Loading...
HomeMy WebLinkAbout184236 04/14/2010 CITY OF CARMEL, INDIANA VENDOR: 068025 Page 1 of 1 ONE CIVIC SQUARE CROSSROAD ENGINEERS, PC :i CHECK AMOUNT: $60,238.82 CARMEL, INDIANA 46032 3417 S SHERMAN DR BEECH GROVE IN 46107 CHECK NUMBER: 184236 CHECK DATE: 4/14/2010 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 202 4340100 21779 10125 19,812.50 HAZEL DELL IMPROVEMEN 203 R4462200 21778 10126 9,988.29 SW CLAY ANNEX PATH DE 202 4340100 21777 10131 14,112.16 ON CALL CONSULTING 202 4340100 21779 10136 5,785.25 HAZEL DELL IMPROVEMEN 202 R4340100 15034 10155 2,935.00 ADDL 64 /MISC PROJECT 202 4340100 10157 29.66 ENGINEERING FEES 202 4340100 21777 10157 5,887.84 ON CALL CONSULTING 202 R4340100 15034 10162 1,688.12 ADDL 64 /MISC PROJECT t CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317 -780 -1555 City of Carmel Invoice number 10126 Michael McBride, City Engineer Date 03/04/2010 1 Civic Square Page number 1 of 2 Carmel, IN 46032 Project: SOUTHWEST CLAY ANNEXATION s�s22D For services performed January 30 through February 26, 2010 PR PAYMENTOF IN VOICE I APPRE These services were !provided in accordance with our contract #03.03.10.03 approved March 3, 2010: Task #2: 106th Street Path Design Proj. #09 -05 Additional Services #126, #126A, #1268 P.O. #19822 Professional Fees Billed Hours Rate Amount Director 4.00 125.00 500.00 Project Engineer 57.50 85.00 4,887.50 CADD Technician 54.50 70.00 3;815.00 Resident. Project Engineer 5.00 95.00 475.00 Reimbursables Billed Units Rate Amount Fees Permits 1.00 110.00 110.00 Rule 5 1.00 200.79 200.79 Phase subtotal 9,988.29 total 9,988.29 Invoice total 9,988.29 City of Carmel Invoice number: 10126 Invoice date: 03/04/2010 City of Carmel Invoice number 10126 Date 03/04/2010 Page number 2 of 2 Project: SOUTHWEST CLAY ANNEXATION Tha 0u! Chip Cha s ti President I I I i City of Carmel Invoice number: 10126 Invoice date: 03104/2010 OWN- 71, CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317- 780 -1555 City of Carmel Invoice number 10136 Michael McBride, City Engineer Date 03/31/2010 1 Civic Square I Page number 1 Carmel, IN 46032 Project: HAZEL DELL PARKWAY IMPROVEMENTS For services performed December 1, 2009 through March 26, 2010 PROMPT PAYM INVOICE IS APPRECIATED!! These services were provided in accordance with our LPA- Consulting contract dated March 17, 2010: Des No.: 0901163 ARRA Inspection Professional Fees Billed Hours Rate Amount Director 4.00 143.76 575.04 Project Manager 55.50 81.58 4,527.69 Resident Project Representative 10.00 61.98 619.80 Reimbursables Billed Units R ate Amount Miles 156.80 0.40 62.72 Phase subtotal 5,785.25 total 5,785.25 Invoice total 5,785.25 Th You! In t President City of Carmel Invoice number: 10136 Invoice date: 03/31/2010 Hazel Dell Parkway Improvements ARRA Inspection Date Range from:., 12/1/2009 to 312 612 0 1 0 Work In Progress E /Activity Total Billed WIPTotal Billable Def Hold Non Billable Writeoff Andrew J. Wolf 5.50 5.50 5.50 Billable Time 5.50 5.50 5.50 Date Total Billed WIP- Total Bill Deferred Hold N Bill Writeoff 3/19/2010 5.50 5.50 5.50 Brad J. Eckerle 37.50 37.50 37.50 Billable Time 37.50 37.50 37.50 Date Total Billed WIPTotal Billabl Defe Hold Non Billable Writeoff 3/10/2010 3 -50 3.50 3.50 3/15/2010 2.00 2.00 2.00 3/16/2010 3.50 3.50 3.50 3/17/2010 4.50 4.50 4.50 3/1912010 5.50 5.50 5.50 3/22/2010 6.00 6.00 6.00 3/23/2010 5.00 5.00 5.00 3/24/2010 2.00 2.00 2.00 3125/2010 1.00 1.00 1.00 3/26/2010 4.50 4.50 4.50 Lance A. Stahley 18.00 18.00 18.00 Billable Time 18.00 18.00 18.00 Dat Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff 12/22/2009 1.00 1.00 1.00 1/6/2010 1.00 1.00 1.00 1/8/2010 3.00 3.00 3.00 1/11/2010 2.00 2.00 2.00 1/12/2010 1.00 1.00 1.00 1/20/2010 2.00 2.00 2.00 2/22/2010 1.00 1.00 1.00 2/23/2010 1.00 1.00 1.00 2/25/2010 2.00 2.00 2.00 3/17/2010 1.00 1.00 1.00 3/17/2010 1.00 1.00 1.00 3/18/2010 1.00 1.00 1.00 3124/2010 1.00 1.00 1.00 Hazel Dell Parkway Improvements ARRA Inspection i Date, Range from: 12111200946:3/26120 Work In Progress Employee /Act Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff Robert A. Bleich 4.50 4.50 4.50 Billable Time 4.50 4.50 4.50 Date Total Billed WIP -Total Billa Deferred- -Hold-Non-Bill Writeoff 3117l2010 3.00 3.00 3.00 3/23/2010 1.00 1.00 1.00 3125/2010 0.50 0.50 0.50 Trent E. Newport 4.00 4.00 4.00 Billable Time 4.00 4.00 4.00 Date Total Billed WIP Total Bill Defe H N Bill Writeoff 1/18/2010 2.00 2.00 2.00 3/16/2010 1.00 1.00 1.00 3/23/2010 1.00 1.00 1.00 Total 69.50 69.50 69.50 Ha zel Dell P kwy ARRA Inspection Mi Log ARRA I nspecti on 156.80 62.72 03/17/10 Dell Parkway Improvements Mileage 48.80 19.52 03/ 19/ Hazel Dell Parkwayimprovements Mileage 38.00 1 5,20 03/22/10 Hazel Dell Parkway Improvements Mileage 70.00 28.00 156.80 62.72 Cross Road Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317 780 -1555 City of Carmel invoice number 10125 Michael McBridl City Engineer Date 03/04/2010 1 Civic Square Page number 1 of 2 Carmel, IN 46032 Project: HAZEL DELL PARKWAY IMPROVEMENTS For services performed January 30 through February 26, 2010 PR PAYMENT' OF INV I APPRECIATED] 1 20 These services were (provided in accordance with our contract #03.03.10.03 approved March 3, 2010: Task #1 ARRA Funding Amount Contract Amount 22,000.00 Percent Complete 100.00 Total Billed 22,000.00 Current Billed 17,805.00 Survey Amount Contract Amount 30,000.00 Percent Complete 100.00 Total Billed 30,000.00 Current Billed 0.00 Road Design Amount Contract Amount 146,000.00 Percent Complete 100.00 Total Billed 146,000.00 Current Billed 0.00 Permit Applications Amount Contract Amount 4,000.00 Percent Complete 0.00 Total Billed 0_.00 Current Billed 0.00 Bid Documents Amount Contract Amount 6,000 -00 Percent Complete 90.00 Total Billed 5,400.00 Current Billed 0.00 Plats Descriptions Units Amount Contract Amount 2.00 1,000.00 Percent Complete 0.00 Total Billed 0.00 0.00 Current Billed 0.00 0.00 City of Carmel Invoice number: 10125 Invoice date: 03/0412010 City of Carmel Invoice number 10125 Date 03/04/2010 Page number 2 of 2 Project: HAZEL DELL PARKWAY IMPROVEMENTS Document Recordation Units Amount Contract Amount 2.00 100.00 Percent Complete 0.00 Total Billed 0.00 0.00 Current Billed 0.00 0.00 RIW Management Units Amount Contract Amount 2.00 1,300.00 Percent Complete 0.00 Total Billed 0.00 0.00 Current Billed 0.00 0.00 RIW Staking Units Amount Contract Amount 2.00 600.00 Percent Complete 0.00 Total Billed 0.00 0.00 Current Billed 0.00 0.00 Total 17, 805.00 ROW Services Consultant Billed Units Rate Amount Midwest Title 1.00 357.50 357.50 Parcel 2 Title Work Traynor Associates, Inc. 1.00 1,650.00 1,650.00 Parcel 2 Phase subtotal 2,007.50 total 2,007.50 Invoice total 19,812.50 Th k You! C Char e t President I 'I City of Carmel Invoice number: 10125 Invoice date: 03/04/2010 k 4- Hall CrossRoad Engineers, PC j 3417 Sherman Drive Beech Grove, IN 46107 317- 780 -1555 City of Carmel Invoice number 10157 Michael McBride, City Engineer Date 03/31/2010 1 Civic Square I Page number 1 of 3 Carmel, IN 46032 Project: CITY OF CARMEL ON CALL CONSULTING SERVICES 2c7 Z— el 0 1 For services performed February 27 through March 26, 2010 PROMPT PAYMENTIOF INVOICE IS APPRECIATED!! (04 These services were provided in accordance with our contract #03.03.10.03 approved March 3, 2010: Task #3: 126th St and Gray Sidewalk Professional Fees Billed Hours Rate Amount Director 0.50 125.00 62.50 Resident Project Engineer 4.00 95.00 380.00 Phase subtotal 442.50 total 442.50 136th Street walk 4Carey Road Professional Fees Billed Hours Rate Amount Director 0.50 125.00 62.50 Project Engineer 0.50 85.00 42.50 Resident Project' Engineer 14.00 95.00 1,330.00 Phase subtotal 1,435.00 total 1,435.00 Altman Pond Design /Permitting Professional Fees Billed Hours Rate Amount Project Engineer 6.00 85.00 510.00 Phase subtotal 510.00 total 510.00 City of Carmel Invoice number: 10157 Invoice date. 03/31/2010 City of Carmel Invoice number 10157 Date 03/31/2010 Page number 2 of 3 Project: CITY OF CARMEL ON CALL CONSULTING SERVICES Stonehedge-Rol ling Meadows Drainage Professional Fees Billed Hours Rate Amount Director 2.50 125.00 312.50 CADD Technician 5.00 70.00 350.00 Resident Project Engineer 6.00 95.00 570.00 Survey Manager, 1.00 95.00 95.00 Crew Chief 6.00 80.00 480.00 Field Man 6.00 60.00 360.00 Phase subtotal 2,167.50 total 2,167.50 Main and Guilford Ci nceptual RAB Professional Fees Billed Hours Rate Amount Resident Project Engineer 2.00 95.00 190.00 Phase subtotal 190.00 total 190.00 1409 Cool Creek Drive Drainage Professional Fees Billed Hours Rate Amount Project Engineer 2.00 85.00 170.00 Resident Project Engineer 1.00 95.00 95.00 Phase subtotal 265.00 total 265.00 Haverstick Drainage 3781 Coachman Drive Professional Fees Billed Hours Rate Amount Director 0.50 125.00 62.50 Project Engineer 1.00 85.00 85.00 Resident Project Engineer 6.00 95.00 570.00 Phase subtotal 717.50 total 717.50 City of Carmel Invoice number: 10157 Invoice date: 03/31/2010 City of Carmel Invoice number 10157 Date 03/31/2010 Page number 3 of 3 Project: CITY OF CARMEL ON CALL CONSULTING SERVICES 116th Gray RAB Conceptual Professional Fees Billed Hours Rate Amount Resident Project, Engineer 2.00 95.00 190.00 Phase subtotal 190.00 total 190.00 Invoice total 5,917.50 T n ou! Chip Ch e P. E. f President I City of Carmel Invoice number: 10157 Invoice date: 03/31/2010 CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317 -780 -1555 City of Carmel Invoice number 10131 Michael McBride, City Engineer Date 03/04/2010 1 Civic Square Page number 1 of 3 Carmel, iN 46032 Project: CITY OF CARMEL ON CALL CONSULTING SERVICES For services performed January 30 through February 26, 2010 PROMPT PAYM O I N V OICE IS A These services were provided in accordance with our contract #03.03.10.03 approved March 3, 2010: Task #3: MISO Topo Exhibit Professional Fees Billed Hours Rate Amount Director 0.50 125.00 62.50 Project Engineer 85.00 382.50 CADD Technician 1.50 70.00 105.00 I Phase subtotal 550.00 total 550.00 I I Altman Pond Design /Permitting Professional Fees Billed Hours Rate Amount Director 3.00 125.00 375.00 Project Engineer 28.00 85.00 2,380.00 CADD Technician 24.00 70.00 1,680.00 Phase subtotal 4 total 4,435.00 Stonehedge Rolling Meadows Drainage Professional Fees Billed Hours Rate Amount Resident Project Engineer 1.50 95.00 142.50 City of Carmel Invoice number: 10131 Invoice date: 03/0412010 City of Carmel Invoice number 10131 Date 03/04/2010 Page number 2 of 3 Project: CITY OF CARMEL ON CALL CONSULTING SERVICES (Continued) Phase subtotal 142.50 total 142.50 Main and Guilford C nceptual RAB Professional Fees Billed Hours Rate Amount Director 12.00 125.00 1,500.00 Phase subtotal 1,500.00 total 1,500.00 US 31 126th St Survey and Design I Professional Fees Billed Hours Rate Amount Director 1.50 125.00 187.50 CADD Manager 3.00 80.00 240.00 Project Engineer 24.00 85.00 2,040.00 Phase subtotal 2,467.50 total 2,467.50 126th Street Sight Distance Correction Survey Prelim Design Professional Fees Billed Hours Rat Amount Director 1.00 125.00 125.00 CADD Manager 2.50 80.00 200.00 Phase subtotal 325.00 total 325.00 i 1409 Cool Creek Drive Drainage Professional Fees Billed Hours Rate Amount Director 0.50 125.00 62.50 Project Engineer 6.50 85.00 552.50 Resident Project Engineer 2.00 95.00 190.00 City of Carmel Invoice number: 10131 Invoice date: 0310412010 City of Carmel Invoice number 10131 Date 03/04/2010 f Page number 3 of 3 Project: CITY OF CARMEL ON CALL CONSULTING SERVICES (Continued) Phase subtotal 805.00 total 805.00 I Haverstick Drainage 3781 Coachman Drive I I Professional Fees Billed Hours Rate Amount Director 1.00 125.00 125.00 Project Engineer, 5.50 85.00 467.50 Resident Project Engineer 13.50 95.00 1,282.50 Reimbursables Billed Units Rate Amount Miles 67.00 .0.48 32.16 Phase subtotal 1,907.16 total 1,907.16 116th Gray RAB Conceptual Professional Fees Billed Hours Rate Amount Director 9.00 125.00 1,125.00 Resident Project Engineer 9.00 95.00 855.00 Phase subtotal 1,980.00 total 1,980.00 Invoice total 14,112.16 Th Y u! c Chip Charlie P. r President City of Carmel Invoice number: 10131 Invoice date: 03/0412010 Cross Road Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317 -780 -1555 City of Carmel Invoice number 10155 Michael McBride, City Engineer Date 03/31/2010 1 Civic Square Page number 1 Carmel, IN 46032 Project: CITY OF CARMEL MISCELLANEOUS i ENGINEERING PROJECT MANAGEMENT For services performed February 27 through March 26, 2010 PROMPT PAYMENT OF INV I APPRE These services were provided in accordance with our contract approved March 19, 1997 including the Additional Services #'64C, #124, P.O115034: Miscellaneous Engineering Project Management Professional Fees Billed Hours Rate Amount CADD Manager 7.00 80.00 560.00 Resident Project Engineer 25.00 95.00 2,375.00 CVS estimate, rnisc. 2.5 IRTIP Apps, 1.5 106th and Ditch landscape coordaintion with Parks Pifer 2.5 Carmel rep -96th Commerce precon at HCHD 3.5 IRTIP application 1.5 IRTIP Application 2 -pfm AUTOMOTIVE ESTIMATE FOR PATH, 1- Guilford IRTIP app Phase subtotal 2,935.00 total 2,935.00 Invoice total 2,935.00 Th k o 1 Chip Ch,arl P. E. l r President City of Carmel Invoice number: 10155 Invoice date: 03/31/2010 CrossRoad Engineers, PC 3417 Sherman Drive Beech Grove, IN 46107 317- 780 -1555 City of Carmel Invoice number 10162 Michael McBride, City Engineer Date 03/31/2010 1 Civic Square Page number 1 of 2 Carmel, IN 46032 Project: CITY OF CARMEL ON CALL PLAN REVIEW For services performed February 27 through March 26, 2010 PROMPT PAYMENT OF INVOICE IS APPRE These services were provided in accordance with our contract approved March 19, 1997 including Additional Services #104, Supplemental P.O. #,y504'$ General Plan Review Professional Fees Billed Hours Rate Amount Senior Project Manager 5.00 115.00 575.00 Project Engineer 3.50 85.00 297.50 808 W. Main Phase subtotal 872.50 total 872.50 Hazel Dell Christian 'Church Children's Ministry Expansion Professional Fees Billed Hours Rate Amount Senior Project Manager 0.50 115.00 57.50 Project Engineer 2.50 85.00 212.50 Phase subtotal 270.00 total 270.00 I PFM Car Truck Care Center Professional Fees Billed Hours Rate Amount Senior Project Manager 0.50 115.00 57.50 Project Engineer 4.00 85.00 340.00 Phase subtotal 397.50 City of Carmel Invoice number: 10162 Invoice date: 03/31/2010 City of Carmel Invoice number 10162 Date 03/31/2010 Page number 2 of 2 Project: CITY OF CARMEL ON CALL PLAN REVIEW total 397.50 Sexton Easement Vacation Professional Fees Billed Hours Rate Amount Senior Project Manager 1.00 115.00 115.00 Reimbursables Billed Units Rate Amount Miles 69.00 0.48 33.12 Phase subtotal 148.12 total 148.12 Invoice total 1,688.12 TNhk u! Chip Charle P. C r President City of Carmel Invoice number: 10162 Invoice date: 03/31/2010 Prescribed by State Board of Accounts ACCOUNTS PAYABLE VOUCHER City Form No. 201 (Rev. 1995) CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. Payee Crossroad Engineers Purchase Order No. 3417 S. Sherman Dr. Terms Beech Grove, IN 46107 Date Due Invoice Invoice Description Amount Date Number (or note attached invoice(s) or bill(s)) 03/04/10 10126 106th St Path Design (SW Clay) $9,988.29 03/31/10 10136 Hazel Dell ARRA inspection $5,785.25 03/04/10 10125 Hazel Dell ARRA design $19,812.50 03/31/10 10157 On -Call Consulting Services $5,917.50 03704/10 10131 On -Call Consulting Services $14,112.16 03/31/10 10155 Misc. Engineering project management $2,935.00 03/31/10 10162 On -Call Plan Review (charged to po 15034 to fix a balance misl $1,688.12 I Tot I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance with IC 5- 11- 10 -1.6. 20 Clerk- Treasurer VOUCHER NO. WARRANT NO. ALLOWED 20 Crossroad Engineers IN SUM OF 3417 S. Sherman Dr Beech Grove, IN 46107 $60,238.82 ON ACCOUNT OF APPROPRIATION FOR Department of Engineering Board Members Pots or INVOICE NO. ACCT /TITLE AMOUNT I hereby certify that the attached invoice(s), or 10126 203-R4462200 $9,�88.29 bill(s) is (are) true and correct and that the 21:779 202-4b $5,;785.25 materials or services itemized thereon for which charge is made were ordered and 2477:7 262 491 received except 292 49i 91777 lnlql 00') A Q4 15034 101R? gag-PAni $1,622 -2 20 Signature Title Cost distribution ledger classification if claim paid motor vehicle highway fund