Loading...
HomeMy WebLinkAboutV28-02 St. Peter's United Church of Christ - Title Sheet pg. 1SHEET NO. DESCRIPTION 1 TITLE SHEET 2 EXISTING CONDITIONS DEMOLITION PLAN 2A SITE LAYOUT PLAN 3 SITE DEVELOPMENT PLAN (PHASE ONE) DETAILS 3A SITE DEVELOPMENT PLAN (PHASE TWO) DETAILS 4 SITE LANDSCAPE PLAN 5 SITE EROSION CONTROL PLAN 10 10 PLANS PREPARED FOR.• LANGSTON DEVELOPMENT COMPANY INC. 1132 S. RANGELINE RD. SUITE 100 CARMEL, INDIANA 46032 TEL.: (377) 846-7017 FAX: (317) 846-0217 CONTACT PERSON: JIM LANGSTON PLANS PREPARED BY: WEIHE ENGINEERS, INC. 10505 N. COLLEGE AVE. INDIANAPOLIS, IN 46280 TEL.: (377) 846-6611 FAX: (377) 843-0546 CONTACT PERSON: DAVE BARNES 9 6 CONSTRUCTION PLANS FOR S T_ PETERS UN /TED CHURCH OF CHRIS T PROPOSED PARKING ADDITION 3 E. CARMEL DRIVE CARMEL, INDIANA 8 Emma hid l" 11 meow ■1n MI P on: ■f nag le;4 MIlra MINIM MIMMEI MMIIM COM 1111111111111 NEM Ell RANI '■ii�l ���illiiiiii mum I titt 4 I 4 4 AMP 4* A t 4 SO f ,.011141 ri sr i 4 4 4 El il m� r/ I� 01:00 ir 1111111h6A1111bliatilit VI gismo r I M F A11•11.1 I I MI mi 1F 10 LIEJ r[11111111 *PROJECT LOCATION AREA MAP CaII 1 -800- 382 -5544 2 WORKING DAYS BEFORE YOU DIG. "IT THE LAW" INDIANA UNDERGROUND PROTECTION SERVICE, INC. 6 GENERAL NOTES: 5 *PROJECT LOCATION 1[ SITE LOCATION MAP 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR VERIFYING THAT ALL PERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY AND STATE AGENCIES PRIOR TO STARTING CONSTRUCTION. 2. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING UTILITIES IN THE VICINITY OF THE CONSTRUCTION AREA BEFORE STARTING CONSTRUCTION. AFTER FIELD VERIFICATION OF EXISTING UTILITIES, CONTRACTOR SHALL CONTACT THE ARCHITECT (ENGINEER) ON ANY VARIATIONS IN DRAWINGS AND SITE CONDITIONS. BEGINNING OF WORK MEANS ACCEPTANCE OF EXISTING CONDITIONS. 3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO NOTIFY AND COORDINATE CONSTRUCTION WITH ALL RESPECTIVE UTILITIES. 4. ALL QUANTITIES GIVEN ON THESE PRINTS, VERBALLY OR IN THE SCOPE OF WORK SECTION ARE ESTIMATES AND SHALL BE CONFIRMED BY THE BIDDING CONTRACTORS. 5. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS FOR EXCAVATIONS: FINAL RULE 29 CFR PART 1926, SUBPART "P" APPLIES TO ALL EXCAVATIONS EXCEEDING FIVE(5) FEET IN DEPTH. 6. IN ADDITION, EXCAVATION EXCEEDING TWENTY (20) FEET IN DEPTH REQUIRE THE DESIGN OF A TRENCH SAFETY SYSTEM BY A REGISTERED PROFESSIONAL ENGINEER. 7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTORS TO MAINTAIN QUALITY CONTROL THROUGHOUT THIS PROJECT. 8. THE ENGINEER AND /OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS. 9. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL STANDARDS. 10. BEARINGS, DIMENSIONS, AND EASEMENTS ARE SHOWN FOR REFERENCE ONLY. SEE RECORD SURVEYS AND PLATS FOR EXACT INFORMATION. 11. ANY FIELD TILES ENCOUNTERED. DURING ANY EXCAVATION SHALL BE REPAIRED AND CONNECTED TO NEW STORM SEWERS WITH POSATIVE DRAINAGE MAINTAINED. 4 INDEX REVISIONS 11.R' o ec ogef( qP t !sr SHEET NO. 1 ,3,3A,4 DESCRIPTION DELETE 817 DETENTION CONTOUR ELEVATION DATE 3/28/2002 3 7 APPROVAL PENDING NOT FOR CONSTRUCTION CiD W U) 0 ti Z L7 Z N 0 00 03 W W J 0 w7 Z N oo O Q cr) ti 4.4 O cf E-4 SHEET NO. PROJECT NO. 1 ALLAN H. WEIHE P.E. 8827 WOO-0829