HomeMy WebLinkAbout03110037 - 182-03 Z - Inlow Park Repairs & Improvements D101DATE:
1.13.10
PROJECT NO.:
7628.001
DRAWN BY:
ZB
CHECKED BY:
MK
SHEET TITLE:
DEMOLITION
PLAN
DRAWING FILES:
T: \7k \7628 \001 \dwgs \D101.dwg
XREF: T: \7k \7628 \001 \dwgs \Titlel.dwg
SHEET NO.:
•C'
lar-1.(0
r ink A 41
t V.+ 4:$42.4, 40
41. AK. A■
0
0
O
e 0
&iii
0
N a; j y..
0
ri'm's x';;
C t'
st zI r rt, '101:
laismoadmo INKarirss
air r
OA SAW CUT CURB /PAVEMENT
OB EXISTING SPRAY FEATURE TO BE REMOVED
EXISTING PAVEMENT AND GRAVEL BASE TO BE REMOVED
IN ITS ENTIRETY WITHIN THIS BOUNDARY.
10
0
ASSUMED NORTH
SCALE: 1"= 10
1. REMOVAL OF EXISTING IMPROVEMENTS ARE AS NOTED ON THE PLANS. THE MATERIALS REMOVED FROM THE SITE
SHALL BE DISPOSED OF IN A PROPER AND LEGAL MANNER PER FEDERAL, STATE, COUNTY, CITY, AND OR LOCAL
LAWS AND ORDINANCES.
2. CONTRACTOR MUST BE AWARE THAT EXISTING BUILDING BASEMENTS AND FOUNDATIONS MAY BE FOUND. PROPER
CARE MUST BE USED TO CONSTRUCT PROPOSED FOUNDATIONS AND UTILITIES. IT SHALL BE THE CONTRACTORS
RESPONSIBILITY TO USE A SOILS ENGINEER FOR RECOMMENDATIONS DURING THE SITE CONSTRUCTION PHASE.
3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS IN THE FIELD PRIOR TO START OF
CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSiONS AND ELEVATIONS DURING
THE ENTIRE CONSTRUCTION SCHEDULE. IF ANY DISCREPANCIES ARE FOUND IN THESE ENGINEERING PLANS OR
LANDSCAPE PLANS FROM ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL CONTACT THE PROJECT MANAGER
IMMEDIATELY. IF ANY DISCREPANCIES FOUND ON THE SURVEY PLAN OR ACTUAL FIELD CONDITIONS, THE
CONTRACTOR SHALL CONTACT THE PROJECT MANAGER IMMEDIATELY FOR INSTRUCTIONS.
4. ALL CONTRACTORS, BUT NOT LIMITED TO THE EXCAVATING CONTRACTOR OR CONTRACTORS, MUST TAKE
PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. ACTUAL FIELD
LOCATIONS OF ALL THE EXISTING UTILITIES ARE THE RESPONSIBILITY OF THE CONTRACTOR AND MUST BE
LOCATED EITHER BY THE REPRESENTATIVE OF THE LOCAL U11UTY COMPANY OR BY A PRIVATE UNDERGROUND
UTILITY LOCATION COMPANY PRIOR TO THE START OF EXCAVATING. VERIFY MINIMUM COVER REQUIREMENTS BY
THE UTILITY CONTRACTOR OR CONTRACTORS, OR AGENCIES, WHICHEVER U11UTY COMPANY OR AGENCIES, THAT
HAS JURISDIC11ON, SO NOT TO CAUSE DAMAGE.
5. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY ALL THE U11UTY COMPANIES AND DEPARTMENT 72
HOURS BEFORE CONSTRUCTION IS TO START TO VERIFY ANY UTILITIES THAT MAY BE PRESENT ON THE SITE. ALL
VERIFICATIONS, LOCATIONS, SIZE, AND DEPTHS SHALL BE MADE BY THE APPROPRIATE UTILITY COMPANIES OR
DEPARTMENTS. WHEN EXCAVATING AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE
UTILITY COMPANY SO A REPRESENTATIVE OF THE UTILITY CAN BE PRESENT DURING THE EXCAVATION TO
INSTRUCT AND OBSERVE DURING THE EXCAVATION.
6. HEAVY CONSTRUCTION EQUIPMENT TRAFFIC MAY CREATE PUMPING AND GENERAL DETERIORATION OF THE
SHALLOWER SOILS IF EXCESS SURFACE WATER IS PRESENT. PROPER PRECAUTIONARY STEPS MUST BE TAKEN
DURING THE ENTIRE CONSTRUCTION SCHEDULE TO ALLEVIATE SUCH DAMAGE.
7. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO THE CURRENT STANDARDS AND SPECIFICATIONS
OF THE FEDERAL, STATE, COUNTY, CITY, OR LOCAL REQUIREMENTS, WHICHEVER HAS JURISDIC11ON.
8. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT EACH DAY AND REMOVE ALL MUD, DIRT, GRAVEL,
AND LOOSE MATERIALS TRACKED, DUMPED, SPILLED OR WIND BLOWN FROM THE SITE ONTO OTHER SITES, RIGHT
OF WAYS, PUBUC OR PRIVATE STREETS OR ROADS, DRIVEWAYS, YARDS, OR SIDEWALKS. THE CONTRACTOR MUST
CLEAN OR PICK UP DAILY IF NECESSARY. THE CONTRACTOR SHALL REDUCE THE AIRBORNE DUST DURING THE
ENTIRE CONSTRUCTION SCHEDULE. WATER MAY BE USED AS A REDUCER.
9. THE U11U11ES INDICATED ON THESE PLANS AND ON THE SURVEY MAY NOT BE A COMPLETE INVENTORY OF ALL
THE EXISTING UTILITIES PRESENT ON AND AROUND THIS SITE. THE LOCATION AND SIZE OF THESE U11U11ES
MAYBE APPROXIMATE. THIS INFORMATION WAS GATHERED OR SUPPLIED BY OTHERS AND USED BY THE ENGINEER
AND MAY NOT BE ACTUAL THE ENGINEER SHALL NOT BE HELD LIABLE FOR ANY INCORRECT OR MISLEADING
UTILITY INFORMATION INDICATED, IMPLIED, OR NOT INDICATED ON THESE PLANS.
10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO BEAR ALL EXPENSES TO REMOVE, RELOCATE AND OR
MODIFY ALL UTILITIES, PRIVATE OR PUBLIC, OR OTHERWISE, IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO VERIFY WITH EACH UTILITY COMPANY AND OR AGENT WHOM IS RESPONSIBLE TO REMOVE,
RELOCATE, AND /OR MODIFY SUCH UTILITY EXISTING OR PROPOSED. IT FURTHER SHALL BE THE CONTRACTORS'
RESPONSIBILITY TO VERIFY IF ANY FUTURE UTILITIES ARE PLANNED AND HOW IT MAY EFFECT THIS PROJECT AND
IT'S OWNER AS TO THEIR FUTURE RESPONSIBILITIES.
10
GRAPHIC SCALE
20
SITE PLANS WERE PROVIDED BY THE OWNER.
IT SHALL BE THE CONTRACTORS RESPONSIBILITY
TO VERIFY ACTUAL FIELD CONDITIONS AND NOTIFY
THE LANDSCAPE ARCHITECT IF DISCREPANCIES OCCUR.
DATE:
THIS DRAWING AND THE IDEAS, DESIGNS AND
CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF THE SCHNEIDER
CORPORATION, AND ARE NOT TO BE USED OR
REPRODUCED, IN WHOLE OR IN PART, WITHOUT
THE WRITTEN CONSENT OF THE SCHNEIDER
CORPORATION.
COPYRIGHTED BY THE SCHNEIDER CORP. (2008)
tkb
Schneider
THE SCHNEIDER CORPORATION
Historic Fort Harrison
8901 Otis Avenue
Indianapolis, IN 46216 -1037
Telephone: 317.826.7100
Fax: 317.826.7200
www.schneidercorp.com
Architecture
Civil Engineering
Environmental Engineering
Geotechnical Services
GIS LIS
Home Builder Services
Interior Design
Land Surveying
Landscape Architecture
Transportation Engineering