HomeMy WebLinkAboutMinutes TAC 01-20-10 excerpt I CJ an 70 20I0 Requested to install path/access way to existing asphalt path along Main Street and to the sidewalk north of property If Right of Way Constraint, minimum is 8 ft. asphalt path Bike/Pedestrian amendment minimum is 10 ft. path Petitioner asked if they are able to contribute funds in an equal amount of the costs of the path rather than installing the path Suggested they contact Engineering Department to work out Details Alexia Donahue Wold -DOCS No comments Nick Redden Engineering (on behalf of Alexia Donahue -Wold) No comments on variance Christine Barton Holmes -DOCS -Bike Path Variance Replace sign variance Comments will be sent with Department Report on January 21'` Sue Maki- Carmel City Utilities Petitioner has no plans to install irrigation system -No comments END 9:35 a.m. Docket No. 09120026 TAC: Hazel Dell Christian Church The applicant seeks approval for a building addition and drop -off area. The site is located at 14501 Hazel Dell Pkwy. The site is zoned S- 1/Residence. Filed by Russ Love of Hazel Dell Christian Church. Alan Peterson and Mike Engledow of Hazel Dell Christian Church along with David Lach with Cripe were present and are seeking approval for an expansion on the existing church that was built in 1999. Addition is in accordance with master plan for overall project approved in 1999. Implementing the next phase for a youth ministry wing and preschool component (which is currently housed in the existing facility) will allow for these areas to move to the new addition. This expansion is the next phase of their master plan. Greg Hoyes Hamilton County Surveyor Office -Sent comment letter, complies with master drainage plan from 1999 Joanie Clark Vectren Energy Evaluating if need additional gas load is needed Passed out contact information Shirley Hunter -Duke Energy Demand on existing transform has plenty of capacity Contact Duke if need additional load services, passed out contact information Angie Conn -DOCS No additional comments Chris Ellison- Carmel Fire Department -No comments David Littlejohn -DOGS- Alternative Transportation Sent comment letter to Shirley Wilson -No additional comments Alexia Donahue -Wold -DOCS -No comments Nick Redden Engineering (on behalf of Alexia Donahue -Wold) -Sent comment letter, no additional comments Sue Maki Carmel City Utilities Petitioner has no plans to install irrigation system -No comments -Sue to follow up with John Duffy regarding water /sewer available END 9:45 a.m. Docket No. 09120027 ADLS Amend: World Wide Motors, Mercedes -Benz The applicant seeks approval for a building remodel and landscape, sidewalk signage changes. The site is located at 3900 E 96 St. The site is zoned B- 3/Business. Filed by Marc Tworek of Versatile Construction Group, LLC. and Docket No. 09120028 ADLS Amend: Mercedes -Benz Service Center The applicant seeks approval for a building remodel/addition and landscape signage changes. The site is located at 4000 E 96`h St. The site is zoned B- 3/Business. Filed by Marc Tworek of Versatile Construction Group, LLC. Marc Tworek of Versatile Construction, Paul Pettenado with World Wide Motors, and Scott Bordenet with Bordenet were present and are seeking an approval to expand and remodel their existing buildings at 3900 East 96 Street and 4000 East 96 Street. The existing 3900 building (currently the service center and sales for World Wide Motors) is to be recreated in order to bring up to Mercedes Benz standards before the end of 2010. The 4000 building is currently Smart Car sales would be renovated to expand showroom for new car sales and the service center at the rear of that building would become used car sales along with adding a showroom for Sprint Truck Sales. An addition to the 4000 building requires a height addition and adds a 5 bay service area for the Sprint Truck sales. The 3900 building would become the service center for all vehicles including a ride uplpick up area for customers. Petitioner questioned the comments received from comment letters regarding EIFS not being allowed 3 feet from ground level; which does not meet the standards of Mercedes Benz specifications. Mercedes Benz would allow for reinforced EIFS to be used. It was suggested from the committee to have Petitioner bring material samples with them to the Special Studies Committee meeting so the members can see what Mercedes Benz is requesting. Greg Hoyes Hamilton County Surveyor Office -Sent comment letter -Does not form regulated drainage water shed, no continents Joanie Clark Vectren Energy Additional gas load needed for addition to 4000 building Passed out contact information Shirley Hunter -Duke Energy -IP &L services facilities Angie Conn -DOCS -No additional comments Chris Ellison Carmel Fire Department Expansion of 4000 building -need to verify sprinkler system is sufficient