HomeMy WebLinkAboutMinutes TAC 05-19-04CARMEL CLAY TECHNICAL ADVISORY COMMITTEE Minutes May 19, 2004 REPRESENTING THE CITY OF CARMEL: Bill Akers, 911 Communications Scott Brewer, Urban Forester Steve Broermann, County Highway John Dobosiewicz, Planning Zoning Dean Groves, Cinergy Dick Hill, Engineering Greg Hoyes, County Surveyor's Gary Hoyt, Fire Department David Littlejohn, Intern Plnning Zoning Chuck Shupperd, Vectren Energy Jay Alley, Clay Regional Waste John South, County Soil Water Jim Blanchard, Blding and Code Enfrcmt Arin Zehner, Intern Bldg Code Enfrcmt Via e -mail: Jay Alley, Clay Township Regional Waste Via e -mail: Jim Blanchard, Building and Code Enforcement Page 3. Carmel Hope Fellowship (Development Plan) Page 4. Docket No. 04040038 SP The Gray Estate, Lot 1 (Secondary Plat) Page 5. Docket No. 04040042 DP Amend /ADLS Amend: Clarian North Hospital Expansion Page 7. Docket No. 04050007 TAC: St. Elizabeth Ann Seton Parish Life Center Page 8. Warren and Phelps Addition, lot 16 pt Optical Office Page 10. Docket No. 04040041 DP /ADLS: Bauer Commercial Park- Tom Wood Page 11. Docket No. 04040040 DP /ADLS: Carmax, Lot 2 Steak n Shake Page 12. Docket No. 04050005 SP- Chateaux de Moulin (Secondary Plat) Page 14. Docket No. 04050015 SP- Stanford Park, Section 1 (Secondary Plat) MayTAC 5/19/04 1 Docket No. 04050016 SP- Stanford Park, Section 3 (Secondary Plat) Page 15. Orin Jessup Land Co, Sec 2, pt lots 238 -241 Matthews Auto Repair Page 16. Docket No. 04050018 SP- Bellewood Subdivision (formerly Schaffer) MayTAC 5/19/04 2 Carmel Hope Fellowship (Development Plan) Filed by Donald N. Hawley REPRESENTING THE PETITIONERS: Dave Barnes, WEIHE ENGINEERS Don Hawley, CARMEL HOPE FELLOWSHIP Comes now Carmel Hope Fellowship. The applicant seeks to construct a church. The site is located at 14535 Carey Road. The site is zoned R -1 /Residential. HOYES: You need a private easement agreement with Taylor Trace, outlet permit for the pond. The bank elevation raised and landscape elevation shown on construction plans. GROVES: IPL's area. SHUPPERD: Currently no gas onsite will you add gas later? HAWLEY: No plans yet. BROERMANN: Are you clear on the comments? BARNES: Yes. HILL: I fax you a copy of my comment letter. Existing curb cuts removed. HAWLEY: We would like to keep the north curb cut for access to the construction site. HILL: We will talk about that. Right -of -way will they dedicate the City's portion? BROERMANN: Everything south of the corner cut. HILL: I do not see a sidewalk or path. HAWLEY: This calls for a ten feet (10') asphalt path everything in the area is five feet (5') concrete. DOBOSIEWICZ: We can bring that out before the Plan Commission. Thoroughfare Plan calls out asphalt path. SOUTH: Site exceeds one acre disturb under Rule Five I need an upgraded Erosion Control Plan and Storm Water Pollution Prevention Plan. AKERS: Existing address will remain. HOYT: We would still like to see a Knox -box on the building. BREWER: Buffer yard guidelines, site plan need graphic details for tree preservation like the three trees on the parking site. We should have a separate meeting for those trees. You are a level "D" buffer and without a lot of area if you need relief you will need a variance filed. DOBOSIEWICZ: Variances along the north and west for setbacks. Neighbor to the south wants screening from the parking lot and his lot. I suggest Evergreens. We will look for BZA to bring it to the buffer standard so I suggest continuing through June to allow you time to meet those requirements. You should meet with that owner to the south because this will affect the decision by the Board on your parcel. I would work with Engineering and County Highway on this to get the right -of -way solidified. Get landscaping issues resolved with S. MayTAC 5/19/04 Brewer. Signage yet? Get copies made for the Board. Cut sheets on lighting need to be submitted 90- degree cutoff. BLANCHARD: Contact Morris Hensley at (571 -2673) regarding the well. All exits require a walkway to a public way. Restrooms in existing building must be brought into compliance with the ADA guidelines. What will be the square footage of the remodel and of the new addition? Will remodel and new construction be at the same time or in phases? What is the time frame? Will there be a construction trailer? If so -will need Temporary Use Application. (Pick up application at the Division of Building Code Enforcement at City Hall on the 1 st floor.) A pre submittal meeting will be required. No building permit will be issued before the pre submittal meeting. You may get a copy of the pre submittal checklist and Commercial procedures on our web site www.ci.carmel.in.us Make sure you have all agencies approvals prior to contacting Sarah Lillard for your pre submittal meeting Slillard@ci.carmel.in.us After your pre submittal meeting it is normally 10 day before your company Will be issued a permit. *Please contact Jim Blanchard 571 -2450 or Jblanchard(cr�,ci.carmel.in.us for any additional comments or concerns in regards for this project. ...END... Docket No. 04040038 SP The Gray Estate, Lot 1 (Secondary Plat) Filed by Dennis Singer of Cripe Associates REPRESENTING THE PETITIONERS: Dennis Singer, CRIPE ASSOCIATES Ron Farrand, CARMEL CLAY SCHOOLS Tim Gray, TIM GRAY ARCHITECTS Comes now The Gray Estate, Lot one. The applicant seeks to plat 1 residential lot. The site is located southeast of E. 131st St. and Gray Rd. The site is zoned S -1 /Residence Low Density. It is a 5.52 lot residential with 2.27acres on 131 east of Gray being purchased by Carmel Schools. No additional public improvements except sidewalks. HOYES: Fax letter last week. Future uses may need an Outlet Permit GROVES: No comments. SHUPPERD: We have gas at the street. BROERMANN: No comments. HILL: I faxed comments yesterday. Outlined current fees for connection and availability suggest talking with J. Duffy in Utilities (571- 2451) on acreage charge. The sidewalk right -of -way will require engineered estimate and performance bond. Dedication of fifty feet (50') right -of -way easement fence needs relocation. MayTAC 5/19/04 4 DOBOSIEWICZ: Move the fence to behind the right -of -way line SOUTH: No comments. AKERS: No comments. HOYT: Faxed letter to you May 6, no further comments. BREWER: No comments. DOBOSIEWICZ: You are scheduled for the June 22, Plan Commission as a public hearing. We will ask the Commission to approve that night. Quit BROERMANN: Claim this parcel as soon as possible since it is less than five acres. SCIMIA: Secondary plat will come through 30 days after the approval of the primary and be signed by the Board of Public Works. SINGER: We have the required 3 acres with the fifty feet (50') frontage easement. DOBOSIEWICZ: Draft a letter to our Department that says what you just told me about the easement and parcel. SINGER: Is there any sidewalk relief in the timing? DOBOSIEWICZ: Put it in when the drive goes in and supply a letter saying within the next twelve (12) months. HILL: Talk with J. Duffy (571 -2451) about the Connection Fees and Bond. The Bond is for work in the right -of -way for work under 131 Street. ...END... Docket No. 04040042 DP Amend /ADLS Amend: Clarian North Hospital Expansion Filed by Joseph Scimia of Baker Daniels REPRESENTING THE PETITIONERS: Joe Scimia, BAKER DANIELS Roger Kilmer, BAKER DANIELS Jamie Poczekay David Doell, CLARIAN Comes now Clarian North Hospital Expansion. The applicant proposes a hospital building expansion to the north. The site is located on the northwest corner of 116th Street and US Highway 31. The site is zoned PUD /Planned Unit Development within the US 31 Overlay Zone. Proposing a five story building, steel and concrete infrastructure same theme and elements as the previous campus. HOYES: I faxed a letter to R. Kilmer. GROVES: No comments. SHUPPERD: Meter sizing has been figured. No further. HILL: Street right -of -way is Carmel. May be commercial curb cuts required. Water and sewer is not Carmel. Please make a change to your plans Chapter COI from Kate Weiss to Mike McBride. BROERMANN: No comments. SCIMIA: Reconfigures of right -of -way? MayTAC 5/19/04 HILL: Send those to McBride. SOUTH: I sent a letter last week. Issue is expansion would be in excess of one acre you will need to adhere to Rule Five requirements. POCZEKAY: We will not be submitting new entire plans. SOUTH: That is correct but we need details on the new section. AKERS: The addition will be the same as the hospital address 11700 Way, five stories and floor designation with suite numbers. HOYT: I sent a letter. I have a perfect location on the Knox -box make sure you do the same on the new building. BREWER: I need to get you a letter. Erosion Control Plan limits show construction 15 -20 feet into the woods where is the tree protection? SCIMIA: We will be matching grade with the woods. BREWER: I need to see detail on that. You have a strip of land that is not filled with trees, why? SCIMIA: We are doing revisions. BREWER: I need to see the revisions. Plant those trees in the wide area not in loops in the sidewalks. You show 78 Little Leaf Linden, suggest changing to Sterling Silver Linden for pest control and dividing the 78 into two species. DOBOSIEWICZ: Ground sign changes? SCIMIA: Location has not changed. The stainless and brick is new. DOBOSIEWICZ: Please note the differences. You will go before the June 22 Plan Commission. Commission will want updated timing for opening and road improvements. BLANCHARD: Someone will need to contact Morris Hensley at 571 -2673 for a possible well permit for the elevator. A pre submittal meeting will be required. No building permit will be issued before the pre submittal meeting. You may get a copy of pre submittal checklist and Commercial procedures on our web site www.ci.carmel.in.us Make sure you have all agencies approvals prior to contacting Sarah Lillard for your pre submittal meeting Slillard@ci.carmel.in.us After your pre submittal meeting it is normally 10 days before your company will be issued a permit. *Please contact Jim Blanchard at 571 -2450 or jblanchard(cr�,ci.carmel.in.us for any additional comments or concerns in regards to this project. ALLEY: Building permits should NOT be issued unless the District has issued a connection permit. A district project application needs to be submitted along with construction plans, which depict any changes to the sanitary sewer, lateral or are mains so that the connection point can be identified and the impact on the District's sewers assessed. A bar screen or grinder pump may be required to prevent large solid from being discharged into the District's sewer system. MayTAC 5/19/04 6 ...END... Docket No. 04050007 TAC: St. Elizabeth Ann Seton Parish Life Center Filed by Gregg Throckmorton of Fanning /Howey Associates, Inc. REPRESENTING THE PETITIONERS: Charlie Frankenberger, NELSON FRANKENBERGER Comes now St. Elizabeth Ann Seton Parish Life Center. The applicant seeks to construct a parish life center building. The site is located northeast of Haverstick Road and 106th Street. The site is zoned S -1 /Residence- Low Density. HOYES: I faxed a letter May 11, 2004 to Fanning Howey. Regulated Drain Easement will there be detention on this site. Debris 42699C dead trees cleared up out of the culvert on 106 Street to protect the church site. I would like an on site meeting. GROVES: No comments. SHUPPERD: Your contact person is Jerry Breech. BROERMANN: No comments. HILL: I faxed comments to you. You will be Carmel utility for sewer and water Board of Works approval. I included connection fees. No performance guarantees required. Sheet number one, sanitary sewer is Carmel not Regional Waste. Identify existing construction limits on plans. Angled drive concern about access. 10 1- 102 what do you have installed to protect trees? We need existing sewer lines shown. SOUTH: I sent you a letter. You will need to meet the Rule Five requirements for over one acre of disturbed. We need you to show the staging area on the plans. AKERS: Access road address. HOYT: I faxed comments to G. Trockmorton May 6 th Will the building be sprinkled? PETITIONER: Yes. HOYT: We need discussion on setting of the connection and hydrant location. We would like to see a Knox -box and caps. We would also like to see an enunciator panel at the main entrance. Is there a basement? PETITIONER: Yes, for mechanical and it is a walkout. BREWER: You do not have tree protection in place need details on that. PETITIONER: We do show a fence on the grading plan G.20 number three. BREWER: Okay, I would like to see original buffer plan. We need to check the buffering and add a graphic planting details to plans. Need to see the amount of trees you are adding. MayTAC 5/19/04 7 DOBOSIEWICZ: Need verification that roof top mounting equipment will be ...END... Warren and Phelps Addition, lot 16 pt Optical Office Filed by Richard Hall REPRESENTING THE PETITIONERS: Jim Shinaver, NELSON FRANKENBERGER Jeff Sipe, ARCHITECT Bob Homburg, ARGOCE Brad Subrin, LEECHCO Dennis Lank, LEECHCO Angeline McLean, LEECHCO Comes now Warren and Phelps Addition, Lot 16 Optical Office. The applicant seeks the following development standards variances. The site is located at 30 1st Street SW. The site is zoned B -2 /Business within the Old Town Overlay, Main Street Sub -area. HOYES: I faxed you a letter. We need a site plan 24 x 36. We will need non enforcement for drainage across the street. GROVES: Fill out a request for new serve upgrade, loading, site plans 24 x 36 and auto -cad. It appears you have overhead from the south. LAUK: 2/220 each. GROVES: Will stay that way? LAUK: No and 400 is too much. MayTAC 5/19/04 screened. HVAC? PETITIONER: We do not have any. DOBOSIEWICZ: On the east side below entry doors. PETITIONER: The retaining wall is there DOBOSIEWICZ: Good to see additional plantings of the west side of the building. Are these temporary classrooms and will this replace that? PETITIONER: Yes but not at this time. DOBOSIEWICZ: Roof design steel and metal and dimensional? I want all this to be architecturally consistent. Do we have signage on this building and lighting? Screens and lighting with 90degree cutoffs for the wall and parking lot. BLANCHARD: Each required accessible means of egress shall be continuous to a public way. The concrete stoops are not considered a walkway and are not continuous to the public way. What is total square footage? Will there be an elevator? If so, please contact Morris Hensley at 571 -2673 for the well permit, which may be required. Will there be an elevator? A pre submittal meeting will be required. No building permit will be issued before the pre submittal meeting. You may get a copy of the pre submittal checklist and commercial procedures on our web site www.ci.carmel.in.us Make sure you have all agencies approvals prior to contacting Sarah Lillard for your pre submittal meeting Slillard@ci.carmel.in.us ...END... Warren and Phelps Addition, lot 16 pt Optical Office Filed by Richard Hall REPRESENTING THE PETITIONERS: Jim Shinaver, NELSON FRANKENBERGER Jeff Sipe, ARCHITECT Bob Homburg, ARGOCE Brad Subrin, LEECHCO Dennis Lank, LEECHCO Angeline McLean, LEECHCO Comes now Warren and Phelps Addition, Lot 16 Optical Office. The applicant seeks the following development standards variances. The site is located at 30 1st Street SW. The site is zoned B -2 /Business within the Old Town Overlay, Main Street Sub -area. HOYES: I faxed you a letter. We need a site plan 24 x 36. We will need non enforcement for drainage across the street. GROVES: Fill out a request for new serve upgrade, loading, site plans 24 x 36 and auto -cad. It appears you have overhead from the south. LAUK: 2/220 each. GROVES: Will stay that way? LAUK: No and 400 is too much. MayTAC 5/19/04 GROVES: 120/220 single phase overhead service? SHUPPERD: You have gas to building setup. LAUK: No. SHUPPERD: We show you do. We have gas at the street. We can go up the east side of the building. BROERMANN: No comments. HILL: I faxed comments yesterday to you. SOUTH: Due to the size and location of the site and erosion sediment control issues will be addressed by the City of Carmel. AKERS: No comments. HOYT: I sent you a comment letter J. Lauk. Will you provide a fire alarm or will the building be sprinkled? LAUK: No. HOYT: We would like a Knox -box installed. BREWER: Planter boxes used in areas where there is no planting room. The boxes are being used by Shapiro's, Clay Terrace, and Providence. You can get them from Sunesis of Cincinnati. I suggest in place of shrubs use a small tree. Do not plant evergreens in planters they do not last. I do suggest structural soils bridged with sidewalk or path concrete or stones. Plant smaller trees that grows more upright. SHINAVER: Two variances, front setback and no parking onsite. DOBOSIEWICZ: Department is in support of those. Put together a commitment for additional right -of -way and maintenance for landscaping along with Setback for front yard. You can dedicate to frontline, no beds in right -of -way. We want to see canvas on the awning. LAUK: What about fabric? DOBOSIEWICZ: Canvas please. BLANCHARD: Someone will need to contact Morris Hensley at 571 -2673 for a possible well permit for the elevator. A pre submittal meeting will be required. No building permit will be issued before the pre submittal meeting. You may get a copy of pre submittal checklist and Commercial procedures on our web site www.ci.carmel.in.us Make sure you have all agencies approvals prior to contacting Sarah Lillard for your pre submittal meeting Slillard@ci.carmel.in.us After your pre submittal meeting it is normally 10 days before your company will be issued a permit. *Please contact Jim Blanchard at 571 -2450 or jblanchard(cr�,ci.carmel.in.us for any additional comments or concerns in regards to this project. ...END... MayTAC 5/19/04 9 Docket No. 04040041 DP /ADLS: Bauer Commercial Park- Tom Wood Filed by Larry Lawhead of Barnes Thornburg REPRESENTING THE PETITIONERS: Mike Hoff, FALCON ENGINEERING Larry Lawhead, BARNES THORNBURG Comes now Bauer Commercial Park Tom Wood. The applicant proposes an automotive inventory parking lot. The site is located at the southeast corner of Bauer and Marie Drives. The site is zoned B -3 /Business HOYES: No comments. GROVES: This is IP and L. SHUPPERD: No comments. BROERMANN: No comments. HILL: I faxed comments to you yesterday. HOFF: Sidewalk or path and do you want it now or can we do it later? DOBOSIEWICZ: Sidewalk and today, it is a requirement. HILL: You will need Board of Works approval for curb cuts and right -of- way. Bonding and Permits needed. What is the existing turning radius? You will need a commercial curb cut and submit the turning radius. Is there an emergency access to that pond? SOUTH: I sent you a letter. You will need to upgrade to Rule Five requirements. HOFF: Your letter concerning wetland plantings to meet the new requirements to remove curbs and turn into grass swales? DBOBOSIEWICZ: Ordinance requires curbs to allow for swales... SOUTH: It does allow for water quality improvement. Use four -bay to catch sediment and wetland. DOBOSIEWICZ: To pull water for the site to the north side to the swale on the north? HOFF: Yes, but we still need a pipe or swale at the other end. SOUTH: If we could surround the whole area by a swale that would work but not desired. DOBOSIEWICZ: I will look forward to your revised plans. HOFF: Okay the four -bay what about the wetland plantings. HILL: Deal directly with Gary on that. BREWER: If there are changes in the landscaping I need to see that. Why were plantings left out on the east side? HOFF: Grade. AKERS: No comments. HOYT: I faxed you a letter May 7. We are asking for a SOS or Knox key switch for emergency access. I will send you that information although; we favor the SOS for access by all neighboring departments. MayTAC 5/19/04 10 DOBOSIEWICZ: Height of fence material? HOFF: Six feet. DOBOSIEWICZ: Issue with chain link and barbed wire, which is unappealing. Explore black vinyl coating on chain link and eliminate the barbed. Any lighting? HOFF: No. DOBOSIEWICZ: Tom Wood lots we want compliance on adjacent properties. Plan Commission is set for June 22. ...END... Docket No. 04040040 DP /ADLS: Carmax, Lot 2 Steak n Shake Filed by Mark Monroe of Drewry Simmons, Pitts Vornehm. REPRESENTING THE PETITIONERS: Jay Kammeyer, STEAK -N -SHAKE Mark Monroe, DREWRY SIMMONS PITTS VORNEHM Jamie shinneman, SCHNEIDER CORPORATION Comes now Carmax, Lot two, Steak -n- Shake. The applicant proposes a restaurant with a drive -thru. The site is located on the northwest corner of 96th Street and Gray Rd. The site is zoned B -3 /Business. HOYES: I faxed you a letter. It does not affect the Regulated Drain it does fall in a flood plain. GROVES: This is IP L. SHUPPERD: You contact is Dave Katron. BROERMANN: No comments. HILL: I faxed my comments. Board of Works approvals on sanitary and water. Total number of seats? KAMMEYER: Ninety -nine. HILL: No bonding. We need separate drainage calcs. Carmel Utilities will comment on this sewer line? SOUTH: I sent you a letter that addresses Rule Five. Better sequence, silt prevention plan, storm water quality issues addressed. AKERS: I will give this a 96 Street address, contact me 572 -2586. HOYT: Knox -box installation. BREWER: Graphic planting detail for shade tree should read root flare not root ball. Please change cherry species. Buffer yard requirements are met. Show protection for the trees already there. Would like to see addition of small trees around the building. DOBOSIEWICZ: Roof top mounted equipment needs screened. Cut sheet for lighting details mounted or in parking lot. Twenty feet typical pole heights please verify. BLANCHARD: Will there be a construction trailer? If so -will need Temporary Use Application. (Pick up application at he Division of Building MayTAC 5/19/04 11 Code Enforcement at City Hall on the 1st floor.) A pre submittal meeting will be required. No building permit will be issued before the pre submittal meeting. You may get a copy of pre submittal checklist and Commercial procedures on our web site www.ci.carmel.in.us Make sure you have all agencies approvals prior to contacting Sarah Lillard for your pre submittal meeting Slillard@ci.carmel.in.us After your pre submittal meeting it is normally 10 days before your company will be issued a permit. *Please contact Jim Blanchard at 571 -2450 or jblanchard(cr�,ci.carmel.in.us for any additional comments or concerns in regards to this project. ...END... Docket No. 04050005 SP- Chateaux de Moulin (Secondary Plat) Filed by Lance Ferrell of Banning Engineering REPRESENTING THE PETITIONERS: Lance Ferrell, BANNING ENGINEERING Joseph Miller, BANNING ENGINEERING Comes now Chateaux de Moulin. The applicant seeks to plat 6 residential lots. The site is located west of 116th Street Spring Mill Road. The site is zoned S -2 /Residence. HOYES: I faxed you a letter I received from Phil Burton, work with them about the drainage. Minor design issues but that is it get me a letter that they do not want to be regulated. GROVES: This is IP L. SHUPPERD: Gas at 116 and we will bring it to the subdivision. BROERMANN: I am still working on a review. DOBOSIEWICZ: This is not Board of Works signatures should be County Commissioners. Do they need a waiver on the private street? BROERMANN: No, but they do need a variance for the street. DOBOSIEWICZ: Do you have a preference in a private street or block? BROERMANN: We do it in an easement. DOBOSIEWICZ: We like it in a block. FERRELL: Five fee back of curb? DOBOSIEWICZ: I will go forty feet on both sides? Five feet sidewalk is required. We want this in a private area BROERMANN: Forty feet what? DOBOSIEWICZ: Common area block. BROERMANN: Then we need an agreement that spells out who takes care of what. DOBOSIEWICZ: That does not work even with agreements. FERRELL: Can you send me an example? BROERMANN: Will the City accept this as street? DOBOSIEWICZ: No. MayTAC 5/19/04 12 HILL: I faxed you comments. This will require signature by the Commissioners. This will require Bonding and Performance Guarantees. DOBOSIEWICZ: Any comments on 116 reviews? BROERMANN: No. SOUTH: Seeding and construction issues. Section C is deficient. FERRELL: We sent a revision. We will need additional information. AKERS: I faxed address list to you. HOYT: I sent you a letter. Will there be a S.O.S. devise on the main gate? No amenity building and please consider turning radius and hydrant makers. DOBOSIEWICZ: You will have a guard shack? FERRELL: Unattended but will get with you on that. BREWER: I need to get you a letter. HOYES: In the regulated subsurface drains, no trees. BREWER: Okay, keeping fence -rows show details and limits of construction with tree protection details. I need an engineered landscape site plan. HOYES: Please send me one too. BREWER: Requirements for buffer. Need to know what is provided and what is required for your buffer level. Send pictures or drawing of the level of existing. Species requirements, no Ash being planted Red Oak is a good swap -out. Cul -de -sac requires moving the woodlands on the edge, which will require more plantings. You have Hawthorns in the median, no Hawthorns in the median they grow to large with thorns. DOBOSIEWICZ: Too recap; required five feet sidewalk, landscape plan revised. Fifteen feet easement on plantings along the perimeter. Power poles we need to know who is moving those. Show it on the plans. See fence details. Also details on the guardhouse. BREWER: Show moved power lines on the revised engineered landscape plan. FERRELL: Put in the ditch through the trees along the property. DOBOSIEWICZ: Cut your swale more central than perimeter, you figure it out with Greg Hoyes. BLANCHARD: Are there any structures that will be removed? If so -no earth moving to take place until a demolition permit is on file. Are there any abandoned wells, septic tanks, or fuel tanks? If so -no earth moving to take place until a demolition permit is on file and /or Morris Hensely has been contacted. (571 -2673) Demolition permit applications may be picked up the office of Building Code Enforcement at City Hall, on the 1 St floor. Is the subdivision open to all builders? (If the subdivision is one builder, please contact Jim Blanchard [iblanchard@ci.carmel.in.us or 571 -2450] regarding the master permitting program.) Who will the primary builders be? What is the approximate size /cost of the homes to be built? Will MayTAC 5/19/04 13 there be a construction trailer, model home, and /or temporary sales office? If so -will need Temporary Use Application. (Pick up application at he Division of Building Code Enforcement at City Hall on the 1st floor.) All lots will need to be identified before we can issue any permits. This can be lot numbers on and /or a sign on the lot itself. Builders on lot numbers 5 and 6 will be required to give elevations on plat plan that the lowest opening in basement will be above the 100 year lake elevation. ALLEY: Sanitary sewer construction plans need to be submitted for review by the District's engineers. A District project application must also be submitted. Please submit two sets of plans to the District for review. An IDEM construction permit may be needed; if so, all IDEM submittal information should be provided following the Districts' plan review. ...END... Docket No. 04050015 SP- Stanford Park, Section 1 (Secondary Plat) Docket No. 04050016 SP- Stanford Park, Section 3 (Secondary Plat) Filed by Dennis Olmstead of Stoeppelwerth Associcates REPRESENTING THE PETITIONERS: Doug Elwood Comes now Stanford Park, Sections one and three. The applicant seeks to plat a total of 186 residential lots on 45.36 acres The site is located on the 13600 Block of Shelborne Rd. The site is zoned R -2 /Residence and R -4 Residence. HOYES: We need an agreement to discharge into the pond. Raise bank of pond for freeboard. GROVES: Ron Booher is your contact. We need Auto -cad and a phone call. SHUPPERD: There is gas on Shelbourn Road. BROERMAN: No comments. HILL: No comments. SOUTH: I sent my comments on Section One, May 13. Section Three large area of exposed. Need brake out for phase during construction and seeding. Address storm water collection for northern Section One. Diversion swale or sediment basin on Shelbourn Road. Recommend bmvs for water quality storm water event over 12- hour period. Suggest four -bay should be consider in lake one. Suggest wetland component and relocating structure one, lake one where you discharge your discharge pipe needs to be moved further west. AKERS: Street name on cover page Cardinal Way is misspelled. Is Section Three town homes or apartments? PETITIONER: Apartments. MayTAC 5/19/04 14 HOYT: I sent you letters. The amenity is a what? PETITIONER: Concession. HOYT: Section Three needs hydrant locations. Incorporate hydrant markers. BREWER: I did not receive a Landscape Plan. DOBOSIEWICZ: We have the meeting for TAC and you do not have a set of plans it makes it impossible to comment. I do not like doing it twice. Make this part of the record that we will not accept submittals without completed materials. Letter from DOCS, May 12. 22.5 setback line needs to be noted that garages need twenty -five feet back from front line. If it is a garage will not allow it to be closer. What I would like you to do is add to the setback line twenty -five feet. Construction plans show punch out at center lane sheet C201 second intersection, resolve that issue. Make the crosswalk closer to the intersection. Filed Special Use for ball fields and will require an Engineered Landscape Plan. Verify entrance details and we will work with engineering along with Claybourne. ...END... Orin Jessup Land Co, Sec 2, pt lots 238 -241 Matthews Auto Repair Filed by E. Davis Coots of Coots, Henke Wheeler REPRESENTING THE PETITIONERS: Mike Probst, WHEIHE ENGINEERS Daniel Matthews, MATTHEWS AUTO REPAIR Comes now Matthews Auto Repair. The applicant seeks the following development standards variance: The site is located at 725 E 106th Street. The site is zoned B- 2 /Business within the Home Place Business District Overlay. HOYES: Waiving detention requirements will not be able to do from impervious surface. We will require detention. Cannot release into a storm drains, which is the Almond Stultz Drain. Small pond or underground will be acceptable. I need engineered site plans. GROVES: We have utilities there but I need engineered site plans. SHUPPERD: There is gas at the building now will you add to the load? Here is your contact person to upgrade meter if necessary. BROERMANN: Relocating or adjusting the width of the entrance we have concern with what type will go in. We would request the right -of -way stick with the Thoroughfare Plan so sixty feet (60) feet half. What we need is for you to keep working with Joel and the dimensions of the building so we can get this correct. HILL: No plans, no comments. SOUTH: I would like a set of plans. Is the total impact less than one acre? MayTAC 5/19/04 15 PROBST Yes. SOUTH: Then you are exempt from the Rule Five Requirement. AKERS: No comments. HOYT: I sent you a letter May 17. I need a set of construction plans before I comment. DOBOSIEWICZ: We need variances and plans to continue this process. BREWER: I need an engineered landscaping plan. DOBOSIEWICZ: Could you support relief without landscaping? BREWER: No and on the plans I need easements and overhead lines shown. DOBOSIEWICZ: This submittal today is unacceptable. You have a need for pavement over more of the site than originally discussed. Variances necessary have not been addressed on landscaping, curbing and drainage. Suggest Petitioner hold off on BZA until you can return to TAC with acceptable engineered and complete plans for appropriate comments. Curbing, landscaping are required by all petitioners along with drainage, and adequate parking. Discussion should continue outside of TAC with your client and us to ensure your success next time through. BLANCHARD: No plans, no comments. ALLEY: Building permits should NOT be issued unless the District has issued a connection permit and any work on the sewer connection will require a District permit and inspection. Detailed construction plans need to be submitted for review. The existing sanitary sewer lateral should be re -used if possible and nay work on the sewer connection will require a District permit and inspection. ...END... Docket No. 04050018 SP- Bellewood Subdivision (formerly Schaffer) Filed by Jeff Douglass of Insight Engineering REPRESENTING THE PETITIONERS: Doug Elmore, PLATINUM PROPERTIES Darrell Phillips, INSIGHT ENGINEERS Comes now Bellewood Subdivision. The applicant seeks to plat a total of 54 residential lots on 41.9 acres The site is located at the northwest corner of 31st Street and West Road. The site is zoned S -1 /Residence- Estate. HOYES: I need to make a site visit and then I will have comments. Cutting and clearing in the creek I have concerns about the trees. GROVES: Ron Booher is your contact. We need Auto -cad and a phone call. SHUPPERD: We have gas out there at 131 Street and West Road. BROERMANN: No comments. HILL: This is still in review I will get you some comments later this week. MayTAC 5/19/04 16 SOUTH: Standard control and sediment issues. Dam construction detail and core trench cross section and spillway filters on out drains. AKERS: I will address this as soon as I get more information. HOYT: No gate or amenity. Lots 48 -49 on Smith Drive we need all hammerhead lots turned into cul -de -sacs for turnaround. Requesting hydrant markers perpendicular to the hydrants, noted on the plans. Fifteen feet at the entrance in not long enough. DOBOSIEWICZ: Make it twenty. BREWER: Your landscape plan is fine with the suggestion to diversify the species. Row of ornamentals then shade then ornamental I will need more room for upright not so many ornamentals. Tree protection fencing is not marked on the plan. DOBOSIEWICZ: Entry sidewalk accessing 13 I s' Street outside of the right -of -way. Keep walk inside the right -of -way. Red Pass Drive the entrance needs widened. Reduce the common area to maintain the five feet. You will need to widen the entrance along West Road. Fourteen feet entry lane, corner cut at West and 191 Street with ADA ramps as well as Red Pass and McClean. To preserve the tress move swale in toward the lot so you do not cut into the Swale. Show all changes on the plans. BREWER: and easements on the landscape plan. BLANCHARD: No earth moving to take place until a demolition permit is on file for the five existing structures to be removed and the abandoned will is capped. Demolition permit applications may be picked up the office of Building Code Enforcement at City Hall, on the 1 St floor. Is the subdivision open to all builders? (If the subdivision is one builder, please contact Jim Blanchard jblanchard@ci.carmel.in.us or 571 -2450] regarding the master permitting program.) Who will the primary builders be? What is the approximate size /cost of the homes to be built? Will there be a construction trailer, model home, and /or temporary sales office? If so -will need Temporary Use Application. (Pick up application at he Division of Building Code Enforcement at City Hall on the I st floor.) All lots will need to be identified before we can issue any permits. This can be lot numbers on and /or a sign on the lot itself. ALLEY: Sanitary sewer construction plans need to be submitted for review by the District's engineers. A district project application must also be smutted. An of -site sewer extension may be needed to service this development. Please submit three sets of plans to the District for review. An IDEM construction permit may be needed; if so, all IDEM submittal information should be provided following the District's plan review. ...END OF TRANSMISSION. MayTAC 5/19/04 17