAL RYEGRASS TALL FESCUE 70 LBS. 50 LBS. 5.6 TO 7.0 3. TALL FESCUE WHITE CLOVER 70 LBS. 2 LBS. 5.5 TO 7.5 10 10 9 Contact Person for Erosion Control Sediment Practices T?cW CORPORATION 3841 W. MORRIS STREET INDIANAPOLIS, IN 46241 TELEPHONE: 317 244 -7637 CONTACT PERSON: STEPHEN D. SHEHORN DOUGLAS L. BEAMER 8 WARNING- THIS PLAN TO BE USED FOR EROSION CONTROL PURPOSES ONLY. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. 9 r 8 --NOTE- THIS PLAN INDICATES EROSION CONTROL MEASURES REQUIRED AI- I ER SOIL STRIPPING AND PAD BUILDING HAS TAKEN PLACE. COORDINATE WITH DEVELOPER FOR MEASURES REQUIRED UNTIL PROPERLY TURNED OVER FOR DEVELOPMENT. COORDINATE WITH SOIL CONSERVATION DISTRICT REPRESENTATIVE FOR ANY OTHER MEASURES REQUIRED DUE TO SITE CONDITIONS. LAWNS AND HIGH-MAINTENANCE AREAS 7 NATIVE MATERIAL OPTIONAL) OPEN LOGY- MAIIUDIANCEABBAMQUIIAIN IDLE 10 tETHANMX STEEP HANKS AND CUTS, LOW MAtt TEINANCS AREAS (NOT MOWED) CHANNELS AND AREAS OF CONCEIr1RATED FLOW PERMANENT SEED 6 2. THE CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30FT. OF THE TEMP. CONCRETE WASHOUT FACILITY WOOD OR METAL STAKES TO SECURE THE STRAW BALES (TWO PER BALE) POLYETHYLENE LINING 10 MIL. EXTENDING OVER BALES I I I III III I I! III ll 1 1 1 III -III -I I -I i I i i i III II SECTION NOTES: 1. AN OAT OR WHEAT COMPANION OR NURSE CROP MAY BE USED WITH ANY OF THE ABOVE PERMANENT SEEDING MIXTURES, AT THE FOLLOWING RATES: (A) SPRING OATS ONE FOURTH TO THREE- FOURTHS BUSHEL PER ACRE (B) WHEAT NO MORE THAN ONE -HALF BUSHEL PER ACRE 2. A HIGH POTENTIAL FOR FERTILIZER, SEED, AND MULCH TO WASH EXISTS ON STEEP BANKS, CUTS, AND IN CHANNELS AND AREAS OF CONCENTRATED INSTALLATION 1. GRADE THE SITE TO ACHIEVE POSITIVE DRAINAGE. 2. ADD TOPSOIL OR COMPOST MULCH TO ACHIEVE NEEDED DEPTH FOR ESTABLISHMENT OF VEGETATION. (COMPOST MATERIAL MAY BE ADDED TO IMPROVE SOIL MOISTURE HOLDING CAPACITY, SOIL FRIABILITY, AND NUTRIENT AVAILABILITY.) SEEDBED PREPARATION 1. TEST SOIL TO DETERMINE PH AND NUTRIENT LEVELS. 2. APPLY SOIL AMENDMENTS AS RECOMMENDED BY THE SOIL TEST AND WORK INTO THE UPPER TWO TO FOUR INCHES OF SOIL. IF TESTING IS NOT DONE, APPLY 400 TO 600 POUNDS PER ACRE OF 12 -12 -12 ANALYSIS FERTILIZER, OR EQUIVALENT. 3. TILL THE SOIL TO OBTAIN A UNIFORM SEEDBED. USE A DISK OR RAKE, OPERATED ACROSS THE SLOPE, TO WORK THE SOIL AMENDMENTS INTO THE UPPER TWO TO FOUR INCHES OF THE SOIL. SEEDING OPTIMUM SEEDING DATES ARE MARCH 1 TO MAY 10 AND AUGUST 10 TO SEPTEMBER 30. PERMANENT SEEDING DONE BETWEEN MAY 10 AND AUGUST 10 MAY NEED TO BE IRRIGATED. SEEDING OUTSIDE OR BEYOND OPTIMUM SEEDING DATES IS STILL POSSIBLE WITH THE UNDERSTANDING THAT RESEEDING OR OVERSEEDING MAY BE REQUIRED IF ADEQUATE SURFACE COVER IS NOT ACHIEVED. RESEEDING OR OVERSEEDING CAN BE EASILY ACCOMPLISHED IF THE SOIL SURFACE REMAINS WELL PROTECTED WITH MULCH. 1. SELECT A SEEDING MIXTURE AND RATE FROM TABLE 1. SELECT SEED MIXTURE BASED ON SITE CONDITIONS, SOIL PH, INTENDED LAND USE, AND EXPECTED LEVEL OF MAINTENANCE. 2. APPLY SEED UNIFORMLY WITH A DRILL OR CULTIPACKER SEEDER OR BY BROADCASTING. PLANT OR COVER THE SEED TO A DEPTH OF ONE- FOURTH TO ONE -HALF INCH. IF DRILLING OR BROADCASTING THE SEED, ENSURE GOOD SEED -TO -SOIL CONTACT BY FIRMING THE SEEDBED WITH A ROLLER OR CULTIPACKER AFTER COMPLETING SEEDING OPERATIONS. (IF SEEDING IS DONE WITH A HYDROSEEDER, FERTILIZER AND MULCH CAN BE APPLIED WITH THE SEED IN A SLURRY MIXTURE.) 3. MULCH ALL SEEDED AREAS AND USE APPROPRIATE METHODS TO ANCHOR THE MULCH IN PLACE. CONSIDER USING EROSION CONTROL BLANKETS ON SLOPING AREAS AND CONVEYANCE CHANNELS MAINTENANCE INSPECT WITHIN 24 HOURS OF EACH RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS UNTIL THE VEGETATION IS SUCCESSFULLY ESTABLISHED. CHARACTERISTICS OF A SUCCESSFUL STAND INCLUDE VIGOROUS DARK GREEN OR BLUISHGREEN SEEDLINGS WITH A UNIFORM VEGETATIVE COVER DENSITY OF 90 PERCENT OR MORE. CHECK FOR EROSION OR MOVEMENT OF MULCH. REPAIR DAMAGED, BARE, GULLIED, OR SPARSELY VEGETATED AREAS AND THEN FERTILIZE, RESEED, AND APPLY AND ANCHOR MULCH. IF PLANT COVER IS SPARSE OR PATCHY, EVALUATE THE PLANT MATERIALS CHOSEN, SOIL FERTILITY, MOISTURE CONDITION, AND MULCH APPLICATION; REPAIR AFFECTED AREAS EITHER BY OVERSEEDING OR PREPARING A NEW SEEDBED AND RESEEDING. APPLY AND ANCHOR MULCH ON THE NEWLY SEEDED AREAS. IF VEGETATION FAILS TO GROW, CONSIDER SOIL TESTING TO DETERMINE SOIL PH OR NUTRIENT DEFICIENCY PROBLEMS. (CONTACT YOUR SOIL AND WATER CONSERVATION DISTRICT OR COOPERATIVE EXTENSION OFFICE FOR ASSISTANCE.) IF ADDITIONAL FERTILIZATION IS NEEDED TO GET A SATISFACTORY STAND, DO SO ACCORDING TO SOIL TEST RECOMMENDATIONS. ADD FERTILIZER THE FOLLOWING GROWING SEASON. FERTILIZE ACCORDING TO SOIL TEST RECOMMENDATIONS. FERTILIZE TURF AREAS ANNUALLY. APPLY FERTILIZER IN A SPLIT APPLICATION. FOR COOL SEASON GRASSES, APPLY ONE -HALF OF THE FERTILIZER IN LATE SPRING AND ONE HALF IN EARLY FALL. FOR WARM SEASON GRASSES, APPLY ONE -THIRD IN EARLY SPRING, ONE -THIRD IN LATE SPRING, AND THE REMAINING ONE -THIRD IN MIDDLE SUMMER. TABLE 1. PERMANENT SEEDING RECOMMENDATIONS THIS TABLE PROVIDES SEVERAL SEED MIXTURE OPTIONS. ADDITIONAL SEED MIXTURES ARE AVAILABLE COMMERCIALLY. WHEN SELECTING A MIXTURE, CONSIDER INTENDED LAND USE AND SITE CONDITIONS, INCLUDING SOIL PROPERTIES (E.G., SOIL PH AND DRAINAGE), SLOPE ASPECT, AND THE TOLERANCE OF EACH SPECIES TO SHADE AND DROUGHT. REFERENCE IN CHAPTER 7 PAGES 35 -40 IN THE INDIANA STORM WATER QUALITY MANUAL 6 METAL PINS OR STAPLES TO SECURE THE POLYETHYLENE LINING TO THE STRAW BALES BINDING WIRE STRAW BALE (TYP) J WOOD OR METAL STAKES (TYP) 2 PER BALE NORTH AMERICAN GREEN 5 EROSION CONTROL Products Guaranteed SOLUTIONS 14649 HIGHWAY 41 NORTH EVANSVILLE, IN 47725 800- 772 -2040 www.nagreen.com 5 VARIES V 10 MIL. PLASTIC LINING 10' MIN. PLAN SECTION LINE INSTALLATION 1. UTILIZE AND FOLLOW THE DESIGN IN THE STORM WATER POLLUTION PREVENTION PLAN TO INSTALL THE SYSTEM. 2. DEPENDENT UPON THE TYPE OF SYSTEM, EITHER EXCAVATE THE PIT OR INSTALL THE CONTAINMENT SYSTEM. 3. A BASE SHALL BE CONSTRUCTED AND PREPARED THAT IS FREE OF ROCKS AND OTHER DEBRIS THAT MAY CAUSE TEARS OR PUNCTURES IN THE POLYETHYLENE LINING. 4. INSTALL THE POLYETHYLENE LINING. FOR EXCAVATED SYSTEMS, THE LINING SHOULD EXTEND OVER THE ENTIRE EXCAVATION. THE LINING FOR BERMED SYSTEMS SHOULD BE INSTALLED OVER THE POOLING AREA WITH ENOUGH MATERIAL TO EXTEND THE LINING OVER THE BERM OR CONTAINMENT SYSTEM. THE LINING SHOULD BE SECURED WITH PINS, STAPLES, OR OTHER FASTENERS. 5. PLACE FLAGS, SAFETY FENCING, OR EQUIVALENT TO PROVIDE A BARRIER TO CONSTRUCTION EQUIPMENT AND OTHER TRAFFIC. 6. PLACE A NON COLLAPSING, NON -WATER HOLDING COVER OVER THE WASHOUT FACILITY PRIOR TO A PREDICTED RAINFALL EVENT TO PREVENT ACCUMULATION OF WATER AND POSSIBLE OVERFLOW OF THE SYSTEM (OPTIONAL). 7. INSTALL SIGNAGE THAT IDENTIFIES CONCRETE WASHOUT AREAS. 8. POST SIGNS DIRECTING CONTRACTORS AND SUPPLIERS TO DESIGNATED LOCATIONS. 9. WHERE NECESSARY, PROVIDE STABLE INGRESS AND EGRESS (SEE TEMPORARY CONSTRUCTION INGRESS /EGRESS PAD ON PAGE 17) OR ALTERNATIVE APPROACH PAD FOR CONCRETE WASHOUT SYSTEMS. MAINTENANCE INSPECT DAILY AND AFTER EACH STORM EVENT. INSPECT THE INTEGRITY OF THE OVERALL STRUCTURE INCLUDING, WHERE APPLICABLE, THE CONTAINMENT SYSTEM. INSPECT THE SYSTEM FOR LEAKS, SPILLS, AND TRACKING OF SOIL BY EQUIPMENT. INSPECT THE POLYETHYLENE LINING FOR FAILURE, INCLUDING TEARS AND PUNCTURES. ONCE CONCRETE WASTES HARDEN, REMOVE AND DISPOSE OF THE MATERIAL EXCESS CONCRETE SHOULD BE REMOVED WHEN THE WASHOUT SYSTEM REACHES 50 PERCENT OF THE DESIGN CAPACITY. USE OF THE SYSTEM SHOULD BE DISCONTINUED UNTIL APPROPRIATE MEASURES CAN BE INITIATED TO CLEAN THE STRUCTURE. PREFABRICATED SYSTEMS SHOULD ALSO UTILIZE THIS CRITERION, UNLESS THE MANUFACTURER HAS ALTERNATE SPECIFICATIONS. UPON REMOVAL OF THE SOLIDS, INSPECT THE STRUCTURE. REPAIR THE STRUCTURE AS NEEDED OR CONSTRUCT A NEW SYSTEM. DISPOSE OF ALL CONCRETE IN A LEGAL MANNER. REUSE THE MATERIAL ON SITE, RECYCLE, OR HAUL THE MATERIAL TO AN APPROVED CONSTRUCTION /DEMOLITION LANDFILL SITE. RECYCLING OF MATERIAL IS ENCOURAGED. THE WASTE MATERIAL CAN BE USED FOR MULTIPLE APPLICATIONS INCLUDING BUT NOT LIMITED TO ROADBEDS AND BUILDING. THE AVAILABILITY FOR RECYCLING SHOULD BE CHECKED LOCALLY. THE PLASTIC LINER SHOULD BE REPLACED AFTER EVERY CLEANING; THE REMOVAL OF MATERIAL WILL USUALLY DAMAGE THE LINING. THE CONCRETE WASHOUT SYSTEM SHOULD BE REPAIRED OR ENLARGED AS NECESSARY TO MAINTAIN CAPACITY FOR CONCRETE WASTE. CONCRETE WASHOUT SYSTEMS ARE DESIGNED TO PROMOTE EVAPORATION. HOWEVER, IF THE LIQUIDS DO NOT EVAPORATE AND THE SYSTEM IS NEAR CAPACITY IT MAY BE NECESSARY TO VACUUM OR REMOVE THE LIQUIDS AND DISPOSE OF THEM IN AN ACCEPTABLE METHOD. DISPOSAL MAY BE ALLOWED AT THE LOCAL SANITARY SEWER AUTHORITY PROVIDED THEIR NATIONAL POLLUTANT DISCHARGE EUMINATTON SYSTEM PERMITS ALLOW FOR ACCEPTANCE OF THIS MATERIAL ANOTHER OPTION WOULD BE TO UTILIZE A SECONDARY CONTAINMENT SYSTEM OR BASIN FOR FURTHER DEWATERING. PREFABRICATED UNITS ARE OFTEN PUMPED AND THE COMPANY SUPPLYING THE UNIT PROVIDES THIS SERVICE. INSPECT CONSTRUCTION ACTIVITIES ON A REGULAR BASIS TO ENSURE SUPPLIERS, CONTRACTORS, AND OTHERS ARE UTILIZING DESIGNATED WASHOUT AREAS. IF CONCRETE WASTE IS BEING DISPOSED OF IMPROPERLY, IDENTIFY THE VIOLATORS AND TAKE APPROPRIATE ACTION. WHEN CONCRETE WASHOUT SYSTEMS ARE NO LONGER REQUIRED, THE CONCRETE WASHOUT SYSTEMS SHALL BE CLOSED. DISPOSE OF ALL HARDENED CONCRETE AND OTHER MATERIALS USED TO CONSTRUCT THE SYSTEM. HOLES, DEPRESSIONS AND OTHER LAND DISTURBANCES ASSOCIATED WITH THE SYSTEM SHOULD BE BACKFILLED, GRADED, AND STABILIZED. CONCRETE WASHOUT TYPE "ABOVE GRADE (NO SCALE) W/ STRAW BALES" 2 -5" (5 CM- 12.5CM) SLOPE INSTALLATION 4 POLYETHYLENE LINING 10 MIL EXTENDING OVER BALES METAL PINS OR STAPLES TO SECURE THE POLYETHYLENE LINING TO THE STRAW BALES r (NO SCALE) WOOD OR METAL STAKES TO SECURE THE STRAW BALES (TWO PER BALE) STRAW BALE (TYP) 12" (30 CM) CONCRETE WASHOUT 3' I<kii rid Vklif hit VIWI' w III .1 I CI i I 3' 1. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS RECP's), INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE RECP'S IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30 CM) OF RECP's EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE RECP's WITH A ROW OF STAPLES /STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF RECP'S BACK OVER SEED AND COMPACTED SOIL. SECURE RECP's OVER COMPACTED SOIL WITH A ROW OF STAPLES /STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF THE RECP's. 3. ROLL THE RECP's (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. RECP'S WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECP's MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES /STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM STAPLES /STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL RECP's MUST BE STAPLED WITH APPROXIMATELY 2" 5" (5 CM 12.5 CM) OVERLAP DEPENDING ON RECP's TYPE. 5. CONSECUTIVE RECP's SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE (7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE RECP's WIDTH. NOTE: IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO PROPERLY SECURE THE RECP's. C�NS'J UC1'ION 3 U -I I ICI I I =1 11 0 3" (7.5 CM) T LACK LETTER 6" HEIGHT 0.5" LAG SCREWS WOOD POST 3 "x3 "x8' SPECIFICATIONS: SITE PREPARATION GRADE THE SITE TO ACHIEVE POSITIVE DRAINAGE. 2 CROSS SECTION PERSPECTIVE VIEW PREPARE A SMOOTH, FIRM SOIL SURFACE AND APPLY SOIL AMENDMENTS. IRRIGATION IRRIGATE AS NEEDED TO ENSURE ROOTING OF SOD. MATERIALS SOIL AMENDMENTS SELECT MATERIALS AND RATES AS DETERMINED BY A SOIL TEST (CONTACT YOUR COUNTY SOIL AND WATER CONSERVATION DISTRICT OR COOPERATIVE EXTENSION OFFICE FOR ASSISTANCE AND SOIL INFORMATION, INCLUDING AVAILABLE SOIL TESTING SERVICES.) OR 400 TO 600 POUNDS OF 12 -12 -12 ANALYSIS FERTILIZER, OR EQUIVALENT. SOD SELECT A HIGH QUALITY, HEALTHY, VIGOROUS VARIETY WELL ADAPTED TO THE REGION AND COMPATIBLE WITH THE INTENDED USE. INSTALLATION SOD SHOULD NOT BE INSTALLED DURING HOT WEATHER, ON DRY SOIL, FROZEN SOIL, COMPACTED CLAY, LOOSE SAND OR GRAVELLY SUBSTRATE SOILS, AGGREGATE, OR PESTICIDE TREATED SOIL. THE IDEAL TIME TO LAY SOD IS MAY 1 TO JUNE 1 OR SEPTEMBER 1 TO SEPTEMBER 30, ALTHOUGH IT CAN BE INSTALLED AS EARLY AS MARCH 15 IF AVAILABLE OR JUNE 1 TO SEPTEMBER 1 IF IRRIGATED. SITE PREPARATION 1. APPLY TOPSOIL IF EXISTING SOIL CONDITIONS ARE UNSUITABLE FOR ESTABLISHING VEGETATION. 2. GRADE THE SITE TO ACHIEVE POSITIVE DRAINAGE AND CREATE A SMOOTH, FIRM SOIL SURFACE. 3. WHERE APPLICABLE, USE A CHISEL PLOW, DISK, HARROW, OR RAKE TO BREAK UP COMPACTED SOILS AND CREATE A FAVORABLE ROOTING DEPTH OF SIX TO EIGHT INCHES. SOD BED PREPARATION 1. TEST SOIL TO DETERMINE PH AND NUTRIENT LEVELS. 2. IF SOIL PH IS TOO ACIDIC FOR THE GRASS SOD TO BE INSTALLED, APPLY LIME ACCORDING TO SOIL TEST RESULTS OR AT THE RATE RECOMMENDED BY THE SOD SUPPLIER. 3. APPLY FERTIUZER AS RECOMMENDED BY THE SOIL TEST. IF TESTING WAS NOT DONE, APPLY 400 TO 600 POUNDS PER ACRE OF 12 -12 -12 ANALYSIS FERTILIZER, OR EQUIVALENT. 4. WORK THE SOIL AMENDMENTS INTO THE UPPER TWO TO FOUR INCHES OF SOIL WITH A DISK OR RAKE OPERATED ACROSS THE SLOPE. 5. RAKE OR HARROW THE AREA TO ACHIEVE A SMOOTH FINAL GRADE AND THEN ROLL OR CULTIPACK THE SOIL SURFACE TO CREATE A FIRM SURFACE ON WHICH TO LAY THE SOD. LAYING THE SOD 1. INSTALL SOD WITHIN THIRTY -SIX HOURS OF ITS CUTTING. 2. STORE THE SOD IN A SHADED LOCATION DURING INSTALLATION. 3. IMMEDIATELY BEFORE LAYING THE SOD, RAKE THE SOIL SURFACE TO BREAK ANY CRUST. (IF THE WEATHER IS HOT, LIGHTLY IRRIGATE THE SOIL SURFACE PRIOR TO LAYING THE SOD.) 4. LAY SOD STRIPS IN A BRICK -LIKE PATTERN. 5. BUTT ALL JOINTS TIGHTLY AGAINST EACH OTHER (DO NOT STRETCH OR OVERLAP THEM), USING A KNIFE OR MASON'S TROWEL TO TRIM AND FIT SOD INTO IRREGULARLY SHAPED AREAS. 6. ROLL THE SOD LIGHTLY AFTER INSTALLATION TO ENSURE FIRM CONTACT BETWEEN THE SOD AND SOIL. 7. IRRIGATE NEWLY SODDED AREAS UNTIL THE UNDERLYING SOIL IS WET TO A DEPTH OF FOUR INCHES, AND THEN KEEP MOIST UNTIL THE GRASS TAKES ROOT. SLOPE APPLICATION 1. INSTALL THE SOD STRIPS WITH THE LONGEST DIMENSION PERPENDICULAR TO THE SLOPE. 2. WHERE SLOPES EXCEED A RATIO OF 3:1, STAPLE OR STAKE EACH STRIP AT THE CORNERS AND IN THE MIDDLE. CHANNEL APPLICATION (SODDING PROVIDES QUICKER PROTECTION THAN SEEDING AND MAY REDUCE THE RISK OF EARLY WASHOUT.) 1. EXCAVATE THE CHANNEL, ALLOWING FOR THE FULL THICKNESS OF THE SOD. 2. LAY THE SOD STRIPS WITH THE LONGEST DIMENSION PERPENDICULAR TO CHANNEL FLOW. 3. STAPLE OR STAKE EACH STRIP OF SOD AT THE CORNERS AND IN THE MIDDLE. 4. STAPLE JUTE OR BIODEGRADABLE POLYPROPYLENE NETTING OVER THE SODDED AREA TO MINIMIZE THE POTENTIAL FOR WASHOUT DURING ESTABLISHMENT. MAINTENANCE INSPECT WITHIN 24 HOURS OF EACH RAIN EVENT AND AT LEAST ONCE EVERY SEVEN CALENDAR DAYS UNTIL SOD IS WELL ROOTED. KEEP SOD MOIST UNTIL FULLY ROOTED. AFTER SOD IS WELL ROOTED (TWO TO THREE WEEKS), MAINTAIN A PLANT HEIGHT OF TWO TO THREE INCHES. TIME MOWING TO AVOID RUTS IN TURF. FERTILIZE TURF AREAS ANNUALLY. APPLY FERTILIZER IN A SPLIT APPLICATION. FOR COOLSEASON GRASSES, APPLY ONE -HALF OF THE FERTILIZER IN LATE SPRING AND ONE -HALF IN EARLY FALL. FOR WARM SEASON GRASSES, APPLY yDiS1 ONE -THIRD IN EARLY SPRING, ONE -THIRD IN LATE SPRING AND ONE- THIF6V1 AMER. REFERENCE IN CHAPTER 7 PAGES 47 -50 IN THE INDIANA STORM WATER QUALITY MANUAL SOD APPLICATION DETAIL (NO SCALE) AJE 12 3841 W Morris St. InpI IN 46241 p. 317,244 763'7 f 317.244.6348 www. tw -co ro .corn 2 09 U) z 0 0 0 z° E. o N a a \i 1111ttIIff11/ TTT f SHIE '4 ST MU PE1 a SHEET NO. PROJECT NO. r-+ 00 1- ∎D ■D �o I I I N tll 0 0 00 0 M "E c a -5, 8 3 co 10 C LLI 0 0 JAMES E. SHIELDS JR. P.E. 10201333 z w C202 W09 -0548 z 0 g o E-1 ti z 0a rn 0 0 N N