Loading...
HomeMy WebLinkAboutC103 Erosion Control Plan'IT 151 .1:• MIK a81-1:l: 44.135 -P41 9ea'Hi^F: p:1•f €f?Y.0 3:t iM9ixY.9Y: ?Ce:;:e �?.'•'�:j3:•.S.fgiiq.iFFE.E4;. EXISTING BARN NEW FITNESS CENTER/BATHHOUSE ,:!i•5y:i;S .33 1 STRAW BA4 i i` P4'F 1 1 1 •i•I •1 t. 11: P:.^,1 33:E.1 :ii:i,44,4i•3 tpBtWi`Fill:.b:•:•r W:,R•rth...; :IP�L2rana EXISTING BUILDING NEW MAINTENANCE BUILDING HOUSE (Ra0cA1ED) 1:cf-rz:x:;a[iFiit r••s.14.H1a EXISTING OFFICE /III #16- GREEN- irGPGCti�•• ••Y• 1 f»q •i 1r 741 742 1 •1 4 ••j i s 'V, {y i t •L r 4: .r•.1•r.w 1:: t_7 :•.r 1ga1 sst �fld6nitilP► .iv:a••w� uy 4 ;7L Cxtd ice j V {`i S• •n 1 1• II ,I. .d r: r f LINE "A" aa�aedsF� 5F4�nt1��5��6f %••r v• 1 w Y ••r Wi g t :,.'d 4.` f elr 1• 1' SE AND MULCH UP TO UNITS OF GOLF RSE SEEDING OR TO CL OF GAS PIPEUNE ASEMENT IF GOLF COURSE IS UNFINISHED 7 Y _.......,t, •1 N �P.i ti ,i~ 1:. i r t •a. 1 W g xFN7Pp•Pf7�pa ygFP t •t' •1 ti• �,r•� t+ .ti• +.1.•••• e+ y ti •1 1•• ti A M s4 7 ti• t s ti P•• t ti t• •f r V. M• IC..., -N ti.. i ••ib••V•i�.:• ••ti SRS Lt,."c t 1 •1 �a. •1• 4• P P 6PC ��CCC,. .titer• i LINE "13" .1 c 1• •f 1 9. t r 1. .ti• •1. fi r r• k 1 •t 1• •,t A t •r t 1. •SIA Ent.. :x• 81 •ti is ti PG If grPiN d •r .1.• •ti 41,, 't ti r is 1 e 1 NOTE: SHADED AREA DENOTES AREA TO BE SEEDED AND STRAW MULCHED. SEDIMENT FILTER DETAIL (L L; 21 i i ix (.3 bindings to be placed parallel to ground -WARNING ...1 PURPOSES ONLY. FOR ANY OTHER INFORMATION SEE I THIS SHEET TO BE USED FOR EROSION CONTROL DEVELOPMENT PLAN. HATCH PATTERN DENOTES TEMPORARY SEEDING HATCH PATTERN DENOTES PERMANENT SEEDING HATCH PATTERN DENOTES EROSION CONTROL BLANKET 2 stakes (typ) per bale Plan Profile flow straw bale stake (typ) straw bale NOTE: FOR OTHER EROSION CONTRO DETAILS SEE SHEET C801. MATCH LINE SEE THIS SHEET •I‘ 2 t ASSUMED NORTH SCALE: 1"=30' MAY MOM SAYS DOWT DIG BUND" 1.`"1 CALL TOLL FREE 1-800-428-5200 EROSION CONTROL AND SEQUENCING 1 FOR CALLS OUTSIDE OF INDIANA PER NDIANA STATE LAW IS-69-1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTFYING THE UNDERGROUND LOCATION SERVICE NO (2) Wt3RKNG DAYS BEFORE COWEN= VIORK. 1 CONTRACTOR SHALL INSTALL ALL REQUIRED SILT FENCES, SILT TRAPS, TREE PROTECTION AND INLET PROTECTION FOR EXISTING INLETS PRIOR TO THE START OF ANY EARTH MOVING OR STRIPPING. 2 CONTRACTOR SHALL INSTALL A STONE CONSTRUCTION ENTRANCE OR SOME OTHER DEVICE PRIOR TO THE START OF EARTHWORK AS NECESSARY TO PREVENT SOIL FROM BEING TRACKED OR WASHED INTO EXISTING ROADWAYS. 3 LAND ALTERATIONS WHICH STRIP THE LAND OF VEGETATION, INCLUDING REGRADING, SHALL BE DONE IN A WAY THAT WILL MINIMIZE EROSION. WHENEVER FEASIBLE, NATURAL VEGETATION SHALL BE RETAINED AND PROTECTED. AS GRADING IS DONE, INSTALL SILT TRAPS, SILT FENCES ,SLOPE DRAINS, TEMPORARY DIVERSIONS AND OTHER RUNOFF CONTROL MEASURES AT APPROPRIATE LOCATIONS TO KEEP SEDIMENT CONTAINED ON SITE. 4 ALL DISTURBED AREAS SHALL BE SEEDED AND STRAW MULCHED AS SHOWN ON THE PLANS IMMEDIATELY AFTER COMPLETION OF GROUND ACTIVITY. FOR LARGE PROJECTS, THIS SEEDING SHOULD BE COMPLETED IN ?HASES AS THE DIFFERENT AREAS OF THE SITE ARE COMPLETED. 5 PERMANENT AND FINAL VEGETATION OR STRUCTURAL EROSION CONTROL DEVICES SHALL BE INSTALLED AS SOON AS PRACTICAL UNDER THE CIRCUMSTANCES. 6 THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM DEPENDING UPON THE WEATHER. IF CONSTRCTION ACTIVITY IS TO CEASE FOR MORE THAN TWO WEEKS, THE DISTURBED AREAS SHALL BE TEMPORARILY SEEDED. 7 ALL STORM SEWER INLET PROTECTION DEVICES SHALL BE PUT IN PLACE AT THE TIME EACH INLET IS CONSTRUCTED. 8 CONTRACTOR SHALL MAINTAIN EROSION CONTROL MEASURES AND DEVICES DURING CONSTRUCTION AND UNTIL SILTATION OF THE STREETS AND STORM SEWERS WILL NO LONGER OCCUR. 9 ONCE ONSITE EROSION AND SILTATION OF THE STREETS AND STORM SEWERS WILL NO LONGER OCCUR, THE CONTRACTOR SHALL REMOVE AND DISPOSE OF THE TEMPORARY EROSION CONTROL DEVICES. 10 THESE GENERAL PROCEDURES MAY NOT COVER ALL SITUATIONS. REFER TO EROSION CONTROL PLANS FOR SPECIFIC NOTES AND ADDITIONAL DETAILS. 11 EROSION CONTROL TO COMPLY WITH INDIANA 327 IAC AND RULE #5, AND INDIANA HANDBOOK FOR EROSION CONTROL IN DEVELOPING AREAS. 12 THE CITY ENGINEER HAS THE AUTHORITY TO REQUEST ADDITIONAL EROSION CONTROL MEASURES OR AMEND EROSION CONTROL PLANS SUBJECT TO ACTUAL SITE v sC i CONTACT PERSON JEFF THOMPSON PLUM CREEK DEVELOPMENT COMPANY LLC 11911 LAKESIDE DRIVE FISHERS, INDIANA 46038 (317) 849-7607 3'X 3' SHEET OF FILTER FABRIC (POLYFELT TS-700 OR EQUIVALENT) SHALL BE PLACED BETWEEN ALL INLET GRATES AND CASTINGS DURING CONSTRUCTION. FABRIC SHALL BE REPLACED OR MAINTAINED AS NEEDED BY THE SITE CONTRACTOR. EXISTING VEGITATION THE MAJORITY OF VEGITATION ON THE SITE IS AROUND THE FEW EXISTING TREES. MOST OF ME AREA IS BARE DIRT OR GRAVEL WHERE THE AREA HAS BEEN USED FOR CONSTRUCTION STAGING AND MATERIALS STORAGE. BENCH MARK T.B.M. U.S.G.S. DISC IN CONCRETE POST 54' WEST OF CENTERLINE OF RIVER AVENUE AND 18' NORTH OF THE CENTERLINE OF 131st STREET STAMPED 95—RHP 1951. T.B.M. 1 CUT "o" SET NORTH RIM OF HARRISON MONUMENT 126th STREET AND RIVER AVE. (S.E. CORNER S.E.1/4 SEC. 27-18-4) Revisions CERTIFIED BY Date 6/7/96 Computer Files XRE— 90481112 XREF-90451PL XREF-90452PL XREF-904—TOPO XREF-904—GOLF ELEV.— 751.46 ELEV.- 747.05 s s. i ND. E A1 A. t ‘4 it-i1-94 THIS G AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSVE INTELLECTUAL PROPERTY OF SCHNEIDER ENGINEERING CORPORATION APO ARE NOT TO BE USED OR REPRODUCED IN WHOLE OR IN PART, WITHOUT THE VIRITTEN CONSENT OF SCHNEIDER ENGINEERING CORPORATION. ©1996, Schneider Engineering Corporation r Schneider Engyineering Corporaiion 3020 North Post Road Indianapolis, Indiana 46226-0068 317-898-8282 317-899-8010 Fax Engineering Surveying Landscape Architecture Geology A Partnered Entity with Bohlen, Meyer, Gibson Associates, Incorporated PLUM CREEK DEVELOPMENT COMPANY LLC PLUM CREEK COMMUNITY CENTER HA/ELTON COUNTY, INDIANA EROSION CONTROL PLAN Project No. 904.81 Drawn DRP Sheet No. c1.03 1 2 4 5 7 8 9 10 11 12 13 14 15 A