Loading...
HomeMy WebLinkAboutV28-02 St. Peter's United Church of Christ - Erosion Control Plan pg. .5EA STABILIZATION PRACTICE: JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT -OCT. NOV. DEC. PERMANENT SEEDING DORMANT SEEDING TEMPORARY SEEDING SODDING MULCHING B D w G A /I F /I B -9 A KENTUCKY BLUEGRASS 40 LBS /ACRE; CREEPING RED FESCUE 40 LBS /ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 20 LBS /ACRE. B KENTUCKY BLUEGRASS 60 LBS /ACRE; CREEPING RED FESCUE 60 LBS /ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 30 LBS /ACRE. C SPRING OATS 3 BUSHEL /ACRE. D WHEAT OR RYE 2 BUSHEL /ACRE. E ANNUAL RYEGRASS 40 LBS /ACRE. (1 LB /1000 SQ. FT.) F SOD G STRAW MULCH 2 TONS /ACRE. /I IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPTEMBER. IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD. SEASONAL SOIL PROTECTION CHART "Holey Moley" says, DON'T DIG BLIND" Call Monday through Friday -7 AM to 6 PM 1 -800 382 -5544 Within Indiana 1 -800 428 -5200 Outside Indiana PER INDIANA STATE LAW IS -69 -1991, IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. 4'X4' TRENCH TO BE BACKFILLED AND COMPACTED Taxi 4111 moo mil t inou Wool lau I �n en malm4, il gilibli Ern 4741.911boto 11.kw- i-Awsp Am.& A A a..o..,,A4110,- 1 i, MIIIIWarir ral AV 1111 111".1 111111, wr A 4 ril ...-s Imre INA, 11/El Ill■ v,. oc 11. S -ILS SAP (NOT TD SCALE) POST 2 "X2" WOOD OR 1.33 LBS /FOOT STEEL 5' MAX. SPACING WIRE FENCE 14 GAGE (MIN)-6" MESH REQ'D. IN SWALES OR AREAS OF CONCENTRATED FLOW NONWOVEN FILTER FABRIC SECURE TTO POSTS WITH 2" LATH UPSLOPE DOWN SLOPE =1 I I-1 I I I C —I 11=1 I I -1 11=1 I 'CIII -111-1 1.II I '1H VIEll 1"I� 1 I—I 1 I ITE 711 X111 -1 SILT FENCE SECTION Eza (NO SCALE) MAINTENANCE: 1. INSPECT WEEKLY AND AFTER EACH STORM EVENT. 2. IF FABRIC IS TORN OR DETERIORATED, REPLACE SECTION IMMEDIATELY. 3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1 /3 OF THE HEIGHT OF THE FENCE OR IS CAUSING FABRIC TO BULGE. 4. TAKE CARE NOT TO UNDERMINE THE ENTRENCHED FABRIC. 5. AFTER DRAINAGE AREA IS STABILIZED, REMOVE FENCE AND SEDIMENT, BRING DISTURBED AREA TO GRADE AND STABILIZE IT. ciD IP O cy O co (N (0 INLET PROTECTION W /FABRIC I1 FRAME AND COVER III v f MAINTENANCE: 1) INSPECT AFTER EACH STORM EVENT OF SILT ACCUMULATION. 2) REMOVE SEDIMENTATION AND REPLACE FILTER FABRIC IF NECESSARY AFTER EACH STORM EVENT OF SILT ACCUMULATION. 3) PERIODICALLY REMOVE SEDIMENT AND TRACKED —ON SOIL FROM THE STREET. _E_ FILTER FABRIC SHOULD BE 6 "(MIN) EXTRA ALL AROUND FOR HAND HOLD. O 0 O (NO SCALE) N 89 °55'00" E 325.41' OUTLET EROSION CONTROL SIDE PLAN RIP —RAP SEE PLANS S 89 °55'00' W 261.03' RIP —RAP 1 T 12" (MIN) (NO SCALE) r EXISTING FLOWLINE OF DITCH FUTURE ADDITION F.F. ELEV. 825.30 EROSION CO \TROL LEGE \D: PERMANENT SEEDING W /MULCH SILT FENCE EROSION CONTROL BLANKET "EX. SAN. M.H. O. O REFER TO SHEET #2A FOR DIFFERENT PHASE AREAS. N FUTURE° CANOPY 0 O 0 8 E. CARMEL 1RIVF1 LEGEND RIGHT —OF —WAY LINE STORM SEWER LINE SWALE SANITARY SEWER LINE 0 SANITARY SEWER MANHOLE SANITARY SEWER LATERAL FLOW DIRECTION $92.67 SPOT ELEVATION i- EXIST. CONTOURS PROPOSED ELEVATION 0 STORM BEEHIVE INLET o STORM INLET T.C. TOP OF CASTING INV. INVERT RCP REINFORCED CONCRETE PIPE PVC POLYVINYLCHLORIDE SANITARY SEWER PIPE M.H. MANHOLE STR. STRUCTURE D. U.E. DRAINAGE AND UTILITY EASEMENT S.D. U.E. SANITARY, DRAINAGE, AND UTILITY EASEMENT H.C. HANDICAP RAMP M.E. MATCH EXISTING GRADE Q CONCRETE END SECTION N 89 °55'00" E 270.00' [q• O o 1 HAND .-AF 1 =AMP (TO REMAIN) EXISTING CHURCH F.F. ELEV. 825.30 C .O. 8 G •C.o. SHEDS (NO FOUNDATION) EX SAN. AU! TC;8� 48 0 n e G— —x— 2 RCP PVC CMP LANDSCAPE TIMBER TELEPHONE PEDESTAL TRANSFORMER BOX CLEAN OUT AIR CONDITIONING UNIT UNDERGROUND ELECTRIC GAS LINE FENCE LINE PROPOSED FLOWLINE WATER VALVE FIRE HYDRANT LIGHT STANDARD STORM SEWER SANITARY SEWER REINFORCED CONCRETE PIPE POLYVINYL CHLORIDE PIPE CORRUGATED METAL PIPE PI O O o c1 0 P1 D 01 LOT 354 1 WOODLAND SPRING r� SECTION 8 EX. STORM M.H. A Al TC =819 SCALE: 1" 30' 15 s s 30 60 -APPROVAL PENDING NOT FOR CONSTRUCTION iza •:cy) ZZ o 0 E 0 W O O CL' W Q 0 o OJ D w J W MIRO ALLAN H. WEIHE P E. 8827 SHEET NO. 5 co Q m o U 0 z a 0 z 0 0 z 0 0 W PROJECT NO. WOO -0829 10 10 9 9 8 8 7 6 6 5 5 4 3 3 2 2 1 co 0