HomeMy WebLinkAboutMinutes TAC 01-20-10 excerpt I CJ an 70 20I0
Requested to install path/access way to existing asphalt path along
Main Street and to the sidewalk north of property
If Right of Way Constraint, minimum is 8 ft. asphalt path
Bike/Pedestrian amendment minimum is 10 ft. path
Petitioner asked if they are able to contribute funds in an equal amount
of the costs of the path rather than installing the path
Suggested they contact Engineering Department to work out
Details
Alexia Donahue Wold -DOCS
No comments
Nick Redden Engineering (on behalf of Alexia Donahue -Wold)
No comments on variance
Christine Barton Holmes -DOCS
-Bike Path Variance
Replace sign variance
Comments will be sent with Department Report on January 21'`
Sue Maki- Carmel City Utilities
Petitioner has no plans to install irrigation system
-No comments
END
9:35 a.m. Docket No. 09120026 TAC: Hazel Dell Christian Church
The applicant seeks approval for a building addition and drop -off area. The site is located
at 14501 Hazel Dell Pkwy. The site is zoned S- 1/Residence. Filed by Russ Love of Hazel
Dell Christian Church.
Alan Peterson and Mike Engledow of Hazel Dell Christian Church along with David
Lach with Cripe were present and are seeking approval for an expansion on the existing
church that was built in 1999. Addition is in accordance with master plan for overall
project approved in 1999. Implementing the next phase for a youth ministry wing and
preschool component (which is currently housed in the existing facility) will allow for
these areas to move to the new addition. This expansion is the next phase of their master
plan.
Greg Hoyes Hamilton County Surveyor Office
-Sent comment letter, complies with master drainage plan from 1999
Joanie Clark Vectren Energy
Evaluating if need additional gas load is needed
Passed out contact information
Shirley Hunter -Duke Energy
Demand on existing transform has plenty of capacity
Contact Duke if need additional load services, passed out contact information
Angie Conn -DOCS
No additional comments
Chris Ellison- Carmel Fire Department
-No comments
David Littlejohn -DOGS- Alternative Transportation
Sent comment letter to Shirley Wilson
-No additional comments
Alexia Donahue -Wold -DOCS
-No comments
Nick Redden Engineering (on behalf of Alexia Donahue -Wold)
-Sent comment letter, no additional comments
Sue Maki Carmel City Utilities
Petitioner has no plans to install irrigation system
-No comments
-Sue to follow up with John Duffy regarding water /sewer available
END
9:45 a.m. Docket No. 09120027 ADLS Amend: World Wide Motors, Mercedes -Benz
The applicant seeks approval for a building remodel and landscape, sidewalk signage
changes. The site is located at 3900 E 96 St. The site is zoned B- 3/Business. Filed by
Marc Tworek of Versatile Construction Group, LLC.
and
Docket No. 09120028 ADLS Amend: Mercedes -Benz Service Center
The applicant seeks approval for a building remodel/addition and landscape signage
changes. The site is located at 4000 E 96`h St. The site is zoned B- 3/Business. Filed by
Marc Tworek of Versatile Construction Group, LLC.
Marc Tworek of Versatile Construction, Paul Pettenado with World Wide Motors, and
Scott Bordenet with Bordenet were present and are seeking an approval to expand and
remodel their existing buildings at 3900 East 96 Street and 4000 East 96 Street. The
existing 3900 building (currently the service center and sales for World Wide Motors) is
to be recreated in order to bring up to Mercedes Benz standards before the end of 2010.
The 4000 building is currently Smart Car sales would be renovated to expand showroom
for new car sales and the service center at the rear of that building would become used
car sales along with adding a showroom for Sprint Truck Sales. An addition to the 4000
building requires a height addition and adds a 5 bay service area for the Sprint Truck
sales. The 3900 building would become the service center for all vehicles including a ride
uplpick up area for customers. Petitioner questioned the comments received from
comment letters regarding EIFS not being allowed 3 feet from ground level; which does
not meet the standards of Mercedes Benz specifications. Mercedes Benz would allow for
reinforced EIFS to be used. It was suggested from the committee to have Petitioner bring
material samples with them to the Special Studies Committee meeting so the members
can see what Mercedes Benz is requesting.
Greg Hoyes Hamilton County Surveyor Office
-Sent comment letter
-Does not form regulated drainage water shed, no continents
Joanie Clark Vectren Energy
Additional gas load needed for addition to 4000 building
Passed out contact information
Shirley Hunter -Duke Energy
-IP &L services facilities
Angie Conn -DOCS
-No additional comments
Chris Ellison Carmel Fire Department
Expansion of 4000 building -need to verify sprinkler system is sufficient