Loading...
HomeMy WebLinkAbout14 Site Utility Demolition Plan East- SU1.30 z 0 0 0 U) mmul1111111111, I m mo mmu m ul SITE UTILITY PLAN EAST SCALE: 1" 30' PLAN NOTES CLEANOUT— SEE DETAIL 7/SU1.5. CONNECT TO ir AT INV. EL XXX.XX 18' OF 6* PVC STORM AT X.X% SLOPE. CLEANOUT— SEE DETAIL 7/SU1.5. CONNECT TO 4* AT INV. EL XXX.XX 42' OF 6* PVC STORM AT X.X% SLOPE. CLEANOUT— SEE DETAIL 7/SU1.5. CONNECT TO 4- AT INV. EL XXX.XX (FROM AREAWAY DRAIN) 65 OF 6* PVC STORM AT X.X% SLOPE. 7 CONNECT TO 18* BUILDING STORM AT INV. EL XXX.XX. 8' OF 18* RCP AT X.X% SLOPE. CONNECT TO 12* BUILDING STORM AT INV. EL XXX.XX. GENERAL SITE UTILITY PLAN NOTES SEE SHEET PSU2.1 FOR SITE WATER AND GAS UNES. SITE SEWER CONTRACTOR SHALL COORDINATE WORK WITH THE SITE PLUMBING/FIRE PROTECTION CONTRACTORS. 2. THE PLANS SHOW THE LOCATION OF UTIUTIES LOCATED WITHIN THE UMITS OF THE CONTRACT ACCORDING TO INFORMATION PROVIDED BY THE VARIOUS UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS EVIDENCED BY OBSERVATION OF ABOVE GROUND CONDITIONS BY THE SURVEYOR. THE ACCURACY OF THE INFORMATION IS NOT GUARANTEED. 3. IT IS THE CONTRACTOR'S RESPONSIBIUTY TO NOTIFY AND COORDINATE CONSTRUCTION WITH ALL RESPECTIVE UTILITIES. 4. EXCAVATIONS EXCEEDING TWENTY (20) FEET IN DEPTH REQUIRE THE DESIGN OF A TRENCH SAFETY SYSTEM BY A REGISTERED PROFESSIONAL ENGINEER. 5. PVC PIPE TO BE USED ONLY AT LOCATIONS SHOWN AND SHALL NOT BE SUBSTITUTED FOR RCP. 6. SEE PLUMBING DRAWINGS FOR CONTINUATION OF UTIUTIES INTO BUILDING. 7. SEE E2.1 FOR SITE ELECTRICAL PLAN. 8. CONSTRUCTION OF ALL SEWER LINES AND STRUCTURES SHALL BE IN ACCORDANCE WITH LOCAL AND STATE CODES, RULES AND REGULATIONS. 9. WHERE WATER LINES AND SEWERS CROSS AND THE WATER UNE CANNOT BE PLACED ABOVE OR BELOW THE SEWER WITH A MINIMUM OF 18" VERTICAL CLEARANCE, THE SEWER MUST BE CONSTRUCTED OF WATER WORKS GRADE DUCTILE IRON PIPE WITH MECHANICAL JOINTS WITHIN 10' OF THE WATER UNE. THE WATER UNES SHALL BE INSTALLED ABOVE THE SEWER WHERE EVER POSSIBLE. 10. WHERE WATER UNES AND SEWERS RUN PARALLEL AND A MINIMUM SEPARATION DISTANCE OF 10' CANNOT BE MAINTAINED, THE SEWER MUST BE CONSTRUCTED OF WATER WORKS GRADE DUCTILE IRON PIPE WITH MECHANICAL JOINTS. 11. TEMPORARY 'TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL STANDARDS. 12. CONTRACTOR SHALL REPLACE ALL PAVING AND CURBS TO MATCH EXISTING AT UTILITY CUTS. SIM SAN SM-10 EX-1 SIR. 206 LEGEND NEW STORM SEWER NEW SANITARY SEWER WATER MAIN EXISTING STORM SEWER EXISTING SANITARY SEWER SANITARY STRUCTURE NUMBER EXIS11NG SANITARY MANHOLE STORM STRUCTURE NUMBER VALVE MANHOLE INLET INVERT ELEVATION CLEANOUT FIRE HYDRANT CAUTION THE LOCATIONS OF ALL DUSTING UNDERGROUND UTIUTIES SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND EVIDENCE (INCLUDING, BUT NOT UNITED TO, MANHOLES, INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS OF EXISTING UNDERGROUND UTILIPES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND ALL CONSTRUC110N. 1-800-382 5544 WITHIN INDIANA 1-317-571-2648 FOR CITY OF CARMEL UTIUTIES CONSULTING ENGINEERS Ter Horst, Lamson Fisk, Inc. 8675 Purdue Road Indianapolis, IN 46268 Phone: 317-334-1500 Fax: 317-334-1552 TLF PROJECT NO. 2001-379-02 CARMEL HIGH SCHOOL 201105.00