Loading...
HomeMy WebLinkAbout185029 04/28/2010 CITY OF CARMEL, INDIANA VENDOR: 363784 Page 1 of 1 ONE CIVIC SQUARE POYNTER SHEET METAL CHECK AMOUNT: $175,505.00 CARMEL, INDIANA 46032 PO BOX 427 BLOOMINGTON IN 47402 -0427 CHECK NUMBER: 185029 CHECK DATE: 4/28/2010 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 902 4460807 20B 175,505.00 PERFORMING ARTS CENTE APPLICATION AND CERTIFICATE FOR PAYMENT CONSTRUCTION MANAGER ADVISER EDITION AIA DOGYMENT C7021CMQ' PAGE ONE OF 4 PAGES TO OWNER: PROJECT: Parcel 7A, Red =ional Performing APPLICATION NO: 20B Distribution to: Carmel Redevelopment Commission Arts Center OWNER One Civic Square PERIOD TO: 3/31/10 CONSTRUCTION Carmel, IN 46032 PROJECT NO: 2695 -4310 MANAGER FROM CONTRACTOR: VIA CONSTRUCTION MANAGER: Shicl- Sexton Co., Inc. (PSM #14065) ARCHITECT POYNTER SHEET METAL ATTN: Lynda Weaver. 902 N. Capitol Avenue, Indianapolis, IN 46204 CONTRACT DATE: 04/18/08 CONTRACTOR 8768 N. STATE: RD. 37 VIA ARCHITECT: BLOOMINGTON, IN 47404 1 CONTRACT FOR: Bid Package 44310 I Sheet Metal CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best ofthe Contractor's knowledge, Application is made for payment, as shown below, in connection with the Contract. information and betiefthe Work covered by this Application for Payment has been Continuation Sheet, AIA Document G703, is attached. completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. 1. ORIGINAL CONTRACT SUM 2,340,500.00 2. Net change by Change Orders CONTRACTOR: 3. CONTRACT SUM TO DATE (Line 1 2) 2 22 3, 261 4. TOTAL COMPLETED STORED TO DATE S (Column G on G703) By: Date: 5. RETAINAGE: 5% of Total Joseph R. ansd Presi nt a. 5 %Qt` FIE S 111,163.00 State of: IN NA County of: MONRO o u D E on G703) Subscribed and m vo to e ore m his day of March b. of Stored Material 0.00 Notary Public: o n F on G703) My Comm Commissio e pyres: ugust 29, 1 Total Retainage (Lines 5a 5b or Total in Column I ofG703) 111,163.00 CERTIFICATE FO ENT 6, TOTAL EARNED LESS RETAINAGE 1,984,839.00 In accordance with the Contract Documents, based on on -site observations and the data (Line 4 less Line 5 Iota]) comprising this application, the Construction Manager and Architect certity to the 7. LESS PREVIOUS CERTIFICATES FOR Owner that to the best of their knowledge, information and belief the Work has PAYMENT (Line 6 from prior Certificate) 1,809,334.00 progressed as indicated, the quality of the Work is in accordance with the Contract 8. CURRENT PAYMENT DUE ta,a 7. Documents, and the Contractor is entitled to payment of AMOUNT CERTIFIED. 9. BALANCE TO FINISH, INCLUDING RETAINAGE S 238,422.00 II �y (Line 3 less Line 6) AMOUNT CERTIFIED 17s 13 t (Attach explanation if amount certified dyers om t re amount applied for. Initial all T otal changes approve figures on this p icatiort and on the Conti Cation heet that changed to conform to the in previous months by Owner $57,761.00 $175,000.00 amount certifie COI TRUC A ER: Total approved this Month $0.00 $0.00 By: Date: D 10 AR TOTALS $57,761.00 $175,000.00 By: Date: NET CHANGES by Change Order ($117,239.00) This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. a THE AMERICAN INSTITUTE OF ARCHITECTS, 1745 NEW YORK AVE., N.W., WASHINGTON, DC 20006 -5292 Users may obtain validation of this document by requesting of the license a completed AIA Document D401 Certification of Document's Authenticity r: CONTINUATION SHEET A 1A DOCUMENT G 703 2 PAGE OF PAGES 3 AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 2 O Contractor's signed certification is attached. APPLICAIIONDATF� 3/12%20-0 In tabulations below, amounts are stated to the nearest dollar. PSM JOB#: 14065 PERIOD TO: 3 Use Column I on Contracts where variable retainage Ior line items may apply. NAME: Carmel PAC CONTRACT NO: 2695 A B C D E F G H I LINE DESCRIPTION OF WORK SCHEDULED WORK COMPLETFD MATERIALS TOTAL R.3LANCF RETAINAGE NO VALUE FROM PREVIOUS THIS PERIOD PRFSFNTLY COMPLETED (G C) TO FINISH (IF VARIABLF APPLICATION STORED AND STORED (C G) RATE) (D E) (NOT IN TO DATE D OR E) (D +E +F) I GENERAL CONDITIONS 200,000.00 $183,400 $8,600 $0 $192,000 96% $8,000 $9,600 2 BOND INSURANCE 45,000.00 $45,000 $0 $0 $45 100% $2,250 3 MOBILIZATION 15,000.00 $15,000 $0 $0 $15.000 100% $750 4 ALLOWANCE NO 11 BP 4310 651.00 $0 $0 $0 $0 0 $651 $0 5 ALLOWANCE NO 16 CAD AS- BUILTS 10,000.00 $0 $0 $o $0 0% $10,000 $0 6 DRAWINGS/COORDINATION 80.000.00 $80.000 $0 $0 $80.000 100% $4.000 7 MECH BASEMENT LEVEL 8 MATERIAL 48,000.00 $48,000 $0 $0 $48,000 100% $2,400 9 LABOR 50,700.00 $50,193 $0 $0 $50,193 99% $507 $2,510 10 LAGGING 7,000.00 $7000 $0 $0 $7,000 100% $350 II BACKHOUSE 12 MATERIAL 56.000.00 $56,000 $0 $0 $56,000 100% $2,800 13 LABOR 59,000.00 $59,000 $0 $0 $59 100% $2,950 14 KITCHEN HOOD DUCT 15 MATERIAL 15,400.00 $15400 $0 $0 $15,400 100% $770 16 LABOR 10,800-00 $8,640 $1,620 $0 510,260 95% $540 $513 17 INSULATION 10,100.00 $8,080 $0 $0 $8,080 80% 52,020 $404 18 MECH RM 1 19 MATERIAL 50,400.00 $50,400 $0 $0 $50,400 100% $2,520 20 LABOR 56,300.00 $56,300 $0 $0 $56,300 100% $2,815 21 INSULATION 16,800.00 $5,040 $11,760 $0 $16 100% $840 22 MECH RM 2 23 MATERIAL 77,000.00 $69,300 $7,700 $0 $77,000 100% $3,850 24 LABOR 93,900.00 $75,120 518,780 $0 $93,900 100% $4,695 25 INSULATION 16.800.00 $0 $0 50 $0 0 $16._800 $0 26 MECH RM 3 50 27 MATERIAL 84,900.00 $84,900 $0 $0 $84,900 100 $4,245 28 LABOR 94,500.00 $94,500 $0 $0 $94,500 100% $4,725 29 INSULATION 16,800.00 $15,120 $0 $0 $15,120 90% $1,680 $756 30 PLENUM LEVEL 31 MATERIAL 49,100.00 $49,100 $0 $0 $49,100 100% $2,455 32 LABOR 75,000.00 $75,000 $Q $0 $75,000 100% $3,750 33 LAGGING 13,000.00 $13,000 $0 $0 $13.000 100 $650 34 ORCHESTRA HIGH LEVEL 35 MATERIAL 34,600.00 $34,600 $0 $0 $34,600 100% $1,730 36 LABOR 35,400.00 $26,550 $5,310 $0 $31,860 90 $3,540 $1,593 37 ORCHESTRA LOW LEVEL 38 MATERIAL 49.400.00 $49,400 $0 $0 $49,400 100°/ $2,470 391 LABOR 62,600.001 $46,950 1 $9.390 1 $0 1 $36,340 90% $6,260 1 $2.817 CONTINUATION SHEET AIA DOCUMENT G703 3 PAGE OF PAGES 3 AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containina APPLICATION NO: 206 Contractor's signed certification is attached. APPLICATION DATE: 3/12/20 In tabulations below, amounts are stated to the nearest dollar PSM 10114: 14065 PERIOD TO: 3,%31 2 C 10 Use Column I on Contracts where variable retainage for line items may apply. NAME: Carmel PAC CONTRACT NO: 2695 -4310 A B C D E F G H I LINE DESCRIPTION OF WORT: SCHI-DULEI7 WORK COMPLETED MATFRIALS TOTAL BALANCE RFTAINAGE NO. VALUE FRCINI PREVIOUS THIS PERIOD PRESENTLY COMPLETED (G +C) TO FINISH (IF VARIABLE APPLICATION STORED AND STORED IC G) RATE) (D E) (NOT IN TO DATE D OR E) (D +E +F) 5% 40 BOX TIER LEVEL 41 MATERIAL 70,000.00 $70,000 $0 $0 $70,000 100% $3,500 42 LABOR 100,300.00 $90,270 $5,015 $0 $95,285 95% $5,015 $4,764 43 LOW BALCONY LEVEL 44 MATERIAL 94,100.00 $94,400 $0 $0 $94,100 100% $4,705 45 LABOR 85,300.00 $68,240 $12,795 $0 $81,035 95% $4,265 $4,052 46 HIGH BALCONY LEVEL 47 MATERIAL 38,400.00 $19,200 $19,200 $0 $38,400 100% $1,920 48 LABOR 50,200.00 $17,570 $17,570 $0 $35,140 70% $15,060 $1,757 49 ATTIC LEVEL +50 50 MATERIAL 41,600.00 $37.440 $4,160 $0 $41,600 100% $2,080 51 LABOR 44,700.00 $35,760 $4470 $0 $40.230 90% $4.470 $2,012 52 ATTIC LEVEL +61 53 MATERIAL 16,800.00 $15,120 $1,680 $0 $16,800 100% $840 54 LABOR 16,300.00 $13,040 $0 $0 $13,040 80% $3,260 $652 55 ATTIC LEVEL +66 56 MATERIAL 39.500.00 $19,730 $7.900 $0 $22650 70% $11,850 $1,383 57 LABOR 37,900.00 $15,160 $3,790 $0 $18,930 50% $18,950 $948 58 ATTIC LEVEL +79 -6 59 MATERIAL 6,700.00 $6,700 $0 $0 $6,700 100% $335 60 LABOR 5,200.00 $5.142 $0 $0 $3,142 99% $58 5257 4 -A ALLOWANCE NO. 11 BP 4310(ASI -031) 7,322.00 $7,322 $0 $0 $7,322 100% $366 4 -B ALLOWANCE NO 11 BP 431 OA -002 10,000.00 $6,600 $0 $0 $6,600 66% $3,400 $330 4 -C ALLOWANCE NO 11 SP 43108 -002 4,798.00 $4,798 $0 $0 $4,798 100% $240 4 -D ALLOWANCE NO 11 BP 43108 -003 1,534.00 $1,534 $Q $0 $1,534 100% $77 4 -E ALLOWANCE NO 11 BP431OB -004 27,142.00 $27,476 ($334) $0 S27142 100% $1,357 4 -F ALLOWANCE NO 11 BP 431OB -005 9,625.00 $0 $9,625 $0 $9,625 100°/ $o 4 -G ALLOWANCE NO 11 BP 4310B -006 175,000.00 $175,000 $0 $0 $175,000 100 $0 441 ALLOWANCE NO 11 BP 43106 -007 546.00 $0 $546 $0 $546 100% $0 4 -1 ALLOWANCE NO 11 BP 431OB -008 10.933.00 $0 $0 $o $0 0% $10,933 $0 4 ALLOWANCE NO 11 BP 43106 -009 12,449.00 $0 $12,4=49 $0 $12,449 100% 900 PENDING CHANGE ORDERS 901 CHANGE ORDER #1 38,542.00 $28,907 $9,635 $0 $38.542 100% $1,927 902 CHANGE ORDER #2 (RCP-1 0) 19,219.00 $15,375 $3,844 $0 $19,219 100% $961 903 CHANGE ORDER #3 BP 43106 -005 175,000.00 ($175,000) $0 $0 ($175,000) 100% ($8,750) $2,223,261 1,920,497 175,505 0 2,096,002 94% 127,254 1 111,163 I i AFFIDAVIT State of Indiana 12/31/2009 14065 -17 I County of Hamilton j The Affiant, Joseph R. Lansdeli being first duly sworn, on oath deposes and says that he/she is an Authorized Representive Poynter Sheet Metal, Inc. I who has a Contract with THE CITY OF CARMEL, under its Owner Agreement with Carmel Redevelopment Commission for the project known as Carmel Performing Arts Center to provide all labor, material, equipment, supervision and insurance as required to complete all Sheet Metal Bid Package on the following described premises in said County, to wit: 777 Third Avenue SW, Carmel, IN 46032 That for the purpose of said Contract, the following persons have been contracted with and have furnished, or are furnishing and preparing materials for, and have performed or are performing labor on said improvement; that there is due and to become due them, respectively; the amounts set forth opposite their names for materials or labor as stated; that this statement is made to said Owner for the pupose of procuring from said Owner Partial Payment on said Contract; and this is a full, true and complete statement of all such persons, and of the amounts paid, due, and to become due them. NAME AND ADDRESS CONTRACT BASE EXTRAS REVISED TOTAL AMOUNT OF BALANCE TO FOR CONTRACT TO CONTRACT PREVIOUS THIS COMPLETE AMOUNT CONTRACT AMOUNT REQUEST REQUEST Validated Custom Solutions Equipment 474,900.00 3,281.00 478,181 -00 478,181.00 Pinnacle Equipment Co., Inc. Equipment 257,500.00 1,639.00 259,139 -00 167,470.00 91,669.00 JM Farrell Company Insulation 50,630.00 8,750.00 59,380.00 59,380.00 Cardinal Contracting Co. Millwrights 16,550.00 16,550.00 16,550.00 Poynter Sheet Metal, Inc. Sheet Metal /HVAC 2,545,920.00 44,091.00 2,590,011.00 1,459,893.95 84,488.50 1,045 628.55 i I TOTALS 3,345,500 -00 57,761.00 3,403,261.00 2,122,094.95 84,488.50 1,196,677.55 AMOUNT OF ORIGINAL 3,345,500.00 TOTAL AMOUNT REQUESTED 2,180,309.00 I I i CONTRACT i EXTRAS TO CONTRACT 57,761.00 LESS 5% OF CONTRACT RETAINED 170,163.05 TOTAL CONTRACT EXTRAS 3,403,261.00 NET AMOUNT EARNED 2,010,145.95 CREDIT TO CONTRACT AMOUNT OF PREVIOUS 2,122,094.95 I I PAYMENTS NET AMOUNT OF CONTRACT 3,403,261.00 AMOUNT DUE THIS PAYMENT 84,488.50 i BALANCE TO COMPLETE 1,196,677.55 I It is understood that the total amount paid to date plus the amount, requested in this Application shall not exceed 70 of the Cost of the Work completed to date. I agree to furnish Waivers of Lien for all materials under my Contract when demanded. SIGNED: Signato Joseph R. Lansdeli, President i For: Poynter Sheet Metal, I nc. Subcontractor Name I i Subscribed and sworn to before me this a,0 (0 NOTARY PUBLIC: day of �/�/1arsh ELINKeIGDWal, wry PIA The above sworn statement should be obtained by the Owner before each and every payment, RRAL" Residing in ,Morgan Ca* r �GO1rtnISS14r11 CbpItBS���, Prescribed by State Board of Accounts ACCOUNTS PAYABLE VOUCHER City Form No. 201 (Rev. 1995) CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. Payee l'a Y n Purchase Order No. �76e X/ .SA, I�� Rag��3 Terms Date Due Invoice invoice Description Amount Date Number (or note attached invoice(s) or bill(s)) 3/31 IO 2-0 4 Total I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance with IC 5- 11- 10 -1.6. 20 Clerk- Treasurer VOUCHER NO. WARRANT NO. ALLOWED 20 IN SUM OF 7 _lid ON ACCOUNT OF APPROPRIATION FOR Board Members PO4 or DEPT. INVOICE NO. ACCT #/TITLE AMOUNT I hereby certify that the attached invoice(s), or 175 5 6-ZlO bill(s) is (are) true and correct and that the materials or services itemized thereon for which charge is made were ordered and received except y 7 20 is iggnature Director of Redevelopment Cost distribution ledger classification if Title claim paid motor vehicle highway fund