Loading...
HomeMy WebLinkAboutFull Color Elevationsfi 144 -0° ROOF EDGE 130 -0' THIRD FLOOR 116 -0' SECOND FLOOR ilk 100' MI GROUND FLOOR 144 -0" ROOF EDGE 130' -0" THIRD FLOOR 116 -0" SECOND FLOOR 100' -0" mi GROUND FLOOR DIRECTORY SIGNAGE J Marar PAINTED BRICK VENEER 111 III SOUTHWEST ELEVATION ii ii ii fi f i 1 p -4 NI i II ii i1 ON NW MN 11 u- PAINTED BRICK VENEER ENTRANCE CANOPY 11 C: ARCH. ROOF EMBELLISHMENTS ARCH. ROOF EMBELLISHMENTS BRICK VENEER DECORATIVE WINDOW SURROUND DECORATIVE STOREFRONTS WITH SIGNAGE PER ORDINANCE 144 -0" gi ROOF EDGE 130 -0" THIRD FLOOR 116' -0" 14i SECOND FLOOR a 100 GROUND FLOOR 144 -0 ROOF EDGE 130' -0" THIRD FLOOR 116 -0" SECOND FLOOR juk 100'-0" GROUND FLOOR BRICK VENEER BRICK VENEER LIN PRE FINISHED CAP SOUTHEAST ELEVATION NORTHEAST ELEVATION 0 -r- AMP S a PRE FINISHED CAP PAINTED WOOD WINDOWS ARCH. ROOF EMBELLISHMENT ACTUAL COLOR MAY VARY DUE TO PRINTING TECHNOLOGY ARCH. ROOF EMBELLISHMENT PAINTED BRICK VENEER STONE SILL PAINTED BRICK VENEER PAINTED WOOD WINDOWS STONE SILL SCANNED RENWICK BUILDING CARMEL, INDIANA Prepared by Ratio Architects, Inc. August 6, 1999 RATIO Copyright 1999 Ratio Architects, Inc.