HomeMy WebLinkAbout03110037 - 182-03 Z - Inlow Park Repairs & Improvements D101DATE: 1.13.10 PROJECT NO.: 7628.001 DRAWN BY: ZB CHECKED BY: MK SHEET TITLE: DEMOLITION PLAN DRAWING FILES: T: \7k \7628 \001 \dwgs \D101.dwg XREF: T: \7k \7628 \001 \dwgs \Titlel.dwg SHEET NO.: •C' lar-1.(0 r ink A 41 t V.+ 4:$42.4, 40 41. AK. A■ 0 0 O e 0 &iii 0 N a; j y.. 0 ri'm's x';; C t' st zI r rt, '101: laismoadmo INKarirss air r OA SAW CUT CURB /PAVEMENT OB EXISTING SPRAY FEATURE TO BE REMOVED EXISTING PAVEMENT AND GRAVEL BASE TO BE REMOVED IN ITS ENTIRETY WITHIN THIS BOUNDARY. 10 0 ASSUMED NORTH SCALE: 1"= 10 1. REMOVAL OF EXISTING IMPROVEMENTS ARE AS NOTED ON THE PLANS. THE MATERIALS REMOVED FROM THE SITE SHALL BE DISPOSED OF IN A PROPER AND LEGAL MANNER PER FEDERAL, STATE, COUNTY, CITY, AND OR LOCAL LAWS AND ORDINANCES. 2. CONTRACTOR MUST BE AWARE THAT EXISTING BUILDING BASEMENTS AND FOUNDATIONS MAY BE FOUND. PROPER CARE MUST BE USED TO CONSTRUCT PROPOSED FOUNDATIONS AND UTILITIES. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO USE A SOILS ENGINEER FOR RECOMMENDATIONS DURING THE SITE CONSTRUCTION PHASE. 3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS IN THE FIELD PRIOR TO START OF CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSiONS AND ELEVATIONS DURING THE ENTIRE CONSTRUCTION SCHEDULE. IF ANY DISCREPANCIES ARE FOUND IN THESE ENGINEERING PLANS OR LANDSCAPE PLANS FROM ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL CONTACT THE PROJECT MANAGER IMMEDIATELY. IF ANY DISCREPANCIES FOUND ON THE SURVEY PLAN OR ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL CONTACT THE PROJECT MANAGER IMMEDIATELY FOR INSTRUCTIONS. 4. ALL CONTRACTORS, BUT NOT LIMITED TO THE EXCAVATING CONTRACTOR OR CONTRACTORS, MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. ACTUAL FIELD LOCATIONS OF ALL THE EXISTING UTILITIES ARE THE RESPONSIBILITY OF THE CONTRACTOR AND MUST BE LOCATED EITHER BY THE REPRESENTATIVE OF THE LOCAL U11UTY COMPANY OR BY A PRIVATE UNDERGROUND UTILITY LOCATION COMPANY PRIOR TO THE START OF EXCAVATING. VERIFY MINIMUM COVER REQUIREMENTS BY THE UTILITY CONTRACTOR OR CONTRACTORS, OR AGENCIES, WHICHEVER U11UTY COMPANY OR AGENCIES, THAT HAS JURISDIC11ON, SO NOT TO CAUSE DAMAGE. 5. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY ALL THE U11UTY COMPANIES AND DEPARTMENT 72 HOURS BEFORE CONSTRUCTION IS TO START TO VERIFY ANY UTILITIES THAT MAY BE PRESENT ON THE SITE. ALL VERIFICATIONS, LOCATIONS, SIZE, AND DEPTHS SHALL BE MADE BY THE APPROPRIATE UTILITY COMPANIES OR DEPARTMENTS. WHEN EXCAVATING AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO A REPRESENTATIVE OF THE UTILITY CAN BE PRESENT DURING THE EXCAVATION TO INSTRUCT AND OBSERVE DURING THE EXCAVATION. 6. HEAVY CONSTRUCTION EQUIPMENT TRAFFIC MAY CREATE PUMPING AND GENERAL DETERIORATION OF THE SHALLOWER SOILS IF EXCESS SURFACE WATER IS PRESENT. PROPER PRECAUTIONARY STEPS MUST BE TAKEN DURING THE ENTIRE CONSTRUCTION SCHEDULE TO ALLEVIATE SUCH DAMAGE. 7. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO THE CURRENT STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY, OR LOCAL REQUIREMENTS, WHICHEVER HAS JURISDIC11ON. 8. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT EACH DAY AND REMOVE ALL MUD, DIRT, GRAVEL, AND LOOSE MATERIALS TRACKED, DUMPED, SPILLED OR WIND BLOWN FROM THE SITE ONTO OTHER SITES, RIGHT OF WAYS, PUBUC OR PRIVATE STREETS OR ROADS, DRIVEWAYS, YARDS, OR SIDEWALKS. THE CONTRACTOR MUST CLEAN OR PICK UP DAILY IF NECESSARY. THE CONTRACTOR SHALL REDUCE THE AIRBORNE DUST DURING THE ENTIRE CONSTRUCTION SCHEDULE. WATER MAY BE USED AS A REDUCER. 9. THE U11U11ES INDICATED ON THESE PLANS AND ON THE SURVEY MAY NOT BE A COMPLETE INVENTORY OF ALL THE EXISTING UTILITIES PRESENT ON AND AROUND THIS SITE. THE LOCATION AND SIZE OF THESE U11U11ES MAYBE APPROXIMATE. THIS INFORMATION WAS GATHERED OR SUPPLIED BY OTHERS AND USED BY THE ENGINEER AND MAY NOT BE ACTUAL THE ENGINEER SHALL NOT BE HELD LIABLE FOR ANY INCORRECT OR MISLEADING UTILITY INFORMATION INDICATED, IMPLIED, OR NOT INDICATED ON THESE PLANS. 10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO BEAR ALL EXPENSES TO REMOVE, RELOCATE AND OR MODIFY ALL UTILITIES, PRIVATE OR PUBLIC, OR OTHERWISE, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY WITH EACH UTILITY COMPANY AND OR AGENT WHOM IS RESPONSIBLE TO REMOVE, RELOCATE, AND /OR MODIFY SUCH UTILITY EXISTING OR PROPOSED. IT FURTHER SHALL BE THE CONTRACTORS' RESPONSIBILITY TO VERIFY IF ANY FUTURE UTILITIES ARE PLANNED AND HOW IT MAY EFFECT THIS PROJECT AND IT'S OWNER AS TO THEIR FUTURE RESPONSIBILITIES. 10 GRAPHIC SCALE 20 SITE PLANS WERE PROVIDED BY THE OWNER. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO VERIFY ACTUAL FIELD CONDITIONS AND NOTIFY THE LANDSCAPE ARCHITECT IF DISCREPANCIES OCCUR. DATE: THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. COPYRIGHTED BY THE SCHNEIDER CORP. (2008) tkb Schneider THE SCHNEIDER CORPORATION Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 -1037 Telephone: 317.826.7100 Fax: 317.826.7200 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnical Services GIS LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering