Loading...
HomeMy WebLinkAboutLetter with Plans February 24th, 2010 mibt s Dept. of Community Services (DOCS) A A 0 ngie Conn/Christine Barton-Holmes One Civic Square, 3 Floor Nu Carmel, IN 46032 Carmel Engineering Dept. Gary Duncan/Nick Redden One Civic Square, 1 Floor t E/ Carmel, IN 46032 f to 24 5A f OC RE: Mercedes Benz Service Center World Wide Motors Remodel F QS Carmel Planning and Engineering Personnel: Owner franchiser requirements have caused the removal of the building addition on the Mercedes car lot (4000 E. 96th Street). This area will now be pavement. Also, landscaping changes per Scott Brewer have been added. Three sets of plans reflecting these revisions will be delivered with this letter to Carmel Engineering. On the World Wide Motors Lot (3900 E. 96th Street), landscaping has been changed per requirements from Scott Brewer. One set of plans for the Mercedes Service Center plan revisions and four sets of landscaping plans for both projects will be delivered with this letter to Carmel Planning. Please contact me is you have and questions or if you require additional prints. Sincerely, 640CGAkki r- D. Scott Bordenet, PE, LS Bordenet Civil Engineering and Land Surveying, LLC 8902 Alibeck Ct., Indianapolis, IN 46256 Office: 317 -536 -6181 sbordenet@civil-ls.com I