HomeMy WebLinkAboutV37-02 Appel Heating & Air Conditioning - Proposed Building Additon - Proposed Site Plan C11' No 0202-016
2/28/02
CLIENT REVIEW
6/19/02
STATE RELEASE
DRAV*4 SY:
cDD
CHECKED BY
SHEET
°I
.41.01.111
mm.M.MIMP omoMMWm'
fattwar. arr. Promals
4
ij
11
It
wk\
\c1
\\cli
A
41 4
ZONED
0
r
0
r-
0
C„
r
11
a
(0
0
0
PROP6SE:D SAIITARY SEWER
'Low LINE OF SWALE
ADJOIN "'PRO LINE
-Is
PROPOSED .STORM,: SEWER
PROPOSED UNDERGROUND ELECTRIC
PROPOSED UNDERGROUND GAS
PROPOSED •UNDERGROUND WATER
.S.
NOT TO SCALE
s
out.
V
E
O 0 0'
GAS GAS GAS
c a ttim
rb
*Mr. 00.•
E
3/4' DIAMETER Ice.E6AR
30' DEPTH MINIMUM
OM.
a
0 ZONED, 1-1
ZONED 1- 1
TING'LEGEND,
EDGE' OE ,wAT6!z:
OVERHEAD UTILITY LINES
UNDERGROUND FIBER OPTIC
SECTION or PROPERTY LINE
BOUNDARY -LINE
EXISTING WATER LINE
I 6' WOODEN' FENCE
6' CHAIN-LINK FENCE
UNDERGROUND TELEPHONE
EASEMENT
SETBACK LINE
CENTERLINE
UNDERGROUND GAS MAIN
UNDERGROUND TELECOMMUNICATIONS
PROPERTY or R/W LINE
UNDERGROUND ELECTRIC LINE
SANITARY SEWER
EXISTING STORM SEWER
N 88O9'44" E 352.70'
;12 CONC.
DUMF'STER PAD
w/6' PRIVACY FENCE
SEE DTI._ 2/C5
88°09'43" W
EXISTING IRON PIN FOUND
ii EXISTING CATCH BASIN
EXISTING WATER VALVE
CUM
4
8”x8" PHONt PEDESTAL
ELECTRIC BOX
STREET SIGN
GAS VALVE
EXISTING CONTOUR
SANITARY MANHOLE
EXISTING TREE
TEMPORARY BENCH MARK
LIGHT POLE
HANDICAP PARKING
MONITORING WELL
UTILITY POLE
2.6O'
VEGETATION
.EX1STING BUSH
EXISTING FIRE HYDRANT
SA1U-CUT
EXISTING
PAVEMENT
PROPOSED 15' NON-EXCLUSIVE
1NGRESS/EGRESS, DRAINAGE dr
UTILITY EASEMENT
6 RETAMNO WALL
4" PIP E
BOLLARD
1 1
ASHLT ;PENT SPECIFICATIONS
The pittin cbilitt-Ctor shall be responsible for the following:
The area to be payed shall be cleared of all rock, debris, rots' and
vegetation. An approved soil sterilant shall be utilized to prevent the
growth •of weeds.
2. All soft, yielding or other unsuitable materials encountered during any
phase of subgrade construction shall be removed ond replaced with
suitable material. The replacement material shalt fill the unstable areo
for the entire depth of the compacted subgrade and meet the subgrade
compaction requirements. The subgrade shall be shaped to the true line
and grade as shown on the plans,
3. The subgrade shall be compacted to 95% laboratory density as
by PASHTO Method T-99.
The subgrade and finish paving shall be tested' by an approved testing
company for uniform smoothness, density and grade.
Slope pavement 0.75% (MIN.) to insure proper surface drainage.
6. The hot mix asphalt base may be placed directly on the prepared subgrade
in one lift for the base course to the required compacted thickness as
specified in local street standards.
The hot mix asphalt base and surface shalt be placed in ont lift to the true line
and grades as shown on the pins. The paving mixture shall be placed and
compacted at a temperature between 250 F. 121 C) and 300 F. (149 C.)
8. The paving mixture shall be transported to the job site in clean well-covered
trucks with smooth dump beds. The base and surface Mixtures ore to be
placed with self contained, power propelled pavers capable of placing the mix
to the required dimensions as shown on the plans.
9. Asphalt grade shall be determined by its ability to satisfactorily coat the
aggregate, resist rutting and remain stiff during high temperatures, and
and sustain freeze/thaw cycles in addition to the considerations of
anticipated weather, mixing process and curing rate.
10. See detail 6 Sheet C5 for pavement cross-sections
11. All proposed asphalt pavement as shown shall be constructed in compliance
with INDOT standard specifications, latest edition.
12. All parking striping and ADA areas shall be marked with a durable non-
shrink, white paint to be approved by the engineer.
PROPOSED
l-lEAVY-PUTY
PROPOSED
1x4' GONG PAD
SEE DTL. 1/C5
PROPOSED
PIPE BOLLARD
SEE DTL. I/C5
1
28.1
PROPOSED
o 1101-EEL STOP
SEE DTL. 3/C5
EXISTING
MASONRY/W
STONE FACE
BUILDING
1,686 sq.ft.
2.33
DOSE
HALF R W
4EXISHTAIF R/W
1
IZONED 8- 1
determined
Site InfOrrnation was token from keeter-Webb Ass., dofe ebruary-,1.,:
It is the contractor s responsibility to verify existing site conditions
prior to starting work.
2. The contractor shall. be responsible far obtaining or verifying that
all permits and approvals are obtained from the respective city,
county, and /or state agencies prior to starting construction.
3. The Plumbing contractor short consult with the Local Water tompany
provide all materials and labor, and pay all costs not borne by the
Local Water Company to provide any new water service.
4. The Plumbing contractor shall consult with the Local Gas Company,
provide all materials and iabOr, andl pay all costs not borne by the
Local Gas Company to provide any new gas service.
5. The Electrical ContrattOr shall cOnsult with the Local Power Company,
provide all materials ond labor, and pay all costs and fees not borne
by the Local Power Company to provide any new underground electrical
service.
6. The Electrical Contractor Shall consult with the Lotal Telephone Company,.
and shall proVide all labor and materials required which are not borne
by the Telephone Company to provide any new telephone service.
7 All utility service' lines shall be constructed in aCcordance with all the
latest applicable codes and to each utilitys and/or city's standards.
8. Use compactedranular fill when utility lines are placed under walks
and driveways.
9. Soil borings have not been performed at this time. Pavement design
is based on an assumed soil bearing pressure of 1500 p.s..
12. Areas between curbing, sidewalks, paving and building shall be filled with
4" of topsoil suitable for landscapng.
16. Site data:
Provide sleeves for mechanical work as required.
Notify Engineer at least 1 day (24 hours) prior to placing 'any concrete.
.SITE NOTES
Zoned 1-1
Lot area
Existing building area
Proposed building area
Impervious area 48.1
Customer parking 9
9' x 20' spaces)
Handicapped parking 1
.Proposed parking 10
Proposed employees
6
0.81 Ac.
1,686 sq. ft.
1955 sq. ft.
Minimum Front Yard Setback 15'
Minimum Rear Yard Setback 15'
Minimum Side Yard Setback 0'
PROPOSED SITE PLAN
GRAPHIC SCALE
20 40
rN FEET
inch 20 ft.
80
002.
13. See this sheet for exterior concrete specifications.
14. All edge of pavement radii are 5 feet unless otherwise noted.
15, Install a 'Knox-box near the front door. Contractor to coordinate type,
style, and location with fire department.