Date: 3/30/10 Cripe Job 990433 -10701 'F
To: Carmel DOCS Re: Coxhall Mansion and Parking Lot
One Civic Square Carmel, IN
Carmel, IN 46032
Attention: Angie Conn 6 Z. 7
We are sending you the following items via: 2 -hour Courier
Shop Drawings Prints X Plans Samples Specifications
Copy of Letter Change Order Attached Report Other
Copies Date Description
4/2/10 Floor plans and elevations
1 3/30/10 CD w /electronic copies of floor plans elevations
THESE ARE TRANSMITTED as checked below:
X For Approval Submit Approved as Submitted Copies for Approval
For Your Use Return Approved as Noted Copies for Distribution
As Requested Not Approved Reviewed for Compliance Signature Requested
Resubmit Corrected Prints For Review and Comment
Remarks: Please feel free to call Michael Garringer at 317- 844 -6777 or maarringer@cripe.biz with
any questions in regards to the architectural drawings.
Signed: Sherri Wilson, Permit Specialist, 706 -6419
c: Scanned to file swilson@cri•e.biz
Transmittal Only:
Notice: The drawing /computer files listed above are the property of Cripe Architects Engineers and are transmitted for
reproduction use only. Any modification or reuse of the documents without written permission from Cripe Architects
Engineers is prohibited. Any person or entity using these documents for any purpose other than the project for which they
were originally intended, with or without permission from Cripe Architects Engineers, by their use agrees to indemnify and
hold harmless Cripe Architects Engineers from any loss, including, but not limited to attorney's fees occurring from their use.
O: \1999\ 990433 \10701 \DOCS \ENGR \PERMITS \TRANSMITTAL_CARMEL DOCS_2010_03_30.DOC
CARMEL TECHNICAL ADVISORY COMMITTEE
MEETING AGENDA
Date: Wednesday, February 17, 2010
Place: Planning/Zoning Dept. Conference Room, 3rd Floor, Carmel City Hall
Start a 9-8$
Veolia Water Indianapolis, LLC is-t e contract operator for the Indianapolis Water (IW) utility, and as such,
has reviewed the Agenda Topics listed below. Note: IW's response for each topic is in Bold Blue Text
b elow the topic description. See the corresponding attachments.
9:00 a.m. IMPA Renewable Energy Project:
The applicant seeks the following special use approval:
Docket No. 09120016 SU ZO 25.13.01.A Tower in business district
The site is located at 11610 N. College Avenue on 3.94 acres and is zoned B6 /Office/ Commercial. Filed
by Scott Perkins of Perkins VonDeylen Architects for Indiana Municipal Power Authority.
No Objection
9:15 a.m. Docket No. 10010007 DP /ADLS: Legacy PUD The Livingstone Cottages
The applicant seeks site plan and design approval for an adult family living/continuing care development.
The site is located at the northwest corner of Community Dr. and Cherry Creek Blvd. It is zoned
PUD/Planned Unit Development. Filed by Brandon Adomatis of Adult Family Living, Inc.
No Objection, however, [W wishes to caution the petitioner not to store any hazardous chemicals
or petroleum products on said site due to it being located from ±4200 Ft. (0.80 Mile) to 1.05 Miles
SW from three of IW's River Road active Wellheads, WRN -1, WRN -2 WRN -3. The site also is
+2300 Ft. from IW's River Road Well Field Wellhead Protected Area (WIIPA -1), I -Year Time of
Travel Boundary Line, and is ±700 Ft. from IW's River Road Well Field Wellhead Protected Area
(W1IPA -5), 5 -Year Time of Travel Boundary Line.
9:25 a.m. Docket. No. 10010006 ADLS: Carmel Science Tech Park, Blk 7, Lot 1 Midwest ISO
The applicant seeks design approval for a building to expand its data center. The site is located at 701
City Center Dr. and is zoned M- 3/Manufacturing. Filed by Fred Simmons of Simmons Architects, LLC
for Midwest ISO.
No Objection
9:35 a.m. Maybe: Coxhall Gardens Mansion Banquet Hall
Objection
Note: the petitioner for the project, below, will work with each TAC member directly and not appear at this meeting,
since they were present at last month's meeting for their use variance item:
Docket No. 10010008 DP /ADLS: Meridian Pointe
The applicant seeks site plan and design approval for a 174 -unit multi family development with retail/office.
The-site is located at 12346 Old Meridian St. It is zoned OM /O Old Meridian District, Office. Filed by
Anthony Birkla of Anderson Birkla Investment Partners, LLC for Carmel Development I, LLC.
No Objection
Page 1 of 1 Filename: TAC2010 -02 i 7.doc
Conn, Angelina V
From: Sherri Wilson [swilson @cripe.biz]
Sent: Tuesday, January 12, 2010 4:14 PM
To: Conn, Angelina V
Cc: Chris Wiseman; Mike Grubb
Subject: RE: Coxhall Gardens /Mansion Renovation
Thanks for the quick response. I'll get with Chris and Mike to see when they want to start the process and will let you
know.
Sherri j
Sherri Wilson 1 00 C_
Permit Sce c is S O0 Z 0 n.
Cripe Architects Engineers 1 I"�
3939 Priority Way S Drive, Suite 400
Indianapolis, IN 46240 CCjOS COO I A(
Direct Line and Fax: 317 706 -6419
Main: 317- 844 -6777
Mobile: 317- 370 -2187
Email: swilson @cripe.biz
www.cripe,biz
From: Conn, Angelina V [mailto:Aconn @carmel.in.gov]
Sent: Tuesday, January 12, 2010 4:13 PM
To: Sherri Wilson
Cc: Chris Wiseman; Mike Grubb
Subject: RE: Coxhall Gardens /Mansion Renovation
HI, Sherri-
suggest that you email and /or mail plans to all TAC members, if you have not done so already. Their contact info is
online at: http: /www.ci.carmel.in.us/ services /DOCS /TAC2010 /TAC %20members %2012.18. We would like a TAC
application submitted to us as well, but will not charge the fee, since it is a Hamilton county parks project. Chris
Wiseman mentioned in an email below that it came through in 2007 do you have a docket no. handy for that one? I
only have 05050009 V and 05010020 TAC...
If possible, we would like you to appear at the Jan. 20 TAC meeting, to present the proposed changes. You would be
heard at the end of the meeting, around 10 am. Here is a link to that agenda:
http: /www.ci.carmel.in.us/ services /DOCS /TAC2010 /TAC2010- 0120.pdf If you prefer not to attend that meeting, but
want to work with each TAC member individually, that is okay as well. Just let me know, either way!
-Angie Conn, Planning Administrator
From: Sherri Wilson [mailto:swilson @cripe.biz]
Sent: Tuesday, January 12, 2010 1:42 PM
To: Conn, Angelina V
Cc: Chris Wiseman; Mike Grubb
Subject: FW: Cox hall Gardens /Mansion Renovation
Angie,
1
We are getting ramped up to start the Coxhall Mansion /Parking renovation. My question for you is that since this was
masterplanned and this is another phase, what do we need to do for DOCS? We are in the process of getting our SWPPP
reviewed by Gary and his office for some preliminary work to prepare for the interior work prior to the site work. Will
this be an administrative approval? I believe that we would be submitting plans for the mansion renovations sometime
in February.
Below are some emails between Chris Wiseman and Gary Duncan. This may help explain a little better.
Please let me know if you have any questions and what we need to do to get things started on your end.
Thanks!
Sherri Wilson
Permit Specialist
Cripe Architects Engineers
3939 Priority Way S Drive, Suite 400
Indianapolis, IN 46240
Direct Line and Fax: 317 -706 -6419
Main: 317- 844 -6777
Mobile: 317- 370 -2187
Email: swilson @criroe.biz
www.cripe.biz
From: Chris Wiseman
Sent: Tuesday, January 12, 2010 1:28 PM
To: Duncan, Gary R; Thomas, John G
Cc: Sherri Wilson; Mike Grubb
Subject: RE: Cox hall Gardens
Storm review will consists of water quality calculations for the rain garden detention area and then storm sewer
caculations for the enclosed storm sewers.
Yes, we are asking for an early release on installation of the construction access and silt fence etc SWPPP plan items. I
believe there will be some minimal earthwork associated with cut and fill on that temporary road as well.
I have attached the current SWPPP plans for review to get this initial permit started.
Is there an abridged permit for just SWPPP review?
If you need these drawings stamped and certified I can resend as well.
Please advise.
Thanks
Chris
Thanks,
Chris Wiseman, PE
Client Services Director
Cripe Architects Engineers
3939 Priority Way South Drive, Suite 400
Indianapolis, Indiana 46240
Telephone: 317.844.6777
Direct Line and Direct Fax:317.706.6429
Email: cwiseman @criDe.biz
Website: www.cripe.biz
2
From: Duncan, Gary R [mailto:gduncan @carmel.in.gov]
Sent: Tuesday, January 12, 2010 9:22 AM
To: Chris Wiseman; Thomas, John G
Cc: Sherri Wilson; Mike Grubb
Subject: RE: Coxhall Gardens
I do not expect much in terms of a drainage review (should just be pipe sizing calc's, correct What we must review
prior to issuance of the storm water management permit is the SWPPP. Are you considering phased construction with
an early release on earth moving? This is possible, we just need to do it right. Please remember to also submit plans and
calculations to Crossroads.
From: Chris Wiseman [mailto:cwiseman @cripe.biz]
Sent: Thursday, January 07, 2010 2:06 PM
To: Thomas, John G; Duncan, Gary R
Cc: Sherri Wilson; Mike Grubb
Subject: RE: Coxhall Gardens
John,
The last project which was approved in 2007 was reviewed and approved by Amanda Foley with the city, so I don't
believe the Soil and Water will review and approve but typically we submit a set to them for coordination.
I have included Gary Duncan and Mike McBride in case I'm under the wrong impression.
Gary,
I plan on submitting to entire plans for review and approval.
Will you need to complete the drainage and r/W review prior to issuance of the storm water Management Permit which is
attached?
The Park Department, Al, would like to install the construction access road, silt fence and contractor staging area so that
internal building demolition can begin prior to the external site improvements. This would allow the building renovation to
begin well before the site work can begin which is anticipated in April.
Please advise.
Thanks
Chris
Thanks,
Chris Wiseman, PE
Client Services Director
Cripe Architects Engineers
3939 Priority Way South Drive, Suite 400
Indianapolis, Indiana 46240
Telephone: 317.844.6777
Direct Line and Direct Fax:317.706.6429
Email: cwiseman @cripe.biz
Website: www.cripe.biz
From: Thomas, John G [mailto:jthomas @carmel.in.gov]
Sent: Thursday, January 07, 2010 11:35 AM
3
To: Chris Wiseman
Subject: Coxhall Gardens
Hi Chris,
The Carmel SWPPP requirements and Stormwater Permit are attached. Again, if the Hamilton County Parks Dept. is part
of the Hamilton County MS4, the SWPPP should be submitted to John South with the Soil and Water Conservation
District and Stormwater Permitting will be administered through IDEM. Bob Thompson, with the Hamilton County
Surveyor's office should be able to verify if the parks department is part of the MS4.
I spoke with Gary and he will still need plans for drainage and r/w review. Please let me know if you need anything else
and have a good day.
Sincerely,
John Thomas, CPESC
Construction Inspector