Loading...
HomeMy WebLinkAboutMinutes Sub 08-03-99CARMEL /CLAY PLAN COMMISSION SUBDIVISION COMMITTEE AUGUST 3, 1999 The regularly scheduled meeting of the Subdivision Committee met at approximately 7:00 PM on August 3 1999, in the Caucus Rooms of City Hall, One Civic Square, Carmel, Indiana. Members present were: Marilyn Anderson; Ron Houck; Norma Meighen; Chris White; and Tom Yedlick. Steve Engelking, Director, Terry Jones and Michael Holligbaugh were present representing the Department of Community Services. Chris White moved to re -order the Agenda to allow Docket No. 44 -99 for SCM Development, Brookstone Park of Carmel Subdivision, to be heard as the last item. APPROVED 5 -0. Item 2. Committee to consider Docket No. 64 -99 SP., a secondary plat application for Estridge Development Company. The petitioner seeks approval to plat 16 lots on 16.08 acres known as High Grove Section 1. The site is located on the east side of Hoover Road between 116 Street and 126 Streets. The site is zoned S -1 /Residence. Filed by Gina Tirinnanzi of Estridge Development Company. Steve VanSoelen, vice president of Estridge Development Companies, appeared before the Committee together with Gina Tirinnanzi and Dave Sexton of the Schneider Corporation. Gina Tirinnanzi gave a brief overview of the High Grove Subdivision, phase I. There are 16.08 acres in section I; total acreage is 25.8 for a density of 1.24 lots per acre. There is a pump station on site. The petitioner has responded to comments from the Technical Advisory Committee members. Steve Engelking stated that the secondary plat is essentially the same as the primary plat, and there are no outstanding issues. Gina Tirinnanzi stated that the Pipeline Company is requesting that the walking path be a woodchip path over the pipeline; beyond that, the path can be asphalt. Steve VanSoelen stated that Estridge will pursue the asphalt path due to the fact that woodchips are difficult to maintain. The path will ultimately tie -in to the neighboring properties when they are developed. The path runs along the back of lots, along the Creek towards the south property line, connecting on Hoover to the walking path from Brenwick's Village of WestClay. S:\PlanCommission\SubdivCommittee\1999aug There was much discussion regarding the cul -de -sac that goes into the stub street. Homeowners purchasing on a cul -de -sac assume that the street will remain a cul -de -sac and not be an open street connecting subdivisions. Ron Houck was very adamant that homeowners would never think to ask the question whether or not a cul -de -sac would be opened and connected to an adjacent development. From a marketing and aesthetic standpoint, Mr. Houck understood Estridge's position of designing the stub street as a cul- de -sac; however, the practicality issue is that when the adjacent property is developed and the cul -de -sac becomes a stub street, it will not fare well with the homeowners. There was further discussion and concerns expressed regarding the appearance of the stub street as a cul -de -sac; the merits of designing it as such; and the possibility of creating problems for future homeowners. The petitioner was willing to market the cul -de -sac as having a potential access to the adjoining property or undeveloped property via a stub street so that people are aware that it may eventually become a connecting street. Ron Houck felt that the issue was not one of design, but rather if it becomes a stub street, people have been living on a cul -de -sac and that dramatically alters their immediate neighborhood. Mr. VanSoelen stated that this issue had been discussed at length at the time the Primary Plat was approved. Those concerns have been taken into consideration and the plat accurately reflects what is in being. The existing right -of -way reflects a stub street, not a cul -de -sac. There was also discussion regarding the sidewalks. The sidewalk will stop where it meets the path. The petitioner agreed to reconfigure the sidewalks so that they would start at the edge of the right -of -way so that it is clear that the road is a possibility. Norma Meighen moved for the approval of Docket No. 64 -99 SP., conditioned upon the following: The petitioner agrees that marketing materials to prospective purchasers of those lots on the cul -de -sac will state that a stub street will occur upon development of the adjacent property; this will also be noted on the recorded plat; Further conditioned upon reconfiguring the sidewalk to the edge of the right -of -way so that it is clearly shows the road as a possibility. APPROVED 5 -0. Item 3. Committee to consider Docket No. 65 -99 SP., a secondary plat application for The Schneider Corporation. The petitioner seeks approval to plat 3 lots on 4.301 acres known as The Parks at Springmill Section 9. The site is located at the northeast corner of Meridian Corners Boulevard and 131 Street. The site is zoned S- 1 /Residence. Filed by Dave Sexton of The Schneider Corporation. Dave Sexton of The Schneider Corporation appeared before the Committee on behalf of the applicant. Jackson Lau of Lau Architects was also in attendance. Mr. Lau has done the architectural design and site planning for the Bethlehem Lutheran Church and Schneider Corporation is handling the Secondary Plat. S:\ P1anCommission \SubdivCommittee \1999aug 2 This particular section of the Parks of Spring Mill was approved as one lot. The site is being split into three lots for economic reasons. The sewer fees on a per acreage basis are not economically feasible for the petitioner and by splitting into three lots, the fees will be paid on an incremental basis. The Fellowship Hall /sanctuary will be located on lot one, phase I. Phases II and III are located on lots 2 and 3 and will contain the education wing and gymnasium; these will be free standing buildings -not connected. Dave Sexton stated that an option at some future date would be connecting the buildings and re- platting into one lot. Steve Engelking stated that the Department has no issue with the petitioner's request. Mike Hollibaugh commented that curb cuts will need to be approved by the Board of Public Works. The City Engineer is aware of the initial plan. Chris White stated that currently, the Subdivision Regulation provides that a dwelling unit cannot be built on the property line because of the side yard setbacks. This should be amended to state that if a building is built on two lots, owned by the same person, building on the property line would be permitted. Ron Houck moved for the approval of Docket No. 65 -99 S.P., a secondary plat application for The Schneider Corporation. APPROVED 5 -0. Item 4. Committee to consider Docket No. 66 -99 SP., a secondary plat application for The Schneider Corporation. The petitioner seeks approval to plat 28 lots on 10.014 acres known as Plum Creek Farms, Section 4. The site is located near the northeast corner of Hazeldell Parkway and 126 Street. The site is zoned S -1 /Residence. Filed by J. Cort Crosby of the Schneider Corporation. Cort Crosby of Schneider Corporation and Chris Werth with Thompson Land Company appeared before the Committee representing the applicant. Section 4 of Plum Creek Farms consists of 28 lots on 10 acres. The petitioner reported that all TAC comments have been addressed. The Department reported that the Secondary Plat conforms to the Primary Plat in all respects. Ron Houck moved for the approval of Docket No. 65 -99 SP, Plum Creek Farms, Section 4. APPROVED 5 -0. Item 1. Committee to consider Docket No. 44 -94 P.P., a primary plat application for SCM Development. The petitioner seeks approval to plat 107 lots on 49 acres known as Brookstone Park of Carmel Subdivision. The site is located on the southeast corner of Ditch Road and 146 Street. The site is zoned S -1 /Residence. Filed by Bruce Fagan of SCM Development. S:\PlanComniission\SubdivCommittee\1999aug Jim Nelson appeared before the Committee representing SCM Development. Also present were Mike Kline and Bruce Fagan. The Primary Plat has been revised and reflects comments of the Committee; however, it is the petitioner's belief that there are individual differences regarding the open space- where it is located and how large it should be. The plan has been revised to address the concerns of the committee. The small pockets of open space have been reconfigured; the circular nature of the street system has been addressed; the east /west connection in regard to pedestrians has been expanded, making the walking trail and common areas more accessible; and the lakes have been re- located. There was also a suggestion from the Committee that the entry be moved southward along Ditch Road. Mike Kline reported that the entry had been moved approximately 250 feet to the south to provide for a more central location within the community and also provide for full view of the water feature. Open space has also been added that extends from Ditch Road east through the largest contiguous area of open space containing the primary conservation area (wetlands and woodlands.) The petitioner has added as much curvi- linear aspects to the roadway as possible. Basically, there is a single loaded street; there are no homes that front the thoroughfare; the homes on the east side of the street will be loaded from cul -de- sacs. Mr. Kline distributed computer generated images of the product. Ron Houck commented that the revised plan is a better use of the open space, and gives better availability to the platting of the lots than the previous plan. Mr. Houck also agreed with the location of the water feature. Norma Meighen moved for the approval of Docket No. 44 -99 PP., Brookstone Park of Carmel Subdivision. APPROVED 5 -0. There being no further business to come before the Committee, the meeting was adjourned at 8:20 PM. Tom Yedlick, Chairman Ramona Hancock, Secretary S:\ P1anCommission \SubdivCommittee \1999aug 4