Loading...
186693 06/21/2010 A CITY OF CARMEL, INDIANA VENDOR: 363784 Page 1 of 1 ONE CIVIC SQUARE POYNTER SHEET METAL CHECK AMOUNT: $76,007.00 CARMEL, INDIANA 46032 PO BOX 427 ro BLOOMINGTON IN 47402 -0427 CHECK NUMBER: 186693 CHECK DATE: 6/2112010 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 902 4460607 21 76,007.00 PERFORMING ARTS CENTE APPLICATION AND CERTIFICATE FOR PAYMENT CONSTRUCTION MANAGER- ADVISER EDITION A N DOCUMENT G7021CMa ��c�\ PAGE ONE OF 3 PAGES TO OWNER: \PROJECT: Farce! 7A Regional Performing APPLICATION NO: 21 B Distribution to: Carmel Redevelopment Comml�ii"oh �O Arts Center OWNER One Civic Square PERIOD TO: 4/30/10 CONSTRUCTION Carmel, IN 46032` 1 PROJECT NO: 2695 -4310 MANAGER FROM CONTRACTOR: VIA CONSTRUCTION MANAGER: Shiel Sexton Co., Inc. (PSM #14065) OARCHITECT F'OYNTEFt SHEET ,l c STN: Ltt�da 1� %eaver, 902 N. Capitol l Avenue. Indianapolis, IN 46204 CONTRACT DATE: 04/18/08 CONTRACTOR 8768 N. STATE: RD. 3 /VIA ARCHITECT: B1.,C)01fIN(i "1 4'404 CONTRACT FOR: Bid Package #4310 'H'VAC Sheet Metal CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge, Application is made for payment, as shown below, in connection with the Contract. information and beliefthe Work covered by this Application for Payment has been Continuation Sheet, AIA Document G703, is attached. completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. 1. ORIGINAL CONTRACT SUM 2,340,500.00 2. Net change by Change Orders CONTRACTOR: 3. CONTRACT SUM TO DATE (Line 1 2) 4. TOTAL COMPLETED STORED TO DATE 2 1 73,5 09.00 (Column G on G703) By: Date: O 5. RETAINAGE: 5% of Contract Total Joseph R, ansde resi nt a. 5 of r' ^m�„ 1 12,663.00 State of: IN ANA County c MONROE o umn D E on G703) Subscribed and re me hi �rp day of a p/Q b. of Stored Material S 0.00 Notary Public: o umn F on G703) My Commission plres: ugust ?9, I4 Total Retainaae (Lines 5a 5b or Total in Column I of G703) S 112,663.00 IL A NT 6. TOTAL EARNED LESS RETAINAGE 2,060,846.00 to accordance with the Contract Documents, based on on -site observations and the data (Line 4 less Inc 5'I otai) comprising this application, the Construction Manager and Architect certity to the 7. LESS PREVIOUS CERTIFICATES FOR Owner that to the best oftheir knowledge, information and beliefthe Work has PAYMENT (Line 6 trom prior Certificate) 1 progressed as indicated, the quality of the Work is in accordance with the Contract S. CURRENT PAYMENT DUE 76.007.iTF Documents, and the Contractor is entitled to payment ofthe AMOUNT CERTIFIED. 9. BALANCE TO FINISH, INCLUDING RETAINAGE S 192,415.00 r 00 (Line 3 less Line 6) AMOUNT CERTIFIED �4 07 (Attach explanation if amount certified differs fi om the amount applied for. Initial all Total changes approved figures on this Application and on the Continuation Sheet that changed to con form to the in previous months by Owner $57,761.00 $175,000.00 amouru ce!`tifiecl.f CONS C'f]" N" NAGER: Total approved this Month $30,000.00 50.00 Bv: Date: L �e c7i L` ARCHI TOTALS $87,761.00 $175,000.00 By: Dare: Z� NET CHANGES by Change Order ($87,239.00) This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. a a- THE AMERICAN INSTITUTE OF ARCHITECTS, 1745 NEW YORK AVE., N.W., WASHINGTON, DC 20006 -5292 Users may obtain validation of this document by requesting of the license a completed AIA Document D401 Certification of Document's Authenticity CO NTINUATION SHEET AIA DOCUMENTG703 2 PAGE Of PAGES 3 AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 21B Contractor's signed certification is attached. APPLICATION DATE: 4/15,12010 In tabulations below, amounts are stated to the nearest dollar. PSM J0119: 14065 PERIOD T0: 4/30/20 Use Column I on Contracts where variable retainage for line items may apply. NAME Carmel PAC CONTRACT NO: 2691 1 -4310 A B C D E F G H I LINE DESCRIPTION OF WORK SCHEDULED WORT: COMPLETFD MATERIALS TOTAL o BALANCE RETATNAGF NO, VALUE FROM PREVIOUS THIS PERIOD PRESENTLY COMPLETED (G =C) TO FiNTSH (IF VARIABLE APPLICATION STORED AND STORED (C G} R.A7 L) (D E) (NOT IN TO DATE D OR E) (D +E +F) 5% 1 GENERAL CONDITIONS 200,000.00 $192,000 $8,000 $G $200.000 100% $10,000 2 BOND INSURANCE 45,000.00 $46,000 $0 $0 $45,000 100% $2,250 3 MOBILIZATION 15,000.00 $15,000 $0 $0 $15,000 100% $750 4 ALLOWANCE NO 11 BP 4310 651.00 $0 $0 $0 $0 0% 5651 $G 5 ALLOWANCE NO 16 CAD AS- BUILTS 10,000.00 $0 $0 $0 $0 0% 510,000 $0 6 DRAWINGSICOORDI NATION 80,000.00 580,000 $0 $0 580,000 100% $4,000 7 MECH BASEMENT LEVEL 8 MATERIAL 48,000.00 $48,000 $0 $0 $48,000 100% $2.400 9 LABOR 50,700.00 $50,193 $(1 $0 $50,193 99% $507 $2.510 10 LAGGING 7.000.00 $7,000 $0 $0 $7.000 100% $350 11 BACKHOUSE 12 MATERIAL 56,000.00 $56,000 $0 $0 $56,000 100 $2,800 13 LABOR 59,000.00 $59,000 $0 $0 $59,000 100% 52,950 14 KITCHEN HOOD DUCT 15 MATERIAL 15,400.00 $t5,400 $0 $0 515,400 100% 5770 16 LABOR 10,800.00 5[0,260 $0 $0 510,260 95% $540 $513 17 INSULATION 10,100.00 $8,080 $0 $0 $8,080 80% $2,020 $404 18 MECH RM 1 19 MATERIAL 50,400.00 550.400 $0 $0 $50,400 100% $2,520 20 LABOR 56,300.00 556,300 $0 $0 $56,300 100% 52.815 21 INSULATION 16,800.00 516,800 $0 $0 $16.800 100% $840 22 MECH RM 2 23 MATERIAL 77,000.00 $77,000 $0 $0 $77,000 100% $3,850 24 LABOR 93,900.00 $93 $0 $0 $93.900 100% $4,695 25 INSULATION 16,800.00 $0 $3,360 $0 $3,360 20% $13440 $168 26 MECH RM 3 27 MATERIAL 84,900.00 $84,900 $0 $0 $84,900 100% $4,245 28 LABOR 94,500.00 $94,500 $0 $0 $94.500 100% $4,725 29 INSULATION 16,80000 $16,1'_0 $L680 $0 $E6,800 100% $840 30 PLENUM LEVEL 31 MATERIAL 49,100.00 $49,100 $0 $G S-49 100% $2,455 32 LABOR 75,000.00 $75,000 $0 $0 $`75,000 100% $3,750 33 LAGGING 13,000.00 $13,000 $0 $0 $13,000 100% $650 34 ORCHESTRA HIGH LEVEL 35 MATERIAL 34,600.00 $34,600 $o $0 $34,600 100% $1,730 36 LABOR 35,400.00 $31.8(10 $1770 $0 $33,630 95% $1,770 $1,682 37 ORCHESTRA LOW LEVEL 38 MATERIAL 49,400.00 $49400 $0 $0 $49,400 100% S2,470 1 391 LABOR 1 62,600,001 $56,340 1 $3,130 1 $0 1 9,470 1 95%1 $3,130 1 $2,974 1 11 r� /1r C� 1, 7� 7 7 CONTINUATION SHEET A JA DO UME I G703 PAGE OF PAGES 3 AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 218 Contractor's signed certification is attached. APPLICATION DATE: 4, S /2Czi7 In tabulations below, amounts are stated to the nearest dollar. PSM JOB#: 14065 PERIOD TO: 4/30 Use Column I on Contracts where variable retainage for line items may apply. NAME Carmel PAC CON IRACTNO: 2695 -4310 A B C D E F G H I LINE DESCRIPTION OF WORK SCHEDULED WORK COMPLETED MATERIALS TOTAL- BALANCE RETAINAGE NO. VALUE FROM PREVIOUS THIS PERIOD PRESENTLY COMPLETED (G C) TO FINISH (IF VARIABLE APPLICATION STORED AND STORED (C G) RACE) (D E) (NOT IN TO DATE D OR E) (D =E +F) 5% 40 BOX TIER LEVEL 41 MATERIAL 70,000.00 $70,000 $0 $0 $70,000 100% $3,500 42 LABOR 100,300.00 $93,285 $0 $o $95,285 95% $5,015 $4,764 43 LOW BALCONY LEVEL 41 MATERIAL 94,100.00 $94,100 $0 $0 $94,100 100% $4,705 45 LABOR 85,300.00 $81,035 $0 $0 $81,035 95% $4,265 $4.052 46 HIGH BALCONY LEVEL 47 MATERIAL 38,400.00 $38,400 $0 $0 $38,400 100% 1,920 48 LABOR 50,200.00 $33,140 $12,550 $0 $47,690 95% $2,510 $2,385 49 ATTIC LEVEL +50 50 MATERIAL 41,600.00 $41,600 $0 $0 $41,600 100% $2,080 51 LABOR 44,700.00 $40,230 $2,235 $0 $42,465 95% $L35 $2,123 52 ATTIC LEVEL +61 53 MATERIAL 16,800.00 $16,800 $0 $0 $16,800 100% $840 54 LABOR 16,300.00 $13,040 $815 $0 $13,855 85% $2.445 $693 55 ATTIC LEVEL +66 56 MATERIAL 39,500.00 $27,650 $11,850 $0 °9,500 100% $1.975 57 LABOR 37,900.00 $18.950 $7,580 $0 $26,530 70% $11,370 $1.327 58 ATTIC LEVEL +79 6 59 MATERIAL 6,700.00 $6,700 $0 $0 $6,700 100% 5335 60 LABOR 5,200.00 $5,142 $0 $0 $5,142 99% $58 $257 4 -A ALLOWANCE NO. 11 BP 4310(ASI -031) 7,322.00 $7,322 $0 $0 $7,322 100% $366 4 -13 ALLOWANCE NO 11 BP 431OA -002 10,000.00 $6,600 $918 $0 ;17,518 75% $2,482 $376 4 -C ALLOWANCE NO 11 BP 431OB -002 4,798.00 $4,798 $0 $0 5;4,798 100% $240 4 -1) ALLOWANCE NO 11 BP 431OB -003 1,534,00 $1.534 $0 $0 $1,534 100% $77 4 -E ALLOWANCE NO 11 BP 431OB -004 27,142.00 $27,142 $0 $0 $27,142 100% $1,357 4 -F ALLOWANCE NO 11 BP 431OB -005 9,625.00 $9,625 $0 $0 $9,625 100% $0 4 -G ALLOWANCE NO 11 BP 43108 -006 175,000.00 $175.000 $0 $0 $Ii5,000 100% $0 4 -H ALLOWANCE NO 11 BP 431OB -007 546.00 $546 $0 $6 $546 100% $0 4 -1 ALLOWANCE NO 11 BP 43106 -008 10,933.00 $0 $10933 $0 $10,933 100% $0 4 ALLOWANCE NO 11 BP 431OB -009 12,449.00 $12.449 $0 $0 $12,449 100% 900 PENDING CHANGE ORDERS 901 CHANGE ORDER #1 38,542.00 $38 $0 $0 $38,542 100% $1.927 902 CHANGE ORDER #2 (RCP -10) 19,219.00 $19.219 $0 $0 $19,219 100% $961 903 CHANGE ORDER #3 BP431OB -005 175,000.00 ($175.000) $0 $0 6175,005)) 100% ($8,750) 904 905 CHANGE ORDER #5 $30,000 $0 $12,686 $0 $12,686 42% $17,314 $634 $2,253,261 -096,002 77,507 0 2,173,509 96% 79.75 1 112.663 4 SHEET ft METAL POYNTER SHEET METAL, INC. CONTRACTOR "S AFFIDAVIT AND WAIVER OF LIEN PARTIAL (X) FINAL We, the undersigned, having been employed by CARMEL REDEVELOPMENT COMMISSION furnish labor and materials to do construction work on the premises known as PARCEL 7A, CARMEL REGIONAL PERFORMING ARTS CENTER hereby warrant that the premises of the above named job cannot be made subject to any valid lien by anyone who furnished material, supplies, labor or services to the undersigned for use in the above named project for any labor, materials or supplies furnished or services performed through 04/30/10 to the extent that the undersigned has been paid as set forth herein. This waiver is given in order to induce payment in the amount of $76,007.00 and upon receipt of the amount due by the undersigned, this waiver as to the amount due becomes valid, enforceable and of full effect. Upon attachment of the canceled check and the legal description of the project, this waiver may be recorded by the Owner or mortgage holder(s) of the project. This Contractor's Affidavit and Waiver of Lien only applies to the extent paid, and does not apply to or cover retention, unresolved claims or unresolved changes, change orders or change requests. Given under our hand and seal this 16 day of APR[L, 2010 POYNTER EET METAL, INC. "4ac-cr Signatu►e oAns ori ed Representative Joseph IZ. PRESID ENT Title of Authorized Representative STATE OF: Indiana COUNTY OF: Monroe Subscribed and sworn to before me this 16""' day of APRIL, 2010 (Notary Public) Commission Expires: August 29, 2014 County of Residence: Morgan Prescribod by State Board of Accounts City Form No. 201 (Rev. 1995) ACCOUNTS PAYABLE VOUCHER CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. a� Payee f L �e f Poyhfer J je� rW L a Purchase Order No. 87 IY• �T��� lld 3 Terms bl ocMi, n jiQ h TA( 474/Oq Date Due Invoice Invoice Description Amount Date Number (or note attached invoice(s) or bill(s)) -30 —IO 2 21 -P10 r 76 007 00 Total 7 D (}a I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance with IC 5- 11- 10 -1.6. 20 Clerk- Treasurer V,OUCHER NO. WARRANT NO. l�Q�d I ALLOWED 20 shee IN SUM OF 87Y N. Sa Rd 37 RI omm+Dn S/V 7 76 047 DO ON ACCOUNT OF APPROPRIATION FOR Pay from TIF I �V 902,1 `f Board Members PO# or DEPT k INVOICE NO. ACCT #!TITLE AMOU l hereby certify that the attached invoice(s), or q0 2 e2-1 Lfq 6D ?07 74,(107. U bill(s) is (are) true and correct and that the Z,z. materials or services itemized thereon for which charge is made were ordered and received except i S f/— 20 /Q Signature Director of Redevelopment Title Cost distribution ledger classification if claim paid motor vehicle highway fund