HomeMy WebLinkAbout00-36 ADLS Fidelity Keystone Office Park Construction Plans - Site Demolition Plan - C101O
Z
r
1
R/ R/W
11"... 1 1 111111111 1
0 15 30 60 120
Sella 110
w
1
S89'55'00 "W
SITE DEMOLITION PLAN
N 89'55'00 "E
246.76'
R/W
1
O
v, Q
DEMOLITION GENERAL NOTES:
1. REMOVAL OF EXISTING ASPHALT PAVEMENT INDICATED ON
PLANS SHALL INCLUDE ALL AGGREGATE BASE MATERIAL.
AREAS TO BE REMOVED SHALL BE SAW CUT CLEAN, NEAT
AND TRUE TO LINE. REMOVE ALL NON- ORGANIC MATTER
THAT WOULD INTERFERE WITH PROPOSED PLANT MATERIAL.
REPLACE ALL EXCAVATED AREAS TO BE PLANTED WITH A
MINIMUM OF 6" OF APPROVED TOPSOIL.
2. REMOVAL OF THE EXISTING IMPROVEMENTS ARE AS NOTED
ON THE PLANS. ALL MATERIALS REMOVED FROM THE SITE
BY THE GENERAL CONTRACTOR OR SUBCONTRACTOR SHALL
BE DISPOSED OF IN A PROPER AND LEGAL MANNER PER
FEDERAL, STATE, COUNTY, CITY, AND OR LOCAL LAWS AND
ORDINANCE.
3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND
ELEVATIONS IN THE FIELD PRIOR TO THE START OF CON-
STRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR ALL FIELD DIMENSIONS AND ELEVATIONS DURING THE
ENTIRE CONSTRUCTION SCHEDULE. IF ANY DISCREPANCIES
ARE FOUND IN THESE ENGINEERING PLANS OR SURVEY
PLANS FROM ACTUAL FIELD CONDITIONS, THE CONTRACTOR
SHALL CONTACT THE A/E IMMEDIATELY.
4, ALL CONTRACTORS BUT NOT LIMITED TO THE EXCAVATING
CONTRACTOR OR CONTRACTORS MUST TAKE PARTICULAR
CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY
LINES AND EQUIPMENT. ACTUAL FIELD LOCATIONS OF ALL
THE EXISTING UTILITIES ARE THE CONTRACTORS RESPONS-
IBILTY AND MUST BE LOCATED EITHER BY THE REPRESENTATIVE
OF THE UTILITY COMPANY OR BY A PRIVATE UNDERGROUND
UTILITY LOCATION COMPANY PRIOR TO THE START OF
EXCAVATING. VERIFY MINIMUM COVER REQUIREMENTS
BY THE UTILITY CONTRACTOR OR CONTRACTORS OR
AGENCIES WHICHEVER UTILITY COMPANIES OR AGENCIES THAT
HAVE JURISDICTION SO NOT TO CAUSE DAMAGE.
5. IT IS THE CONTRACTORS RESPONSIBILITY TO NOTIFY ALL
THE UTILITY COMPANIES AND DEPARTMENTS 72 HOURS
BEFORE CONSTRUCTION IS TO START TO VERIFY ANY
UTILITIES THAT MAY BE PRESENT ON SITE. ALL VERIFI-
CATIONS, LOCATIONS, SIZE AND DEPTHS SHALL BE MADE
BY THE APPROPRIATE UTILITY COMPANIES OR DEPARTMENTS.
WHEN EXCAVATING AROUND OR OVER EXISTING UTILITIES,
THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO
A REPRESENTATIVE OF THE UTILITY CAN BE PRESENT DURING
THE EXCAVATION TO INSTRUCT AND OBSERVE DURING THE
EXCAVATION.
6. TRENCHES FOR ALL UTILITIES SHALL BE BACKFILLED COM-
PLETELY WITH APPROVED ENGINEERED GRANULAR MATERIAL
SUITABLE TO THE A /E. SEE THE APPROPRIATE DETAILS
AND SPECIFICATIONS FOR THE APPROVED MATERIALS.
7. HEAVY CONSTRUCTION AND EQUIPMENT TRAFFIC MAY CREATE
PUMPING AND GENERAL DETERIORATION OF THE SHALLOWER
SOILS IF EXCESS SURFACE WATER IS PRESENT. PROPER
PRECAUTIONARY STEPS MUST BE TAKEN DURING THE
ENTIRE CONSTRUCTION SCHEDULE TO ALLEVIATE SUCH
DAMAGE.
8. ALL CONSTRUCTION METHODS AND MATERIALS MUST
CONFORM TO CURRENT STANDARDS AND SPECIFICATIONS
OF THE FEDERAL, STATE, COUNTY, CITY OR LOCAL
REQUIREMENTS, WHICHEVER HAS JURISDICTION.
9. ALL APPURTENANCES NOT DESIGNATED FOR DEMOLITION SHALL
BE PROTECTED FROM DAMAGE BY THE CONTRACTOR. ANY
DAMAGE DURING CONSTRUCTION SHALL BE RESTORED,
RECONSTRUCTED OR REPLACED BY THE CONTRACTOR AT
HIS EXPENSE. ALL DAMAGES SHALL BE RESTORED OR
REPLACED TO AT LEAST THEIR ORIGINAL CONDITION OR AS
REQUIRED OR DICTATED BY FEDERAL, STATE, COUNTY, CITY
OR LOCAL AGENCIES.
10. IT IS THE RESPONSIBILITY OF THE CONTRACTOR OR CON-
TRACTORS TO OBTAIN AND PAY FOR ALL FEDERAL, STATE,
COUNTY, CITY, OR LOCAL PERMITS FOR ANY AND ALL WORK
REQUIRED UNLESS OTHERWISE NOTED IN THE CONTRACT OR
SPECIFICATIONS.
11. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE
AT HIS OR HER EXPENSE ALL AUTOMOBILE AND PEDESTRIAN
TRAFFIC CONTROL DEVICES REQUIRED BY FEDERAL. STATE,
COUNTY, CITY OR LOCAL AGENCIES.
12. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT
EACH DAY AND REMOVE ALL MUD. DIRT, GRAVEL AND LOOSE
MATERIALS TRACKED, DUMPED, SPILLED OR WIND BLOWN
FROM THE SITE ONTO OTHER SITES, RIGHT OF WAYS, PUBLIC
OR PRIVATE STREETS OR ROADS, DRIVEWAYS, YARDS OR
SIDEWALKS. THE CONTRACTOR MUST CLEAN OR PICK UP
DAILY IF NECESSARY. THE CONTRACTOR SHALL REDUCE THE
AIRBORNE DUST DURING THE ENTIRE CONSTRUCTION
SCHEDULE. WATER MAY BE USED AS A REDUCER.
13. THE UTILITIES INDICATED ON THESE PLANS AND ON THE
SURVEY MAY NOT BE A COMPLETE INVENTORY OF ALL THE
EXISTING UTILITIES PRESENT ON AND AROUND THIS SITE.
THE LOCATION AND SIZE OF THESE UTILITIES MAY BE
APPROXIMATE. THIS INFORMATION WAS GATHERED OR
SUPPLIED BY OTHERS AND USED BY THE A/E AND MAY
NOT BE ACTUAL. THE A/E SHALL NOT BE HELD LIABLE
FOR ANY INCORRECT OR MISLEADING UTILITY INFORMATION
INDICATED, IMPLIED OR NOT INDICATED ON THESE PLANS.
DEMOLITION KEY NOTES:
REMOVE EXISTING PAVEMENT, SAW CUT PAVEMENT
NEAT, CLEAN TRUE TO LINE ALONG PAVEMENT EDGE.
REMOVE EXISTING TREE OR SHRUB.
REMOVE EXISTING POST.
REMOVE EXISTING CURB.
QE RELOCATE EXISTING ELECTRICAL TRANSFORMER.
LEGEND:
DEMOLITION (GENERAL)
EXISTING CONCRETE CURB
PROPERTY LINE
RIGHT -OF -WAY LINE
SETBACK LINE
EASEMENT LINE
STREET CENTER LINE
CONSTRUCTION LIMIT LINE
REMOVE EXISTING TREE OR SHRUB
'DON'T DIG BLIND'
'IT'S Tit LAW'
IOW UNINGROLND IROICCTICO 'MCC IC.
Cali 1 -800- 382 -5544
2 Working Days
Before You Dig.
CSOArchitects
Engineers &Interiors
9100 Keystone Crossing
Suite 200
Indianapolis, Indian 46240
317.848.7800
FAX 317.574.0957
ArdNtectve
Engneerng
Land Planing
Historic Architecture
Landscape ArdWechre
interior Design
Space Planing
OCopynght 1995
scope M.
09 'at .e
D ra d., a IM b.b.9,
an..l
a n +.m+ Th
Cy
o ib
Y (me 4,
v
,.1.
.<.M.a
ere
I„.v
�...w ak
e
t..
Revisions
Date
01/19/00
Drawn By
ACH
Checked By
DBH
CARMEL DRP
CARMEL, IN
11
certned By
Cortland
By
-z
B.
910023
STATE
,DANA'
TONAL
3
HO
N0.
j
OF f
I s
V-- 0.
Sheet No.
C101
2 Of 10 sheets
Fie No.
99427
O
Z
r
1
R/ R/W
11"... 1 1 111111111 1
0 15 30 60 120
Sella 110
w
1
S89'55'00 "W
SITE DEMOLITION PLAN
N 89'55'00 "E
246.76'
R/W
1
O
v, Q
DEMOLITION GENERAL NOTES:
1. REMOVAL OF EXISTING ASPHALT PAVEMENT INDICATED ON
PLANS SHALL INCLUDE ALL AGGREGATE BASE MATERIAL.
AREAS TO BE REMOVED SHALL BE SAW CUT CLEAN, NEAT
AND TRUE TO LINE. REMOVE ALL NON- ORGANIC MATTER
THAT WOULD INTERFERE WITH PROPOSED PLANT MATERIAL.
REPLACE ALL EXCAVATED AREAS TO BE PLANTED WITH A
MINIMUM OF 6" OF APPROVED TOPSOIL.
2. REMOVAL OF THE EXISTING IMPROVEMENTS ARE AS NOTED
ON THE PLANS. ALL MATERIALS REMOVED FROM THE SITE
BY THE GENERAL CONTRACTOR OR SUBCONTRACTOR SHALL
BE DISPOSED OF IN A PROPER AND LEGAL MANNER PER
FEDERAL, STATE, COUNTY, CITY, AND OR LOCAL LAWS AND
ORDINANCE.
3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND
ELEVATIONS IN THE FIELD PRIOR TO THE START OF CON-
STRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR ALL FIELD DIMENSIONS AND ELEVATIONS DURING THE
ENTIRE CONSTRUCTION SCHEDULE. IF ANY DISCREPANCIES
ARE FOUND IN THESE ENGINEERING PLANS OR SURVEY
PLANS FROM ACTUAL FIELD CONDITIONS, THE CONTRACTOR
SHALL CONTACT THE A/E IMMEDIATELY.
4, ALL CONTRACTORS BUT NOT LIMITED TO THE EXCAVATING
CONTRACTOR OR CONTRACTORS MUST TAKE PARTICULAR
CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY
LINES AND EQUIPMENT. ACTUAL FIELD LOCATIONS OF ALL
THE EXISTING UTILITIES ARE THE CONTRACTORS RESPONS-
IBILTY AND MUST BE LOCATED EITHER BY THE REPRESENTATIVE
OF THE UTILITY COMPANY OR BY A PRIVATE UNDERGROUND
UTILITY LOCATION COMPANY PRIOR TO THE START OF
EXCAVATING. VERIFY MINIMUM COVER REQUIREMENTS
BY THE UTILITY CONTRACTOR OR CONTRACTORS OR
AGENCIES WHICHEVER UTILITY COMPANIES OR AGENCIES THAT
HAVE JURISDICTION SO NOT TO CAUSE DAMAGE.
5. IT IS THE CONTRACTORS RESPONSIBILITY TO NOTIFY ALL
THE UTILITY COMPANIES AND DEPARTMENTS 72 HOURS
BEFORE CONSTRUCTION IS TO START TO VERIFY ANY
UTILITIES THAT MAY BE PRESENT ON SITE. ALL VERIFI-
CATIONS, LOCATIONS, SIZE AND DEPTHS SHALL BE MADE
BY THE APPROPRIATE UTILITY COMPANIES OR DEPARTMENTS.
WHEN EXCAVATING AROUND OR OVER EXISTING UTILITIES,
THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO
A REPRESENTATIVE OF THE UTILITY CAN BE PRESENT DURING
THE EXCAVATION TO INSTRUCT AND OBSERVE DURING THE
EXCAVATION.
6. TRENCHES FOR ALL UTILITIES SHALL BE BACKFILLED COM-
PLETELY WITH APPROVED ENGINEERED GRANULAR MATERIAL
SUITABLE TO THE A /E. SEE THE APPROPRIATE DETAILS
AND SPECIFICATIONS FOR THE APPROVED MATERIALS.
7. HEAVY CONSTRUCTION AND EQUIPMENT TRAFFIC MAY CREATE
PUMPING AND GENERAL DETERIORATION OF THE SHALLOWER
SOILS IF EXCESS SURFACE WATER IS PRESENT. PROPER
PRECAUTIONARY STEPS MUST BE TAKEN DURING THE
ENTIRE CONSTRUCTION SCHEDULE TO ALLEVIATE SUCH
DAMAGE.
8. ALL CONSTRUCTION METHODS AND MATERIALS MUST
CONFORM TO CURRENT STANDARDS AND SPECIFICATIONS
OF THE FEDERAL, STATE, COUNTY, CITY OR LOCAL
REQUIREMENTS, WHICHEVER HAS JURISDICTION.
9. ALL APPURTENANCES NOT DESIGNATED FOR DEMOLITION SHALL
BE PROTECTED FROM DAMAGE BY THE CONTRACTOR. ANY
DAMAGE DURING CONSTRUCTION SHALL BE RESTORED,
RECONSTRUCTED OR REPLACED BY THE CONTRACTOR AT
HIS EXPENSE. ALL DAMAGES SHALL BE RESTORED OR
REPLACED TO AT LEAST THEIR ORIGINAL CONDITION OR AS
REQUIRED OR DICTATED BY FEDERAL, STATE, COUNTY, CITY
OR LOCAL AGENCIES.
10. IT IS THE RESPONSIBILITY OF THE CONTRACTOR OR CON-
TRACTORS TO OBTAIN AND PAY FOR ALL FEDERAL, STATE,
COUNTY, CITY, OR LOCAL PERMITS FOR ANY AND ALL WORK
REQUIRED UNLESS OTHERWISE NOTED IN THE CONTRACT OR
SPECIFICATIONS.
11. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE
AT HIS OR HER EXPENSE ALL AUTOMOBILE AND PEDESTRIAN
TRAFFIC CONTROL DEVICES REQUIRED BY FEDERAL. STATE,
COUNTY, CITY OR LOCAL AGENCIES.
12. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT
EACH DAY AND REMOVE ALL MUD. DIRT, GRAVEL AND LOOSE
MATERIALS TRACKED, DUMPED, SPILLED OR WIND BLOWN
FROM THE SITE ONTO OTHER SITES, RIGHT OF WAYS, PUBLIC
OR PRIVATE STREETS OR ROADS, DRIVEWAYS, YARDS OR
SIDEWALKS. THE CONTRACTOR MUST CLEAN OR PICK UP
DAILY IF NECESSARY. THE CONTRACTOR SHALL REDUCE THE
AIRBORNE DUST DURING THE ENTIRE CONSTRUCTION
SCHEDULE. WATER MAY BE USED AS A REDUCER.
13. THE UTILITIES INDICATED ON THESE PLANS AND ON THE
SURVEY MAY NOT BE A COMPLETE INVENTORY OF ALL THE
EXISTING UTILITIES PRESENT ON AND AROUND THIS SITE.
THE LOCATION AND SIZE OF THESE UTILITIES MAY BE
APPROXIMATE. THIS INFORMATION WAS GATHERED OR
SUPPLIED BY OTHERS AND USED BY THE A/E AND MAY
NOT BE ACTUAL. THE A/E SHALL NOT BE HELD LIABLE
FOR ANY INCORRECT OR MISLEADING UTILITY INFORMATION
INDICATED, IMPLIED OR NOT INDICATED ON THESE PLANS.
DEMOLITION KEY NOTES:
REMOVE EXISTING PAVEMENT, SAW CUT PAVEMENT
NEAT, CLEAN TRUE TO LINE ALONG PAVEMENT EDGE.
REMOVE EXISTING TREE OR SHRUB.
REMOVE EXISTING POST.
REMOVE EXISTING CURB.
QE RELOCATE EXISTING ELECTRICAL TRANSFORMER.
LEGEND:
DEMOLITION (GENERAL)
EXISTING CONCRETE CURB
PROPERTY LINE
RIGHT -OF -WAY LINE
SETBACK LINE
EASEMENT LINE
STREET CENTER LINE
CONSTRUCTION LIMIT LINE
REMOVE EXISTING TREE OR SHRUB
'DON'T DIG BLIND'
'IT'S Tit LAW'
IOW UNINGROLND IROICCTICO 'MCC IC.
Cali 1 -800- 382 -5544
2 Working Days
Before You Dig.