Loading...
HomeMy WebLinkAbout2003 C0 Cover Sheet - AdditionsCarmel, Indiana 431 0 ac co 0 Ce 0 146th Street 131st Street 126th Street Project Site 116th Street a) N 0 �z White a) L a) SITE LOCATION PLAN INDEg OF DRAWINGS VOLUME 1 OF 2 CIVIL SITE C1.1 SITE DEMOLITION PLAN C1.2 SITE DEMOLITION PLAN C1.3 SITE LAYOUT PLAN C1.4 SITE LAYOUT PLAN C1.5 GRADING PLAN C1.6 GRADING PLAN C1.7 EROSION CONTROL PLAN Cl .8 EROSION CONTROL PLAN C1.9 SITE UTILITY PLAN C1.10 SITE UTILITY PLAN C1.11 SANITARY SEWER PLAN AND PROFILE C 1.12 SITE DETAILS C1.13 SITE DETAILS SD -1 LANDSCAPE WORK SD -2 LANDSCAPE WORK 1-6 ARCHITECTURAL *461-•- COMPOSITE PLANS MAIN LEVEL DEMOLITION PLAN UNIT A EMOLITION PLANS UNIT B 1 MAIN LEVEL PLAN UNIT A LOWER LEVEL PLAN UNIT B 4 002"3"' MAIN LEVEL PLAN UNIT B 4040d MAIN LEVEL PLAN /MEZZANINE LEVEL PLAN UNIT C at4ap6- ROOF PLANS AND NOTES UNITS A B ROOF DETAILS A3.1 EXTERIOR ELEVATIONS UNIT A A3.2 EXTERIOR ELEVATIONS UNIT B A3.3 EXTERIOR ELEVATIONS UNIT C °M WALL SECTIONS UNIT A WALL SECTIONS UNIT A ALTERNATE BID WALL SECTIONS DETAILS BUILDING SECTIONS UNIT 8 WALL SECTIONS UNIT B 4 4441r&— WALL SECTIONS UNIT B WALL SECTIONS UNIT 8 WALL SECTIONS UNIT C WALL SECTIONS UNIT C INTERIOR ELEVATIONS TOILET ROOM PLANS AND ELEVATIONS INTERIOR ELEVATIONS UNIT 8 ARCHITECTURAL (CONY) 'gJ'°_ INTERIOR ELEVATIONS UNIT B "r TERIOR ELEVATIONS UNIT C MAIN LEVEL REFLECTED CEILING PLAN UNIT A 4111 01614-- LOWER LEVEL REFLECTED CEILING PLAN UNIT B :3.•. MAIN LEVEL REFLECTED CEILING PLAN UNIT 8 REFLECTED CEILING PLANS UNIT C 4J.1 STAIR AND ELEVATOR DETAILS 044814- DOOR FRAME ELEVATIONS and DETAILS /dia. WINDOW and STOREFRONT FRAME ELEVATIONS and DETAILS a PtIt°3- WINDOW and STOREFRONT DETAILS '9"1 MISCELLANEOUS DETAILS %SIP-- MISCELLANEOUS DETAILS Font--- MAIN LEVEL EQUIPMENT PLAN UNIT A LOWER LEVEL EQUIPMENT PLAN UNIT B `7'I"8 -3- MAIN LEVEL EQUIPMENT PLAN UNIT B FLOOR PATTERN DETAILS 4115 MAIN LEVEL EQUIPMENT PLAN UNIT C gITCHEN LO KITCHEN EQUIPMENT PLAN SCHEDULE COFFEE SHOP EQUIPMENT PLAN SCHEDULE ROUGH -IN SCHEDULES, NOTES, DETAILS PLUMBING ROUGH -IN PLAN ELECTRICAL ROUGH -IN PLAN PLUMBING ELECTRICAL ROUGH -IN PLANS STRUCTURAL 4.60.4- GENERAL NOTES AND SCHEDULES .1 FOUNDATION PLAN UNIT A ".1t-£�- FOUNDATION PLAN UNIT 8 :4 FOUNDATION PLAN UNIT C '*fa ROOF FRAMING PLAN UNIT A MAIN FLOOR FRAMING PLAN UNIT 8 LOWER ROOF HIGH ROOF FRAMING PLAN UNIT B "900.- MEZZANINE FLOOR FRAMING PLAN UNIT C -3 .8 ROOF FRAMING PLAN UNIT C TYPICAL DETAILS SECTIONS ti SECTIONS AND DETAILS SECTIONS AND DETAILS 'S' f.4 SECTIONS AND DETAILS ARCHITECTS ENGINEERS ■go INTERDE5IG TOTAL ARCHITECTURAL DEVELOPMENT 141 East Ohio Street Indianapolis, IN 46204 317/263 -9655 FAX 317/263 -9644 www.interdesign.com CONSTRUCTION DOCUMENT SET 14 MARCH 2003 Construction 201 North r th Illinois Street 22nd Floor Indianapolis, Indiana 46204 317.237.2900 Fax: 317.237.2916 www_s-bconstruction.com CONSULTING ENGINEERS 440 North Meridian Street Suite 100 Indianapolis, Indiana 46204 P 13171 624 -1600 F [317] 624 -1400