Loading...
HomeMy WebLinkAboutL102 Landscape Details1 SH �L 2" SHREDDED BARK MULCH 1 2 SCALE: NOT TO SCALE BACKFILL WITH A MIXTURE OF 3" ORGANIC COMPOST, 1" SAND, AND ORGANIC SLOW RELEASE FERTILIZER 2 SCALE: NOT TO SCALE REMOVE ANY TWINE OR SYNTHETIC TAPES FROM SHRUB TRUNK REMOVE BURLAP FROM TOP 1/3 OF ROOTBALL 3" SAUCER FILLED WITH SHREDDED BARK MULCH EXTENDED 6" FROM PIT r: a`.�iA`� ?J :ye�K�•} i.. vJ4`!� �IVT�. i�.�N_l�i 4vN{`!. w\ h DETAIL pp t.t adl }u�arr[ TYPICAL SPACING GROUNDCOVE :i ,TAIL WEED BARRIER FINISH GRADE EXISTING SUBSOIL OR COMPACTED BACKFILL 4 5 NOTE: LOCATE 1 STAKE DIRECTLY SOUTHWEST OF TREE TRUNK 6 TR -1 1 F' s SCALE: NOT TO SCALE SE Wheat or Rye Oats Annual Ryegrass Non Irrigated* Irrigated Dormant Seeding SCALE: NOT TO SCALE AKING D Irrigation needed during this erosion at times other than use mulch. Spring Oats Annual ryegrass 1 Ib. Temporary Seedings Not necessary where mulch is applied. 7 f ir Temporary Seeding Dates Late summer seeding dates if mulch is applied. Increase seeding application by 50%. FIGURE 5 -3 G SCHHIDULE AIT, May Jun Jul Aug Jan Feb Mar Apr Permanent Seeding Dates Sep Oct Nov Dec period. To control in the shaded areas, may be extended 5 days Kind of Seed 1000 Sq. Ft. Acre Remarks Wheat or Rye 3.5 lbs. 2 bu. Cover seed 1" to 1 1/2" deep 9 2.3 lbs. 3 bu. Cover seed 1" deep 40 lbs. Cover seed 1/4"deep* 10 10 D 11 11 2 PLY HOSE TO SHEATH WIRE GALVANIZED TWISTED WIRE METAL STAKES LENGTH VARIES (TYP. OF 3) 3 SHREDDED HARDWOOD BARK MULCH EXTENDED 6" BEYOND PIT DO NOT COVER TREE TRUNK 3" SOIL SAUCER FINISH GRADE REMOVE ANY TWINE OR SYNTHETIC TAPES REMOVE BURLAP FROM TOP 1/3 OF ROOTBALL OR WIRE BASKET(IF APPLICABLE) EXCAVATE HOLE LARGER THAN ROOTBALL ANGLE SIDES OF HOLE BACKFILL WITH A MIXTURE OF 50% TOPSOIL 50% ORIGINAL SOIL EXISTING SUBSOIL OR COMPACTED BACKFILL H C SCALE: NOT TO SCALE 1DLOUS TR SECTION 2 PLY HOSE TO SHEATH WIRE GALVANIZED TWISTED WIRE WOODEN STAKES LENGTH VARIES (TYP. OF 3) 3" SHREDDED HARDWOOD BARK MULCH EXTENDED 6 BEYOND PIT DO NOT COVER TREE TRUNK 3" SOIL SAUCER FINISH GRADE REMOVE ANY TWINE OR SYNTHETIC TAPES REMOVE BURLAP FROM TOP 1/3 OF ROOTBALL OR WIRE BASKET(IF APPLICABLE) EXCAVATE HOLE LARGER THAN ROOTBALL ANGLE SIDES OF HOLE BACKFILL WITH A MIXTURE OF 50% TOPSOIL 50% ORIGINAL SOIL EXISTING SUBSOIL OR COMPACTED BACKFILL SCALE: NOT TO SCALE 1 12 12 TR 13 13 E A 14 1 15 1 THE CONTRACTOR SHALL LOCATE AND VERIFY THE EXISTENCE OF ALL UTIUTIES PRIOR TO STARTING WORK. 2. THE CONTRACTOR SHALL SUPPLY ALL PLANT MATERIALS IN QUANTITIES SUFFICIENT TO COMPLETE THE PLANTING AS SHOWN ON DRAWINGS. 3. ALL MATERIAL SHALL CONFORM TO THE GUIDELINES ESTABLISHED BY THE CURRENT "AMERICAN ASSOCIATION OF NURSERY STOCK PUBUSHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN OR EQUIVALENT. 4. NO PLANT SHALL BE INSTALLED BEFORE ROUGH GRADING HAS BEEN FINISHED AND APPROVED. 5. ALL PLANTS SHALL BEAR THE SAME RELATIONSHIP TO FINISHED GRADE AFTER INSTALLED AS THEY DID PRIOR TO BEING DUG. 6. ALL PLANTS SHALL BE BALLED AND WRAPPED OR CONTAINER GROWN AS SPECIFIED. NO CONTAINER GROWN STOCK WILL BE ACCEPTED IF IT IS ROOT BOUND. ALL ROOT WRAPPING MATERIAL MADE OF SYNTHETICS OR PLASTICS SHALL BE REMOVED AT THE TIME OF PLANTING. 7. WITH CONTAINER GROWN STOCK, THE CONTAINER SHALL BE REMOVED AND THE CONTAINER BALL SHALL BE CUT THROUGH THE SURFACE IN TWO VERTICAL LOCATIONS. 8. THE DAY PRIOR TO PLANTING, THE LOCATIONS OF ALL TREES AND SHRUBS SHALL BE STAKED FOR APPROVAL BY THE OWNER'S REPRESENTATIVE. 9. THE LANDSCAPE CONTRACTOR SHALL REFER TO THE CONTRACT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 10. CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ONE CALENDAR YEAR FROM TIME OF PROVISIONAL ACCEPTANCE. 11. IF THERE IS A DISCREPANCY BETWEEN THE PLANT QUANTITY SHOWN ON THE PLANT UST AND THE QUANTITY SHOWN ON THE PLANS, THE QUANTITY SHOWN ON THE PLANS WILL TAKE PRECEDENCE. 12. CONTRACTOR SHALL REPAIR ANY DAMAGE TO PROPERTY FROM PLANTING OPERATIONS AT NO COST TO THE OWNER. 13. SOD SHALL BE LAID OUT PARALLEL TO THE CONTOURS AND HAVE STAGGERED JOINTS. ON STEEP SLOPES GREATER THAN 3:1 OR DRAINAGE SWALES, THE SOD SHALL BE STAKED WITH STAPLES AT THE CORNERS TO BE SECURED TO THE GROUND. 14. SOD SHALL BE LAID OVER A MINIMUM OF 2" TOPSOIL TOPSOIL SHALL NOT BE SPREAD OUT UNTIL FINAL GRADING HAS BEEN APPROVED BY THE PROJECT ENGINEER. TOPSOIL SHALL ALSO BE APPROVED BEFORE SOD IS LAID. 15. CRABAPPLE TREES SHALL NOT HAVE HAVE ANY BRANCHES BELOW 36" ABOVE THE ROOTBALL, AND SHALL HAVE NO "V" CROTCHES. 16. FOR SEEDING SPECIFICATIONS, SEE PROJECT SPECIFICATIONS. Revisions 'GENERAL NOTES CERTIFIED BY Computer Files 904.81 THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSI€ INTELLECTUAL PROPERTY OF SCHNEIDER ENGINEERING CORPORATION AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE OR N PART, WITHOUT THE WRITTEN CONSENT OF SCHNEIDER ENGINEERING CORPORATION. 1996, Schneider Engineering Corporation r ll Sthid� 6117 Engineering j Corporation 3020 North Post Road Indianapolis, Indiana 46226 -0068 317- 898 -8282 317 -899 -8010 Fax Engineering Surveying Landscape Architecture GIS LIS Geology A Partnered Entity with Bohlen, Meyer, Gibson Associates, Incorporated PLUM CREEK DEVELOPMENT COMPANY LLC PLUM CREEK COMMUNITY CENTER HAMILTON COUNTY, INDIANA Date Project No. 04/06/96 I 904.81 LANDSCAPE DETAILS Drawn JRR Sheet No. Approv. IL— 1L02 J E D C B F A K J H G