HomeMy WebLinkAboutMinutes TAC 03-17-04CARMEL CLAY
TECHNICAL ADVISORY COMMITTEE
MINUTES
March 17, 2004
REPRESENTING THE CITY OF CARMEL:
Scott Brewer, DOCS Urban Forester
Steve Broermann, Hamilton Cnt� HN -\vv
An Butler, Dept. of Community Service
J ohn Dobosiewicz, D t. of Com. Service
Brook Ga ownick, Sheriff's Dept
Dean Groves, Ciner r
Dick Hill, City Engineerin
Greg Hoyes, Counter Surveyor's
Garr Hoyt, Carmel Fire Department
Chuck Shupperd, Vectren Energy
Attachments: Andv Kern
J ohn South, Hmltn Cnty Soil and Water
Attachments: Teresa Magee
Via e mail: Andy Kern, Clair Township Regional Waste District
Via e -mail: Teresa Magee, Panhandle Eastern Pipeline Company
Page 3. Docket No. 04030001 DP Amend /ADLS: Weston Park, Lot 3 National City Bank
Development Plan Amendment and ADLS
Page 4. Docket No. 04030003 TAC: Mayflower Park, Lot 3, Blk 3
(Aces Power Marketing)
Page 6. Replat of Mayflower Park, Lot 1, Block 1
Page 7. Docket #04020019 SU) Hamilton Crossing West, Bldg 1
Little Star School- Special Use
Page 8. #04020013 V) Crooked Stick Golf Course Clubhouse
Page 11. Docket Nos. 04020033 PP and 04020034 SP: Bennett Minor Subdivision
Page 12. Village of WestClay,
Sections: V02 -A, 1202 -A, 1202 -B, and 5001- Secondary Plats
Page 13. Docket No. 04030009 TAC: Hazel Dell Christian Church Building Addition
NfarTAC2004
1
Page 16. Heather Knoll, Section 1 (Secondary Plat and Construction Plans)
Page 18. Carmel Science Technology Park:
Congressional Flex Space (Development Plan)
Page 21. Carmel Hope Fellowship (Development Plan)
MarTAC2004
2
Docket No. 04030001 DP Amend /ADLS: Weston Park, Lot 3 National City Bank
Development Plan Amendment and ADLS
Filed by Kenneth Sebree, SEBREE ARCHITECTS INC
REPRESENTING THE PETITIONERS:
Ken Sebree, SEBREE ARCHITECTS INC
Mike Hoff
Comes now Weston Park, Lot 3, National City Bank. The applicant seeks approval for a bank building
with parking. The site is located southwest of 106th Street Michigan Road. The site is zoned I-
1 /Industrial and is located within the US 421 Overlay Zone. This is a KITE project. It is a one -story
building.
HOYES: I sent you a letter. You need to coordinate with Jennifer Roberts, Civil Design.
What is the reason behind failing to use the stub already provided?
HOFF: It was a twelve- inch (12') and we needed a fifteen (15). I talked with them since
and they are meeting that size and will lower it to tap in. J. Roberts is meeting with
us tomorrow to discuss the easement in question.
HOYES:
So you will send me revised prints?
HOFF:
Yes.
HILL:
This is out of our area.
GROVES:
This is IPL.
SHUPPERD:
We need you to call in a service request and fill out the customer data sheet for
load requirement to size the meter.
BREWER:
This site does not meet the Level A Buffer required. You also have buffering
requirements along US 421. I will send a letter out on that. You only show twelve
(12) Shade Trees, no Ornamentals. Level A Buffer requires twenty -nine (29)
Shade Trees, and nineteen (19) ornamentals.
DOBOSIEWICZ:
That is on the north and south?
BREWER:
You only show three species of Shade Trees and two are Maples. I want just one
Maple with four total Shade Trees with a couple ornamentals. On your graphic
drawing please show Root Flare planting at grade level. Call me to schedule an
appointment.
GAJOWNIK:
No comments.
HOYT:
Is this sprinkled?
HOFF:
No.
HOYT:
We are still going to request a Knox -box.
SEBREE:
Okay, we need to find a location. Can we discuss that?
HOYT:
Yes.
BROERMANN:
I am assuming KITE is building the streets and entrances.
SEBREE:
That's correct.
BROERMANN:
We are ready to go.
SOUTH:
I did not receive a set. Is the site over one acre?
HOFF:
One -point three (1.3).
SOUTH:
You will need to upgrade your Erosion Control Plan to meet the new Rule Five
requirements.
MarTAC2004
3
SOUTH: There are additional items required. If you are not familiar with them jump on our
Website at "hamilton.swcd.org
DOBOSIEWICZ: You will need your landscaping updated prior to Plan Commission packet
distribution. If it is not met, we will table the item until May. It appears your
engineer may not have the landscape requirements for the site. I would also
discourage them from using steel edging around the landscape beds. In addition,
the lighting and landscaping when approved, is part of the overall, has a consistent
theme along US 421 and you will want to coordinate that with the Developer. On
the access drive you need to show access to the opposite side it lines up with. We
want to see proposed too. For the ground sign we need an updated sign plan
showing the panel on the sign.
SEBREE: Are we okay to move forward?
DOBOSIEWICZ: To the Plan Commission.
HOFF: What is the meeting date?
DOBOSIEWICZ: April 20, 2004, provided you meet the deadlines for packets, notice and
submittals.
KERN: The District's consulting engineers have reviewed the plans. The District will send
them to IDEM for State permit. If these plans change as a result of the TAC
review, the District will need to review them again. Building permits should NOT
be issued unless the District has issued connection permits.
MAGEE: No conflicts.
...END...
Docket No. 04030003 TAC: Mayflower Park, Lot 3, Blk 3
(Aces Power Marketing)
Filed by Greg Snelling, WOOLPERT
REPRESENTING THE PETITIONERS
Jamie Browning, BROWNING INVESTMENTS
Greg Snelling, WOOLPERT
Kevin Foster
Comes now Mayflower Park, Lot 3, Block 3. The applicant seeks approval for an office building.
The site is located northeast of Mayflower Park Drive and West 99th Street. The site is zoned I-
1 /Industrial. The proposed plan is a 25,000 square feet office building located within Mayflower
Park.
HOYES: I sent a comment letter March 16, 2003. You need an outlet permit and
show an emergency overflow that retention pond.
HILL: This is out of our jurisdiction.
GROVES: We will need Auto cad.
BROWNING: This is IP L
GROVES: If you are sure than we will go with that.
MarTAC2004
4
BROWNING:
It is.
SHUPPERD:
We have gas out at the street. We need you to fill out that sheet for load
requirements to size the meter.
BREWER:
It appears you meet all the requirements. There is some question about tree
preservation and which ones are being saved and which ones are not. Make
sure they are physically marked.
GAJOWNIK:
No.
HOYT:
I sent a letter to G. Snelling. Is this sprinkled?
SNELLING:
Yes.
HOYT:
We need to set up a meeting. We did request post exterior valves and a
Knox -box with caps. The building should have a Fire Alarm Panel with a
remote location at the front entrance of the building and the main panel in
the riser room. Is this a single or multi- tenant building?
BROWNING:
Single, Stock and Bond trading floor with rows of desks and computers.
HOYT:
Single story?
BROWNING:
Yes, with elevations as a two -story type.
HOYT:
Basement?
BROWNING:
No.
DOBOSIEWICZ:
What is the clear story?
BROWNING:
Ten.
HOYT:
Does this fall in the Michigan Road Overlay?
BROWNING:
No.
BUTLER:
I sent a letter, no further.
BROERMANN:
This is a private street, no comments.
SOUTH:
I sent you a letter. Your plan does not conform to the new Rule 5.
SNELLING:
We are in a learning curve like everyone else on this Rule 5.
SOUTH:
I will pass you a copy of the new requirements. Erosion Control Plan needs
some modifications.
DOBOSIEWICZ:
Is it modifications to the plans or is it additional detailing on construction
process?
SOUTH:
The Pollution Prevention Plan is new with an area that describes how the
petitioner will prevent offsite pollution during the construction process like,
chemicals, fuels, and hazardous waste.
DOBOSIEWICZ:
I believe it would be advantageous to hold a seminar with the Surveyor's
Office and all the Engineering Firms to discuss and determine how this
should be addressed.
SOUTH:
Okay.
DOBOSIEWICZ:
This is a TAC only item. Provided they get they get the follow up letter
from S.Brewer on the landscaping. If it is an approved plan you are familiar
with the pre submittal process downstairs with Building Permits. You will
need an Outlet Permit from the County Surveyor, approval letter for
landscaping, G. Hoyt's issues resolved and once you file for that submittal,
Building Code will send out an E -mail to all these agencies and they
respond to Building Code if they have issues. Are there any lot splits?
MarTAC2004
5
BROWNING: It is recorded and ready.
DOBOSIEWICZ: Address those issues and you will be ready to pull permits.
MAGEE: No conflicts.
KERN: The petitioner will need to contact the District to discuss the proposed
sanitary sewer connection; District specifications apply in this area and will
need to be included on the plans. Other requirements may also apply at the
time the District issues its connection permit. Building permits should NOT
be issued unless the District has issued connection permits.
...END...
Replat of Mayflower Park, Lot 1, Block 1
Filed by Gary Murray, MID STATES ENGINEERING
REPRESENTING THE PETITIONERS:
Gary Murray, MID -STATE ENGINEERING
Comes now Replat of Mayflower Park, Lot 1- Block 1. The applicant seeks approval to subdivide
the above listed lot. The site is located west of Mayflower Park Drive on 99th Street. The site is
zoned I -1 /Industrial. We are looking to replat this lot into two lots in Mayflower Park. There is an
existing building on the western lot that has access through Block -1 via an ingress /egress
easement. We have added fifty feet frontage so they get access to a back building. After this is
approved we will come again with plans on Lot 1B -Block 1.
HOYES:
No objections.
HILL:
No objections.
GROVES:
This is IP L, no comments.
SHUPPERD:
No comments.
BREWER:
I need a set of Landscape Plans.
GAJOWNIK:
No comments.
HOYT:
I sent you a letter, no comments.
BUTLER:
You should have my letter there before you.
BROERMANN:
No comments
South
No comments.
DOBOSIEWICZ:
In addition to the Department's letter, the improvements today are they in
Lot -IA?
MURRAY: There is about a one hundred feet concrete pad and this Lot line is about
sixty feet with the (interrupted).
DOBOSIEWICZ: This is the old Mayflower Trucking?
MURRAY: Yes. There is a building here with a concrete pad that comes over to that
line... (interrupted).
DOBOSIEWICZ: So if they developed that Lot -1B it would be a shared parking?
MURRAY: Yes.
MarTAC2004
6
DOBOSIEWICZ: On page two of your Secondary Plat there are some modifications needed
to the signature block. It would not go to the Board of Public Works so
there is no chairman or secretary. The Signature block for M. Hollibaugh's
signature should read, "Granted Administrative Approval" You can check
out the language on the Mid States plats for West Carmel Center, Block -B,
Lots one and two.
MURRAY: Okay.
DOBOSIEWICZ: Address the comments in that letter.
MAGEE: No conflicts.
KERN: The District has no comments on the re -plat unless it affects the sanitary
sewers in development.
...END...
Docket #04020019 SU) Hamilton Crossing West, Bldg 1
Little Star School- Special Use
Filed by Blair Carmosino, DUKE REALTY
REPRESENTING THE PETITIONERS:
Blair Carmosino, DUKE REALTY
Brant Kercheval DUKE REALTY
Pete Anderson, DUK REALTY
Clay Gick, DUKE REALTY
Comes now Little Star School, Special Use. The site is located southwest of 131 st Street and US
31. The site is zoned B -5 /Business and is within the US 31 Overlay Zone. Hamilton Crossing
One is predominately office building. If you are familiar with Hamilton Crossing this is the
southern end of the park Meridian Corners. The "U" shaped subject building here (pointing to
plans) the tenant would occupy the portion fronting Hamilton Crossing Boulevard which is about
5000 square feet school for Autistic Children. It is a one -on -one. The school requires outdoors
activities. So we are going to improve an area playground 31' x 46'feet fenced. We will improve
the sidewalks to and from the space. We will remove and relocate the fence from Keystone
Crossing to new the location. We had an in house pick -up for the permit before the variance, so
we understand we are working at our own risk. The permit did not address external issues. What
permit so we need for the playground, if any?
DOBOSIEWICZ: You do not need one for the playground area, just the Special Use for the
property.
PETITIONER: There are no buses. They are delivered and picked up by their parents.
CARMOSINO DOCS had a question on parking. The inventory of the building as
submitted on the expansion the exact numbers is four per 1000, which
exceeds the code requirement.
HOYES: No comments.
MarTAC2004
HILL:
No comments.
SHUPPERD:
Do you have gas in the building?
CARMOSINO:
It is already serviced. It is all- electric.
GROVES:
No comments.
BREWER:
I need Landscape plans.
GAJOWNIK:
No comments.
HOYT:
No concerns. How many kids?
CARMOSINO:
Seven students with a one -to -one ration student /teacher. So fourteen
HOYT:
occupying max fifteen.
HOYT:
What are the ages?
CARMOSINO:
Two years old to older elementary.
PETITIONER:
It is an applied behavioral therapy program.
BUTLER:
I sent you a letter, no further.
BROERMANN:
No comment.
SOUTH:
No comment.
DOBOSIEWICZ: The only comment I would make for the purpose of the Board Meeting
..END...
404020013 V) Crooked Stick Golf Course Clubhouse
MarTAC2004
8
would be to get us a photo of the existing playground at Keystone at the
Crossing with a larger shot, stepping back 40/50 feet to show the rest of
the playground area with the parking. You may have issue with the public
on the existing lights in parking area. You should also tell the Board that
the maximum might be as high as twenty so you would not have to come
back through.
HOYT:
Is this regulated by the State?
CARMOSINO:
We are not sure.
HOYT:
Do they receive State money?
PETITIONER:
They do not.
HOYT:
That might generate an inspection from the State Fire Marshal's office. I
am not sure if it will need to have an alarm like a Pre School or Day -Care.
CARMOSINO:
We will investigate that.
HOYT:
You might have different requirements if you fall in that category.
CARMOSINO:
When is our next date?
DOBOSIEWICZ:
March 22, 2004.
MAGEE:
No conflicts.
KERN:
No plans have been submitted for District review. Please advise the
developer to submit three (3) sets of plans to the District and two (2) sets
to CTE Engineers for review and comment.
..END...
404020013 V) Crooked Stick Golf Course Clubhouse
MarTAC2004
8
Filed by David Warshauer, BARNES THORNBURG
REPRESENTING THE PETITIONERS:
John Peterson, RATIO ARCHITECTS
Bob Doster, SCHNEIDER ENGINEERING
Comes now Crooked Stick Golf Course Clubhouse. This item is docketed as a variance. The
Petitioner is requesting relief from the curbing requirement for the parking lot. However the TAC
submittal is from review of the Construction Plans for the new Clubhouse facility.
My name is Bob Doster with Schneider Engineering. Here with me today is John Peterson with
Ratio Architects. The site is located northwest of Ditch Road and West 116th Street. The site is
zoned P -1/ Parks and Recreation. We are going to tear down the existing Clubhouse and rebuild
on the same site. No changes to proposed parking. We talked with S. Brewer and he is ready to
sign off on the Landscaping. The other provisions are utility feeds to the existing building.
HOYES: I sent a comment letter Monday. This is private we have no issues.
HILL: It is out of our jurisdiction.
GROVES: This is IP L.
SHUPPERD: Prior to construction we retire that existing service and move it out of the
way of the construction limits. Then rerun to the new location. Is the
square feet bigger?
PETERSON: Thirteen different zones.
SHUPPERD:
You can contact J. Brigg and go over you requirements. You will want to
make sure that the increased load will carry or we can come off of Burning
Tree Lane off the back which is a shorter distance.
GAJOWNIK:
No comments.
HOYT:
The building is going to be protected by a Fire Suppression System. We
came to an agreement for water supply hookup on the west side. In the
back of the Clubhouse is Burning Tree Lane in yet?
DOSTER:
Yes, that existing.
HOYT:
I need to check out the width on that. We will do a site evaluation. We also
agreed to Knox -box and caps on the sprinkling system. We came to an
agreement on the location for the Enunciator Panel at the entrance.
DOSTER:
Between the main entrance and the Pro -shop.
HOYT:
Basement?
DOSTER:
No.
HOYT:
and the Golf Carts are electric?
DOSTER:
Yes.
BUTLER:
No comments.
BROERMANN:
No changes in the entrance, so no comments.
SOUTH:
I will get you a review letter. It appears you are attempting to meet the
new requirements. I would support the lack of curbs as far as storm water
and water quality issues.
MarTAC2004
9
DOBOSIEWICZ: For the purpose of the packets I think you should relate to the Board at the
...END...
MarTAC2004
10
meeting with photos of the existing perimeter of the parking lot, to give
them a transition today of what is not being affected. I would suggest some
type of treatment for perimeter parking lot limits for high truck traffic with
regard to the dumpster area drop off. Something to define this area, like
railroad ties to keep from rutting the lawn. You are asking the drivers to do
a lot in that small space so some type of material to create a transition
between pavement and natural surface. This is a TAC only item it will not
be back. After all the issues are addressed and the variance approved they
could move forward. Start a dialogue with Gayle Stahl with Building Code
Enforcement (317 -571- 2444).
I was out on the site last week and there is earth moving and equipment
and gravel being placed in this area north of Crooked Stick Lane adjacent
to the maintenance area. I need some explanation of what is happing on
that site.
DOSTER:
We will get the Golf Course on this should they contact you?
DOBOSIEWICZ:
Okay, that will delay responsiveness to your request. We need it addressed
immediately.
DOSTER:
Contact you?
DOBOSIEWICZ:
Yes, we need to know what this 150' x 300' feet gravel and mounding area
is.
DOSTER:
I know they were talking about a temporary facility for the Clubhouse
using doublewides.
DOBOSIEWICZ:
That would be part of this process and they are neglecting to look at it
through this petition. That is an error. I hope to have it resolved before the
BZA meets. I want to keep them on schedule and we need to know what is
going on. There is a lot of dirt being moved around without erosion
control.
SOUTH:
More than an acre.
DOBOSIEWICZ:
Yes.
SOUTH:
They are in violation.
KERN:
District specifications apply in this area and will need to be included on the
plans. Building permits should NOT be issued unless the District has
issued connection permits.
...END...
MarTAC2004
10
Docket Nos. 04020033 PP and 04020034 SP: Bennett Minor Subdivision
Filed by Dave Barnes, WEIHE ENGINEERS
REPRESENTING THE PETITIONERS:
Dave Barnes, WEIHE ENGINEERS
Don Lewis, RW LEWIS INC
Comes now Bennett Minor Subdivision. A two Lot subdivision off of 136 Street between Ditch
and Towne Roads The applicant seeks to create a 2- lot minor subdivision. The site is located at
2020 W. 136th Street. The site is zoned S -I /Residence Estate.
My name is Dave Barnes with Weihe Engineers. Here with me today is Ron Lewis with R.W.
Lewis. He will be constructing the home for Doctor Bennett. It is a total tract of ten acres, which
will be divided into two lots with an existing home on the northeast corner of this ten -acre tract.
This will become lot -two. This tract has no frontage on 136 Street therefore there is an ingress/
egress easement for the existing and we will continue to use in addition to an easement across lot
one for the new home. It will be Well and Septic at this time. The tract is wooded with intentions
of preserving as many trees as possible.
HOYES:
D. Barnes I sent you a comment letter Monday. You will need Septic
approval. If you need an outlet for the perimeter drain you can go north
through Westwood Estates.
HILL:
No comments.
GROVES:
Ron Booher is your contact. He has requested updated prints and Auto
cad.
SHUPPERD:
We have gas at the existing.
GAJOWNIK:
No comments.
HOYT:
No comments.
BUTLER:
No additional.
BROERMANN:
No comments.
SOUTH:
D. Barnes I sent you a letter describing soil types. I made the same
comment for the need of a drain tile access. Basements are not
recommended this is a fairly wet site.
DOBOSIEWICZ:
I the letter we sent did not address this it is going Board of Public Works
not County Commissioners. Drive access comes off of the existing?
BARNES:
Yes.
DOBOSIEWICZ:
Who is the property owner along 136 Street?
BARNES /LEWIS:
John Reader.
DOBOSIEWICZ:
It is an awkward situation for us from the standpoint that the access
easement goes back to this area. Typically we get into situations with the
Fire Department that we have along driveway, twelve feet of gravel that
services a house in a wooded area and becomes an issue for access.
HOYT:
You do make a valid point. How will you get access?
DOBOSIEWICZ:
We could get another subdivision with two lots and thirty feet wide streets
with the question, do we really need to construct a cul -de -sac with a thirty
MarTAC2004
11
feet wide street and a seventy -five feet cul -de -sac or can we get by with a
hammerhead paved surface that does not require the building of a street?
HOYT: Excellent point. Is there a bridge?
LEWIS: No.
BARNES: Do I need to respond?
DOBOSIEWICZ: No, it is an observation.
MAGEE: No conflicts.
KERN: District sanitary sewers do not exist in the area of the proposed
subdivision. If sanitary sewers are desired, a formal request will be
required.
...END...
VILLAGE OF WESTCLAY,
Sections: V02 -A, 1202 -A, 1202 -B, and 5001- Secondary Plats
Filed by Brandon Burke, SCHNEIDER CORP
REPRESENTING THE PETITIONERS:
Kevin Krulic, BRENWICK
Brandon Burke, SCHNEIDER CORPORATION
Comes now Village of WestClay. The applicant seeks approval to plat a section of the above
referenced subdivision. The site is generally located southeast of 131 st Street and Towne Rd.
The site is zoned PUD. My name is Brandon Burke of Schneider Corporation with offices at
12821 East New Market Street, Suite 100. Here with me today is Kevin Krulic of Brenwick
Development. We are presenting three different sections. Section 5001 located in the southeast
quadrant of 131 Street and Towne Road. With an entrance on 131 Street it has approximately
forty- eight, (48) lots and twelve point eight, (12.8) acres. Another section for discussion today is
section V02A. It consists of eight, (8) lots with five and one half, (5.1/2) acres. It is located
southeast of the Village area. With the final section 1202 is split into "A and B" twenty -one lots
on sixteen acres.
HOYS:
I sent a comment letter out last night. On sections V02 and 5001 we did
not have any major issues. On 1202A and B, we may have drainage issues
and we do realize we have gas pipelines in the area.
HILL:
I sent you copies of comments.
BURK:
I tried to submit an ordinance with regarding sidewalks.
HILL:
I do have a issue with the nineteen feet, (19') wide streets. How do you
handle the parking on the narrow streets?
BURK:
The majorities of streets are in areas serving small amount of lots and
would not have any type of thoroughfare traffic. The vision is if one car is
parked on the street there would still be one travel lane with the volume of
cars traveling through there is small.
HILL:
What determines an Asphalt path or a Chat Stone path?
MarTAC2004
12
KRULIK: There are several ideas determining that, set out in the Primary Plat. What
areas needed a softer path for walking and running also to prohibit skate
boarding. It is becoming a maintenance problem and we are re- evaluating
the Chat Stone.
GROVES: This is Ron Booher's area he will need updated prints and Auto -cad along
with New Service Request made for each section.
SHUPPERD: We will come out of the adjacent projects.
BREWER: I have been in touch with Parks Peiffer. I have no Landscape Plans so I
have no comments.
GAJOWNIK: No comments.
HOYT: I sent you comment letters. On Section 5001 does it have its own amities?
KRULIK: No.
HOYT: After looking at the water layout. Can we add a hydrant along Trad Street
between Lots 48, and 457? These streets are narrow; my trucks have
trouble turning out there anyway and with the parking along the street
make a potential problem for response time in the future. We had a run out
there and because the construction workers had parked on the street we
could not get through.
BUTLER: No additional.
BROERMANN: No Comments.
SOUTH:
I will get you a letter.
DOBOSIEWICZ:
Can you talk briefly to us about Section 5001 and the common areas,
Block B and C. Is Block C commons, under a scraped plan?
BURKE:
Yes, we scraped it but want to make it a green belt.
DOBOSIEWICZ:
The lots across from the apartments, have they been platted?
BURKE:
It is under construction now.
DOBOSIEWICZ:
So what modifications have been made to the street turnout?
BURKE:
The street turnout was removed and curb extended.
DOBOSIEWICZ:
On the Duke of York Street and Thorough Bridge High Street can we talk
about the need to curb across those two and why we are not matching
pavement to pavement
KRULIK:
With the nineteen feet streets can you cross slope them instead of
crowning? When you do that the elevation difference in the street we are
looking to place Valley Gutter through there to maintain the larger street
runoff.
DOBOSIEWICZ:
Is there Valley Curb where the alleys meet the street?
KRULIK:
Yes.
DOBOSIEWICZ:
Have you had problems with the asphalt butted against the valley curb
where alleys intersect?
KRULIK:
Yes, and we are pass due placing concrete aprons at the entrances.
DOBOSIEWICZ:
That sidewalk intersects concrete and then you come back five feet from
that start the path?
MarTAC2004
13
KRULIK:
We are in the process of doing that. The existing paths do intersect the
streets. There is only one street, which is Horseferry Street that is being
replaced with a concrete apron.
DOBOSIEWICZ:
The spec on this is to curb and widen 131S Street or has it been widened?
BURKE:
No it has not. If you look at 302 or 303 we noted the existing.
DOBOSIEWICZ:
Is there any additional striping?
BURK:
We addressed it on the next page.
DOBOSIEWICZ:
Reissue docket numbers on these. Also you have Board of Works on here
and from now on your approval will come through Engineering on
construction plans.
MAGEE:
No conflicts.
KERN:
Three (3) sets of plans need to be submitted to District and two (2) sets
sent to CTE Engineers for review and comment. An IDEM permit will be
required and the submittal packet should be sent to the District for review.
The District will submit the project to IDEM for permit approval. A pre
construction meeting will need to be held before the construction of the
proposed sanitary sewers. Building permits should NOT be issued unless
the District has issued connection permits.
...END...
Docket No. 04030009 TAC: Hazel Dell Christian Church Building Addition
Filed by Mike Engledow, SCHMIDT ASSOCIATES
REPRESENTING THE PETITIONERS:
Mike Engledow, SCHMIDT ARCHITECTS
Alan Peterson, PETERSON ENTERPRISES
Comes now Hazel Dell Christian Church, building addition. The applicant seeks approval for a building
addition. The site is located at 14501 Hazel Dell Parkway. The site is zoned S -1 /Residence Low
Density. We are looking at addition to the existing facility off Hazel Dell Parkway. It is approximately
13,500 square feet, one -story Education Building with an additional 36 parking spaces added.
HOYES: I sent a letter to C. Flandermeyer. He said he would send me a revised sheet addressing our
comments.
HILL: The only issue we have is the acreage deferred from payment of available. It was the
City's understand that would be paid when the expansion occurred.
GROVES: How will you feed this? Sub feeding from existing or new panels?
PETERSON: New sub panels.
GROVES: Will we need to set another transformer?
PETERSON: We will check into that, I believe it was sized for future but I will get back with you.
GROVES: He is a new service request form to be filled out. If we do set a separate feed for this you
will need G. Hoyt's blessing on the airlocks. Because of the National Code we cannot hit a
building twice without proper firewalls and doors.
SHUPPERD: Are you going to add more gas equipment or was it sized the first time for the future.
MarTAC2004
14
PETERSON: To repeat the last comment, we will check into that as well.
SHUPPERD: If you need additional equipment get a hold of Jerry Brigg he is your contact. It looks like
the service is not going to interfere with the addition. If you are going to add additional
equipment then I recommend upgrading the meter size.
BREWER: I talked with C. Flandermeyer. I have not sent him a letter. A couple of issues, there is no
new landscaping around the addition it will need to match the existing building. So I am
asking for more landscaping around the foundation. Several of the original ADLS
plantings have die out especially along the northern edge. Please replace those. A couple of
the tees being moved are Ash. We do not recommend planting Ash due to a new exotic
insect that kills all species of Ash. So we ask that you just replace that species.
PETERSON: We have replaced all but that north side. Was there another place you were thinking of?
BREWER: That you do not remove trees from Hazel Dell Parkway.
PETERSON: I believe you are referring to the time we temporarily relocated a few to raise the
farmhouse. Once we leveled the house we did put them back.
GAJOWNIK: No comments.
HOYT: I sent a letter to C. Flandermeyer. Is the building going to be connected to the existing
sprinkler system?
ENGLEDOW: Yes.
HOYT: Basement?
ENGLEDOW: No.
HOYT: At our original meeting we discussed the future need of additional hydrants. We will need
to sit down and discuss that. You could share with Riverview and their project or put in
hydrant from the east.
PETERSON: Most of our current expansion is east but still have more to come south. This is going to
be a small addition compared to future expansion.
HOYT: That is why I think we need one at the east end then when you come through with the
future expansion we will have availability. We typically like to see them on all four corners
of a site this large.
PETERSON: Then we should sit down and plan as we expand.
BUTLER: No comments.
BROERMANN: No comments.
SOUTH: I sent a letter to C. Flandermeyer. The total disturbed is it more than one acre?
ENGLEDOW: Yes. We will send you more drawings and inspections for the Rule -5.
SOUTH: This has to be approved prior to your NOI submittal. The sooner you can get it to me for
review the sooner construction can start.
DOBOSIEWICZ: The original submittal in 1999, the Special Use for the church did that include a
full build -out
PETERSON: Yes.
DOBOSIEWICZ: Then petition will be TAC only in anticipation of moving forward to acquire
building permit. You need to resolve those other issues prior to moving on to
Building and Code enforcement. I suggest your general contractor get familiar
with Carmel's pre submittal process by calling Gayle Stahl (317 -571 -2444) for
the submittal timelines. The other issue is providing screening for the rooftop
monitoring equipment. I suggest that you send your submittals for that along with
this project so we can take a look at how that is going to be addressed. There is a
cut -sheet for a building mounted fixture for lighting we would ask that be revised
and replaced with a ninety degree cutoff. It is not the amount of light casting on
MarTAC2004
15
...END...
Heather Knoll, Section 1 (Secondary Plat and Construction Plans)
Filed by Dennis Olmstead, STOEPPELWERTH ASSOCIATES
REPRESENTING THE PETITIONERS:
Doug Elmore, PLATINUM PROPERTIES
Ed Fleming, STOEPLEWERTH
Comes now Heather Knoll, Section 1. The applicant seeks to plat 42 -lots. The site is located on
the north side of 141S Street, one -half mile west of Towne Road. The site is zoned S-
1 /Residence -Very Low Density. When finished this project will connect 141S and 146 Street. We
are developing this in two sections. The first section will have 42 lots and 37 in the second. We
will be doing all the dirt work in the beginning.
HOYES: I am still reviewing this project. This includes a reconstruction of the Stultz and Almond
Drain. We are working with M. McBride City Engineer on drainage at 141 Street and
Towne Road.
HILL: I faxed comments. The two streets at 141 considered Collectors do not match our
Thoroughfare Plan, (TP).
DOBOSIEWICZ: What is 141 Street called out on the TP?
HILL: It calls out 80.
DOBOSIEWICZ: ...and through this area we redefined it to come up with a different cross section.
They comply with that.
HILL: The Collector is 40.
DOBOSIEWICZ: On 141 Street? That is consistent with the County's TP.
HILL: It appears when you put in that offsite Storm that will require a separate Board of
Works approval.
MarTAC2004
16
the ground from the neighborhood you could see that point source of light. The
issue is the light source that is distracting.
ENGLEDOW:
Okay.
DOBOSIEWICZ:
You have received D. Hill's letter regarding additional water and sanitary fees that
would occur prior to the issuance of the building permit. That will cover the rest of
the property.
ENGLEDOW:
Now this group does not need to see new drawings just how we addressed these
issues?
DOBOSIEWICZ:
I would follow up with those agencies that delivered comments that require
modifications. When you file for your building permit all the agencies get an e-
mail that ask if there are outstanding issues and they respond accordingly. When
you walk in to the pre submittal meeting you need to have everything in line in
anticipation of getting a permit several days later. If you are not ready do not
bother it would not be accepted.
MAGEE:
No conflicts.
KERN:
No comments.
...END...
Heather Knoll, Section 1 (Secondary Plat and Construction Plans)
Filed by Dennis Olmstead, STOEPPELWERTH ASSOCIATES
REPRESENTING THE PETITIONERS:
Doug Elmore, PLATINUM PROPERTIES
Ed Fleming, STOEPLEWERTH
Comes now Heather Knoll, Section 1. The applicant seeks to plat 42 -lots. The site is located on
the north side of 141S Street, one -half mile west of Towne Road. The site is zoned S-
1 /Residence -Very Low Density. When finished this project will connect 141S and 146 Street. We
are developing this in two sections. The first section will have 42 lots and 37 in the second. We
will be doing all the dirt work in the beginning.
HOYES: I am still reviewing this project. This includes a reconstruction of the Stultz and Almond
Drain. We are working with M. McBride City Engineer on drainage at 141 Street and
Towne Road.
HILL: I faxed comments. The two streets at 141 considered Collectors do not match our
Thoroughfare Plan, (TP).
DOBOSIEWICZ: What is 141 Street called out on the TP?
HILL: It calls out 80.
DOBOSIEWICZ: ...and through this area we redefined it to come up with a different cross section.
They comply with that.
HILL: The Collector is 40.
DOBOSIEWICZ: On 141 Street? That is consistent with the County's TP.
HILL: It appears when you put in that offsite Storm that will require a separate Board of
Works approval.
MarTAC2004
16
DOBOSIEWICZ: Have you acquired right -of -way from the adjacent owner to the east for the
MarTAC2004
17
D -cell Taper?
FLEMING:
No not yet.
HILL:
Will the development across the street have a passing blister?
DOBOSIEWICZ:
The entrance to the adjacent development is over 700 feet to the east.
HILL:
Without improvements?
DOBOSIEWICZ:
I will cover that. They need to come up with two- twelve feet (12) lanes with
curb and gutter along this frontage.
GROVES:
This falls in Ron Booher's areas. You will need to call in a New Service Request
along with updated plans and Auto -cad.
SHUPPERD:
This subdivision will be served on the main we are running at Ridge of Hayden
Run.
BREWER:
I need an Engineered Landscape Plan.
DOBOSIEWICZ:
You need to provide D. Klaubaugh and us an Engineered Landscape Plan.
BREWER:
You have the numbers. I need to see where you are putting them.
DOBOSIEWICZ:
You show an asphalt trail, landscaping and a pond all in the same area. We want
to see it laid out on an Engineered Plan. Submit that to S. Brewer.
GAJOWNIK:
I show you do not have street names. You need to sent your list of names right
away and send it to Bill Akers.
HOYT:
I see a Gazebo is that it on the site?
FLEMING:
Yes.
HOYT:
We are requiring the blue Hydrant Markers with Hayden's service perpendicular
to the street. Do not apply it with the binder lay it on the finished street.
BUTLER:
You have my review letter.
BROERMANN:
No.
SOUTH:
I will send you a review letter. It needs to meet the new Rule 5. I assume the
Erosion Control Plan includes your offsite grading?
FLEMING:
Yes.
DOBOSIEWICZ:
I am assuming you are working with the Surveyor's Office on the relocation of the
legal drain across the site are issues more complicated the farther east you go. We
will look forward to the Stulz and Almond issues to be addressed. This site also
involves Centex in the discussion. I would ask that you pick up this median on the
west side of the intersection and taper back to pick up the median right there,
(pointing to the plan) on the other end of the intersection. On the site grading, you
show a pond that extends onto your site sheet C202. You will need a temporary
easement to back the pond off. I will let you deal with the owner of that property.
I believe the house adjacent to you is for sale now would be a good time to
approach them for acquisition of right -of -way for the d -cell 146"' Street. We may
ask that you make additional improvements along the frontage to the east three feet
widening and installation of an asphalt path along that parcel that would satisfy
the requirement to do any type of offsite. At the entrance on the south side it does
not look as if you are identifying a passing blister. I want a coordinated approach
across that frontage so if you can show us how everybody is going to line
everything up. It might be a situation where the passing blister starts and
becomes the left turn lane into the subdivision in the south. If it were constructed
above and beyond the fact that you created a passing blister for your site that
would also lean toward satisfying the two- twelve feet (12) lanes curb and gutter
MarTAC2004
17
on that portion of roadway. But we need that addressed through our office. What
is your construction start date?
FLEMING: One month from now.
MAGEE: No conflicts.
KERN: Three (3) sets of plans need to be submitted to District and two (2) sets
sent to CTE Engineers for review and comment. An IDEM permit will be
required and the submittal packet should be sent to the District for review.
The District will submit the project to IDEM for permit approval. A pre
construction meeting will need to be held before the construction of the
proposed sanitary sewers. Building permits should NOT be issued unless
the District has issued connection permits.
...END...
Carmel Science Technology Park:
Congressional Flex Space (Development Plan)
Filed by Mila Slepaya, MID STATES ENGINEERING
REPRESENTING THE PETITIONERS:
John Hart, JC HART
Todd May, JC HART
Gary Nance, NANCE DESIGN
Ken Sebree, SEBREE ARCHITECTS
Gary Murray, MID STATES ENGINEERING
Comes now Carmel Science Technology Park: Congressional Flex Space. The applicant seeks to
construct two buildings. The site is located at southwest 122nd St Congressional Blvd. The site is
zoned M -3 /Manufacturing. My name is John Hart with JC Hart Company. Our plan is essentially
the same with the exception that we now have three buildings. The primary building on the corner
will house JC Hart's Corporate Headquarters along with Hoosier Contracting /Hearthview
Residential. That building is 19, 270 square feet. We are still looking at a combination office and
warehouse with a modification of two additional buildings. We are looking to plat three lots and
create common area for all the parking, landscape and motor court access areas for the warehouse
site. Then we will make the site improvements with finished pads so someone can come in and
build to suit. The site plan modifications are landscape courts between the buildings opposed to the
service driveways. We have also tried to follow the guidance of the Sub Committee
recommendations.
HOYES: I sent a letter on Monday. Surveyor's Office records show that both outlets
on the site are Hamilton County regulated drains and falls in the WR Furtig
Watershed that has a restriction although Carmel Science and Technology
Park was master designed for it. We need to make sure that we are not
over utilizing the other pipes in the area.
MURRAY: We will respond to these in writing.
MarTAC2004
18
HILL: I faxed you comments. I repeated our original comments. This is our third
review. The two originals have not been address. It appears the driveway
issue has not been resolved. The requirement of the Thoroughfare Plan is
seventy feet, (70') half M. McBride sent a letter explaining that situation
but the plat is not showing it.
MURRAY: We filed for a variance for that area.
DOBOSIEWICZ: That would not be to lessen the right -of -way. It would be to reduce the
HILL:
DOBOSIEWICZ:
MURRAY
HILL:
MURRAY
HILL:
MURRAY
HILL:
GROVES:
HART:
GROVES:
SHUPPERD
BREWER:
HART:
1 all Ili RVITJ11.7
required landscape setbacks. You need to resolve this issue with
Engineering. It shows a thirty -five feet, (35') half and there was issue with
the alignment of the roadway. It needs to meet the standard in the
ordinance. Also issue with Congressional Boulevard's right -of -way.
I believe the Plan shows thirty, (30) and the Thoroughfare Plan calls out
forty, (40).
Our logic is that we would grant a reduction in the required landscape yard
width. The plans need to be modified to show Thoroughfare right -of -way
and the landscape based on that and here is what we are asking for. Your
plans have never been revised to address that.
Are the plans for 122 Street in your office?
Yes, or contact Woolpert. Another issue is the outlet for your storm looks
like it you are using the existing and wondered how it will be affected by
new construction.
We will change the casing valve
Will those inlets be changed?
I don't know. Who is your contact at Woolpert?
I will get you that.
We have power cable running on the south side of 122 Street and the
west side of Congressional Boulevard. We also have switchgear at the
corner. It appears we have an existing twenty -two feet utility easement. We
may need to move those. Our leads are coming off the north and east sides
of your property. We require a fifteen feet easement for our equipment.
Are all three buildings going in at once?
No, just building two.
You will need to fill out the New Service Request and loading worksheet.
We will need a finalized hard copy and Auto -cad.
We have gas on the south side of 122 Street. Fill out the Customer Data
Sheet with load requirements and meter sets.
I noticed you have a reduction in the numbers of plantings. Can you tell me
the reason behind the changes?
I believe because the new configurations of the buildings and may be a
matter of spacing. We lost some islands and after you add it all up
contributed to the changes.
You have also added some lawn areas, so add the ornamentals back in
there. I have not seen any Tree Preservation along the west side lawn area.
MarTAC2004
19
NANCE:
We will review that. That area is heavily wooded and our area is
undergrowth. We will just be clearing the underbrush.
BREWER:
Then I would suggest you feather in the other plantings you area missing.
HART:
You want us to get back to the original counts?
BREWER:
Yes.
GAJOWNIK:
No comments.
HOYT:
I sent letter to G. Nance. We are requesting a Knox -box. Will it be
sprinkled?
HART:
Yes.
HOYT:
Will you set up a meeting for installation of the box?
NANCE:
You met with Kevin Call of our office and everything will be consistent
with what he told you.
SOUTH:
I owe you a plan review. You will need to bring it up to the new Rule -5
Requirements.
DOBOSIEWICZ:
Is your site elevation consistent for all three buildings?
HART:
Yes.
DOBOSIEWICZ:
The more you can convey to the Plan Commission a simple format the
better. Drawings have been reworked...
NANCE:
We will have actual elevations for each building when we meet before the
committee.
DOBOSIEWICZ:
Are you looking to get on the Agenda for March 30?
HART:
Yes. HART: Yes.
DOBOSIEWICZ:
Packet deadline is Friday, March 19, 2004. The more information the Plan
Commission has, the lower number of questions the better position for
approval. With regard to the plat that is not something you need to change
right away. Those plans because of the submittal required action by the
BZA if your intention is to get on their Agenda for April, would be to give
them information on the right -of -way concerning the alignment on 122
Street and on Congressional to meet the requirements along there. Here is
the setback based on the Thoroughfare Plan here is the reduction and width
of the landscape yard we are requesting. Spell it out.
NANCE:
We will spell it out.
DOBOSIEWICZ: The only issues are the landscape and setbacks. I would also give them the
dumpster enclosure and what the signage looks like again.
MAGEE: No conflicts.
KERN: We have received plans and request that the plans be revised to show the
profile of the sanitary main line. A pre construction meeting will need to
be scheduled to coordinate District inspection of the work. Building
permits should NOT be issued unless the District has issued connection
permits.
...END...
MarTAC2004
20
Carmel Hope Fellowship (Development Plan)
Filed by Donald N. Hawley, CARMEL HOPE FELLOWSHIP
REPRESENTING THE PETITIONERS:
Don Hawley, CARMEL HOPE FELLOWSHIP
Comes now Carmel Hope Fellowship. The applicant seeks to construct a Church. The site is
located at 14535 Carey Road. The site is zoned R -1 /Residential. This item will come back through
TAC on Phase Two, Phase One is limited improvement, and they will be asking the BZA for
granting of a variance to allow gravel- parking area for limited amount of time. My name is Don
Hawley I sent changes and revision through the mail to everyone. This would be best described as
three phases. The first phase is to remodel the existing for a temporary meeting place with
temporary parking.
HOYES:
I e- mailed a comment letter yesterday. No objections to the phase -one. We
will need to do additional drainage calcs for future expansion.
HAWLEY:
Talked with Weihe Engineers for drainage calculations on Taylor Trace.
HILL:
Phase one is this an existing residence is it currently connected to sewer?
HAWLEY:
Yes and it is hooked up to sewer but not water.
HILL:
And the fees were paid.
HAWLEY:
Yes and paid on usage.
HILL:
S. Broermann is the existing driveway in you right -of -way?
BROERMANN:
No.
HILL:
I believe you will need the Board of Works approval on the curb cut.
DOBOSIEWICZ:
So you know D. Hawley the fee you paid was for the house not for future
sanctuary availability...
HILL:
I have that in my comment letter.
DOBOSIEWICZ:
There is a sizable figure attached to this.
HAWLEY:
I did get some figures on that.
HILL:
Will you be connecting water later?
HAWLEY:
Yes.
GROVES:
We do not know how deep your service is and be careful digging and re-
running the service for the parking lot. Also I do not know what size wire
it may have to be increased. We should schedule to met and review the
overall plan.
HAWLEY:
It is a 200 Amp Service currently and I believe that will be adequate and
then we will bring in another service.
GROVES:
As long as it meets code and separation with firewalls and safety doors.
HAWLEY:
Will we need to replace the PVC with conduit under the parking lot?
GROVES:
That would be my recommendation along with the service to the house.
HAWELY:
I always use 4" schedule.
GROVES:
We always use 4 I will need updated plans and Auto -cad.
HAWLEY:
Auto -cad may not happen.
SHUPPERD:
This is total electric?
HAWLEY:
Yes.
MarTAC2004
21
SHUPPERD:
Will it stay electric?
HAWLEY:
The house will but we are not sure about the new structure.
BREWER:
This is a Level D landscaping. I do not have a problem with phasing the
plantings but I want you to show it now, show all the landscaping now.
BUTLER:
You were just given our letter. No additional.
HOYT:
I believe we asked for a Knox -box for the building. I notice parking is all
one -way going in and out. In the future we will need to look at the canopy
height. Under the code you are not required to arm the building with
alarms.
BROERMANN:
I met with Jim yesterday and talked with Jon about bypassing the Board of
Commissioners and do it administratively. So if you could have Jim give
me call we can get that taken care of.
DOBOSIEWICZ:
We are going to need some time to review these revised plans and get you
some comments. Our preference would be to see two direction traffic in
this first parking lane. You are specing nine by twenty (9 x 20) space when
you could spec ten by eighteen (10 x 18) space and pick up some room for
traffic flow. It seems if we moved the entrance over a bit and straighten the
parking it will create a better flow. S. Broermann do you have any
problems with them moving the entrance closer to the intersection by
twenty -five feet.
BROERMANN:
When we right -of -way for the 146 Street project a lot of that included a
non access easement along there. There are three driveways now with non
access easements between each drive. It will be a matter of vacating one.
DOBOSIEWICZ
I am talking about getting the future drive away from the adjacent property
owner by the twenty -five feet and lining it up with the drive that goes up
and around the building. The other issue about the storm drainage this
cannot work without storm drainage working and you are occupying quite
a bit of the site with hard surface. I do not think it is appropriate to take
this to the BZA without that being addressed. Along with A. Butler's letter
setbacks will be needed with regard to the twenty -five feet buffer width as
well as the building and parking setbacks along the roadway. We will offer
our support of the reduction of the buffer along the roadways where we
could eventually see this being a situation where along 146 Street the
building pulled up to the future right -of -way. The difference between the
existing and future right -of -way there is twenty feet. So we are talking
more than two additional lane widths. I hesitate to offer our support to
move forward to the BZA without curb and pavement of the parking area
without the knowledge of Phase two and three. Our support is contingent
upon a timeframe permissible before moving to Phase two, the rest of the
parking and Phase three the sanctuary. If can get those answers it will make
the Board comfortable in making a decision that keeps you moving
forward.
MAGEE:
No conflicts.
...END OF TRANSMISSION.