Loading...
HomeMy WebLinkAbout04100007-10, 13, & 15 KFC & Lohn John Silvers - Stormwater Pollution Prevention Notes & Details - C3.1il E 9 I fi l i j ii I c ,:';1-t. 1r r pep: ,s— ij i 4.1 1 j .t i il j a i .i t .f tTSri t i 44 '(it 1 '1, 1tf SV r #r ifj t {Tt STORM WATER POLLUTION PREVENTION NOTES 1. ALL WORK SPECIFIED AS AN tNDOT ITEM SHALL BE GOVERNED BY THE CURRENT STATE OF INDIANA DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MATERIAL SPECIFICATION HANDBOOK. IT IS THE CONTRACTOR'S RESPONSIBIUTY TO POSSESS AND TO BE FAMILIAR WITH APPLICABLE SECTIONS. 2. THIS CONTRACT DRAWING SHALL BE MADE AVAILABLE ON SITE AT ALL TIMES AND PRESENTED UPON REQUEST. IF UNFORESEEN STORMWATER POLLUTION PREVENTION IS ENCOUNTERED, ADDITIONAL STORMWATER POLLUTION PREVENTION (SWPP) MEASURES MAY BE REQUESTED BY THE OWNER, COUNTY ENGINEER, PROJECT ENGINEER OR SOIL CONSERVATION SERVICE REPRESENTATIVE AT ANYTIME. SUCH REQUESTS SHALL BE IMPLEMENTED IMMEDIATELY AT CONTRACTOR'S EXPENSE. ALL STORM WATER POLLUTION PREVENTION ITEMS SHALL BE INSTALLED AS SHOWN OR NOTED ON THE SITE PLAN. 4. PLANT TEMPORARY SEEDING AND MULCHING IN ALL AREAS THAT SHALL BE INACTIVE FOR 15 DAYS OR MORE. ALL DISTURBED AND ERODED EARTH SHALL BE REGRADED AND SEEDED WITHIN 14 DAYS WITH SEEDING, AS DEFINED ABOVE AND AS SHOWN ON THE TABLE BELOW, TO ESTABLISH STABILITY AND PROVIDE SEDIMENT CONTROL. WHERE POSSIBLE, TEMPORARY SEEDING GROWTH SHALL NOT BE MOWED UNTIL IT HAS GONE TO SEED FOR 1 YEAR. TEMPORARY SEEDING SPECIFICATIONS: SEEDING DATES SEED TYPE APPLICATION RATE PER 1,000 S.F. MARCH 1 AUGUST 15 OATS PERENNIAL RYE GRASS OR TALL FESCUE AFTER NOVEMBER 1 STRAW OR HAY MULCH SEED BED PREPARATION LIME 10 -10 -10 OR 12 -12 -12 FERTILIZER 1# AUGUST 16 NOVEMBER 1 RYE, WHEAT OR PERENNIAL RYE GRASS 3# TALL FESCUE 1# 3# 2 -3 BALES 100# 12 -15 SILT BARRIERS SHALL BE INSTALLED AROUND ALL EXISTING OR NEW STORM INLETS, CATCH BASINS, YARD DRAINS. INSTALL ROCK CHECK DAMS FOR HEADWALL INLETS FOR STORM WATER POLLUTION PREVENTION. STORM WATER POLLUTION PREVENTION MEASURES SHALL BE INSTALLED OR TOPSOIL STOCKPILES AND OTHER TEMPORARILY DISTURBED AREAS AS SHOWN ON THESE PLANS AND AS DIRECTED BY THE ENGINEER. 7. TEMPORARY SEDIMENTATION AND STORM WATER POLLUTION PREVENTION MEASURES MUST BE INSPECTED AND LOGGED BY THE CONTRACTOR FOR INSPECTION, LOGGING SHALL BE WEEKLY AND AFTER RAIN STORMS. UTILITY COMPANIES MUST COMPLY WITH ALL STORM WATER POLLUTION PREVENTION MEASURES AS DEFINED ON THE STORM WATER POLLUTION PREVENTION PLANS, DETAILS AND NOTES. THE TOTAL AREA OF DISTURBANCE FOR THIS PROJECT IS 0.71 ACRES. ALL EXISTING WATER COURSES WITHIN THE PROJECT LIMITS SHALL BE TEMPORARILY PROTECTED DURING LAND CLEARING AND GRADING OPERATIONS. SOILS WITHIN 50 FEET OF SAID WATER COURSES SHALL BE STABILIZED WITHIN 2 DAYS OF THE INITIAL CLEARING GRADING OPERATION AS SHOWN ON PLANS. 11. `ALL DISTURBED AREAS SHALL BE STABILIZED WITHIN 7 DAYS OF FINAL GRADING. 12. T tS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN ALL SEDIMENTATION AND STORM WATER POLLUTION PREVENTION ITEMS AT ALL TIMES. 13. ALL STORM WATER POLLUTION PREVENTION PRACTICES WILL BE INSTALLED BEFORE ANY OTHER EARTHMOVING OCCURS. 14. THE FOLLOWING STORM WATER POLLUTION PREVENTION AND SEDIMENT CONTROL MEASURES WILL BE USED ON THIS SITE: 1.SILT BARRIERS 2SILT FENCE LESS THAN 5% SLOPE ATTACH GEOTEXTILE OVER WIRE MESH BACKING TO 2x4 WOOD FRAME, OVERLAPPING FABRIC TO NEXT STAKE 18" MAX. DRAIN GRATE 1 36" 18" i r NOTES: 1. DROP INLET SEDIMENT BARRIERS ARE TO BE USED FOR SMALL, NEARLY LEVEL DRAINAGE AREAS. (LESS THAN 5%) 2. USE 2X4 WOOD OR EQUIVALENT METAL STAKES, (3 FT. MIN. LENGTH) 3. INSTALL 2X4 WOOD TOP FRAME TO INSURE STABILITY. 4. THE TOP OF THE FRAME (PONDING HEIGHT) MUST BE WELL BELOW THE GROUND ELEVATION DOWNSLOPE TO PREVENT RUNOFF FROM BY— PASSING THE INLET. A TEMPORARY DIKE MAY BE NECESSARY ON THE DOWNSLOPE SIDE OF THE STRUCTURE. w 000 PLAN VIEW DROP INLET w A �0 Dil SECTION A —A FABRIC PROPERTIES MIN. TENSILE STRENGTH MAX. ELONGATION 0 60 LBS. MIN. PUNCTURE STRENGTH MIN. TEAR STRENGTH MIN. BURST STRENGTH APPARENT OPENING SIZE MIN. PERMITTIVITY ULTRAVIOLET EXPOSURE STRENGTH RETENTION SILT BARRIER NOT TO SCALE 1. SET THE STAKES. 707. TOP FRAME NECESSARY FOR STABIUTY PONDING HT. 2x4 WOOD FRAME 4 SIDES OF D.I. it/ 120 LBS. 50% 50 LBS. 40 LBS. 200 PSI =0.84 mm 1x10( -2) SEC -1) 4 5. WIRE MESH SHALL BE OF SUFFICIENT STRENGTH TO SUPPORT FABRIC WITH WATER FULLY IMPOUNDED AGAINST IT. IT SHALL BE STRETCHED TIGHTLY AROUND THE FRAME AND FASTENED SECURELY TO THE FRAME. 6. GEOTEXTILE SHALL HAVE AN EQUIVALENT OPENING SIZE OF 20 -40 SIEVE AND BE RESISTANT TO SUNLIGHT. IT SHALL BE STRETCHED TIGHTLY AROUND THE FRAME AND FASTENED SECURELY. IT SHALL EXTEND FROM THE TOP OF THE FRAME TO 18 IN. BELOW THE INLET NOTCH ELEVATION. THE GEOTEXTILE SHALL OVERLAP ACROSS ONE SIDE OF THE INLET SO THE ENDS OF THE CLOTH ARE NOT FASTENED TO THE SAME POST. 2. EXCAVATE '00)0" 1RENCA °P5LCIPE ALONG THE LINE OF STAKES. 1 1 _go •G s NOT TO SCALE 3. STA'B'LE FILTER MATERIAL. TO STAKES J AND EXTEND IT INTO THE TRENCH. CONSTFUCTi.ONJFA FILTER BARRIER 13ACKFI11 AND COMPACT TH EXCAVATION SOIL sus PI .01 DAL F F. as e. CL r oc v J ur 0. J C.) 0 is r. in CS Pt ro 0 0 0 0 in 5 tfl 0 w ro _X e- t GI ti v N di KFC./ LJS ts ro ro 0 C 0 0 G KL6O-y04 CON 1 13AC I DA I E XX XX XX 131,111 DING TYPE KI fiO y04 PI AN VI ASTON .Iar304 -1- sill I NUMf Bf ft 12-XXXX S l OElf Nt.1MI3f 11 2(X)4087.05 1331 S. f i/1NGFI INF 110AI C;/1NMF1 IN 46032 STORMWATER POLLUTION PREVENTION NOTES DETAILS 08 27,04 MPORARY DIKE IF NEEDED E 9 I fi l i j ii i ill 1 ,s— ij STORM WATER POLLUTION PREVENTION NOTES 1. ALL WORK SPECIFIED AS AN tNDOT ITEM SHALL BE GOVERNED BY THE CURRENT STATE OF INDIANA DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MATERIAL SPECIFICATION HANDBOOK. IT IS THE CONTRACTOR'S RESPONSIBIUTY TO POSSESS AND TO BE FAMILIAR WITH APPLICABLE SECTIONS. 2. THIS CONTRACT DRAWING SHALL BE MADE AVAILABLE ON SITE AT ALL TIMES AND PRESENTED UPON REQUEST. IF UNFORESEEN STORMWATER POLLUTION PREVENTION IS ENCOUNTERED, ADDITIONAL STORMWATER POLLUTION PREVENTION (SWPP) MEASURES MAY BE REQUESTED BY THE OWNER, COUNTY ENGINEER, PROJECT ENGINEER OR SOIL CONSERVATION SERVICE REPRESENTATIVE AT ANYTIME. SUCH REQUESTS SHALL BE IMPLEMENTED IMMEDIATELY AT CONTRACTOR'S EXPENSE. ALL STORM WATER POLLUTION PREVENTION ITEMS SHALL BE INSTALLED AS SHOWN OR NOTED ON THE SITE PLAN. 4. PLANT TEMPORARY SEEDING AND MULCHING IN ALL AREAS THAT SHALL BE INACTIVE FOR 15 DAYS OR MORE. ALL DISTURBED AND ERODED EARTH SHALL BE REGRADED AND SEEDED WITHIN 14 DAYS WITH SEEDING, AS DEFINED ABOVE AND AS SHOWN ON THE TABLE BELOW, TO ESTABLISH STABILITY AND PROVIDE SEDIMENT CONTROL. WHERE POSSIBLE, TEMPORARY SEEDING GROWTH SHALL NOT BE MOWED UNTIL IT HAS GONE TO SEED FOR 1 YEAR. TEMPORARY SEEDING SPECIFICATIONS: SEEDING DATES SEED TYPE APPLICATION RATE PER 1,000 S.F. MARCH 1 AUGUST 15 OATS PERENNIAL RYE GRASS OR TALL FESCUE AFTER NOVEMBER 1 STRAW OR HAY MULCH SEED BED PREPARATION LIME 10 -10 -10 OR 12 -12 -12 FERTILIZER 1# AUGUST 16 NOVEMBER 1 RYE, WHEAT OR PERENNIAL RYE GRASS 3# TALL FESCUE 1# 3# 2 -3 BALES 100# 12 -15 SILT BARRIERS SHALL BE INSTALLED AROUND ALL EXISTING OR NEW STORM INLETS, CATCH BASINS, YARD DRAINS. INSTALL ROCK CHECK DAMS FOR HEADWALL INLETS FOR STORM WATER POLLUTION PREVENTION. STORM WATER POLLUTION PREVENTION MEASURES SHALL BE INSTALLED OR TOPSOIL STOCKPILES AND OTHER TEMPORARILY DISTURBED AREAS AS SHOWN ON THESE PLANS AND AS DIRECTED BY THE ENGINEER. 7. TEMPORARY SEDIMENTATION AND STORM WATER POLLUTION PREVENTION MEASURES MUST BE INSPECTED AND LOGGED BY THE CONTRACTOR FOR INSPECTION, LOGGING SHALL BE WEEKLY AND AFTER RAIN STORMS. UTILITY COMPANIES MUST COMPLY WITH ALL STORM WATER POLLUTION PREVENTION MEASURES AS DEFINED ON THE STORM WATER POLLUTION PREVENTION PLANS, DETAILS AND NOTES. THE TOTAL AREA OF DISTURBANCE FOR THIS PROJECT IS 0.71 ACRES. ALL EXISTING WATER COURSES WITHIN THE PROJECT LIMITS SHALL BE TEMPORARILY PROTECTED DURING LAND CLEARING AND GRADING OPERATIONS. SOILS WITHIN 50 FEET OF SAID WATER COURSES SHALL BE STABILIZED WITHIN 2 DAYS OF THE INITIAL CLEARING GRADING OPERATION AS SHOWN ON PLANS. 11. `ALL DISTURBED AREAS SHALL BE STABILIZED WITHIN 7 DAYS OF FINAL GRADING. 12. T tS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN ALL SEDIMENTATION AND STORM WATER POLLUTION PREVENTION ITEMS AT ALL TIMES. 13. ALL STORM WATER POLLUTION PREVENTION PRACTICES WILL BE INSTALLED BEFORE ANY OTHER EARTHMOVING OCCURS. 14. THE FOLLOWING STORM WATER POLLUTION PREVENTION AND SEDIMENT CONTROL MEASURES WILL BE USED ON THIS SITE: 1.SILT BARRIERS 2SILT FENCE LESS THAN 5% SLOPE ATTACH GEOTEXTILE OVER WIRE MESH BACKING TO 2x4 WOOD FRAME, OVERLAPPING FABRIC TO NEXT STAKE 18" MAX. DRAIN GRATE 1 36" 18" i r NOTES: 1. DROP INLET SEDIMENT BARRIERS ARE TO BE USED FOR SMALL, NEARLY LEVEL DRAINAGE AREAS. (LESS THAN 5%) 2. USE 2X4 WOOD OR EQUIVALENT METAL STAKES, (3 FT. MIN. LENGTH) 3. INSTALL 2X4 WOOD TOP FRAME TO INSURE STABILITY. 4. THE TOP OF THE FRAME (PONDING HEIGHT) MUST BE WELL BELOW THE GROUND ELEVATION DOWNSLOPE TO PREVENT RUNOFF FROM BY— PASSING THE INLET. A TEMPORARY DIKE MAY BE NECESSARY ON THE DOWNSLOPE SIDE OF THE STRUCTURE. w 000 PLAN VIEW DROP INLET w A �0 Dil SECTION A —A FABRIC PROPERTIES MIN. TENSILE STRENGTH MAX. ELONGATION 0 60 LBS. MIN. PUNCTURE STRENGTH MIN. TEAR STRENGTH MIN. BURST STRENGTH APPARENT OPENING SIZE MIN. PERMITTIVITY ULTRAVIOLET EXPOSURE STRENGTH RETENTION SILT BARRIER NOT TO SCALE 1. SET THE STAKES. 707. TOP FRAME NECESSARY FOR STABIUTY PONDING HT. 2x4 WOOD FRAME 4 SIDES OF D.I. it/ 120 LBS. 50% 50 LBS. 40 LBS. 200 PSI =0.84 mm 1x10( -2) SEC -1) 4 5. WIRE MESH SHALL BE OF SUFFICIENT STRENGTH TO SUPPORT FABRIC WITH WATER FULLY IMPOUNDED AGAINST IT. IT SHALL BE STRETCHED TIGHTLY AROUND THE FRAME AND FASTENED SECURELY TO THE FRAME. 6. GEOTEXTILE SHALL HAVE AN EQUIVALENT OPENING SIZE OF 20 -40 SIEVE AND BE RESISTANT TO SUNLIGHT. IT SHALL BE STRETCHED TIGHTLY AROUND THE FRAME AND FASTENED SECURELY. IT SHALL EXTEND FROM THE TOP OF THE FRAME TO 18 IN. BELOW THE INLET NOTCH ELEVATION. THE GEOTEXTILE SHALL OVERLAP ACROSS ONE SIDE OF THE INLET SO THE ENDS OF THE CLOTH ARE NOT FASTENED TO THE SAME POST. 2. EXCAVATE '00)0" 1RENCA °P5LCIPE ALONG THE LINE OF STAKES. 1 1 _go •G s NOT TO SCALE 3. STA'B'LE FILTER MATERIAL. TO STAKES J AND EXTEND IT INTO THE TRENCH. CONSTFUCTi.ONJFA FILTER BARRIER 13ACKFI11 AND COMPACT TH EXCAVATION SOIL sus PI .01 DAL F F. as e. CL r oc v J ur 0. J C.) 0 is r. in CS Pt ro 0 0 0 0 in 5 tfl 0 w ro _X e- t GI ti v N di KFC./ LJS ts ro ro 0 C 0 0 G KL6O-y04 CON 1 13AC I DA I E XX XX XX 131,111 DING TYPE KI fiO y04 PI AN VI ASTON .Iar304 -1- sill I NUMf Bf ft 12-XXXX S l OElf Nt.1MI3f 11 2(X)4087.05 1331 S. f i/1NGFI INF 110AI C;/1NMF1 IN 46032 STORMWATER POLLUTION PREVENTION NOTES DETAILS 08 27,04 MPORARY DIKE IF NEEDED