HomeMy WebLinkAboutL102 Landscape Details1
SH
�L
2" SHREDDED BARK MULCH
1
2
SCALE: NOT TO SCALE
BACKFILL WITH A MIXTURE OF
3" ORGANIC COMPOST, 1" SAND,
AND ORGANIC SLOW RELEASE
FERTILIZER
2
SCALE: NOT TO SCALE
REMOVE ANY TWINE OR SYNTHETIC
TAPES FROM SHRUB TRUNK
REMOVE BURLAP FROM TOP
1/3 OF ROOTBALL
3" SAUCER FILLED WITH SHREDDED
BARK MULCH EXTENDED 6" FROM PIT
r: a`.�iA`� ?J :ye�K�•} i.. vJ4`!� �IVT�. i�.�N_l�i 4vN{`!. w\ h
DETAIL
pp t.t
adl }u�arr[
TYPICAL SPACING
GROUNDCOVE
:i
,TAIL
WEED BARRIER
FINISH GRADE
EXISTING SUBSOIL OR
COMPACTED BACKFILL
4
5
NOTE: LOCATE 1 STAKE DIRECTLY
SOUTHWEST OF TREE TRUNK
6
TR
-1 1
F'
s
SCALE: NOT TO SCALE
SE
Wheat or Rye
Oats
Annual Ryegrass
Non Irrigated*
Irrigated
Dormant
Seeding
SCALE: NOT TO SCALE
AKING D
Irrigation needed during this
erosion at times other than
use mulch.
Spring Oats
Annual ryegrass 1 Ib.
Temporary Seedings
Not necessary where mulch is applied.
7
f ir
Temporary Seeding Dates
Late summer seeding dates
if mulch is applied.
Increase seeding application by 50%.
FIGURE 5 -3
G SCHHIDULE
AIT,
May
Jun
Jul
Aug
Jan Feb Mar Apr
Permanent Seeding Dates
Sep Oct Nov Dec
period. To control
in the shaded areas,
may be extended 5 days
Kind of Seed 1000 Sq. Ft. Acre Remarks
Wheat or Rye 3.5 lbs. 2 bu. Cover seed 1" to
1 1/2" deep
9
2.3 lbs. 3 bu. Cover seed 1" deep
40 lbs. Cover seed 1/4"deep*
10
10
D
11
11
2 PLY HOSE TO SHEATH WIRE
GALVANIZED TWISTED WIRE
METAL STAKES LENGTH VARIES
(TYP. OF 3)
3 SHREDDED HARDWOOD BARK
MULCH EXTENDED 6" BEYOND PIT
DO NOT COVER TREE TRUNK
3" SOIL SAUCER
FINISH GRADE
REMOVE ANY TWINE OR SYNTHETIC TAPES
REMOVE BURLAP FROM TOP 1/3 OF
ROOTBALL OR WIRE BASKET(IF
APPLICABLE)
EXCAVATE HOLE LARGER THAN
ROOTBALL ANGLE SIDES OF HOLE
BACKFILL WITH A MIXTURE OF
50% TOPSOIL 50% ORIGINAL SOIL
EXISTING SUBSOIL OR COMPACTED
BACKFILL
H C
SCALE: NOT TO SCALE
1DLOUS TR
SECTION
2 PLY HOSE TO SHEATH WIRE
GALVANIZED TWISTED WIRE
WOODEN STAKES LENGTH VARIES
(TYP. OF 3)
3" SHREDDED HARDWOOD BARK
MULCH EXTENDED 6 BEYOND PIT
DO NOT COVER TREE TRUNK
3" SOIL SAUCER
FINISH GRADE
REMOVE ANY TWINE OR SYNTHETIC TAPES
REMOVE BURLAP FROM TOP 1/3 OF
ROOTBALL OR WIRE BASKET(IF
APPLICABLE)
EXCAVATE HOLE LARGER THAN
ROOTBALL ANGLE SIDES OF HOLE
BACKFILL WITH A MIXTURE OF
50% TOPSOIL 50% ORIGINAL SOIL
EXISTING SUBSOIL OR COMPACTED
BACKFILL
SCALE: NOT TO SCALE
1 12
12
TR
13
13
E
A
14
1
15
1 THE CONTRACTOR SHALL LOCATE AND VERIFY THE EXISTENCE OF ALL
UTIUTIES PRIOR TO STARTING WORK.
2. THE CONTRACTOR SHALL SUPPLY ALL PLANT MATERIALS IN
QUANTITIES SUFFICIENT TO COMPLETE THE PLANTING AS SHOWN ON
DRAWINGS.
3. ALL MATERIAL SHALL CONFORM TO THE GUIDELINES ESTABLISHED BY
THE CURRENT "AMERICAN ASSOCIATION OF NURSERY STOCK
PUBUSHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN OR
EQUIVALENT.
4. NO PLANT SHALL BE INSTALLED BEFORE ROUGH GRADING HAS
BEEN FINISHED AND APPROVED.
5. ALL PLANTS SHALL BEAR THE SAME RELATIONSHIP TO FINISHED
GRADE AFTER INSTALLED AS THEY DID PRIOR TO BEING DUG.
6. ALL PLANTS SHALL BE BALLED AND WRAPPED OR CONTAINER GROWN
AS SPECIFIED. NO CONTAINER GROWN STOCK WILL BE ACCEPTED IF
IT IS ROOT BOUND. ALL ROOT WRAPPING MATERIAL MADE OF
SYNTHETICS OR PLASTICS SHALL BE REMOVED AT THE TIME OF
PLANTING.
7. WITH CONTAINER GROWN STOCK, THE CONTAINER SHALL BE REMOVED
AND THE CONTAINER BALL SHALL BE CUT THROUGH THE SURFACE IN
TWO VERTICAL LOCATIONS.
8. THE DAY PRIOR TO PLANTING, THE LOCATIONS OF ALL TREES AND
SHRUBS SHALL BE STAKED FOR APPROVAL BY THE OWNER'S
REPRESENTATIVE.
9. THE LANDSCAPE CONTRACTOR SHALL REFER TO THE CONTRACT
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
10. CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH
ONE CALENDAR YEAR FROM TIME OF PROVISIONAL ACCEPTANCE.
11. IF THERE IS A DISCREPANCY BETWEEN THE PLANT QUANTITY SHOWN
ON THE PLANT UST AND THE QUANTITY SHOWN ON THE PLANS, THE
QUANTITY SHOWN ON THE PLANS WILL TAKE PRECEDENCE.
12. CONTRACTOR SHALL REPAIR ANY DAMAGE TO PROPERTY FROM
PLANTING OPERATIONS AT NO COST TO THE OWNER.
13. SOD SHALL BE LAID OUT PARALLEL TO THE CONTOURS AND HAVE
STAGGERED JOINTS. ON STEEP SLOPES GREATER THAN 3:1 OR
DRAINAGE SWALES, THE SOD SHALL BE STAKED WITH STAPLES AT
THE CORNERS TO BE SECURED TO THE GROUND.
14. SOD SHALL BE LAID OVER A MINIMUM OF 2" TOPSOIL TOPSOIL
SHALL NOT BE SPREAD OUT UNTIL FINAL GRADING HAS BEEN
APPROVED BY THE PROJECT ENGINEER. TOPSOIL SHALL ALSO BE
APPROVED BEFORE SOD IS LAID.
15. CRABAPPLE TREES SHALL NOT HAVE HAVE ANY BRANCHES BELOW
36" ABOVE THE ROOTBALL, AND SHALL HAVE NO "V" CROTCHES.
16. FOR SEEDING SPECIFICATIONS, SEE PROJECT SPECIFICATIONS.
Revisions
'GENERAL NOTES
CERTIFIED BY
Computer Files
904.81
THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED
HEREIN ARE THE EXCLUSI€ INTELLECTUAL PROPERTY OF SCHNEIDER
ENGINEERING CORPORATION AND ARE NOT TO BE USED OR REPRODUCED
IN WHOLE OR N PART, WITHOUT THE WRITTEN CONSENT OF SCHNEIDER
ENGINEERING CORPORATION.
1996, Schneider Engineering Corporation
r ll Sthid�
6117 Engineering
j Corporation
3020 North Post Road
Indianapolis, Indiana
46226 -0068
317- 898 -8282
317 -899 -8010 Fax
Engineering
Surveying
Landscape Architecture
GIS LIS
Geology
A Partnered Entity with Bohlen, Meyer, Gibson Associates, Incorporated
PLUM CREEK DEVELOPMENT COMPANY LLC
PLUM CREEK COMMUNITY CENTER
HAMILTON COUNTY, INDIANA
Date Project No.
04/06/96 I 904.81
LANDSCAPE DETAILS
Drawn
JRR
Sheet No.
Approv.
IL— 1L02
J
E
D
C
B
F
A
K
J
H
G