Loading...
HomeMy WebLinkAboutC301 Erosion Control PlanN C0 CO Er; a) rn 0 E c 0 0 0 L c 0 0 0 0 J a) 0 0 J R 0 0 0 N 0 J C 0 0 0 CO I- Q J E 0 N 0 0 0 N N 0 0 6 a) 4 E; c 0 0 0 a) O a- 0 a) co co 0 0 0 0 co CO U) 0 Q) a- 0 U) c3 d de I =1.7_ TEMPCRARY CONSTRUCTION ENTRA\ICE PROPOSED BUILDING 19,920 S.F. F.F.E. 743.80 CONSTRUCTION LIMITS X4 4 CONSTRUCTION LIMITS Q Z Z w Q 1.0 r.� W 0 I 1 I 1 I I 1 I I 1 I 11 1 I 1 11 -1 II 1 1 L I I I I -L NO SCALE SOILS MAP r /38 OK& 11=ND =MD NNW 411=1. GIM. IMMO MEM MIII•1111•1110 NNW CONSTRUCTION LIMITS _1 nc2 HAVEN POINT BOULEVARD t CONSTRUCTION SEQUENCE 1.) INSTALL SILT FENCE AND INLET PROTECTION ON EXISTING INLETS 2.) STRIP TOPSOIL, AND ROUGH GRADE SITE. FINE GRADE AND SEED THE OFFSITE SWALE AREA. 3_) TEMPORARY SEED ALL DISTURBED AREAS_ 4.) START BUILDING CONSTRUCTION. 5.) INSTALL SANITARY, STORM SEWERS AND OTHER UTILITIES. 6.) STONE PARKING LOT. 7.) SEED ALL REMAINING DISTURBED AREAS. 8.) PLACE PARKING LOT BINDER COURSE. 9.) FINAL GRADING_ 10_) PERMANENT SEEDING_ 11.) COMPLETE BUILDING CONSTRUCTION. 12.) PLACE SOD AND LANDSCAPING WHERE APPLICABLE. 13.) PLACE SURFACE ASPHALT COURSE. 14.) REMOVE SILT FENCE AND INLET PROTECTION AFTER ALL AREAS ARE STABILIZED. ALL AREAS THAT ARE LEFT UNDISTURBED FOR 7 DAYS SHALL RECEIVE SEED AND MULCH. 0 I r II 1 �I I ii. OMID OEM NNW .0.0 owe fro wow 4 .i N t I 1 O cr I N- r. 1 N WASTE MANAGEMENT AND SPILL PREVENTION PLAN WASTE MANAGEMENT THE CONTRACTOR SHALL DESIGNATE A SPECIFIC AREA FOR EQUIPMENT MAINTENANCE AND REPAIR. ALL EQUIPMENT MAINTENANCE SHALL BE PERFORMED OVER PLASTIC SHEETING TO PREVENT SOIL CONTAMINATION_ ALL WASTE FLUIDS SHALL BE COLLECTED. THE CONTRACTOR SHALL PROVIDE APPROPRIATE RECEPTACLES FOR SPENT OILS, GASOLINE, GREASE, AND SOLVENTS IN THIS AREA. THESE ITEMS WILL BE REMOVED FROM THE SITE FOR FUTURE USE BY THE CONTRACTOR_ CONTRACTOR SHALL RECYCLE ALL USED OIL. OTHER CONSTRUCTION DEBRIS (E.G_ METALS, WOOD, CORRUGATED CARDBOARD) SHALL BE RECYCLED WHENEVER POSSIBLE. ALL DRUMS SHALL BE PLACED ON SKIDS OR PALLETS TO PREVENT RUSTING AND TO ALLOW EASY INSPECTION FOR LEAKS. A STORAGE AREA SHALL BE ESTABLISHED BY THE CONTRACTOR FOR STORAGE OF HAZARDOUS MATERIALS FOR EXAMPLE PAINTS, SOLVENTS, ADHESIVES, PESTICIDES, FERTILIZERS, AND CHEMICALS_ SECONDARY CONTAINMENT WILL BE USED WHENEVER POSSIBLE. THIS HAZARDOUS MATERIAL STORAGE AREA WILL BE PROTECTED FROM RAIN AND SNOW AND WILL BE LOCATED AWAY FROM HIGH TRAFFIC AREAS AND AWAY FROM NATURAL DRAINAGE. EQUIPMENT WASHDOWN AND CONCRETE WASHOUT AREAS SHALL BE LOCATED ONLY IN AREAS WHICH ARE CONTAINED AND DO NOT DRAIN TO ANY NATURAL DRAINAGES. ALL CONTAINERS, BOTH FULL AND EMPTY, SHALL BE SECURELY CLOSED (1.E. WATER TIGHT) AND STORED IN AN UPRIGHT FASHION. ALL CONTAINERS, WITH BOTH HAZARDOUS AND NON HAZARDOUS CONTENTS, SHALL BE LABELED TO INDICATE CONTAINER CONTENTS. LIQUID MATERIALS AND HAZARDOUS MATERIALS SHALL NOT BE PLACED IN DUMPSTERS. THIS INCLUDES PAINTS, OILS, SEALANTS, ADHESIVES, ETC. IF MATERIALS ARE BLOWN FROM WASTE RECEPTACLES, SUCH MATERIALS SHALL BE PICKED UP DAILY BY THE CONTRACTOR. WASTE RECEPTACLES SHALL NOT BE FILLED ABOVE LEVEL FULL. SANITARY FACILITIES SHALL BE ADEQUATELY MAINTAINED. WASTE DISPOSAL ALL NON- REGULATED WASTE SHALL BE DISPOSED OF OR RECYCLED BY THE CONTRACTOR. THIS INCLUDES MATERIALS SUCH AS CONCRETE, PAPER, PLASTIC, STYROFOAM, ALUMINUM CANS, GLASS, SCRAP BUILDING MATERIALS, ETC. HAZARDOUS MATERIALS THAT CAN BE REUSED SHALL BE REMOVED FROM THE SITE FOR FUTURE USE BY THE CONTRACTOR. ADEQUATELY SIZED AND LOCATED WASTE RECEPTACLES FOR NON HAZARDOUS MATERIALS SHALL BE PROVIDED BY THE CONTRACTOR. THE CONTRACTOR SHALL PREVENT WASTE FROM BEING BLOWN OUT OF RECEPTACLES BY WIND. ACCUMULATED WASTE IN THESE RECEPTACLES SHALL BE COLLECTED AND DISPOSED OF REGULARLY BY THE CONTRACTOR. SPILL PREVENTION STORE CHEMICALS IN SECONDARY CONTAINERS (RECOMMENDED FOR CONTAINERS LESS THAN 10 GAL; REQUIRED FOR CONTAINERS GREATER THAN 10 GAL). DO NOT STORE INCOMPATIBLE MATERIALS IN THE SAME SECONDARY CONTAINMENT BASIN. AVOID TRANSFERRING CHEMICALS FROM ONE CONTAINER TO ANOTHER. IF A TRANSFER IS NECESSARY, PERFORM THE TRANSFER IN SECONDARY CONTAINMENT. ENSURE THAT ALL CHEMICAL CONTAINERS ARE PROPERLY LABELED, INDICATING THE CONTENTS AND HAZARDS INVOLVED. STORE CHEMICALS IN AN AREA PROTECTED FROM WEATHER. INSPECT ALL CONTAINERS FOR DAMAGE OR LEAKS AT LEAST WEEKLY AND BEFORE ATTEMPTING TO MOVE THEM. EACH EMPLOYEE SHOULD LOOK FOR DAMAGED OR LEAKING CONTAINERS EACH TIME THEY USE A CHEMICAL FROM THE STORAE AREA OR ADD TO THE CHEMICAL STOCK_ WHEN WORKING WITH HAZARDOUS MATERIALS, PROTECT THE GROUND OR FLOORING WITH A SUITABLE COVERING (ONE WHICH IS RESISTANT TO PENETRATION BY THE MATERIAL BEING USED AND THAT WILL CONTAIN SMALL DRIPS AND SPILLS). PAY ATTENTION WHEN REFUELING VEHICLES /EQUIPMENT SO THAT THEY ARE NOT OVERFILLED. IF A LEAK IS DETECTED IN A VEHICLE OR PIECE OF EQUIPMENT, REPAIR THE LEAK AS SOON AS POSSIBLE; PLACE PLASTIC SHEETING, OR OTHER RECEPTACLE OF SUFFICIENT SIZE TO CONTAIN ALL LEAKING FLUID, UNDER THE LEAK UNTIL THE REPAIR IS MADE_ IF REPAIRS CANNOT BE MADE WITHIN 24 HOURS OR IF THE LEAKING FLUID CAN NOT BE CONTAINED, THEN THE LEAKING EQUIPMENT MUST BE REMOVED FROM THE SITE IMMEDIATELY. SPILL RESPONSE PLACE ALL CONTAMINATED SOIL ON AN ADEQUATELY -SIZED SHEET OF PLASTIC_ IF A HAZARDOUS MATERIAL SPILL OCCURS ON PAVEMENT, IT SHALL BE ABSORBED WITH SAND OR OTHER INERT MATERIAL, AND THEN PLACED ON PLASTIC SHEETING. THIS INCLUDES SPILLS OF VEHICLE FLUIDS. PAVEMENT WILL NOT BE WASHED WHERE A HAZARDOUS MATERIAL SPILL HAS OCCURRED (INCLUDING VEHICLE FLUIDS) UNTIL ALL SPILLED MATERIAL HAS BEEN CLEANED UP. COVER CONTAMINATED SOIL OR INERT ABSORBENT MATERIAL WITH PLASTIC TO PREVENT RUNOFF CONTAMINATION AND TO PREVENT THE MATERIAL FROM BECOMING AIRBORNE IN WIND_ NOTIFY THE RESPONSIBLE PARTY OF THE SPILL AS SOON AS POSSIBLE. THEY WILL COORDINATE THE DISPOSAL OF THE CONTAIMINATED WASTE. 0 LEGEND 30 60 SILT FENCE INLET PROTECTION RIPRAP CONSTRUCTION LIMITS PROPOSED SURFACE WATER FLOW DIRECTION DANDY BAG TO BE USED FOR INLET PROTECTION GRAPHIC SCALE IN FEET EROSION CONTROL NOTES PROPOSED 0 O t ig fit. 90 Al PLAN INDEX ITEMS RELATING TO THE SW PPP ARE INCLUDED AS NOTES ON THIS SHEET A2 11x17 INCH PLAT IS INCLUDED WITH THE SUBMITTAL A3 THIS PROJECT INVOLVES THE CONSTRUCTION OF TWO OFFICE BUILDINGS, ASSOCIATED PARKING LOTS, AND OTHER SITE- RELATED UTILITIES. A4 THE VICINITY MAP IS LOCATED ON THE COMER SHEET. AS LATITUDE 39'55'52" LONGITUDE 86'00'00" A6 LOT BOUNDARIES ARE SHOWN ON THE PLAN. A7 HYDROLOGIC UN'T CODES: 05120201090043. AS THERE ARE NO STATE OR FEDERAL WATER QUALITY PERMITS REQUIRED FOR THIS SITE. A9 STORMWATER WILL DISCHARGE INTO A STORY SEWER SYSTEM WITHIN THE OVERALL NORTH HAVEN DEVELOPMENT TO IC WEST AND ULTIMATELY INTO CARMEL CREEK. A10 THERE ARE NO WETLANDS ON THE PROPERTY_ All STORMWATER DISCHARGES INTO THE A STORM SEWER SYSTEM WHICH EVENTUALLY FLOWS INTO CARMEL CREEK. Al2 STORMWATER SHOULD NOT ENTER GROUNDIKTER WITHIN THE SITE LIMITS. A13 THERE ARE NO FLOODPLAINS, FLOODWAY AGES OR FLOODWAYS ON THE SITE. Al 4 PRE CONSTRUCTION RELEASE RATE: 7.5 CFS POST CONSTRUCTION PEAK DISCHARGE: 18.3 CFS Al 5 ADJACENT LAND USES: NORTH: MULTI- FAMILY RESIDENTIAL SOUTH: COMMERCIAL /RESIDENTIAL EAST: MINING WEST: OFFICE Alb CONSTRUCTION LIMITS ARE SHOWN IN THE PLAN VIEW. A17 THE SITE IS CURRENTLY OCCUPIED BY A MOWED LAWN Alb SOILS INFORMATION: We WESTLAND SILTY CLAY LOAM THE ENTIRE PROPERTY CONTAINS FILL MATERIAL FROM PREVIOUS PROJECTS, THEREFORE, TESTING SHOULD BE PERFORMED TO INSURE PROPER SOIL COMPACTION IS OBTAINED. A BASEMENT IS NOT RECOMMENDED BELOW THE STATIC WATER ?ABLE. A19 ALL PROPOSED STORMWATER SYSTEMS ARE SHOWN IN THE PLAN VIEW_ DETAILED INFORMATION (I.E. INVERT ELEVATIONS) CAN BE FOUND ON THE UTILITY PLAN. A20 THERE IS NO OFF -SITE CONSTRUCTION ACTNI!TY PLANNED WITH THIS PROJECT. A21 THERE ARE NO SOIL STOCKPILES PLANNED FOR THIS PROJECT. A22 EXISTING TOPOGRAPHY IS SHOWN IN THE PLAN VIEW. A23 PROPOSED CONTOURS AND SPOTSHOTS ARE PROVIDED IN THE PLAN VIEW TO INDICATE DRAINAGE PATTERNS. B1 POTENTIAL POLLUTANT SOURCES DURING CONSTRUCTION ACTIVITIES INCLUDE SPILLS AT FUELING LOCATIONS AND LEAKING VEHICLES AND EQUIPMENT, SOIL, SOIL, TRASH AND CONCRETE WASHOUT. MINIMAL AMOUNTS OF COMBUSTION ENGINE POWERED EQUIPMENT WILL BE ON SITE. ANY REQUIRED FUELING WILL BE DONE IN STONE STAGING AREA TO ASSURE IMMEDIATE SPILL IDENTIFICATION AND CLEAN UP. WORKER VEHICLES WILL BE PARKED IN STAGING AREA, AGAIN, ALLOWING IMMEDIATE IDENTIFICATION AND CLEANUP. SHOULD A LEAK OCCUR OIL DRY WILL BE KEPT ON SITE FOR ANY SUCH CLEANUPS. NO OTHER POLLUTANTS ARE FORESEEN AS BEING ON SITE. B2 A CONSTRUCTION SEQUENCE CAN BE FOUND ON THIS SHEET. B3 THE APPROPRIATE EROSION CONTROL MEASURES ARE SHOWN IN THE PLAN VIEW. SEE THE DETAIL SHEETS FOR THE CONSTRUCTION SPECIFICATIONS OF EACH MEASURE. B10 THE EXISTING LAKE WEST OF THE SITE WILL BE USED FOR WATER QUALITY MEASURES. TriiS LAKE IS VERY DEEP SINCE IT WAS PREVIOUSLY A MINING SITE. POLLUTANTS ARE EXPECTED TO SETTLE TO THE BOTTOM WITH NO EFFECT ON THE OVERALL POND DEPTH OR THEY WILL FLOAT AND BE SKIMMED BY THE OWNER. 811 SEE SEEDING SCHEDULE DETAIL AND DIVISION 2 SPECIFICATIONS. 812 SEE EROSION CONTROL INSTALLATION AND SEEDING SCHEDULE DETAILS. B13 SEE B1 ABOVE. B14 SEE EROSION CONTROL INSTALLATION DETAIL. 815 NOT APPLICABLE. Cl EXPECTED POLLUTANTS WILL BE MINIMAL IN NATURE, POST DEVELOPMENT. OIL, GREASE, ANTIFREEZE, GASOLINE, ETC. MAY OCCUR IN LIMITED AMOUNTS AS A RESULT OF PARKING OF VEHICLES BY EMPLOYEES AND VISITORS. C2 ALL EROSION CONTROL MEASURES AS SHOWN ON THE PLAN VIEW WILL BE INSTALLED BEFORE ANY DISTURBANCE OF 111E PROJECT OCCURS. FINAL STABILIZATION OF THE SITE WILL BE ACCOMPLISHED USING PERMANENT SEEDING OF ALL OPEN AREAS, LANDSCAPING WITH MULCH ON PARKING ISLANDS, AND PLACEMENT OF ASPHALT PAVEMENT. C3 BUILDING OWNER WILL BE MAINTAINING ALL PARKING AREAS ON A WEEKLY BASIS. THIS MAINTENANCE INCLUDES FREQUENT SWEEPING OF ALL PAVED SURFACES AS WELL AS COLLECTION OF ANY LITTER. ALL GREEN SPACES WILL BE MAINTAINED WITH REGULAR MOWING DURING GROWING SEASONS. PERIODIC FERTILIZER APPLICATIONS WILL OCCUR TO 1HE GREEN SPACES. C4 PERMANENT STORMWATER QUALITY MEASURES WILL BE THE SAME AS DESCRIBED IN 810. THE OWNER WILL PERFORM REGULAR MAINTENANCE INCLUDING REMOVAL OF SEDIMENT WITHIN 11FE SWALE AND DETENTION BASIN AND REPLACING IT ON SITE. C5 OWNER OF THE BUILDING WILL DESIGNATE INDIVIDUALS ON A LOCAL BASIS TO BE RESPONSIBLE FOR UPKEEP /MAINTENANCE OF THE FACILITY, INCLUDING THE PARKING AND OPEN AREAS OF THE PROPERTY. DON'T DIG BLIND 'HOLEY HOLEY' 1-800-382-5544 CALL TOLL FREE Duke CONSTRUCTION 600 East 96th Street Suite 100 Indianapolis IN 46240 Phone: 317 808 -6000 Foy 317 808 -6797 5 Of 11 Sheets Duke Realty Job Number: DW -Job# A/E Job Number: 61667.02 Certified zic i' 44 S S :0D:o. fit 4 i tER� f err b 1980 7 ST fl f c�Ae _0:: izt +ez