ADDITIONAL STORMWATER POLLUTION PREVENTION MEASURES
DESCRIPTION AND PURPOSE
6
TO PREVENT OR REDUCE THE AMOUNT OF CONTAMINATION TO STORMWATER RESULTING FROM VEHICLE AND EQUIPMENT MAINTENANCE BY
MAINTAINING A "DRY AND CLEAN SITE THE BEST PRACTICE WOULD BE TO PERFORM MAINTENANCE ACTIVITIES AT AN OFFSITE FACILITY
WHENEVER POSSIBLE. IF THIS OPTION IS NOT FEASIBLE, THEN WORK SHOULD BE PERFORMED ONLY IN DESIGNATED AREAS, WHILE
PROVIDING ADEQUATE COVER FOR MATERIALS STORED OUTSIDE, ROUTINELY CHECKING FOR LEAKS AND SPILLS, AND CONTAINING AND
CLEANING UP ALL SPILLS IMMEDIATELY.
SUITABLE APPLICATIONS
THESE PROCEDURES ARE APPLICABLE FOR ALL CONSTRUCTION PROJECTS WHERE AN ONSITE STAGING YARD AREA IS NECESSARY FOR
THE STORAGE AND MAINTENANCE OF HEAVY CONSTRUCTION EQUIPMENT AND VEHICLES.
LIMITATIONS
VEHICLE AND EQUIPMENT MAINTENANCE SHOULD ONLY BE PERFORMED ONSITE WHEN IT IS IMPRACTICAL TO SEND THEM OFFSITE FOR
MAINTENANCE AND REPAIR. TRANSPORTING VEHICLES AND /EQUIPMENT OFFSITE SHOULD BE DONE ONLY AT THE STABILIZED
CONSTRUCTION ENTRANCE /EXIT. VEHICLE STORAGE AND EQUIPMENT MAINTENANCE PROVIDES FOR A POTENTIALLY SIGNIFICANT SOURCE OF
STORMWATER POLLUTION. ONSITE ACTIVITIES THAT CAN CONTAMINATE STORMWATER INCLUDE GENERAL MAINTENANCE SUCH AS CHANGING
OR REPLACEMENT OF FLUIDS AND FILTERS, ENGINE REPAIR AND SERVICE, AND OUTDOOR EQUIPMENT STORAGE OR PARKING (FROM
SOURCES SUCH AS THE ENGINE, OIL, FUEL, OR HYDRAULIC FLUID LEAKS).
IMPLEMENTATION
IF MAINTENANCE MUST OCCUR ONSITE, WORK SHOULD BE DONE ONLY IN DESIGNATED AREAS LOCATED AWAY FROM DRAINAGE COURSES.
DEDICATED MAINTENANCE AREAS SHOULD BE PROTECTED FROM STORMWATER INFILTRATION AND RUNOFF. THE MAINTENANCE AREA SHOULD
BE LOCATED AT LEAST 50 FEET FROM DOWNSTREAM DRAINAGE FACILITIES, WATERWAYS, AND FLOOD PLAINS.
STORE AN ADEQUATE AMOUNT OF SPILL CLEANUP MATERIALS ONSITE WHERE THEY CAN BE READILY ACCESSIBLE.
DRIP PANS OR ABSORBENT PADS SHOULD BE USED DURING VEHICLE AND EQUIPMENT MAINTENANCE WORK THAT INVOLVES FLUIDS,
UNLESS THE MAINTENANCE WORK IS PERFORMED OVER AN IMPERMEABLE SURFACE WITHIN THE DEDICATED MAINTENANCE AREA
USE ABSORBENT MATERIALS ON SMALL SPILL AREAS. REMOVE THE CONTAMINATED ABSORBENT MATERIALS PROMPTLY AND DISPOSE OF
THEM PROPERLY.
ALL FUELING TRUCKS AND FUELING AREAS SHALL HAVE SPILL KITS AND /OR USE OTHER ADEQUATE SPILL PROTECTION DEVICES.
INSPECT ONSITE VEHICLES AND EQUIPMENT DAILY AT THE BEGINNING OF EACH DAY FOR LEAKS AND REPAIR IMMEDIATELY.
KEEP VEHICLES AND EQUIPMENT CLEAN; DO NOT ALLOW EXCESSIVE BUILD -UP OF OIL, GREASE OR SILT MATERIALS THAT MAY
CONTAMINATE OTHER PORTIONS OF THE SITE.
EMPLOYEES AND SUBCONTRACTORS SHALL BE TRAINED IN PROPER MAINTENANCE AND SPILL MEDIATION PROCEDURES.
PROPERLY DISPOSE OF USED OILS, FLUIDS, LUBRICANTS, AND SPILL CLEANUP MATERIALS PER LOCAL AND STATE LAWS.
SEPARATE AND RECYCLE WASTES SUCH AS GREASES, USED OIL, HYDRAULIC FLUID, OIL FILTERS, ANTIFREEZE, CLEANING SOLVENTS,
BATTERIES, AND TRANSMISSION FLUIDS. IF THESE MATERIALS ARE STORED ONSITE, PROVIDE ADEQUATE SECONDARY CONTAINMENT AND
COVERS.
DO NOT PLACE USED OIL IN AN UNAPPROVED DUMPSTER, POUR INTO A STORM DRAIN OR WATERCOURSE, OR POUR ONTO THE GROUND.
DRIP PANS OR PLASTIC SHEETING SHOULD BE PLACED UNDER ALL VEHICLES AND EQUIPMENT PLACED ON WATERWAY DOCKS, BARGES,
OR OTHER STRUCTURES LOCATED OVER WATER BODIES WHEN THE VEHICLE OR EQUIPMENT IS ANTICIPATED TO BE IDLE FOR MORE THAN
ONE HOUR.
DO NOT BURY OR BURN USED TIRES.
DEWATERING
SEDIMENT LADEN WATER SHALL NOT BE PUMPED TO STORM SEWER OUTLETS OR NATURAL DRAINAGE WAYS. DISPOSAL SHALL BE CONFINED
TO AREAS NOT SUBJECT TO SHEET FLOW RUNOFF WHERE THE EFFLUENT CAN BE DRIED OUT. THIS RESTRICTION SHALL APPLY TO AREAS
WHERE LIME STABILIZATION HAS BEEN IMPLEMENTED.
LITTERING ON THE PROJECT SITE IS PROHIBITED.
TO PREVENT CLOGGING OF THE STORM DRAINAGE SYSTEM LITTER AND DEBRIS SHOULD BE REMOVED FROM DRAINAGE GRATES, TRASH
RACKS, AND DITCHES DAILY.
TRASH RECEPTACLES SHOULD BE PROVIDED IN THE CONSTRUCTION STAGING AREAS, FIELD TRAILER AREAS, AND AREAS UTILIZED FOR LUNCH
AND BREAK PERIODS.
DOMESTIC TRASH FROM WORK AREAS WITHIN THE CONSTRUCTION LIMITS OF THE SITE SHOULD BE COLLECTED AND PLACED IN WATERTIGHT
DUMPSTERS WEEKLY AT A MINIMUM. DOMESTIC TRASH SHOULD BE COLLECTED FROM THE SITE REGARDLESS OF THE SOURCE. COLLECTED
LITTER AND DEBRIS SHOULD NOT BE PLACED IN OR NEXT TO THE STORMWATER DRAINAGE SYSTEMS OR WATERWAYS.
DUMPSTERS OF SUFFICIENT SIZE AND QUANTITY SHOULD BE PROVIDED TO CONTAIN THE SOLID WASTE GENERATED BY THE PROJECT.
DUMPSTERS SHOULD BE REMOVED FROM THE PROJECT SITE ONCE THEY BECOME FULL AND THE CONTENTS DISPOSED OF BY THE TRASH
HAULING CONTRACTOR.
CONSTRUCTION DEBRIS AND WASTE SHOULD BE REMOVED FROM THE SITE WEEKLY OR MORE FREQUENTLY AS REQUIRED. THE CONTRACTOR
SHOULD USE THEIR BEST JUDGMENT IN ANTICIPATING WHEN A DUMPSTER WILL BE FULL AND SCHEDULE A PICKUP IN ADVANCE OF THE
DUMPSTER BEING FULL TO PREVENT OVER TOPPING OF THE DUMPSTER OR PLACEMENT OF EXCESS MATERIAL ON THE GROUND.
CONSTRUCTION MATERIAL VISIBLE TO THE PUBLIC SHOULD BE STORED OR STACKED IN AN ORDERLY MANNER AWAY FROM THE STORM
DRAINAGE SYSTEM, WATERWAYS, AND FLOOD PLAIN.
STORMWATER RUNOFF SHOULD BE DIVERTED FROM STORED SOLID WASTE THROUGH THE USE OF BERMS, DIKES, OR OTHER TEMPORARY
DIVERSION STRUCTURES OR THROUGH THE USE OF MEASURES TO ELEVATE THE WASTE COLLECTION DUMPSTER.
SOLID WASTE STORAGE AREAS SHOULD NOT BE LOCATED IN AREAS PRONE TO FLOODING OR PONDING AND SHOULD BE LOCATED AT LEAST
50 FT FROM STORM DRAINAGE SYSTEMS AND WATERWAYS.
INSPECTION AND MAINTENANCE
INSPECT AND VERIFY THAT ACTIVITY -BASED PRACTICES ARE IN PLACE PRIOR TO THE START OF CONSTRUCTION IN THAT AREA. INSPECT
EACH PRACTICE WEEKLY TO VERIFY IMPLEMENTATION.
INSPECT CONSTRUCTION WASTE COLLECTION AREA REGULARLY TO INSURE ALL WASTE MATERIALS ARE BEING DISPOSED OF PROPERLY.
ARRANGE FOR REGULAR WASTE COLLECTION WITH A TRASH HAULING CONTRACTOR.
CONCRETE AND MASONRY WASHOUT AREAS
THE FOLLOWING STEPS WILL HELP REDUCE STORMWATER POLLUTION FROM CONCRETE AND MASONRY WASTES: DISCUSS THE CONCRETE
MANAGEMENT TECHNIQUES DESCRIBED, SUCH AS HANDLING OF CONCRETE WASTE AND WASHOUT AREAS WITH THE READY -MIX CONCRETE
SUPPLIER BEFORE ANY DELIVERIES ARE MADE. DISCUSS MASONRY WASTE MANAGEMENT TECHNIQUES WITH THE MASONRY CONTRACTORS
FOR THE CONTROL OF CEMENT MIXER WASHOUT AREAS.
INCORPORATE REQUIREMENTS FOR CONCRETE AND MASONRY WASTE MANAGEMENT INTO MATERIAL SUPPLIER AND SUBCONTRACTOR
AGREEMENTS.
STORE DRY AND LIQUID MATERIALS IN A COVERED AREA AWAY FROM DRAINAGE AREAS. PREVENT MASONRY SAND STOCKPILE FROM
WASHING INTO STREETS, STORM DRAINAGE SYSTEMS, AND WATERWAYS.
AVOID MIXING EXCESS AMOUNTS OF FRESH CONCRETE OR MORTAR.
PERFORM WASHOUT OF CONCRETE TRUCKS OFFSITE OR IN DESIGNATED AREAS ONLY.
7
6
5
SOLID WASTE MANAGEMENT AND COLLECTION, STORAGE, AND
DISPOSAL OF MATERIALS
DESCRIPTION AND PURPOSE
SOLID WASTE MANAGEMENT PROCEDURES AND PRACTICES ARE DESIGNED TO PREVENT OR REDUCE THE POTENTIAL FOR DISCHARGE OF
POLLUTANTS TO STORMWATER FROM SOLID OR CONSTRUCTION WASTE BY PROVIDING DESIGNATED WASTE COLLECTION AREAS AND
CONTAINERS, ENSURING REGULAR DISPOSAL, AND TRAINING OF EMPLOYEES AND SUBCONTRACTORS.
SUITABLE APPLICATIONS
TOXIC WASTE MATERIALS
INSPECTION AND MAINTENANCE
THIS PRACTICE IS APPLICABLE FOR CONSTRUCTION SITES WHERE THE FOLLOWING WASTES ARE GENERATED OR STORED:
SOLID WASTE GENERATED FROM DEMOLITION ACTIVITIES SUCH AS TREES OR SHRUBS, DEMOLITION OF EXISTING STRUCTURES, AND NEW
BUILDING CONSTRUCTION MATERIALS INCLUDING CONCRETE, MASONRY, WOOD, METAL, GLASS, RUBBER, STYROFOAM, PAPER, PLASTIC, PIPE,
ELECTRICAL COMPONENTS, AND PACKAGING MATERIALS.
DOMESTIC WASTES INCLUDE: FOOD CONTAINERS, BEVERAGE CONTAINERS, COFFEE CUPS, PAPER BAGS, PLASTIC WRAPPERS, STYROFOAM, AND
CIGARETTES
CONSTRUCTION WASTES INCLUDING BRICK, MORTAR, TIMBER, STEEL AND METAL SCRAPS, PIPE AND ELECTRICAL CUTTINGS, NON HAZARDOUS
EQUIPMENT PARTS, STYROFOAM AND OTHER MATERIALS SEND TRANSPORT AND PACKAGE CONSTRUCTION MATERIALS
IMPLEMENTATION
THE FOLLOWING STEPS WILL AID IN KEEPING THE SITE CLEAN AND REDUCE THE POTENTIAL FOR STORMWATER POLLUTION:
SELECT A DESIGNATED WASTE COLLECTION AREA ONSITE THAT IS DOWNSTREAM FROM THE STORMWATER COLLECTION SYSTEM AND AT LEAST
50 FEET AWAY FROM ALL WATERWAYS AND FLOOD PLAINS.
INFORM THE TRASH HAULING CONTRACTOR THAT ONLY WATERTIGHT DUMPSTERS FOR ONSITE USE WILL BE ACCEPTED.
INSPECT DUMPSTERS WHEN THEY REACH THE SITE FOR LEAKS. REJECT ANY DUMPSTER THAT IS NOT WATERTIGHT OR IS DEFECTIVE.
PROVIDE AN ADEQUATE NUMBER OF CONTAINERS WITH LIDS OR COVERS TO KEEP RAINWATER OUT AND TO PREVENT LOSS OF MATERIALS
DUE TO WINDY CONDITIONS.
ALLOW FOR ADDITIONAL DUMPSTERS OR MORE FREQUENT PICKUPS DURING THE DEMOLITION PHASE OF CONSTRUCTION TO INSURE TRASH
MATERIALS DO NOT GET STORED ON THE GROUND.
HAVE SITE TRASH COLLECTED DAILY. DURING RAINY AND WINDY CONDITIONS IT MAY BE NECESSARY TO COLLECT TRASH MORE THAN ONCE
A DAY.
REMOVE SOLID WASTE MATERIALS PROMPTLY FROM THE SITE SINCE EROSION AND SEDIMENT CONTROL MEASURES TEND TO COLLECT TRASH
WHICH HINDERS THE EFFECTIVENESS OF THE EROSION CONTROL MEASURES.
INSURE THAT TOXIC LIQUID WASTES SUCH AS USED OILS, SOLVENTS, AND PAINTS AND CHEMICALS SUCH AS ACIDS, PESTICIDES, ADDITIVES,
AND CURING COMPOUNDS ARE NOT DISPOSED OF IN DUMPSTERS DESIGNATED FOR CONSTRUCTION DEBRIS BUT ARE PROPERLY DISPOSED
OF ACCORDING TO LOCAL AND STATE LAWS.
DO NOT WASH OUT DUMPSTERS ON THE CONSTRUCTION SITE. DUMPSTER CLEANING SHOULD BE THE RESPONSIBILITY OF THE TRASH
HAULING CONTRACTOR.
ARRANGE FOR REGULAR WASTE COLLECTION BEFORE DUMPSTERS OVERFLOW. DO NOT PILE MATERIAL ABOVE THE DUMPSTER SIDE OR
ALLOW MATERIAL TO DRAPE OVER THE SIDES.
IMMEDIATELY CLEAN UP DUMPSTER SHOULD A SPILL OCCUR.
MAKE SURE THAT CONSTRUCTION WASTE IS COLLECTED, REMOVED, AND DISPOSED OF IN A TIMELY MANNER BY AN AUTHORIZED DISPOSAL
CONTRACTOR.
PERFORM MORTAR MIXER WASHOUT IN ONE DESIGNATED AREA FOR THE DURATION OF THE PROJECT.
DO NOT WASH OUT CONCRETE TRUCKS OR MORTAR MIXERS INTO STORM DRAINS, OPEN DITCHES, STREETS, OR WATERWAYS.
DO NOT ALLOW EXCESS CONCRETE OR MORTAR TO BE DUMPED ONSITE, EXCEPT IN DESIGNATED AREAS.
FOR ONSITE WASHOUT AREAS:
LOCATE WASHOUT AREA AT LEAST 50 FEET FROM STORM DRAINS, OPEN DITCHES, OR WATERWAYS.
DO NOT ALLOW RUNOFF TO LEAVE THE DESIGNATED AREA BY CONSTRUCTING A TEMPORARY PIT OR BERMED AREA LARGE ENOUGH FOR
LIQUID AND SOLID WASTE.
WASH OUT WASTES INTO THE TEMPORARY PIT WHERE THE CONCRETE CAN SET, BE BROKEN UP, AND BE DISPOSED OF PROPERLY.
-AVOID CREATING UNNECESSARY RUNOFF BY DRAINING WATER FROM THE WASHOUT AREA INTO A BERMED, LEVEL AREA WHEN WASHING
CONCRETE TO REMOVE FINE PARTICLES AND EXPOSE THE AGGREGATE.
DO NOT WASH SWEEPINGS FROM EXPOSED AGGREGATE CONCRETE INTO THE STREET OR STORM DRAIN SYSTEM. COLLECT AND RETURN
SWEEPINGS TO AGGREGATE BASE STOCKPILE OR DISPOSE OF PROPERLY.
INSPECT AND VERIFY THAT PRACTICES ARE IN PLACE PRIOR TO THE START OF EACH ASSOCIATED ACTIVITY. WHILE ACTIVITIES ARE IN
PROGRESS, INSPECT EACH PRACTICE WEEKLY TO VERIFY CONTINUED IMPLEMENTATION.
KEEP ADEQUATE SUPPLIES OF SPILL CLEANUP MATERIALS ONSITE. INSURE THAT ALL EMPLOYEES ARE AWARE OF MATERIAL STORAGE
LOCATIONS AND ACCESS CAN BE OBTAINED TO THE MATERIALS.
MAINTAIN FLUID WASTE CONTAINERS IN LEAK PROOF CONDITION. REMOVE AND REPLACE ANY CONTAINERS FOUND TO BE DEFECTIVE.
VEHICLES AND EQUIPMENT SHOULD BE INSPECTED AT THE START OF EACH DAY. IMMEDIATELY REPAIR ALL LEAKS. IT IS PREFERRED THAT
THE PROBLEM VEHICLE OR EQUIPMENT BE REMOVED FROM THE PROJECT SITE FOR REPAIRS TO MINIMIZE ONSITE IMPACTS.
INSPECT EQUIPMENT FOR DAMAGED HOSES AND LEAKY GASKETS DAILY. IMMEDIATELY REPAIR OR REPLACE FAULTY COMPONENTS.
DESCRIPTION AND PURPOSE
VEHICLE AND EQUIPMENT FUELING PROCEDURES AND PRACTICES ARE DESIGNED TO PREVENT FUEL SPILLS OR LEAKS AND REDUCE OR
ELIMINATE CONTAMINATION OF SOILS AND STORMWATER. THIS CAN BE ACCOMPLISHED BY USING OFFSITE FACILITIES, FUELING IN DESIGNATED
ONSITE AREAS ONLY, ENCLOSING OR COVERING STORED MATERIAL, UTILIZING SPILL CONTROLS, AND TRAINING EMPLOYEES AND
SUBCONTRACTORS IN PROPER FUELING
PROCEDURES.
LIMITATION
ONSITE VEHICLE AND EQUIPMENT FUELING SHOULD ONLY BE DONE WHEN IT IS NOT FEASIBLE TO SEND VEHICLES AND EQUIPMENT OFFSITE
FOR FUELING. VEHICLES AND EQUIPMENT ENTERING AND EXITING THE SITE SHOULD ALWAYS BE DONE AT THE STABILIZED CONSTRUCTION
ENTRANCE /EXIT.
IMPLEMENTATION.
THE USE OF OFFSITE FUELING STATIONS IS ENCOURAGED WHENEVER FEASIBLE. THESE FACILITIES ARE EQUIPPED TO HANDLE FUELING AND
SPILLS PROPERLY. PERFORMING THIS WORK OFFSITE MAY BE MORE ECONOMICAL BY ELIMINATING THE NEED FOR A SEPARATE DESIGNATED
FUELING AREA AND CONTAINMENT MEASURES ONSITE.
DISCOURAGE EMPLOYEES FROM "TOPPING -OFF" FUEL TANKS TO PREVENT UNNECESSARY SPILLS.
ABSORBENT SPILL CLEANUP MATERIALS AND SPILL KITS SHALL BE AVAILABLE IN ONSITE FUELING AREAS AND ON MOBILE FUELING TRUCKS.
PROPERLY DISPOSE OF USED MATERIALS AFTER USE.
5
C U C 7 'I 0 N IPLA NS
ABSORBENT PADS OR DRIP PANS SHOULD BE USED DURING VEHICLE AND EQUIPMENT FUELING UNLESS THE FUELING IS PERFORMED OVER
AN IMPERVIOUS SURFACE WITHIN A DEDICATED FUELING AREA.
ABSORBENT MATERIALS FOR SMALL SPILLS SHALL BE USED. DO NOT WASH OR BURY THE SPILL MATERIAL AS THIS ONLY RESULTS IN
ADDITIONAL REMEDIATION REQUIREMENTS. REMOVE THE CONTAMINATED ABSORBENT MATERIALS PROMPTLY AND DISPOSE OF PROPERLY
ACCORDING TO LOCAL AND STATE LAWS.
AVOID FUELING OF CONSTRUCTION EQUIPMENT AT VARIOUS LOCATIONS AROUND THE SITE. TRANSPORT THE VEHICLE OR EQUIPMENT TO
DESIGNATED ONSITE FUELING AREAS WHERE ADEQUATE PREVENTION AND SPILL CONTAINMENT MATERIALS ARE LOCATED.
EMPLOYEES AND SUBCONTRACTORS SHOULD BE TRAINED IN PROPER FUELING AND CLEANUP PROCEDURES.
DEDICATED FUELING AREAS SHOULD BE PROTECTED FROM STORMWATER INFILTRATION AND RUNOFF, AND SHOULD BE LOCATED AT LEAST 50
FT AWAY FROM DOWNSTREAM DRAINAGE FACILITIES, WATERWAYS, AND FLOOD PLAINS. FUELING MUST BE PERFORMED IN A LEVEL AREA.
PROTECT FUELING AREAS WITH BERMS OR DIKES TO PREVENT INFILTRATION, RUNOFF, AND TO CONTAIN SPILLS.
NOZZLES USED IN VEHICLE AND EQUIPMENT FUELING SHOULD BE EQUIPPED WITH AN AUTOMATIC SHUTOFF TO CONTROL SPILLS AND DRIPS.
FUELING OPERATIONS SHOULD BE MONITORED BY THE FUELING OPERATOR AT ALL TIMES.
FEDERAL, SLATE, AND LOCAL REQUIREMENTS SHOULD BE OBSERVED FOR ANY TEMPORARY ABOVE GROUND STORAGE TANKS.
INSPECTION AND MAINTENANCE
VEHICLES AND EQUIPMENT SHOULD BE INSPECTED DAILY FOR LEAKS. LEAKS SHOULD BE REPAIRED IMMEDIATELY PREFERABLY WITH THE
PROBLEM VEHICLE OR EQUIPMENT REMOVED FROM THE PROJECT SITE FOR REPAIR.
MAINTAIN ADEQUATE SUPPLIES OF SPILL CLEANUP MATERIALS ONSITE AND INSURE ALL PERSONNEL KNOW THEIR STORAGE LOCATION.
IMMEDIATELY CLEAN UP SPILLS AND PROPERLY DISPOSE OF CONTAMINATED SOIL AND CLEANUP MATERIALS ACCORDING TO LOCAL AND STATE
LAWS.
Contact Person for Erosion
Control Sediment Practices
TccW CORPORATION
3841 W. MORRIS STREET
INDIANAPOLIS, IN 46241
TELEPHONE: 317— 244-7637
CONTACT PERSON: STEPHEN D. SHEHORN
DOUGLAS L. BEAMER
—NOTE
THIS PLAN INDICATES EROSION CONTROL MEASURES
REQUIRED AFTER SOIL STRIPPING AND PAD BUILDING
HAS TAKEN PLACE. COORDINATE WITH DEVELOPER FOR
MEASURES REQUIRED UNTIL PROPERTY TURNED OVER
FOR DEVELOPMENT. COORDINATE WITH SOIL
CONSERVATION DISTRICT REPRESENTATIVE FOR ANY
OTHER MEASURES REQUIRED DUE TO SITE CONDITIONS.
WARNING—
THIS PLAN TO BE USED FOR
EROSION CONTROL PURPOSES ONLY.
ADDITIONAL EROSION CONTROL
MEASURES MAY BE REQUIRED IN
THE FIELD BY THE INSPECTOR.
1'E 2
s\
3841 VNI, Moms St., hipts.. IN 46241
p. 31 J .244 7637 f. 31 7.244.$348
wwwtw -corn. corn
i.'
0 0 0
d
0. 413
4 4
04
u
U:=
O u
4 04 h a u
41 45
O bp
�a
0 0
o�
rn
ua
U)
0
PE 1
Qi43
a‘l
SHEET NO.
00
O
h
O
00
OF
onimintoo
D IA NP•.•
a
u
h a
O
M
o h o
M
2
c a.
'5. 8
y -0
u) co
-p J
CD
0
A w CO w
1 W mm ram CO
O C N
VI/ x
A 0 0 A
>`�c.: N
PROJECT NO.
W09 -0548
z
JAMES E. SHIELDS JR. P.E. 10201333
C204