HomeMy WebLinkAbout00-36 ADLS Fidelity Keystone Office Park Construction Plans - Erosion Control Plan - C105EROSION CONTROL SEQUENCING MAINTENANCE SCHEDULE
x�
INSPECTION AND MAINTENANCE INSTALLATION/REMOVAL SEQUENCE
X a ri
CSOArchitects
Engineers &Interiors
9100 Keystone Crossing
Suite 200
Indianapolis, Indiana 46240
317.848.7800
FAX 317.574.0957
Arditecfire
Land
Historic Architecture
LLandscaped+Neeve
Space Planning
°Copyright 1995
SILT FENCE
SWF. r".
Drawings „,.a
w sr i
w a
ri
m.
w"
as a
WEEKLY OR AFTER STORM EVENTS AS NEEDED
Revisions
RIPRAP DAM SEDIMENT FILTER
Date
01/19/00
Drawn By
ACH
Checked By
DBH
!WEEKLY OR AFTER STORM EVENTS AS NEEDED
Z
Q
J
a
tJ
0
et
Z
O
Z
O D W �I�
C
0
CC
W
Z
J
_J W
Q
U
4
PH
W
0
MI
MI
O
Mi
z
rA
fli
;\v/;
Yv ��Yi
F
RIPRAP OUTFALL PROTECTION
W
c==1
EROSION CONTROL MATTING
-r
W
0
G1
TEMPORARY SEEDING
Celled By
0
Certified By
Vi ----"J
S. HU
!4
N b
910023
kSTATE Cf
O
i�e./�
3 4
VERIFY THIS IS NO LONGER REQUIRED
Sheet No. aL
0105
6 of 10 Sheets
Fib No.
99427
EROSION CONTROL SEQUENCING MAINTENANCE SCHEDULE
EROSION CONTROL MEASURE
INSPECTION AND MAINTENANCE INSTALLATION/REMOVAL SEQUENCE
STONE ENTRANCE
!AS REQUIRED
PRIOR TO CLEARING EARTHWORK
SILT FENCE
WEEKLY OR AFTER STORM EVENTS AS NEEDED
PRIOR TO CLEARING EARTHWORK
TREE PROTECTION FENCING
WEEKLY OR AS NEEDED
PRIOR TO CLEARING EARTHWORK
EXISTING INLET PROTECTION
WEEKLY OR AFTER STORM EVENTS AS NEEDED
PRIOR TO CLEARING EARTHWORK
RIPRAP DAM SEDIMENT FILTER
1 WEEKLY OR AFTER STORM EVENTS AS NEEDED
AFTER ROUGH GRADING
STRAW BALE INLET SEDIMENT FILTER
!WEEKLY OR AFTER STORM EVENTS AS NEEDED
AFTER ROUGH GRADING
STONE FILTER INLET PROTECTION
WEEKLY OR AFTER STORM EVENTS AS NEEDED
AFTER PAVING
TOPSOIL STOCKPILE TEMPORARY SEEDING
WATER AS NEEDED
AFTER TOPSIL STRIPPING STOCKPILE
RIPRAP OUTFALL PROTECTION
WEEKLY OR AFTER STORM EVENTS AS NEEDED
AFTER ROUGH GRADING
EROSION CONTROL MATTING
WATER AS NEEDED
AFTER FINISH GRADING AND PERMANENT SEEDING
TEMPORARY SEEDING
WATER AS NEEDED
AFTER FINISH GRADING
PERMANENT SEEDING
j WATER AND MULCH AS NEEDED
AFTER FINISH GRADING.
REMOVAL OF RIPRAP DAMS
VERIFY THIS IS NO LONGER REQUIRED
AFTER UPSTREAM DRAINAGE AREAS ARE STABILIZED
REMOVAL OF STRAW BALE INLET PROTECTION
VERIFY THIS IS NO LONGER REQUIRED
AFTER UPSTREAM DRAINAGE AREAS ARE STABILIZED
REMOVAL OF TREE PROTECTION
VERIFY THIS IS NO LONGER REQUIRED
AFTER ADJACENT AREAS ARE PERMANENT SEEDED.
REMOVAL OF STONE FILTER INLET PROTECTION.
I VERIFY THIS IS NO LONGER REQUIRED
AFTER UPSTREAM LOTS ARE STABILIZED
REMOVAL OF SILT FENCE
VERIFY THIS IS NO LONGER REQUIRED
AFTER UPSTREAM DRAINAGE AREAS ARE STABIUZED
REMOVAL OF TEMPORARY CMP SEDIMENT RISER
i VERIFY THIS IS NO LONGER REQUIRED
AFTER UPSTREAM DRAINAGE AREAS ARE STABILIZED
P41
II
0 FUTURE I
pi e OFFICE BUILDING
II4
Fe4
S�
O I I
r t
0 4 I j
et
ee k
I C I
ft 4
r
CIO F
S
410
t
i
e
P
17
I I I
I
rt
I T i Q
Cv
t +jaafartrar s i�a&14►`l�I,�' 0 iw;s AAA g
tifr
padd
�1 '���a�- -a�l�- w il y ai����� .��••l l �•�ry��•�'I��•PI i j•�' B OI �1, 4 �a► �4a�ly�o��. ��P�- a�l�- ��lY'��OYI't'0�� Ii��• OI�i�• a' I�i�• O l�ij• PQij• PI t s I I l��o�� ��1 i"4
,I $I N I��.QI a ��.4:IBS.��a! QI... a! I.._ a! Iw.- a!Ia�s!Iw�a!4fw��P_Iww�!Iw��!Iw 03 w.�!Iw p a 4§2.0 an asas act es MEME
aw w..e! !I OI OII OII�OI�► b SS
y► �II Tapara erne wawa IlAr .-a► a Mirai►.erara��e►�o�w-a Ibfl raTha.`�.0 Wal a v ®O �nsIlra�nrallir �aa�A. -sl. La�IAra a n a sar.S °n arnah L
h to
W
0
I
f 1!
\■ii��>
t►
0
III
s41 4
1
I
00'
1 o
t
4
�4
4
i 1
R:e;.]/Sta .rfldaSAlla{ •a:eswrlwlives. JHI
een -a telrot 't
0 15 30 60
120
R
EROSION CONTROL PLAN
SCALAT ■S0'
INSTALLATION SEQUENCE
1. INSTALL SOIL EROSION FENCES, STONE ENTRANCES, TREE
PROTECTION, AND EXISTING INLET PROTECTION.
2. SITE GRADING AND TERPPORARY SEEDING
3. INSTALL UNDERGROUND UTILITIES AND INLET PROTECTION
DEVICES
4. PARM"ING LOT CONSTRUCTION
5. FINAL GRADING, TOPSOIL AND PERMANENT SEEDING
6. REMOVE TEMPORARY SOIL EROSION MEASURES
TEMPORARY SEEDING
MARCH 1 TO MAY 15: OATS 0 3 BUSHELS /ACRE
APQIL TO AJGUST 30 ANNUAL RYEGRASS 0 2 BUSHELS /ACRE
JW 20 T) r CTOBER 15: WHEAT 0 2 BUSHELS /ACRE
PR! JIDE k RIGATION FOR TEMPORARY SEEDING FROM JUNE 1
THe` 1 AUC ST 1.
EXISTING
FOUR -STORY
OFFICE BUILDING
CARMEL DRIVE
1
NTS
NOTE:
1 1= II I -1 I
=i
=i 1 -1I
II
S -75 EROSION
CONTROL BLANKET
AS MANUFACTURED
BY NORTH AMERICAN
GREEN OR EQUAL, UNLESS NOTED.
EROSION CONTROL MATTING
DETAIL FOR TYPICAL SWALE 01
C104
DOWN SLOPE
SILT FENCE DETAIL 02
C104
NTS
TEMPORARY GRAVEL
CONSTRUCTION ENTRANCE
NTS
INLET PROTECTION
DETAIL AFTER
PAVEMENT PLACEMENT o
C104
NTS
START BLANKET AT TOP OF SWALE AND
ROLL IN THE DIRECTION OF THE WATER FLOW
IN THE SWALE. REFER TO MANUFACTURE'S
RECOMMENDATION'S FOR CHANNEL PLACEMENT
AND STAPLE PATTERNS.
NTS
II
il
II I II I ill
=11I n I I' -III
1 1=1 I 1
I II
=II;
-111F-111= III 1 1
n1 III =1
N
w
cc
VARIES
111 II[ -111 11
1_1 j
NOTE: STRAW BALES TO BE STAKED -2 STAKES
PER BALE MIN. -4 BALES PER STRUCTURE
BOUND W /WIRE
SECTION A
INLET SEDIMENT
FILTER DETAIL
2" TO 3" COURSE
AGGREGATE
6" MIN.
GEOTEXTILE FABRIC TO
STABILIZE FOUNDATION
1 1/2 "X 1 1/2 "X 24" LONG
WOOD LATH TO SECURE TO
STAKES
36" WIDE NON -WOVEN
POLYPROPYLENE GEOTEX FABRIC
(4.5 OZ /S.Q YARD)
MAINTAIN BY REMOVING
ACCUMULATED SILT
CUT CONTINUOUS TRENCH, 6"
TO 8" DEEP INSERT LOOSE
END OF FABRIC, BACKFILL
W/ EXCAVATED MATERIAL
COMPACT
2 "X 2 "X 36" LONG HARDWOOD
STAKES W/ ONE END
SHAPPENED &SPACED 5' -0" O.C.
2X2 WOOD STAKE
STRAW BALE
GRATE
GRADE
(NEW OR EXISTING)
SEEDED AND
STRAW MULCH
MAX. 3:1 SLOPE
Sp.
PLAN
GAPS BETWEEN BAGS
ACTS AS SPILLWAY
ALL PAVED AREA INLETS SHALL BE PROTECTED
WITH SANDBAGS UNTIL VEGETATION IS SECURE
03
C104
EROSION CONTROL NOTES:
1. ALL EROSION AND SEDIMENT CONTROL WORK SHALL
CONFORM TO THE STANDARDS, SPECIFICATIONS AND
PROCEDURES OF THE CITY, COUNTY, OR OTHER GOVERNING
AGENCIES, WHICHEVER HAS JURISDICTION.
2. SOIL EROSION CONTROL DEVICES AND PRACTICES WILL BE
ESTABLISHED IMMEDIATELY BEFORE ANY CLEANING, GRADING,
EXCAVATING, FILLING OR OTHERWISE DISTURBING OF NATURAL
TERRAIN. THE CONTRACTOR SHALL PRESERVE THE NATURAL
VEGETATION AS MUCH AS POSSIBLE.
3. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL
REMAIN IN PLACE DURING THE ENTIRE CONSTRUCTION PHASE.
ONLY THOSE CONTROLS AND DEVICES THAT ARE TEMPORARY
IN NATURE SHALL BE REMOVED OR MODIFIED TO ALLOW
PROGRESS OF CONSTRUCTION. DAILY INSPECTIONS MUST BE
MADE BY THE CONTRACTOR FOR EFFECTIVENESS OF THE
EROSION AND SEDIMENT CONTROL DEVICES. NECESSARY
REPAIRS OR REPLACEMENT MUST BE MADE WITHOUT DELAY.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CARE,
MAINTENANCE REPAIR AND RECONSTRUCTION OF ALL DEVICES,
CONTROLS AND ERODED AREAS. IF THE CONTRACT IS GIVEN
TO THE EXCAVATING CONTRACTOR OR A SUBCONTRACTOR AND
THEY FAIL TO CARE, AND REPAIR ALL DAMAGE TO THE
EROSION CONTROL DEVICES, THEN THE GENERAL CONTRACTOR
WILL BE RESPONSIBLE FOR THIS WORK AND ANY DAMAGE
THAT MAY HAVE OCCURRED.
5. FINAL OR TEMPORARY SEEDING AND OR SODDING MUST BE
DONE IMMEDIATELY AS DIRECTED BY THE LANDSCAPE PLAN,
EROSION CONTROL PLAN AND OR GRADING /DRAINAGE PLAN.
6. STRAW BALES, SILT FENCING AND OR GRAVEL PROTECTION
SHALL BE USED AS INDICATED ON PLANS. IF LOCAL
ORDINANCE DICTATE ALTERNATE EROSION CONTROL DEVICES
AND DETAILS, IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO USE THE REQUIRED LOCAL DEVICES.
7. ALL MUD, DIRT OR GRAVEL SPILLED, TRACKED OR DUMPED
ON PUBLIC OR PRIVATE STREETS, ROADS, DRIVEWAYS OR
SIDEWALKS, THE CONTRACTOR MUST REMOVE QUICKLY AND
PROMPTLY.
8. IMMEDIATELY AFTER SEEDING, MULCH ALL SEEDED AREAS
WITH UNWEATHERED STRAW SPREAD UNIFORMLY AT THE
RATE OF TWO TONS PER ACRE OR 100 POUNDS PER
1,000 SQUARE FEET. THIS MULCH SHOULD BE ANCHORED
WITH A DISC -TYPE ANCHORING TOOL AND OR APPROVED
TACKIFIER. IF ALLOWED, A WOOD CELLULOSE FIBER MULCH
(HYDROMULCH) AND APPROVED TACKIFIER MAY BE USED
IN LIEU OF STRAW MULCH. ALL METHODS MUST MEET ALL
THE LOCAL OR CITY REQUIREMENTS.
9. PROVIDE PAVEMENT UNDERDRAINS AS INDICATED ON PLANS.
INSTALL 4" DIAMETER PERFORATED PLASTIC PIPE OR 4"
DIAMETER CORRUGATED PLASTIC PIPE PER THE LENGTH
INDICATED ON PLANS. SLOPE PIPE AND TRENCH AT SAME
SLOPE AS THE SUBGRADE. UNDERDRAIN PIPES SHALL BE
PROTECTED FROM DAMAGE DURING CONSTRUCTION BEFORE
THE PAVEMENT IS INSTALLED.
10. PIPE LENGTHS INDICATED ARE FOR HYDRAULIC PURPOSES
ONLY AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ACTUAL LENGTHS REQUIRED TO COMPLETE THE INSTALL-
ATION AS SHOWN.
11. ALL EXCAVATED AREAS TO BE SEEDED OR SODDED AFTER
FINAL GRADING UNLESS OTHERWISE NOTED. SEE LAND-
SCAPE PLAN AND EROSION CONTROL PLAN FOR DIRECTION
AND VERIFICATION.
MIS
PROJECT NOTES:
1A. SEE TITLE SHEET
1 B. CONSTRUCTION OF TWO OFFICE BUILDINGS
AND PARKING.
1C. SHOWN ON PLANS
1D. SHOWN ON PLANS
1E. LAND USE OF ADJECENT AREAS
NORTH: RESIDENTIAL (APARTMENTS)
SOUTH: COMMERCIAL (OFFICE BUILDINGS)
EAST: COMMERCIAL (OFFICE BUILDINGS)
WEST: COMMERCIAL (GROCERY STORE)
2A. EXISTING SURFACE IS MEADOW, WITH
TALL GRASS AND WEEDS.
2B. THERE ARE NO WETLANDS, LAKES, OR WATER
COURSES ON OR ADJACENT TO THE SITE.
2C. THERE IS NO EXISTING FLOODPLAIN ON SITE.
2D. SEE TITLE SHEET FOR SOILS MAP.
2E. SHOWN ON PLANS.
2F. SHOWN ON PLANS.
2G. RECEIVING WATERS ARE WHITE LICK CREEK VIA
ROADSIDE DRAINS AND DITCHES.
2H. THE POTENTIAL EXISTS FOR GROUNDWATER RECHARGE IN
THE PROPOSED UNDERGROUND STORAGE SYSTEM.
21. -3A. SHOWN ON PLANS
3B. NOT APPLICABLE
4B. -4H SHOWN ON PLANS
41. SHOWN ON PLANS
4,1 NOT APPLICABLE
4K. SHOWN ON PLANS
LEGEND:
1110 NM= MINN
7 U O O
O f O
-R/W--
INLET
R/ W-
INLET PROTECTION DETAIL (AFTER PAVING)
SEE DETAIL 02/0105
INLET SEDIMENT FILTER DETAIL (BEFORE PAVING)
SEE DETAIL 03/0105
SILT FENCE (SEDIMENT FENCE)
SEE DETAIL 01/C105
SOIL TYPE
EROSION CONTROL MATTING
SEE DETAIL 04/C105
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE
SEE DETAIL 05/0105
PROPERTY LINE
/N- RIGHT -OF -WAY LINE
STREET CENTER LINE
CONSTRUCTION LIMIT LINE
'DON'T DIG BLIND'
'IT'S THE LAW"
fd,Y UaaIfNIo ,Rcl I %tt,tt K.
CaIi 1- 80O -3B2 -5544
2 Working Days
Before You Dig.