Loading...
HomeMy WebLinkAboutLandscape Development Details LS3.0PLANTING PROCEDURE 1. EXCAVATE ROOTBALL PIT. 2. ADD EXCAVATED SOIL 4 TAMP. SET TREE SUCH THAT ROOT FLARE 15 2 -3" HIGHER THAN FINISHED GRADE. 3. BACKFILL W/ SOIL MIX "WATER IN 4. COMPLETE BAGKF I LL I NG, CONSTRUCT TRENCH EDGE ADD SPECIFIED MULCH. 5. STAKE 4 GUY SECURELY. I' -O" SCALE: 3/4" =1' -O" FILE NAME:LAPLOOI 11- 11 1 11 11 111 ili! GENERAL NOTES: 1. SEE SPECIFICATIONS FOR DRAINAGE TEST REQUIREMENTS PRIOR TO PLANTING. SEC. 021100. 2. DO NOT ALLOW AIR POCKETS TO FORM WHEN BAGKF I LL I NG. 3. IMMEDIATELY SOAK WITH WATER. 4. DO NOT BREAK ROOTBALL. A TYICAL TREE ROOTBALL PIT RUBBER HOSE (A5 SPECIFIED) GUY WIRE (A5 SPECIFIED) MULCH LAYER (A5 SPECIFIED) !III 1 111 Is. 11 1 1 1111 1 1 1 1 1 I i�1i=i1(1 1111- 111{= if ?_t�11 il� =,i 1!1!= �f{ i I!i 111' 1 11 1 'l Ij;i i4 I 1111 111 j I i i 1111 =ii I=!i1 k= 11 =I,1! i.= .1111 =f 1 !Hi 1 1 I 1 1 l HI =1111= i EVERGREEN TREE STAKING' AND GUYING IN CULTIVATED AND MULCHED PLANTING AREA SCALE: 1/2"=1 FILE NAMELAPL008 ROW SPAG I NG SCALE: 3/4" =1 -O" F ILENAME: LAPL020 t ill 111— =H1 =1111= GUY WIRE TOP OF ROOTBALL PIT TREE RUBBER HOSE- ROOT BALL MULCH AREA (AS SPECIFIED) FINISHED GRADE HEDOE PLANTING (DOUBLE ROW) REMOVE BURLAP ON TOP 1/2 OF ROOTBALL FINISHED GRADE MULCH LAYER (AS SPECIFIED) TRENCH EDGE (TYP.) PLANTING SOIL MIX (A5 SPECIFIED) ADD EXCAVATED SOIL AS NEEDED TO BRING TREE TO FINISHED GRADE. TAMP LIGHTLY BUT THOROUGHLY PRIOR TO SETTING TREE TO PREVENT SETTLING. SCARIFY BASE OF PLANT PIT WHEN EXCAVATING PIT. BREAK THROUGH LOOSEN ALL "HARDPAN" (REMOVE AS NECESSARY TO FACILITATE DRAINAGE.) SET TREE PLUMS PRIOR TO STAKINS CULTIVATED PLANTING SOIL STAKE (AS SPECIFIED) DRIVE BELOW GRADE ROOTBALL O.G. SPAG I NG I" OF GROWN FOR EVERY FOOT OF BED WIDTH. TOPS OF ROOTBALLS TO BE SET A MINIMUM OF 2" ABOVE FINISHED GRADE. MULCH (AS SPECIFIED) CULTIVATE A 4" MINIMUM LAYER OF SPECIFIED PLANTING SOIL MIX INTO BED. UNDISTURBED SUBGRADE PLAN 50ALE :1 /4 =1'-0 ROOTBALL TRENCH EDGE (TYP.) CULTIVATE SOIL WITH ROTO TILLER TO A MINIMUM DEPTH OF 12" BREAK THROUGH ANY EXISTING "HARDPAN" AND REMOVE TO PROVIDE GOOD PERCOLATION POSITIVE DRAINAGE. RUBBER HOSE (AS SPECIFIED) GUY WIRE (A5 SPECIFIED) MULCH LAYER (AS SPECIFIED) STAKE (AS SPECIFIED) EXCAVATED SOIL 1 j 1 11 11 -1 ll; 1 1 1 1 I i �Ilf! -1111_ !ll_il'I�- ?11__1!11= il RUBBER HOSE (A5 SPECIFIED) GUY WIRE (AS SPECIFIED) MULCH RING li DRIVE BELOW GRADE 1 �11j1� 111 ROOTBALL SCALE: I /2 I -O" FILE NAME LAPLOII 1_ 11ii 1; l =1 1 =I I, 11 11 =1111 1111 1111=1111111 1111= TREE STAKING AND GUYING IN CULTIVATED ANC, MULCHED PLANTING AREA C -3 Z.,�F..e. MULTI -TRUNK TREE STAKING AND GUYING SLOPE PLANTING PROCEDURE 1. LAY OUT BED AND OUTLINE WITH TRENCH EDGE. PLACE SOIL FROM EDGE WITHIN BED. 2. ROTOTILL BED TO 12" DEPTH. SPREAD 4" MIN. LAYER OF PLANTING SOIL MIX OVER BED. ROTOTILL SOIL MIX INTO TOP OF BED. 3. INSTALL PLANTS MULCH. WATER THOROUGHLY. SHRUB PLANTING SCALE: 3/4 I -O" FILE NAME :LD29 -I -I6 3 1111 111! 11 111- 1111 ii;1 i!i! 1111 111! II GUY WIRE TOP OF ROOTBALL PIT TREE MULCH RING (BOTTOM OF ROOTBALL PIT) RUBBER HOSE Ii I _11 1 1 =II 1 ROOT BALL GUY WIRE TOP OF ROOTBALL PIT MULTI -TRUNK TREE MULCH RING (BOTTOM OF ROOTBALL PIT) RUBBER HOSE =Ili: PLAN SCALE: I/4 ".I NOTE: SET TREE PLUMB PRIOR TO STAKING CULTIVATED PLANTINS SOIL STAKE (AS SPECIFIED) DRIVE BELOW GRADE ROOTBALL O .0 PLAN ROOT BALL ScALE:1/4" =1 NOTE: I. ATTACH C UYS TO THE CENTRAL LARGEST TRUNK. 2. SPACE STAKES EVENLY AROUND (4 OUTSIDE) ROOTBALL PIT SUCH THAT WIRES DO NOT COME IN CONTACT WITH OTHER TRUNKS. 3. SET TREE PLUMB PRIOR TO STAKING SHRUB (AS SPECIFIED) LEAVE NO ROOTS EXPOSED MULCH LAYER (A5 SPECIFIED) PLANTING SOIL MIX (AS SPECIFIED) FINISHED GRADE TRENCH EDGE (TYP) UNDISTURBED SUBGRADE •00 V CULTIVATE SOIL IN LANDSCAPE AREA TO MINIMUM DEPTH OF 12" BREAK THROUGH ANY EXISTINS HARDPAN AND REMOVE AS NECESSARYTO PROVIDE GOOD PERCOLATION POSITIVE DRAINAGE. STAKE (AS SPECIFIED) DRIVE BELOW GRADE REFER TO ROOTBALL PIT DETAIL RUBBER HOSE (AS SPECIFIED) GUY WIRE (AS SPECIFIED) MULCH LAYER (AS SPEC. I F I ED) ROOTBALL TREE STAKING AND GUYING SCALE: 1/2"=P-0" FILE NAME :LAPLOO4 SCALE: I I' -O" FILE NAME:LAPL011 SCALE: 3/4" I -O" FILE NAME :LAPLO27 HEDGE PLANTING (SINGLE ROW) PLANTINS PROCEDURE 1. LAY OUT BED AND OUTLINE WITH TRENCH EDGE. PLACE SOIL FROM EDGE WITHIN BED. 2. ROTOTILL BED TO 12" DEPTH. SPREAD 3" MIN. LAYER OF PLANTINS SOIL MIX OVER BED. ROTOTILL SOIL MIX INTO TOP OF BED. 3. INSTALL PLANTS 4 MULCH. WATER THOROUGHLY. JUNIPER PLANTING IN MULCHED CULTIVATED PLANTING AREA GUY WIRE TOP OF ROOTBALL PIT MULCH RING (BOTTOM OF ROOTBALL PIT) RUBBER HOSE ROOT BALL NOTE: SET TREE PLUMB PRIOR TO STAKINS O.G. SPAG I NG PLAN GROWN BED 2 -3 TOP OF ROOTBALL TO BE A MIN. OF 2" ABOVE FINISHED GRADE. MULCH (AS SPECIFIED) 7 A 4" MINIMUM LAYER OF }PEGIFIED PLANTING SOIL MIX INTO BED. FINISHED GRADE UNDISTURBED SUBGRADE TRENCH EDGE (TYP.) PLAN SCALE :1 /4".1 i -0: ROOTBALL CULTIVATE SOIL WITH ROTO TILLER TO A MINIMUM DEPTH OF 12" BREAK THROUGH ANY EXISTINS "HARDPAN" AND REMOVE TO PROVIDE GOOD PERCOLATION 4 POSITIVE DRAINAGE. JUNIPER (AS SPECIFIED) LEAVE NO ROOTS EXPOSED MULCH LAYER (A5 SPECIFIED) PLANTING SOIL MIX (AS SPECIFIED) FINISHED GRADE TRENCH EDGE (TYP.) EDGE OF LANDSCAPE AREA, PAVEMENT EDGE, OR BACK OF CURB. UNDISTURBED SUBGRADE BREAK THROUGH ANY EXISTINS "HARDPAN" AND REMOVE AS NECESSARY TO PROVIDE SOOD PERCOLATION POSITIVE DRAINAGE. CULTIVATE SOIL IN LANDSCAPE AREA TO MINIMUM DEPTH OF 12" •0o 6 EXECUTIVE PARK DR. STE 300 ATLANTA 0 GEORGIA 30329 P 404 1 248 1 1960 F 404I248I 1092 EMAIL hgor@ hgcr.com www.hgor.com FILE# 01237LD1 NOT RELEASED FOR CONSTRUCTION APPROVAL REVISIONS REV. NO /1\ DATE 4/10/02 1 III 0 UT) III ID 0 DESCRIPTION CITY COMMENTS 0 Z N IIU 0 N9 Z W 0 7 DI 00 0E aQ w x I 11 x0 Q a0t• m 111 0 U1) z cz rz4 Q w a 0 0 c� PROJECT NO 20- 01024.02 3/1/02 DATE LANDSCAPE DEVELOPMENT DETAILS LS3.0 SHEET NO