Loading...
HomeMy WebLinkAboutC601 Storm Sewer Plan760 755 750 745 740 735 730 725 720 1 e f y 2 INV- 742.40 3 to) CNI .cc C C L.A.J o cn 2 cn w tfl L TC-_ 744.80 GRANULAR BACKFIU_ INV- 742.00(W) 0 15' RCP(E) INV- 1 RCP(N) INV- 736.00 _r 20 of 12" RCP 0 2.00% 4 5 STR. No. 102 (PAVED AREA INLET) STR. No. 103 (END SECTION) 18" GAS P PEUNE TOP OF PIPE 740.5 ff) 1 INV- 734.29 6 153' of 15" HDPE 0 1.12% a LAKE 1 14 NORMAL POOL ELEV=740.00 STR. No. 101 (END SECTION) TC- 744.80 INV- 736.00(N) 7 DOSING BUILDING NEW MNNENANCE BULOING NEW GRADE 7 INV- 740.70(E) J 8 eTh (PAVED AREA INLET) STR. No. 106 (BEEHIVE INLET) EXISTING GRADE 1 /1_ 202' of 15" RCP 0 0.31% STR. No. 104 P TC- 745.09 INV- 741.33(S) STORM SEWER PLAN IL ,a- cp 0 1- LL.1 9 10 12" RCP(E) INV- 741.94 55' of 12" RCP 0 0.30% STORM SEWER PROFILE TC- 744.60 INV- 742.10(N) STR. No. 105 (BEEHIVE INLET) 11 44 16 17 TC- 745.09 12" RCP(S) INV- 741.94 15" RCP(W) INV- 741.33 /37,7" RANuLA BA6OLC 12 EXISTING GRADE NEW GRADE INV- 741.58(E) 13 175' of 12" RCP 0 0.30% INV- 742.10(W) 14 15 HOLEY MOLEY SAYS DON'T DIG BLIND 1-800-382-5544 CALL TOLL FREE 1-800-428-5200 FOR CALLS OUTSIDE OF INDIANA PER INDIANA STATE LAW IS 69 1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. TC- 744.60 SCALE: 1"=50' HORZ.: 1"=50' SCALE: VERT.: 1"=5' 760 755 750 745 740 735 730 725 720 GENERAL NOTES: 1. ALL CUTS ARE TAKEN FROM THE DOSING GRADE TO THE PIPE INVERT. 2. ALL STATIONING IS TAKEN FROM THE NEAREST DOWNSTREAM STRUCTURE. 3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL UTILITY LOCATIONS BEFORE CONSTRUCTION BEGINS. 4. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPUCABLE LOCAL AND STATE STANDARDS. 5. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE PERFORMED IN COMPUANCE WITH APPUCABLE 0.S.H.A. STANDARDS FOR WORKER SAFETY. 6. CONTRACTOR SHALL MINIMIZE DAMAGE TO EXISTING TREES. BENCH MARK T.B.M. U.S.G.S. DISC IN CONCRETE POST 54' WEST OF CENTERLINE OF RIVER AVENUE AND 18' NORTH OF THE CENTERLINE OF 131st STREET STAMPED 95-RHP 1951. ELEV.- 751.46 T.B.M. 1 CUT "0" SET NORTH RIM OF HARRISON MONUMENT CO 126th STREET AND RIVER AVE. (S.E. CORNER S.E.1/4 SEC. 27 Revisions CERTIFIED BY Date 6/7/96 Computer Files 1k. \904\DWGS\81\90481SM1 XREF-90481PL2 XREF-90452PL XREF-90451PL ELEV.- 747.05 No STATE OF 4( 4 A i, 6 THIS DRAYANG AO THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY Of SCHNODER ENGINEERING CORPORATION APO ARE NOT TO BE USED OR REPRODUCED IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF SCHNODER ENGINEERING CORPORATION. 1996, Schneider Engineering Corporation r "0„ Schneider Engineering L „di Corporation 3020 North Post Road Indianapolis, Indiana 46226-0068 317-898-8282 317-899-8010 Fax A Partnered Entity with Bohlen, Meyer, Gibson Associates, incorporated PULM CREEK DEVELOPMENT COMPANY Lie PLUM CREEK COMMUNITY CENTER HAMILTON COUNTY, INDIANA STORM SEWER PLAN Project No. 904.81 Drawn DRP Sheet No. Engineering Surveying Landscape Architecture GIS LIS Geology Approv. C 6011. M L