Loading...
HomeMy WebLinkAboutLtr-Gilko 040810April 8, 2010 MIN Mr. Gregory J. Ilko, P.E. Project Manager CrossRoad Engineers, P.0 WOOLPERT 3417 South Sherman Drive Beech Grovel, IN 46107 Woolpert RE: ITT Building Expansion 7635 Interactive Way Suite 100 Dear Mr. Ilko: Indianapolis, IN 46278 -2727 We are in receipt of your drainage review letter for the above listed project, dated 317.518.3396 3/26/10. The following responses have been provided to address your review Office: 317.299.7500 comments: Fax: 317.291.5805 1. Sheet C300 has been revised to show additional elevations to depict how the www.woolpert.com emergency overflow will convey water to the existing storm sewer along Hamilton Crossing Blvd, which is the receiving system. In addition, an exhibit has been provided to show the flood routing from the site to the off -site detention pond at the southwest end of Hamilton Crossing. Flood water will be contained along Hamilton Crossing Boulevard and not impact adjacent buildings. This exhibit will be added to the Drainage Report. 2. The sub surface drain has been shown on sheet C300 and a note added to reference sheet C111 for additional information on this drain. These responses should address all of your comments. Please contact me if any further questions. Sincerely, WOOLPERT, INC. Jon Sheidler, PE Project Engineer Cc: Gary Duncan, Department of Engineering Greg Hoyes, Hamilton County Surveyor Angie Conn, Department of Community Services